Solicitation W911QY-16-R-0026
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W911QY-16-R-0026 01-Apr-2016
b. TELEPHONE NUMBER
508-233-6104
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 03 May 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911QY9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
GEORGE BERNARD
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
W6QK ACC-APG NATICK
CONTRACTING DIVISION
BLDG 1 GENERAL GREENE AVENUE
NATICK MA 01760-5011
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W905JZ 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
SR W038 USA SOLDIER SYSTEMS CTR
BRUCE COFFIN
PUBLIC WORKS DIVISION GENERAL GREENE AVENUE
NATICK MA 01760-5002
TEL: 508-233-6923 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$7,500,000
NAICS:
561730
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
X
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF90
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W911QY-16-R-0026
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1 Job Landscaping Services
FFP
Supply all labor, materials, and equipment for landscaping services in accordance with the Statement Of Work, set forth herein.
See the pricing schedule incorporated herein.
FOB: Destination
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 2 Each Manpower Reporting
FFP
The contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract. See Clause 5152.0237- 4005. Instructions, including the Contractor and Subcontractor User Guides, are available at the CMRA (Contractor Manpower Reporting Application) website at:
https://cmra.army.mil. For further assistance, email the CMRA Help Desk at contractormanpower@hqda.army.mil
This CLIN is not separately priced.
UNIT UNIT PRICE MAX AMOUNT
0003 1 Job Reports
FFP
Contractor shall provide monthly reports for list of equipment to be serviced and maintained for the upcoming month in accordance with Contract Data Requirements List (CDRL) DD Form 1423, Data Item A001, Exhibit A.
UNIT UNIT PRICE MAX AMOUNT
0004 1 Job Quality Control Plan
FFP
Contractor shall provide Quality Control Plan in accordance with the requirements, quantities, and schedules as set forth in the attached Contract Data Requirements List (CDRL) DD Form 1423, Data Item A002, Exhibit B. The Quality Control Plan is for the life of the contract, including Optional Period of Performances if exercised.
UNIT UNIT PRICE MAX AMOUNT
1001 1 Job OPTION Landscaping Services
FFP
Option Year 1 Supply all labor, materials, and equipment for landscaping services in accordance with the Statement Of Work, set forth herein.
UNIT UNIT PRICE MAX AMOUNT
1002 1 Each OPTION Manpower Reporting
FFP
Option Year 1 The contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract. See Clause 5152.0237- 4005. Instructions, including the Contractor and Subcontractor User Guides, are available at the CMRA (Contractor Manpower Reporting Application) website at:
https://cmra.army.mil. For further assistance, email the CMRA Help Desk at contractormanpower@hqda.army.mil
UNIT UNIT PRICE MAX AMOUNT
1003 1 Job OPTION Reports
FFP
Option Year 1 Contractor shall provide monthly reports for list of equipment to be serviced and maintained for the upcoming month in accordance with Contract Data Requirements List (CDRL) DD Form 1423, Data Item A001, Exhibit A.
UNIT UNIT PRICE MAX AMOUNT
2001 1 Job OPTION Landscaping Services
FFP
Option Year 2 Supply all labor, materials, and equipment for landscaping services in accordance with the Statement Of Work, set forth herein.
UNIT UNIT PRICE MAX AMOUNT
2002 1 Each OPTION Manpower Reporting
FFP
Option Year 2 The contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract. See Clause 5152.0237- 4005. Instructions, including the Contractor and Subcontractor User Guides, are available at the CMRA (Contractor Manpower Reporting Application) website at:
https://cmra.army.mil. For further assistance, email the CMRA Help Desk at contractormanpower@hqda.army.mil
UNIT UNIT PRICE MAX AMOUNT
2003 1 Job OPTION Reports
FFP
Option Year 2 Contractor shall provide monthly reports for list of equipment to be serviced and maintained for the upcoming month in accordance with Contract Data Requirements List (CDRL) DD Form 1423, Data Item A001, Exhibit A.
UNIT UNIT PRICE MAX AMOUNT
3001 1 Job OPTION Landscaping Services
FFP
Option Year 3 Supply all labor, materials, and equipment for landscaping services in accordance with the Statement Of Work, set forth herein.
