W911RX_22_R_0001_FT_POLK_JOC.pdf

PDF 5 MB Posted

Attached to
Fort Polk, LA Job Order Contract (JOC)
Solicitation number
W911RX-22-R-0001
Issued by

About this file

This is a request for proposal for an indefinite delivery indefinite quantity job order contract to provide real property sustainment, restoration, and modernization minor construction services at Fort Polk, Louisiana. The contract will have a one-year base period and four one-year option periods, with an estimated total value between $25-50 million awarded as firm-fixed-price task orders ranging from $2,000 to $1 million. The solicitation closes on January 24, 2022. Responses are required by the dates specified. The contract will be a 100% small business set-aside under NAICS code 236220 with a size standard of $39.5 million. The Department of the Army Mission and Installation Contracting Command at Fort Hood is the issuing agency.

View the file

Other files

File Type Posted
Amendment 2-W911RX-22-R-0001 0002-28Jan22.pdf PDF
Attachment 4. Notional Task Order, Rev2, 28Jan22.pdf PDF
Attachment 9-W911RX-22-R-0001 Ft Polk Solicitation.docx DOCX document
9 Attachment 3 Past Performance Questionnaire Rev2 - Ft Polk JOC.docx DOCX document
Amendment 1 W911RX-22-R-0001.pdf PDF
9 Attachment 3 Past Performance Questionnaire Rev1 - Ft Polk JOC.docx DOCX document
9_Attachment_3_Past_Performance_Questionnaire___Ft_Polk_JOC.docx DOCX document
14_Attachment_7_Coefficient_Non_PrePriced_Items___Polk.xlsx XLSX spreadsheet
11_Attachment_4a__Notional_Task_Order_Requirements_Technical_Drawing.pdf PDF
5_Technical_Exhibit_E_Division_00_Procurement___Contracting.docx DOCX document
8_Attachment_2_Specific_Relevant_Contracts___JOC.docx DOCX document
12_Attachment_5_Coefficient_Normal___Polk.xlsx XLSX spreadsheet
7_Attachment_1_Consent_Letter___Ft_Polk_JOC.docx DOCX document
1_Technical_Exhibit_A__Ft_Polk_JOC_Statement_of_Work__SOW_.docx DOCX document
3_Technical_Exhibit_C_Ft_Polk_Historial_Workload.pdf PDF
4_Technical_Exhibit_D_Wage_Decision__LA20210023.pdf PDF
6__Technical_Exhibit_E_Division_00_Procure_Contract.docx DOCX document
13_Attachment_6_Coefficient_Other_Than_Normal___Polk.xlsx XLSX spreadsheet
10__Attachment_4__Notional_Task_Order.pdf PDF
2_Technical_Exhibit_B__Ft_Polk_Maps.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction services for a broad variety of small, minor construction projects for the U.S. Army at Fort Polk, LA.

This is 100% 8(a) Set-Aside.

The contract aw arded as a result of this solicitation w ill be a single-aw ard Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Job Order Contracting (JOC) consisting of a 12-month base performance period and four 12-month option periods. The preponderance of the w ork under this contract w ill be the main cantonment areas at Fort Polk and its satellite facilities. Other areas are show n at Technical Exhibit B.

Reference Block 11 below : The time for commencement of w ork and the calendar days allocated for completion of w ork w ill be determined at the task order level. See Technical Exhibit A, Statement of Work (SOW) for further details regarding the ordering process.

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

23-Dec-2021

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days af ter receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

MICC - FORT RILEY

1792 12TH STREET

FORT RILEY KS 66442

W911RX

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W911RX22R0001 73

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Job

JOC Normal Working Hours - Base Period

FFP

Base Period Coefficient Normal Working Hours are Monday through Friday, 7:30 a.m. to 4:30 p.m.

local time (excluding Federal Holidays).

The value inserted here is transferred from Attachment 5, Development of Coefficient for Normal Working Hours.

FOB: Destination

PSC CD: Z2JZ

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 Job

JOC Other Than Normal - Base Period

FFP

Base Period Coefficient Other Than Normal Working Hours are anytime Monday through Friday, after 4:30 p.m. local time, on weekends, and/or Federal Holidays when work is required to be performed on an emergency basis, or at the Government's convenience to minimize the impact on ongoing military operations.

The value inserted here is transferred from Attachment 6, Development of Coefficient for Other Than Normal Working Hours.

FOB: Destination

PSC CD: Z2JZ

NET AMT

0003 Job JOC Non-PrePriced - Base Period

FFP

Base Period Coefficient The total Non-PrePriced line items allowable under this program SHALL NOT EXCEED 10% of the total contract value. The value inserted here is transferred from Attachment 7, Development of Coefficient for Non-PrePriced Line Items.

