This is a Questions and Answers document for solicitation W911QY-26-R-MONU addressing contractor inquiries regarding the monument sign installation project at Natick Soldiers Systems Center. The Q&A clarifies critical project requirements including that the sign will be externally illuminated (not internally), no formal bid document is required, and no landscape design beyond grass fill around the concrete pad is mandated. Site visits were offered on 07/28/2026 and 07/29/2026 at 0930 hours. Key logistical details include that contractors must notify the Project Manager before removing existing shrubbery, cannot park cranes on site, must use chain link fencing if storing equipment in the grass area, and must submit visitor passes for all workers. The contractor bears responsibility for verifying underground utilities and obtaining Ground Penetrating Radar if needed at no government cost. The electrical connection will utilize existing power from the outside common meter panel on the first house in the housing area, controlled by a photo cell for all exterior street lights and sign power.

The document addresses technical specifications including that the concrete pad shall not exceed 3 feet from the front face of the sign, the sign height may be modified if needed to account for snowfall, and the contractor must notify the DPW Architect for approval of any angle modifications. The old sign must be returned to DPW intact without damage; only the sign itself is to be returned. A 5% bid bond is required along with performance and payment bonds per SF 24, 25, and 25A. Labor information, specifications, and material lists must be included in proposals. The contractor must dispose of excess materials such as mulch and coordinate all final positioning with the DPW Architect during a field visit.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

QuestionsAnswers
Is there a formal solicitation bid document to fill out?No, there is no formal solicitation document to fill out.
Is a bid bond required?Yes, a bid bond, a payment bond, and a performance bond will all be required. SF 24, 25, and 25a have been attached to this amended solicitation. FAR clauses 52.228-1 and 52.228-15 are being incorporated into this solicitation.
Is this an internally illuminated LED sign?No, this will be an externally illuminated sign. Please refer to Page 2 paragraph "Electrical" of the SOW.
Is there an electrical permit required?A building or electrical permit is not required.
Are site visits available?The government is offering two separate site visits at this time. 07/28/2026 @0930 and 07/29/2026 @0930. Please email ahead of time to confirm the visit and any further access requirements.
Is there an EC requirement?If referring to Electrical circuit (EC), the answer is yes. To connect the exterior light to the electrical circuit and timer located in the housing area.
Does the government have an estimated cost for this project?Per regulation we cannot give out the governments estimated cost.
Where does the existing shrubbery get moved to?Give notice to PM of when they will be removed and set them aside for later pick up.
Can the grass area near the site be used to store/place equipment?No, unless Contractor puts up a chain link fence around their work area.
What will the landscape be? Rock, mulch, etcFill the space with grass around the concrete pad. NO Landscape is required
Can a crane be parked in the area?No.
Are there water, gas, electrical lines running under the site?The contracttor is responsible to verify if lines are running under the site.
Where is the electrical connection?The Electrical power is existing at the existing sign from the outside common meter panel on the first house on the right as you enter the housing area. The photo cell controls all the outside street lights and the sign power.
If Ground Penetrating Radar is required, is it on the contractor to pay for this?NO
Does the government want an electrical inspection on exisiting infastructure?NO, all infastructure has been previosly inspected and the existing line is to be used from the fence Jbox to the new sign light location. Notify DPW electrical engineer for all inspections to be perfromed.
Do we include labor information, specifications, and a material list?YES
Can the fire hydrant near the area be used?NO use the hose on the closest house.
Can we remove the yellow arrow from the main part of the sign and place it on the base for aesthetic purposes?Make it as a design option
Is the street name required on the base of the sign?NO
Does the tree hanging over the existing sign need to be trimmed and landscaped?YES , only if blocking the new sign
Do we want the sign at its current angle or a modified angle?MODIFY if needed, the contractor shall notify the DPW PM Architect for approval
What does the contractor do with excess material such as mulch?Dispose
Is there an allowance to be made for depth and length of the concrete pad to account for the lights?Shall not exceed 3 ft from the front face of the sign
Can we provide a scale drawing of the sign, concrete pad, and angle relative to the road?Follow the UFC requirements for the sigh as well as provided on the SOW package, adjust the height of the sign if required, Increase height of the sign to account for snowfall . Coordinate with DPW architect the final position (Angle) the angule will be determinated (field visit to verify final position).
Where does the old sign go?ONLY THE SIGN Will be returned to DPW - Do not break or damege the old sign.
Where do contractors park?They can park on the Installation - Need to submit visitors pass for all workers…see Rigo
What percetange bid bond is required?5%
Reccomendations from contractorsIncrease height of the sign to account for snowfall (SEE 25)