UNIT UNIT PRICE MAX AMOUNT
3002 1 Each OPTION Manpower Reporting
FFP
Option Year 3 The contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract. See Clause 5152.0237- 4005. Instructions, including the Contractor and Subcontractor User Guides, are available at the CMRA (Contractor Manpower Reporting Application) website at:
https://cmra.army.mil. For further assistance, email the CMRA Help Desk at contractormanpower@hqda.army.mil
UNIT UNIT PRICE MAX AMOUNT
3003 1 Job OPTION Reports
FFP
Option Year 3 Contractor shall provide monthly reports for list of equipment to be serviced and maintained for the upcoming month in accordance with Contract Data Requirements List (CDRL) DD Form 1423, Data Item A001, Exhibit A.
UNIT UNIT PRICE MAX AMOUNT
4001 1 Job OPTION Landscaping Services
FFP
Option Year 4 Supply all labor, materials, and equipment for landscaping services in accordance with the Statement Of Work, set forth herein.
UNIT UNIT PRICE MAX AMOUNT
4002 1 Each OPTION Manpower Reporting
FFP
Option Year 4 The contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract. See Clause 5152.0237- 4005. Instructions, including the Contractor and Subcontractor User Guides, are available at the CMRA (Contractor Manpower Reporting Application) website at:
https://cmra.army.mil. For further assistance, email the CMRA Help Desk at contractormanpower@hqda.army.mil
UNIT UNIT PRICE MAX AMOUNT
4003 1 Job OPTION Reports
FFP
Option Year 4 Contractor shall provide monthly reports for list of equipment to be serviced and maintained for the upcoming month in accordance with Contract Data Requirements List (CDRL) DD Form 1423, Data Item A001, Exhibit A.
PRICING SCHEDULE
Pricing Schedule
Services shall be priced in accordance with the Performance Work Statement (PWS) and Technical Exhibit (TE)-1.
Note: The Technical Exhibit (TE)-1 applies to all services. However, it is only referenced below when a separate price is requested for Capability 1, 2, and 3.
Base Period
Item 1. Grass Cutting and Trimming – Price Per acre $___________ (Reference Sections 1.5, 1.5.1 through 1.5.9.4)
Item 2. Storm Debris - Price as needed - Quote will be requested when services are required (Reference Section 1.5.9.5)
Item 3. Periodic Lawn Treatment - Priced per year (Reference Section 1.5.9.6 and TE-1 schedule Capability 1, 2, and 3)
Capability 1 $____________
Capability 2 $____________
Capability 3 $____________
Item 4. Landscape Maintenance – Priced per year (Reference Sections 1.5.9.7 through 1.5.9.10 and TE-1 schedule
Capability 1, 2, and 3)
Item 5. Tree Pruning and Removal, Shrub/Brush Trimming - Price as needed – Quote will be requested when services are required (Reference Section 1.5.9.11)
Item 6. Leaf & Debris Removal – Priced per year beginning every fall $___________ (Reference Sections 1.5.10 and 1.5.10.1)
Note: This price is to remove all the Leaf & Debris for the Installation. The removal is ongoing from when the leaves start falling through when they are all gone. This is all one price inclusive. Not a price per visit.
Item 7. Irrigation Maintenance, Service and Repair – Priced per year (Reference Section 1.5. 11 and TE-1 schedule
Item 8: Irrigation System Repairs for Over and above normal wear and tear - Quote will be requested when repairs are required.
Item 9: Grounds Repair Services - Playground equipment – Priced per year (Reference Section 1.5. 12 and TE-1 schedule Capability 1, 2, and 3)
Item 10: Grounds Repair Services - Erosion and Stabilization - Price as needed - Quote will be requested when services are required (Reference Section 1.5.12-1)
Item 11: Fitness Trail – Priced per year (Reference Section 1.5. 13 and TE-1 schedule Capability 1, 2, and 3)
Item 12: Street Sweeping – Priced per sweep - $___________ (Reference Section 1.5.14) Note: This is an on call service.