FOB: Destination

1001 Job OPTION JOC Normal Working Hours - OY1

FFP

JOC Normal Working Hours - OY1 Option Year 1 Coefficient Normal Working Hours are Monday through Friday, 7:30 a.m. to 4:30 p.m. local time (excluding Federal Holidays).

The value inserted here is transferred from Attachment 5, Development of Coefficient for Normal Working Hours.

1002 Job OPTION JOC Other Than Normal - OY1

FFP

JOC Other Than Normal - OY1 Option Year 1 Coefficient Other Than Normal Working Hours are anytime Monday through Friday, after 4:30 p.m. local time, on weekends, and/or Federal Holidays when work is required to be performed on an emergency basis, or at the Government's convenience to minimize the impact on ongoing military operations.

The value inserted here is transferred from Attachment 6, Development of Coefficient for Other Than Normal Working Hours

1003 Job OPTION JOC Non-PrePriced - OY1

FFP

JOC Non-PrePriced - OY1 Option Year 1 Coefficient The total Non-PrePriced line items allowable under this program SHALL NOT EXCEED 10% of the total contract value. The value inserted here is transferred from Attachment 7, Development of Coefficient for Non-PrePriced Line Items.

2001 Job OPTION JOC Normal Working Hours – OY2

FFP

JOC Normal Working Hours – OY2 Option Year 2 Coefficient Normal Working Hours are Monday through Friday, 7:30 a.m. to 4:30 p.m. local time (excluding Federal Holidays).

The value inserted here is transferred from Attachment 5, Development of Coefficient for Normal Working Hours.

2002 Job OPTION JOC Other Than Normal – OY2

FFP

JOC Other Than Normal – OY2 Option Year 2 Coefficient Other Than Normal Working Hours are anytime Monday through Friday, after 4:30 p.m. local time, on weekends, and/or Federal Holidays when work is required to be performed on an emergency basis, or at the Government's convenience to minimize the impact on ongoing military operations.

The value inserted here is transferred from Attachment 6, Development of Coefficient for Other Than Normal Working Hours.

2003 Job OPTION JOC Non-PrePriced – OY2

FFP

JOC Non-PrePriced – OY2 Option Year 2 Coefficient The total Non-PrePriced line items allowable under this program SHALL NOT EXCEED 10% of the total contract value. The value inserted here is transferred from Attachment 7, Development of Coefficient for Non-PrePriced Line Items.

3001 Job OPTION JOC Normal Working Hours - OY3

FFP

JOC Normal Working Hours - OY3 Option Year 3 Coefficient Normal Working Hours are Monday through Friday, 7:30 a.m. to 4:30 p.m. local time (excluding Federal Holidays).

The value inserted here is transferred from Attachment 5, Development of Coefficient for Normal Working Hours.

3002 Job OPTION JOC Other Than Normal - OY3

FFP

JOC Other Than Normal – OY3 Option Year 3 Coefficient Other Than Normal Working Hours are anytime Monday through Friday, after 4:30 p.m. local time, on weekends, and/or Federal Holidays when work is required to be performed on an emergency basis, or at the Government's convenience to minimize the impact on ongoing military operations.

The value inserted here is transferred from Attachment 6, Development of Coefficient for Other Than Normal Working Hours.

3003 Job OPTION JOC Non-PrePriced - OY3

FFP

JOC Non-PrePriced – OY3 Option Year 3 Coefficient The total Non-PrePriced line items allowable under this program SHALL NOT EXCEED 10% of the total contract value. The value inserted here is transferred from Attachment 7, Development of Coefficient for Non-PrePriced Line Items.

4001 Job OPTION JOC Normal Working Hours - OY4

FFP

JOC Normal Working Hours - OY4 Option Year 4 Coefficient Normal Working Hours are Monday through Friday, 7:30 a.m. to 4:30 p.m. local time (excluding Federal Holidays).

The value inserted here is transferred from Attachment 5, Development of Coefficient for Normal Working Hours.

4002 Job OPTION JOC Other Than Normal - OY4

FFP

JOC Other Than Normal – OY4 Option Year 4 Coefficient Other Than Normal Working Hours are anytime Monday through Friday, after 4:30 p.m. local time, on weekends, and/or Federal Holidays when work is required to be performed on an emergency basis, or at the Government's convenience to minimize the impact on ongoing military operations.

The value inserted here is transferred from Attachment 6, Development of Coefficient for Other Than Normal Working Hours.

