AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Modification is to extend the time for the submission of proposals to Thursday, 26 July 2018 at 4:30pm CST to permit the US Government additional time to respond to Contractor questions and provide additional time for those answ ers to be incorporated into their proposals.
18 of 39 questions have been answ ered in Section C of the Amended Solicitation. Another amendment to the solicitation w ill occur once the remaining questions have been answ ered.
1. CONTRACT ID CODE PAGE OF PAGES
U 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jul-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911RP18R0023
X 9B. DATED (SEE ITEM 11)
07-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jul-2018
CODE
ARMY CONTRACTING COMMAND - ROCK ISLAND
PINE BLUFF ARSENAL CONTRACTING OFFICE
10-020 KABRICH CIRCLE, BLDG 17-120
ATTN: CCRC-AEP
PINE BLUFF AR 71602-9500
W911RP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
GARETH C. HYNDMAN II, Contracting Officer
870-540-3014 gareth.c.hyndman.civ@mail.mil
W911RP18R0023
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 16-Jul-2018 04:30 PM to 26-Jul-2018 04:30 PM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
CONTRACTOR QUESTIONS
1. Is it the government’s intent to have the contractor pick up and move the GFE to 31-630?
Answer: Yes, it will be contractor’s responsibility to pick-up and move the GFE to 31-630.
2. What is the government looking for as the design portion of this solicitation?
Answer: The contractor is responsible for providing a complete system that will flow from one operation to the next. Specific items included but not be limited to are: the design of the conveyor feeding the bag opener; the HC Attrition Mill to transfer Drum Feed system; Installation of the double cone mixer; platform for the mixer; Drum Dumper System; Feed system between the drum dumper and the mixer and the fire protection system.
3. Are we just to turn in design specs on equipment purchased?
Answer: The contractor should write a complete proposal that includes how he intends to meet each and every requirement of the specification and drawings. The contractor should include as part of his proposal the design specs on the equipment that he will be providing.
4. Are the parts readily available commercially for the equipment made by Pine
Bluff?
Answer: Parts should be readily available.
5. The 220 days did that account for any parts that can’t be purchased off the shelf for the equipment?
Answer: The 220 days does take into account the long lead time items that are to be provided by the contractor.
6. If reverse engineering is involved is the government going to a lot that time?
Answer: There should be no reverse engineering required for this project.
7. Will the government accept different name brand equipment for the fire alarm than specified or does it have to be that specific equipment?
Answer: While the Det-Tronics System has been established as the standard for what PBA is installing in its production facilities, PBA is willing to consider any product equal to the Brand Name. However, if the contractor is going to propose anything other than the desired system, then express approval must be obtained in advance. If the contractor offers the Brand Name system, no advance approval is required.
8. As part of the refurbish part of the equipment is the equipment to be condition new or condition fit form and function?
Answer: The equipment is to be fit form and function. Contractor is to do the refurbishment that is called out specifically in the specification and then anything else to make the equipment operational.
9. If a Mod becomes necessary at any time during the project is that time to be added to the period of performance without liquidated damages?
Answer: Additional time is typically negotiated as part of the modification process.
Furthermore, under the excusable delay rules, any excusable delay is not held against the contractor.
10. During the RFI phase of the solicitation I submitted the 1200 series of conductive flooring. At that time I was sent a change of suggested materials that reflected that Milamar met the criteria and would be included in the final solicitation. Is there a reason that Milimar was not included?
Answer: This material was reviewed after the question was raised in the RFI phase of the solicitation and was found to be acceptable. The specification was supposed to be modified to include this material but somehow the change did make it into the final copy of the specification. Therefore the final sentence of paragraph 3.3.8.2.j of the specification is to be replaced with the following sentence.
“Suggested materials for conductive flooring: (Dex-0-Tex Conductive Neotex - 367; Crossfield Products or General Polymer 3524 epoxy conductive primer sealer, and top coat 3525E static control epoxy coating) or (Milamar Coatings ICO Gel to repair any cracks and spalled concrete, then Milamar Coatings ICO Floor SL to level the floor, then Milamar Coatings 1200 CS Primer, then the grounding plates, then Milamar Coatings 1200 Ground Plane and then Milamar
Coatings 12100 ESD topcoat all applied in accordance with Milamar Coatings ESD Static Control Flooring Installation Guide).”
11. Who has the existing Controls? (How do they want the temperature controlled?
By chilled water valve or by fan on/off?) Will the control contractor be able to integrate into the existing system and provide your request for complete control operation?
Answer: Trane 's Tracer Summit is the control system. The contractor will be able to integrate into the existing system. The HVAC controls provided by the contractor shall include everything outside of the tracer summit control unit.
12. Explosion Proofing? Actuators for dampers/sensors
Answer: We need the diverter (splitter dampers) actuators and sensors on the vacuum and dust collection Class II Div1 if it is electrical. Pneumatic actuators can be used. The diverter for the a/c unit doesn’t need to be rated, and all sensors and electrical equipment in the bay area shall be NEMA 4.
13. Does the existing dust collection system/vacuum system require any kind of cleaning? Is there any residue left of what was being collected before? Was the dust being collected before explosive? If so who is responsible for cleaning if required?
Answer: The dust collection and vacuum systems do require cleaning. There is most likely explosive dust lining the pipes in the current system. Not sure who is required to clean them for construction.
14. Are the splitter dampers for the HVAC/duct collection/vacuum duct to be manually operated or motorized? If motorized explosion proof?
Answer: See answer 2.
15. If dampers are manually operated how would you suggest the humidity be turned off as required? (switch or sensors)
Answer: Actuated diverter and diverter position selector switch shall be connected to and controlled by the existing controls.
16. On the HVAC duct the prints call for a 2 position 3 way diverter, is air supposed to be able to go down both trunk lines at one time or is one system to have a trunk line closed and the opposite trunk line open? Could you give more detail on your intent of the operation? What is the CFM/static of the existing duct system?
Answer: The diverter needs to deliver 100% of the air to one line or the other. We will not have both lines running at the same time. There are 2 production lines in the building and we will not be using the HVAC for both at any given time.
17. Regarding the HC Bag Opener Feed Conveyor. What is the length and width of the bags? What cleat centers do you need on the incline conveyor? Do you know what height cleat is required for the bags at 30° incline? 1 1/2" high cleat is the standard.
Answer: The bags are about 30" Long and 20" Wide. The cleat centers need to be about 3 feet apart. Standard 1 1/2" high cleats will be fine.
18. Referring to Section B - Supplies or Services and Prices Item No. 0001AE (pg. 5 of 50 in solicitation) We don't see an Appendix III. - Contractor shall provide FFP for (7) contract data requirements as listed in the specification Appendix III Could you verify and confirm what they are talking about for this?
Answer: Yes, Appendix III contains the seven (7) CDRLs. That is all.
(End of Summary of Changes)