Item 13: Ball Field – Priced per year (Reference Section 1.5. 15 and TE-1 schedule Capability 1, 2, and 3)
Item 14: Tree Removal & Stump Grinding Price as needed - Quote will be requested when services are required
(Reference Section 1.5.16)
First Optional Period of Performance
Item 1. Grass Cutting and Trimming – Price Per acre $___________ (Reference Sections 1.5, 1.5.1 through 1.5.9.4)
Item 2. Storm Debris - Price as needed - Quote will be requested when services are required (Reference Section 1.5.9.5)
Item 3. Periodic Lawn Treatment - Priced per year (Reference Section 1.5.9.6 and TE-1 schedule Capability 1, 2, Item 4. Landscape Maintenance – Priced per year (Reference Sections 1.5.9.7 through 1.5.9.10 and TE-1 schedule
Item 5. Tree Pruning and Removal, Shrub/Brush Trimming - Price as needed – Quote will be requested when
Item 6. Leaf & Debris Removal – Priced per year beginning every fall $___________ (Reference Sections 1.5.10
Note: This price is to remove all the Leaf & Debris for the Installation. The removal is ongoing from when the leaves start falling through when they are all gone. This is all one price inclusive. Not a price per visit.
Item 7. Irrigation Maintenance, Service and Repair – Priced per year (Reference Section 1.5. 11 and TE-1 schedule
Item 8: Irrigation System Repairs for Over and above normal wear and tear - Quote will be requested when repairs
Item 9: Grounds Repair Services - Playground equipment – Priced per year (Reference Section 1.5. 12 and TE-1
Item 10: Grounds Repair Services - Erosion and Stabilization - Price as needed - Quote will be requested when
Item 11: Fitness Trail – Priced per year (Reference Section 1.5. 13 and TE-1 schedule Capability 1, 2, and 3)
Item 12: Street Sweeping – Priced per sweep - $___________ (Reference Section 1.5.14) Note: This is an on call
Item 13: Ball Field – Priced per year (Reference Section 1.5. 15 and TE-1 schedule Capability 1, 2, and 3)
Item 14: Tree Removal & Stump Grinding Price as needed - Quote will be requested when services are required
Second Optional Period of Performance
Item 1. Grass Cutting and Trimming – Price Per acre $___________ (Reference Sections 1.5, 1.5.1 through 1.5.9.4)
Item 2. Storm Debris - Price as needed - Quote will be requested when services are required (Reference Section 1.5.9.5)
Item 3. Periodic Lawn Treatment - Priced per year (Reference Section 1.5.9.6 and TE-1 schedule Capability 1, 2, Item 4. Landscape Maintenance – Priced per year (Reference Sections 1.5.9.7 through 1.5.9.10 and TE-1 schedule
Item 5. Tree Pruning and Removal, Shrub/Brush Trimming - Price as needed – Quote will be requested when
Item 6. Leaf & Debris Removal – Priced per year beginning every fall $___________ (Reference Sections 1.5.10
Note: This price is to remove all the Leaf & Debris for the Installation. The removal is ongoing from when the leaves start falling through when they are all gone. This is all one price inclusive. Not a price per visit.
Item 7. Irrigation Maintenance, Service and Repair – Priced per year (Reference Section 1.5. 11 and TE-1 schedule
Item 8: Irrigation System Repairs for Over and above normal wear and tear - Quote will be requested when repairs
Item 9: Grounds Repair Services - Playground equipment – Priced per year (Reference Section 1.5. 12 and TE-1
Item 10: Grounds Repair Services - Erosion and Stabilization - Price as needed - Quote will be requested when
Item 11: Fitness Trail – Priced per year (Reference Section 1.5. 13 and TE-1 schedule Capability 1, 2, and 3)
Item 12: Street Sweeping – Priced per sweep - $___________ (Reference Section 1.5.14) Note: This is an on call
Item 13: Ball Field – Priced per year (Reference Section 1.5. 15 and TE-1 schedule Capability 1, 2, and 3)
Item 14: Tree Removal & Stump Grinding Price as needed - Quote will be requested when services are required
Third Optional Period of Performance
Item 1. Grass Cutting and Trimming – Price Per acre $___________ (Reference Sections 1.5, 1.5.1 through 1.5.9.4)
Item 2. Storm Debris - Price as needed - Quote will be requested when services are required (Reference Section 1.5.9.5)
Item 3. Periodic Lawn Treatment - Priced per year (Reference Section 1.5.9.6 and TE-1 schedule Capability 1, 2, Item 4. Landscape Maintenance – Priced per year (Reference Sections 1.5.9.7 through 1.5.9.10 and TE-1 schedule
Item 5. Tree Pruning and Removal, Shrub/Brush Trimming - Price as needed – Quote will be requested when
Item 6. Leaf & Debris Removal – Priced per year beginning every fall $___________ (Reference Sections 1.5.10
Note: This price is to remove all the Leaf & Debris for the Installation. The removal is ongoing from when the leaves start falling through when they are all gone. This is all one price inclusive. Not a price per visit.