4003 Job OPTION JOC Non-PrePriced - OY4

FFP

JOC Non-PrePriced – OY4 Option Year 4 Coefficient The total Non-PrePriced line items allowable under this program SHALL NOT EXCEED 10% of the total contract value. The value inserted here is transferred from Attachment 7, Development of Coefficient for Non-PrePriced Line Items.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 04-APR-2022 TO

03-APR-2023

N/A HQS & JRTC - USAG (FORT POLK)

HQS & JRTC - USAG

6661 WARRIOR TRAIL, B#350

FORT POLK LA 71459

W42NU5

0002 POP 04-APR-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 04-APR-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 04-APR-2023 TO

03-APR-2024

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 04-APR-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 04-APR-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 04-APR-2024 TO

03-APR-2025

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 04-APR-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 04-APR-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 04-APR-2025 TO

03-APR-2026

N/A (SAME AS PREVIOUS LOCATION)

3002 POP 04-APR-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

3003 POP 04-APR-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 04-APR-2026 TO

03-APR-2027

N/A (SAME AS PREVIOUS LOCATION)

4002 POP 04-APR-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

4003 POP 04-APR-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

EXHIBITS / ATTACHMENTS

EXHIBIT/ATTACHMENT

DOCUMENT TYPE DESCRIPTION

Technical Exhibit A Ft. Polk JOC, Statement of Work (SOW)

Technical Exhibit B Ft. Polk Maps

Technical Exhibit C Ft. Polk Historical Workload

Technical Exhibit D Wage Decision, LA20210023

Technical Exhibit E Division 00 – Procurement and Contracting Requirements Technical Exhibit F Division 01 – General Requirements

Attachment 1 Consent Letters

Attachment 2 Specific Relevant Contracts Format

Attachment 3 Past Performance Questionnaire

Attachment 4 Notional Task Orders

Attachment 4a Technical Drawings

Attachment 5 Development of Coefficient for Normal Working Hours

Attachment 6 Development of Coefficient for Other than Normal Working Hours

Attachment 7 Development of Coefficient for Non-PrePriced

Section 00100 - Bidding Schedule/Instructions to Bidders

INSTRUCTIONS TO OFFERORS

A. Proposal Submittal and Inquiries

Proposals shall be submitted electronically to:

Procurement Integrated Enterprise Environment (PIEE) Solicitation Module;

https://piee.eb.mil NLT 4:00 pm CST on 24 January 2022.

***Please note that proposal submittals SHALL be submitted electronically to the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module at https://piee.eb.mil. ***

The Procurement Integrated Enterprise Environment (PIEE) (https://piee.eb.mil) is the Department’s core tool for facilitating full utilization of electronic processing of data and documents in the Procure-to-Pay environment.

Within that environment, is the Solicitation Module which provides the capability for secure, timestamped submission of contractors’ proposals. The Solicitation Module was designed specifically to capture the documentation needed to memorialize the date and time of offer submissions, as well as to retain those files and the attendant time and date stamps. It supports large file sizes of 1.9 GB per file, with no limit on the number of files, as well as multiple file formats. It also is integrated with the System for Award Management for publishing associated notices in accordance with Federal Acquisition Regulation Part 5 requirements.

Vendors must register in the Procurement Integrated Enterprise Environment for the specific applications they wish to use.

Below are hyperlinks to assist with registering, Solicitation Module training and vendor customer support:

- Instructions on how to register for PIEE (Vendor Registration) can be found at https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/vendorRegister.xhtml

- Instructions / Web Based Training for Solicitation Module can be found at https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml

- Vendor Customer Support can be found at https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/CustomerSupport.xhtml

All questions/inquiries related to proposal submissions and accessing PIEE, shall be directed to the PIEE help desk.

All other inquiries regarding this solicitation shall be submitted through electronic email to anthony.g.tiroch2.civ@army.mil and victoria.a.joseph.civ@army.mil. The closing date and time for questions is 4:00 pm CST on 7 January 2022. No telephonic interaction will be allowed.

B. General Instructions (Section 00100)

This procurement is being conducted under Federal Acquisition Regulation (FAR) Subpart 15, Contracting by Negotiations. Offers will be evaluated using the criteria under

Section 00100, “Evaluation Factors for Award.” Noncompliance with these Instructions may hamper the Government's ability to properly evaluate the proposal, and could result in the proposal being eliminated from further consideration for contract award.

W911RX22R0001

1. The submission of a signed proposal as specified in this solicitation shall constitute the Offeror's understanding and acceptance of all terms and conditions of the solicitation. Accepted proposals shall remain in effect and valid for a period of 120 calendar days from the date set for closing.

2. These instructions prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure consistency in the submission of necessary information to provide for the comprehensive evaluation of proposals.

