W911RX26BA006 - Questions and answers.pdf

PDF 35 KB Posted

Attached to
Ft. Bliss Kitchenette Remodeling - BLDG 2447
Solicitation number
W911RX26BA006
Issued by

About this file

This is a Questions and Answers document for federal contract W911RX26BA006 dated July 16, 2026. The document addresses contractor inquiries regarding kitchenette electrical and fire alarm system modifications.

Three questions were posed and answered regarding specific technical requirements. The first question requested interior photographs of the electrical panel with the dead front cover removed to verify breaker capabilities, ampacity, available physical space, bus bar condition, and hardware compatibility before adding new loads. The second question sought confirmation on whether a new 100-ampere panel should be installed inside Electrical Room 130, along with room photographs to verify equipment fit. The government response clarified that the Performance Work Statement and contract drawings require the awarded contractor to verify breaker capabilities before adding new loads, and that based on contractor assessment, installation of a new 100-ampere panel may be required to ensure full electrical system capability within the kitchenette. The third question requested photographs of the existing fire alarm control panel terminal strip terminal cabinet, its location, and fire alarm maintenance contractor contact information. All three answers direct contractors to reference the new attachment "B2447 Kitchenette-RFI Photos" for the requested documentation. This Questions and Answers document serves to clarify technical scope elements related to electrical and fire alarm system work within the kitchenette project scope.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911RX26BA006

Questions and Answers

July 16, 2026

Q: Please provide interior photographs of the electrical panel with the dead front cover removed. This is required to verify breaker capabilities, ampacity, confirm available physical space, inspect the bus bar condition, and ensure hardware compatibility before adding the new loads.

A: Please see new attachment ‘B2447 Kitchenette-RFI Photos’.

Q: (Paragraph 1.4.20.2) Could you please confirm if the intent is to install the new 100A panel inside Electrical Room 130? Additionally, please provide photos of the room to ensure the equipment will fit properly.

A: Drawings and PWS specify that the awarded Contractor is to verify breaker capabilities before adding new load. Based on contractor assessment, installation of a new 100A panel my be required to ensure full capability of electrical systems within the kitchenette.

Additionally, please see new attachment ‘B2447 Kitchenette-RFI Photos’

Q: (Paragraph 1.4.22.5.1) Please provide photographs of the existing fire alarm control panel (FACP) terminal strip terminal cabinet, location and the contact information for the fire alarm maintenance contractor.

A: Please see new attachment ‘B2447 Kitchenette-RFI Photos’.