Item 7. Irrigation Maintenance, Service and Repair – Priced per year (Reference Section 1.5. 11 and TE-1 schedule
Item 8: Irrigation System Repairs for Over and above normal wear and tear - Quote will be requested when repairs
Item 9: Grounds Repair Services - Playground equipment – Priced per year (Reference Section 1.5. 12 and TE-1
Item 10: Grounds Repair Services - Erosion and Stabilization - Price as needed - Quote will be requested when
Item 11: Fitness Trail – Priced per year (Reference Section 1.5. 13 and TE-1 schedule Capability 1, 2, and 3)
Item 12: Street Sweeping – Priced per sweep - $___________ (Reference Section 1.5.14) Note: This is an on call
Item 13: Ball Field – Priced per year (Reference Section 1.5. 15 and TE-1 schedule Capability 1, 2, and 3)
Item 14: Tree Removal & Stump Grinding Price as needed - Quote will be requested when services are required
Fourth Optional Period of Performance
Item 1. Grass Cutting and Trimming – Price Per acre $___________ (Reference Sections 1.5, 1.5.1 through 1.5.9.4)
Item 2. Storm Debris - Price as needed - Quote will be requested when services are required (Reference Section 1.5.9.5)
Item 3. Periodic Lawn Treatment - Priced per year (Reference Section 1.5.9.6 and TE-1 schedule Capability 1, 2, Item 4. Landscape Maintenance – Priced per year (Reference Sections 1.5.9.7 through 1.5.9.10 and TE-1 schedule
Item 5. Tree Pruning and Removal, Shrub/Brush Trimming - Price as needed – Quote will be requested when
Item 6. Leaf & Debris Removal – Priced per year beginning every fall $___________ (Reference Sections 1.5.10
Note: This price is to remove all the Leaf & Debris for the Installation. The removal is ongoing from when the leaves start falling through when they are all gone. This is all one price inclusive. Not a price per visit.
Item 7. Irrigation Maintenance, Service and Repair – Priced per year (Reference Section 1.5. 11 and TE-1 schedule
Item 8: Irrigation System Repairs for Over and above normal wear and tear - Quote will be requested when repairs
Item 9: Grounds Repair Services - Playground equipment – Priced per year (Reference Section 1.5. 12 and TE-1
Item 10: Grounds Repair Services - Erosion and Stabilization - Price as needed - Quote will be requested when
Item 11: Fitness Trail – Priced per year (Reference Section 1.5. 13 and TE-1 schedule Capability 1, 2, and 3)
Item 12: Street Sweeping – Priced per sweep - $___________ (Reference Section 1.5.14) Note: This is an on call
Item 13: Ball Field – Priced per year (Reference Section 1.5. 15 and TE-1 schedule Capability 1, 2, and 3)
Item 14: Tree Removal & Stump Grinding Price as needed - Quote will be requested when services are required
ADDENDUM TO 52.212-1
ADDENDUM TO 52.212-1 Instruction to Offerors -- Commercial Items (Oct 2015)
1. Solicitation Summary
A. The Army Contracting Command – Aberdeen Proving Ground (ACC-APG), Natick Contracting Division on behalf of US Army Garrison Public Works Directorate has a requirement for Improved Grounds - Landscaping Maintenance services at the Natick Soldier System Center, Natick, MA..
B. The Government anticipates awarding a Firm Fixed Price Requirements contract. Funds will be obligated for services ordered upon issuance of Delivery Orders and not by the basic contract. The contract will consist of a one year Base and four - one year optional ordering periods. (Note: The Base year may be shortened in order First Optional Period to begin on 1 April 2017) The total contract shall not exceed five (5) years. The Base and four optional Ordering Periods consist of the following CLINS:
Base Period: 0001 through 0004 Date of Contract Award through 364 days after contract award (Note: The Base year may be shortened in order First Optional Period to begin on 1 April 2016
First Optional Period: 1001 through 1003 365 days through 729 days after contract award Second Optional Period: 2001 through 2003 730 days through 1094 days after contract award Third Optional Period: 3001 through 3003 1095 days through 1460 days after contract award Fourth Optional Period: 4001 through 4003 1461 days through 1825 days after contract award
C. This acquisition is a 100% Economically Disadvantaged Women-Owned Small Business (EDWOSB) Set- Aside. The North American Industry Classification System (NAICS) Code is 238220 and the size standard is $7.5 Million.