3. If an Offeror believes that the requirements in these instructions contain an error, an ambiguity, omission, or are otherwise deemed unsound, the Offeror shall immediately notify to anthony.g.tiroch2.civ@army.mil and victoria.a.joseph.civ@army.mil in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.

4. The Government will retain one copy of all unsuccessful proposals. Proposals received in response to the original solicitation will be considered current and will be retained through contract award.

5. All referenced documents for this solicitation are available on the Beta.Sam.Gov

Opportunities website. Potential Offerors are encouraged to subscribe for real-time e-mail notifications when information is posted to the website for this solicitation.

6. Debriefings. The Procuring Contracting Officer (PCO) will promptly notify Offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505. The PCO will notify unsuccessful Offerors in the competitive range of the source selection decision in accordance (IAW) debriefing shall make their request IAW the requirements of FAR

15.505 or 15.506, as applicable.

C. Proposal Preparation Instructions

IMPORTANT: Failure to follow the below proposal preparation instructions may cause a proposal to be deemed unacceptable by the Government and thus eliminated from the competition without further consideration.

1. Offeror’s proposal shall consist of four (4) separate volumes: General, Technical Acceptability, Past Performance, and Price.

2. Proposal Format

a. Exceptions. Offerors are required to comply with all solicitation requirements, instructions and deliverables, representations and certifications, technical requirements, as well as those identified as evaluation factors or subfactors (Sections 00010 through 00700). Failure to satisfy a stated requirement may result in an offer being determined non-responsive and ineligible for award. If the Offeror takes exception to any of the requirements specified in this solicitation, the Offeror shall clearly describe the exception in the format supplied below. Exceptions shall provide a complete explanation of why the exception was taken, what benefit accrues to the Government (if any), and its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. Strict adherence to the format below is required for an exception to be actionable.

Failure on the Offeror’s part to comply with this condition does not constitute a failure on the part of the Government to evaluate and respond to an exception. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Offerors are cautioned that taking an exception may render the offer ineligible for award. It is recommended that the Offeror contact the KO through email at anthony.g.tiroch2.civ@army.mil and victoria.a.joseph.civ@army.mil immediately/prior to solicitation closing upon identifying an area that may result in an exception. This information shall be provided in the format below.

Table 1 - Solicitation Exceptions

Solicitation Document Page/Paragraph Requirement/Portion Rationale & Impact

Section 00010,00100, SOW, Specifications, Instructions to Offerors, Basis for Award

Solicitation Page and Paragraph Numbers

Identify the requirement or portion to which exception is taken

Describe the rationale and impact of the exception

a. The proposals shall be organized into four (4) volumes (separately titled attachments correlating to the volume titles above).With the exception of company logos on stationary, graphics, photographs, and color coding of spreadsheets and calculations for emphasis, proposals shall be printable as black ink on white paper, in a 12-point font. Digital files shall be provided in Microsoft Word, PowerPoint, and/or Excel. A PDF file format is allowable for Volumes I, II, and III only. File names shall be provided in the format of “Volume #, Company Name – Initial” for the first submission. File name of later submissions (if necessary), shall follow the same naming convention with the exception of the extension of “Revision X” indicating the number of the revision. Page limitations are as follows:

Table 2 – Page Limits

Volume Title Page Limits

I General None

II Technical Acceptability except Subfactor (c) 75

Subfactor (c) - Notional Task Order Requirements only 75

III Past Performance None

IV Price None

b. Proposal Limitation. If the page limits listed above are exceeded, the pages in excess of the limit shall be removed and unread. The Government will not accept any changes to proposals after the closing date of the solicitation. . If discussions become necessary, page limitations may be placed on responses to Evaluation Notices (ENs). The specified page limits for EN responses will be established at the appropriate time.

c. Page limits include all appendices, charts, graphs, diagrams, tables, photographs, drawings, etc., submitted as part of the proposal.

d. Page limits do not include cover sheets for proposal volumes, tables of content, glossary of terms, abbreviations and acronyms, indices title pages, cross reference indices, and section dividers and tables if they are inserted solely to provide ease to the reader in locating parts/sections of the proposal. Pages will be counted if they contain any other information, i.e., diagrams, extraneous data, etc. Pages marked “This page intentionally left blank” will not be counted

e. Proposals shall be submitted on 8 ½ X 11” size paper. Larger illustrations and tables supporting proposal information can be 8 1/2 x 14” if it is necessary to enlarge text for legibility. Margins on all documents, regardless of type, shall be at least 1” on the top and bottom and ¾” on each side. All pages within each volume of the proposal shall be consecutively numbered. In the event a proposal contains an ambiguity in the numbering of pages, the Government may exercise its own discretion in counting pages.

f. Indexing. Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume.

g. Glossary of Abbreviations and Acronyms. Each volume shall contain a glossary of all terms, abbreviations and acronyms used, with a definition for each.

