ETSSLS_Attachment_0003_Equipment_Packing_Plan.pdf
PDF 616 KB Posted
- Solicitation number
- W911QY-18-R-0018
About this file
W911QY-19-D-0003 Attachment 0003 - Equipment Packing Plan
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Expeditionary TRICON Self-Service Laundry System (ETSSLS)
ETSSLS Pack Out Instruction
May 2018
1 – Pad, Furniture modified hangs from dryer securement pins, in front of the washer /dryers prior to closing unit
1 – Waste 3K zipper top bag (Top of Shelf)
Dryer 2
- 1 AC shelf
- 1 Mat, anti fatigue
1 – power cable, 100 Amp, 25’ (Under Shelf)
Dryer 4
- Hose, 2.0” x 25’
Washer 4
- 1 waste basket
- 1 door curtain
- 2 ETS leveling jacks
Washer 2
- 1 wall mount heater
- Hose, ½” x 2’
- Hose 3/8” x 1’
1 – Pad, Furniture modified hangs from dryer securement pins, in front of the washer /dryers prior to closing unit
1 – Waste 3K zipper top bag (Top of Shelf)
Dryer 1
- Hose, 1.5” x 25’
1 – power cable, 100 Amp, 25’ (Under Shelf) 1- Ground rod
Washer 1
- 1 wall mount heater
- Hose 1.5” x 5’
- Hose 1.0” x 5’
Washer 3
- 1 waste basket
- 1 door curtain
- 2 ETS leveling jacks
Dryer 3
- 1 AC shelf
- 1 Mat, anti-fatigue
(2) – Assembly, ECU Modifications, 9-2-4830 are packed behind the dryer units, on the pack out shelf
(1) Toolbox 20” x 8.75” x 10.5” is packed out behind the dryer units, on the pack out shelf, containing;
• WYE, cam and groove, M xM x F
• Reducer, Cam and Groove, 2.0” F x 1.5” M, brass
• Tee, assembly, 1.5” F x M x M
• Screw driver, flat head
• Socket, deep wall, 9/16’
• Ratchet, 3/8”
• Nut driver, 5/16”
• Switch, pressure
• Gasket, 1.5”
• Gasket, 1”
• Hose clamps
Ceiling lift pole is packed under the roof panel, after the expansions are collapsed, prior to closing container doors
File details come from the government source that posted it.