D. Site visit will be held on 13 April 2016 at 10:00 AM EST. All parties shall meet in the 1st Floor lobby of Building 1, Natick Soldier Systems Center (NSSC), 10 General Green Avenue, Natick, MA 01760. Interested parties shall e-mail Mr. George Bernard at george.h.bernard.civ@mail.mil and Mr. Michael Vincent at Michael.W.Vincent.civ@mail.mil prior to 12:00 PM EST, 11 April 2016 of their intent to attend the site visit.
The e-mail to George Bernard and Michael Vincent shall contain all persons’ information planning to attend the site visit to include their Full First and Last Name, Date of Birth, Driver's License Number and State Issued from, Current Address, and States resided in during past 5 years. Please allow an hour to get through the Security Entrance Gate. If there are questions due to weather the day of the site visit, please call the following NSSC hot line to determine if NSSC is open at 508-233-4144.
E. This requirement is subject to the availability of funds. Proposals shall be valid for at least 120 days. Please annotate the last day the proposal will be valid. Firms will not be reimbursed for any costs associated with their proposal preparation.
F. The solicitation including any Attachments and Contract Data Requirements Lists (CDRLs) may be downloaded from FedBizOpps at web site https://www.fbo.gov.
G. The Service Contract Act applies.
2. System for Award Management (SAM) – Any Offeror that submits a proposal in response to this solicitation must be registered in the System for Award Management (SAM), in accordance with FAR Clause 52-232-33 and DFARS Clauses 252-2001-7000 and 525.204-7004 Alt A, prior to contract award. Registration information can be found at: https://www.sam.gov/portal/public/SAM.
3. Proposal Submission: The Offeror shall submit a proposal consisting of three (3) volumes. These three volumes shall be labeled, Volume I - Technical Proposal (Factor 1); Volume II -Past Performance (Factor 2); and Volume III- Cost/Price Proposal (Factor 3). Proposal can either be submitted by Hard Copy in separate binders (3 copies of each Volume and one Compact Disk with a PDF file for Volume) or submitted by e-mail to george.h.bernard.civ@mail.mil and michael.w.vincent.civ@mail.mil with a PDF file for each Volume.
A. Volume I Technical (Factor 1) - The technical proposal shall provide a technical description of how the Performance Work Statement (PWS) for Improved Grounds - Landscaping Maintenance services will be successfully accomplished. The Offeror's proposal shall address each below subfactor. No Pricing information shall be submitted in Volume I.
Subfactor 1: Implementation and Resources - Limited to 5 pages
The Offeror shall provide an implementation plan that clearly outlines and identifies the necessary resources (e.g., human resources, technical experience, equipment, etc.), to perform improved grounds maintenance services on the Natick Soldier System Center installation. At a minimum, this plan must address or contain the following:
Narrative of Offeror’s organization, resource teams, years of experience, and qualifications for performing Improved Grounds - Landscaping Maintenance contract services.
Resources for performing all functional requirements as described in the solicitation, to include the use of subcontractors.
Subfactor 2: Personnel Licensing and Training Qualifications, and Insurance
The Offeror shall provide proof of comprehensive/liability insurance along with their proposal.
Offeror shall submit all certifications and licenses required to perform the work including the arborist, transport and disposal of the solid waste removed for installation
Subfactor 3: Quality Control - Limited to 5 pages
The Offeror shall demonstrate a Quality Control Plan. Discuss how quality issues will be dealt with. Include, as a minimum, meetings, inspections, correction of non-compliant work and how to ensure non-recurrence and reporting of quality problems to Government officials. Describe how the quality of any subcontractor's will be monitored.
B. Volume II Past Performance (Factor 2) - Offerors shall submit up to five (5) past or current contracts that are similar in nature to the work that shall be performed.
(1) All information required pertains to all proposed major subcontractors, as well as the Offeror. The Offeror shall submit with its proposal its major subcontractors’ letter(s) of consent allowing the Government to disclose the subcontractors’ past performance to the Offeror during negotiations.
(2) Contract descriptions. Past performance information on no more than 5 contracts (as a prime or subcontractor) over the past five (5) years) which are relevant to the efforts required by this solicitation shall be submitted. The Government may choose to investigate contracts beyond the past five (5) years for the purpose of the evaluation. In addition, any and all contracts terminated in whole or in part during the past five (5) years, to include those currently in the process of such termination are considered relevant and the Offeror shall provide past performance information for those contracts.