1. Proposal Content

Volume I – General

a. Offerors are required to submit a completed SF 1442 (including acknowledgment of Amendments) and Section 00600. Failure to follow the below Contract Proposal preparation instructions may cause your proposal to be deemed unacceptable by the Government.

b. Submission Requirements. The General Volume shall be organized as follows and contain the identified information.

c. Exceptions/Assumptions (if required): Identification and explanation of any exceptions or deviations.

Additionally, any assumptions used in the proposal preparation shall be identified and fully explained.

d. SF 1442: The SF 1442 shall be submitted fully completed. The Offeror shall acknowledge any amendments to the solicitation in accordance with the instructions on the SF 1442 and FAR 52.215-1, Instructions to Offerors - Competitive Acquisition. The Offeror shall provide the name, title and telephone number of the company/division point of contact regarding decisions made with respect to their proposal and who can obligate it contractually. Also, identify those individuals authorized to negotiate with the Government.

e. Section 00600 (Representations & Certifications): The Offeror shall ensure that Section 00600 is submitted thoroughly completed with all blocks in each certification/representation completed truthfully and completely.

f. Bid Guarantee. The Offeror shall submit a bid guarantee in the amount of $3,000,000.00.

Volume II – Technical Acceptability

a. The Technical Acceptability Volume shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims in the Offeror’s proposal. Legibility, clarity, and coherence are very important. Proposals will be evaluated against the Technical Acceptability subfactors defined in Section 00100, Evaluation Factors for Award. The proposal shall not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the Offeror intends to meet these requirements. Statements that the Offeror understands, can, or will comply with the SOW or General Requirements, (including referenced publications, technical data, etc.); statements paraphrasing the SOW or General Requirements or parts thereof (including applicable publications, technical data, etc.); and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., will be considered unacceptable. Offerors shall assume that the Government has no prior knowledge of their facilities and expertise, and will base its evaluation on the information presented in the Offeror's proposal. Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired.

b. The Technical Acceptability Volume shall, at a minimum, be prepared in a form consistent with the evaluation criteria for award set forth in Section 00100 of this solicitation. The section shall be prepared in an orderly format and in sufficient detail to enable the Government to make a thorough evaluation of the Offeror’s technical competence and ability to comply with the contract task requirements. The Offeror shall address as specifically as possible the actual methodology that would be used for accomplishing the SOW tasks in accordance with the Unified Facilities Guide Specifications (UFGS). The Technical Acceptability Volume shall be organized according to the following general outline:

1) Table of Contents: The table of contents section shall include a list of table and drawings and across reference matrix, as applicable.

a.) Subfactor (a) – Mission Capability: It is imperative that the Offerors articulate their experience and understanding of how a JOC operates. Provide a plan that incorporates methodology, processes and resources to manage the overall effort, mobilize and set up on the installation, respond to the KO’s notification of a Task Order requirement for emergency repairs as well as routine work requirements, the methodology you would employ to estimate, and submit task order proposals, and Task Order management including an explanation of how you will monitor the prosecution and management of a high volume of awarded Task Orders simultaneously. The Plan must clearly demonstrate your understanding of the utilization of a unit price book (RSMeans) for task order proposals. Demonstrate how your plan will satisfy both the technical and administrative requirements of this solicitation.

b.) Subfactor (b) - Proposed Staffing: Proposed Staffing: Provide a staffing plan to include an organizational flow chart and narrative that describes your company’s hierarchy and accountability, key personnel you intend to perform critical functions under the awarded contract, and how those positions act as a team in providing complete management and oversight for the performance of the contract and all Task Orders.

The Government considers the following key positions to be the absolute minimum acceptable level of management staffing requirements: Project Manager, Superintendent, Quality Control Plan Manager and Estimator. Key personnel employed under the awarded contract shall meet the minimum qualifications described in the paragraphs below. All personnel performing in the described positions shall be direct employees of the prime contractor; none of these functions is allowed to be subcontracted below the prime contractor.

The Plan shall discuss the Offeror’s retention and replacement program for these key positions, to include timelines for replacement and how the Offeror will execute those functions until a new employee is hired.

The Plan shall describe how the Offeror will provide additional resources during seasonal workload fluctuation.

Under this small business set-aside, Offerors are free to propose teaming arrangements, mentor/protégée agreements, partnerships, and joint ventures so long as they are official business arrangements allowable under the Small Business Act. Any arrangements proposed shall be sanctioned by the Small Business Administration, and the KO will validate the eligibility of those arrangements as part of this subfactor.

Project Manager (PM): This individual shall be a full-time, dedicated employee of the prime contractor and speak fluent English. The Project Manager shall possess a minimum of 10 years of experience in the Construction field, with at least five (5) of those 10 years of experience in construction management, and shall possess at least an associate’s degree in one of the following disciplines: Engineering, Architecture, Construction Science, Business Management, or Construction Management. The Project Manager shall have the maturity and business acumen to manage the entire effort, successfully plan and execute all task orders, and possess extensive understanding of and familiarity with the principles, methods, and techniques of architectural, civil, mechanical, and electrical engineering. The Project Manager shall be vested with the authority to commit the contractor and act as an official representative of the company. The Project Manager shall have documented work experience in Federal government construction contracts, and be completely familiar with all Federal regulations relative to conducting construction on a Federal installation, to include all environmental and preservation implications.

Superintendent: A superintendent shall be assigned to task order worksites in accordance with FAR clause 52.236-

6. The superintendent shall be a full- time employee of the prime contractor, speak fluent English, and be directly accountable to the PM. To avoid conflicts of interest, superintendents shall not perform dual functions on the same jobsite; e.g., superintendents shall not perform additional duties in a quality control management or safety officer role on a covered task order. Each superintendent shall possess a minimum of five (5) years documented journeyman level work experience in the construction field, with no less than five (5) years of that experience being in a supervisory position. The individual(s) shall provide verification of credible qualifications through a recognized union in the construction trades environment. Each superintendent shall manage no more than a total of four (4) active projects at any given time, provided there is no more than 10 minutes travel time between job sites.

Superintendence of the job can be supplemented with competent job site foremen who are knowledgeable and experienced in the type of work being performed on the site. The individual(s) identified will be responsible for timely progress and completion of all assigned work, and be wholly devoted to the supervision of work in progress under this contract and task orders issued there from only. The superintendent shall be responsible for maintaining the approved progress schedule (schedule of values).

Quality Control Manager (QCM): This individual shall be a full-time, dedicated employee of the prime contractor, speak fluent English, and be directly accountable to the corporate level Quality Control Manager only.

As the QCM, this individual shall be responsible for the overall quality of work performed under this contract, and possess knowledge of and show current license/certification in a 40-hour OSHA Safety Inspection Certification and the US Army Corps of Engineers Quality Control Training Course. The QCM and any utilized support staff shall remain autonomous to the corporate level Quality Control Manager, and not be influenced by other members of the on-site staff. The QCM shall have a minimum of five (5) years of experience in construction quality control in Department of Defense agency (i.e., Corps of Engineers, Air Force, Navy, Marine Corps, etc.) activities. The QCM SHALL NOT HAVE OTHER DUTIES THAN QUALITY CONTROL. Should the QCM fail to be dedicated solely to quality control functions identified herein, or be otherwise directed to perform outside these boundaries, this shall be construed as a contract violation. The QCM shall possess adequate skills and experience to implement and enforce the Contractor's Quality Control Plan (see detailed Quality Control Plan requirements at TE F, Division 1, General Requirements). There shall be only one QCM under the contract. An alternate QCM, meeting the same qualification standards stated herein, may be utilized during short absences of the QCM; however, an alternative shall not perform in that capacity when the assigned QCM is present. The QCM and any quality control staff shall have adequate construction work experience to detect violations in all construction phases, and all disciplines (mechanical, electrical, plumbing, and civil) of construction quality control. The Government has determined that adequate construction work experience is expertise in all four disciplines (mechanical, electrical, plumbing, and civil), and show current license/certification in their respective areas of expertise (whether it be mechanical, electrical, plumbing or civil). The quality control support staff shall be directly accountable to the quality control management chain of command without influence from production.

Site Safety and Health Officer (SSHO): The Contractor shall provide a fully qualified Site Safety and Health Officer meeting the qualifications and training requirements in the EM 385-1-1 for up to and every four awarded task orders situated within a 10-minute commute of one another.

Estimator: This individual shall be a full-time, dedicated employee of the prime contractor, speak fluent English, and be directly accountable to the Project Manager. The Estimator shall have a minimum of five (5) years of documented work experience estimating construction work in multiple construction disciplines, with no less than three (3) of the eight (8) years of experience utilizing commercially developed construction pricing guides. In the absence of the Project Manager, the Estimator shall prepare and negotiate task order proposals.

c.) Subfactor (c) - Notional Task Order Requirements: Attachment 4 and 4a provides a fictional workload scenario of five (5) notional Task Order projects that are typical of a JOC. These scenarios do not represent actual construction workload. Offerors are expected to apply those principles, processes and knowledge required herein to prepare a detailed proposal for each of the notional Task Orders.

Responses must incorporate all roles and responsibilities, means and methods, and the requirements at TE A, Division 1, General Requirements of this solicitation. The Unit Price Book discussed at TE A Division 1, General Requirements shall be utilized to provide line items, take-off quantities, unit prices, etc., to support proposed task order prices. All requirements normally associated with actual Task Order proposal requests should be considered in the response. All five Task Order proposals must be supported by the Offeror’s rationale for selection of line items, critical path milestones, etc., in order to be acceptable for evaluation and consideration for award.

Volume III – Past Performance

The Government will perform a Confidence Assessment of the Offeror’s past performance to arrive at a confidence rating. The Confidence Assessment represents the evaluation of an Offeror's past work record to assess the Government's confidence in the Offeror's probability of successfully performing as proposed. Past Performance information described herein is required on the Offeror and all subcontractors, teaming partners, and/or joint venture partners proposed to perform. In addition, the Offeror shall detail the percentage of work performed by each subcontractor or partner based on the total proposed price. The Offeror shall submit, along with the information required in this paragraph, a consent letter (see Attachment 1), executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing release of adverse past performance information to the Offeror so the Offeror can respond to such information. For each identified effort for a commercial customer, the Offeror shall also submit a client authorization letter, authorizing release to the Government of requested information on the Offeror's performance.

The Offeror shall include documentation regarding their relevant past performance as it directly relates to the work being procured under this solicitation. The Offeror SHALL NOT go back any farther than six (6) years from the issue date of this solicitation for the submitted data. The past performance data shall document a successful history of past contract performance. This volume has no page limitation. Relevant efforts are defined as services/efforts that are the same as or similar to the effort (as compared to NAICS code 236220) required by the solicitation including work on an active military installation, work in occupied buildings, and work with same/similar state and federal construction codes. Projects considered relevant may include JOC, Simplified Acquisition Base Engineer Requirements (SABER) contracts, or Construction, Repair, Renovation, Sustainment, Restoration, and Modernization (SRM) contracts of at least $2,000 and a duration of no less than 60 days of performance. The Offeror is required to submit past performance data on its self as it directly relates to the work being procured under this solicitation. If the Offeror has no past performance data then it must so state. If it is relying on the past performance data of a joint venture or teaming partner that must also be stated and evidence submitted showing that such a joint venture exist for the purposes of this acquisition. Data concerning the Offeror shall be provided first, followed by each proposed major subcontractor, teaming partners, and/or joint venture partners in alphabetical order. In the case of a joint venture, the prime Offeror joint venture should demonstrate successful experience and past performance as that joint venture, as well as each member of the joint venture as applicable. Failure to provide the past performance data/information requested can result in a proposal being determined to be noncompliant and may be eliminated from further consideration.

In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the Offeror’s Past Performance Volume and information obtained from other sources, such as the CPARS, PPIRS or similar systems, Defense Contract Management Agency (DCMA) and commercial sources. Offerors are reminded that both independent data and data provided by Offeror in their proposals may be used by the Government to evaluate Offeror past performance. However, the burden of providing thorough, complete, and current past performance information as requested in this paragraph remains with the Offeror. Proposals that do not contain the information requested by this paragraph risk rejection or a less than acceptable performance rating by the Government.

In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)) and, as a result, will receive a "Neutral Confidence" rating for the Past Performance factor. All past performance comments received will be taken into account and could affect the overall rating. The overall past performance evaluation is a subjective decision based on the whole of all data received.

Submission Requirements. The Offeror shall submit a Past Performance Volume containing the following:

1) Table of Contents

2) Consent Letters (Attachment 1): Executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing the release of past performance information so the Offeror can respond to such information.

3) Client Authorization Letters: For each identified effort for a commercial customer authorizing release to the Government of requested information on the Offeror’s performance under a specific contract.

4) Organization Structure Change History: Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant present or past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment.

Since the Government intends to consider present and past performance information provided by other sources as well as that provided by the Offeror(s), your "roadmap" should be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources.

5) Specific Relevant Contracts Format (Attachment 2): is limited to four (4) pages per reference. The Offeror shall provide documentation outlining the Offeror’s past performance with contracts, as a prime or major subcontractor, which is the same or similar in nature, size, and complexity to the services being procured under this solicitation. The submittal shall include specific narrative explanation and rationale supporting objectives achieved and assertion of relevance and how it was determined that the work performed previously was the same or similar in nature, size, and complexity to the work specified by this solicitation. For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The Offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. The Offerors shall also provide a copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the Offeror or proposed subcontractor. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination. Additionally, provide a narrative describing any litigation activity (i.e. bond claims, liquidated damages, insurance actions, or claims related to project performance, etc.) that the Offeror has been, or is currently party to involving its subcontractors, customers or any Surety within the past six (6) years. The narrative should include the Parties involved, the magnitude of the Claim and the resolution.

6) Past Performance Questionnaire (Attachment 3): is for the contracts identified on each Specific Relevant Contract Reference. The Offeror shall forward a copy of the Past

Performance Questionnaire to the points of contact responsible for monitoring performance under such contracts. The points of contact shall return the questionnaires directly to anthony.g.tiroch2.civ@army.mil and victoria.a.joseph.civ@army.mil no later than 4:00 pm CST, 27 January 2022. Any questionnaires not returned directly to anthony.g.tiroch2.civ@army.mil and victoria.a.joseph.civ@army.mil will not be reviewed or evaluated. The information contained in the questionnaires will be used to evaluate the Offeror’s past performance. New entities formed for the purpose of proposing on this solicitation (joint venture, teaming partners, or mentor protégé) that have no past performance history under that business arrangement are permitted to submit past performance information for the individual entities forming the arrangement.

Volume IV – Price

a. General. The Government reserves the right to require the submission of Other Than Certified Cost or

Pricing Data as is deemed necessary to arrive at a fair and reasonable price. All information relating to the proposed cost/price data must be submitted in electronic format. Electronic versions of the Cost/Price proposal shall be submitted in MS Office Excel format only, and shall NOT be read only or password protected. All formulas, lookup tables, and links shall be intact, and no links shall exist to files not included with the submission. Excel workbooks should not contain hidden spreadsheets. PDF or flat files will not be acceptable. Failure to comply with these formatting requirements may result in rejection of the proposal. Offeror’s submittals shall be free of viruses, Trojans, spyware, and other malicious code for which appropriate detection and removal/quarantine software exists.

b. The basis for pricing this JOC incorporates the use of a commercial cost estimating and project management software tool (e.g., WinEst, MS Project, e4Clicks) which employs a price modifier known as a coefficient. A coefficient is a numerical factor that is multiplied by the estimated total project costs to derive the final fixed price Task Order price proposed to the Government. The coefficient includes various factors reflecting the contractor’s cost of doing business and operating a field office on Fort Polk, LA (e.g., direct and indirect labor, field overhead, corporate overhead, equipment leases, transportation, training and certification, permits and licenses, profit) and a factor reflecting an evaluation of the accuracy of a contract-specified cost estimating tool to the local subcontractor/supplier market. This is generally done using a Unit Price Book (UPB) such as RSMeans, and is generally referred to as the “value of the book.” The Government uses RSMeans cost estimating tool. All estimates shall be submitted using a commercial cost estimating software and shall contain all of the line items found in the RSMeans bound volumes.

c. Submission Requirements. The Offeror shall submit a Price Volume containing the following:

1) Bondability Letter: The Offeror shall provide a letter from a qualifying surety that validates the ability to provide bonding at the contract’s program ceiling and specifies the Offeror’s aggregate and single project limits, remaining bond capacity, and impact anticipated from the proposed contract. The program ceiling is $10 Million/year for $50 Million/5-year contract. In accordance with AFARS 5117.9004-2(g), “Bonding must be sufficient to cover the stated estimated annual maximum contract value”. The contractor will be responsible for providing the required level of bonds for the base year and any exercised option year prior to the start of performance which is 100% of the penal sum at the start of the base year and every option year that is exercised.

2) Section 00010 (Solicitation Contract Form): Section 00010 shall be submitted fully completed and error free. It shall contain the Offeror’s coefficient rates for the established Contract Line Items (CLINs).

Development of Coefficients: This solicitation requires the development of three separate coefficient factors; (1) Normal Working Hours; (2) Other Than Normal Working Hours; and (3) Non-prepriced Items. The Government has determined the following allocation of CLIN values within the established annual ceiling / per category as shown below:

3) CLIN X001 Normal Working Hours (85% or $8,500,000.00)

4) CLIN X002 Other Than Normal Working Hours (5% or $50,000.00)

5) CLIN X003 Non-prepriced Items (Not-To-Exceed 10% or

$1,000,000.00)

When developing coefficients for submission, Offerors shall utilize Attachments 5, 6, and 7 and consider the cost elements identified therein as the minimum types of costs to incorporate into their coefficients.