Information shall include the following:
- Role as prime or subcontractor
- Place of performance, CAGE Code and DUNS numbers
- Contracting activity, current address, telephone number (verify that these are current)
- Procuring Contracting Officer's name, current telephone number (verify that these are current)
- Technical representative/COR name, current telephone number
- Contract Number
- Contract Type
- Awarded Cost/Price
- Final or projected final cost/price
- Original delivery Period of Performance
- Final or projected final Period of Performance
- Effectiveness of actions taken to resolve past and ongoing performance problems.
(3) Performance. For each of the Contracts described above the Offeror shall describe the objectives achieved detailing how the effort is similar to the requirements of this solicitation. For any contracts which did not/do not meet the original requirements with regard to original cost, schedule, and/or technical performance, the Offeror shall provide a brief explanation of the reason(s) for such shortcomings and any demonstrated corrective actions taken to avoid recurrence. The Offeror shall list each time the delivery schedule was revised, and provide an explanation of why the revision was necessary. The Offeror shall also provide a copy of any cure notices or showcause letters received on each contract listed and description of any corrective action taken. For any contracts terminated for default or cause, the Offeror shall address the reasons for the termination.
(4) The Offeror shall request that each the Contracting activity of the previous contracts to fill out a Performance Risk Assessment Questionnaire (Attachment 1) and submit it by e-mail directly to george.h.bernard.civ@mail.mil prior to the proposal due date and time. The Offeror shall provide a list of Contracting activities including name, phone number, and e-mail address that have been requested to fill out the Performance Risk Assessment Questionnaire.
(5) FAILURE TO SUBMIT A TIMELY PROPOSAL EXACTLY IN ACCORDANCE WITH THE
SUBMISSION INSTRUCTIONS MAY RESULT IN THE OFFEROR’S PROPOSAL BEING
REJECTED AS NONRESPONSIVE OR NONCOMPLIANT AND THEREFORE INELIGIBLE FOR
AWARD CONSIDERATION, AT THE SOLE DISCRETION OF THE GOVERNMENT.
C. Volume III Price Proposal (Factor 3): This volume shall include:
(1) A completed Pricing Schedule. CLINs 0001 through 4003 on pages 3 through 10 are priced in the Pricing Schedule on Pages 11 through 18. The Pricing Schedule shall be filled out for each item for the Base Year and the Four Optional Period of Performances. Pricing shall be provided for each item and all Period of Performances. Also, the Excel Pricing sheet (Attachment 2) shall have the prices entered and the prices shall match the prices that are on the Pricing Schedule. Only a price number shall be enter in the Excel Pricing sheet. No formulas shall be entered into the Excel pricing sheet and there shall be no changes to its format.
(2) A completed and signed Standard Form 1449, with blocks 17 and 30 completed. An official having the authority to bind the firm contractually shall sign the SF1449. If this individual is not an officer of the company, the proposal shall be accompanied by some form of written evidence of the individual's authority to bind the company, under contract, to a particular course of action. This might include such evidence as a written delegation of said authority, signed by an officer of the company.
(3) Annotate compliance with Period of Performance.
(4) Administrative information as required throughout this RFP.
(5) Complete all required clauses FAR Clauses 52.219-1 and 52.219-28.
(6) Complete all the required certifications, representations, and acknowledgments for the Prime Contractor such as FAR Clause 52.212-3.
(7) Acknowledge any amendments to this solicitation. Amendments must be acknowledged by signature of an official having the authority to bind your firm contractually by the completion of the SF1449 or appropriate annotation on the SF1449.
D. Proposals shall be addressed to the following:
Army Contracting Command – Aberdeen Proving Ground Natick Contracting Division (CCAP-SCN) Bldg 1, 3rd Floor ATTN: George Bernard 10 General Greene Avenue Natick, MA 01760
Proposal may also be e-mailed to george.h.bernard.civ@mail.mil
The legend "TO BE DELIVERED UNOPENED to George Bernard”
Offerors shall not submit a transmittal letter with proposals. Such a letter is unnecessary, and statements therein frequently create conflicts or ambiguities.
4. QUESTIONS CONCERNING THIS SOLICITATION.
Questions shall be submitted to George Bernard at george.h.bernard.civ@mail.mil no later than 7 days prior to Request for Proposal closing date. The Government will provide its response through amendments. The Government will not guarantee a response to any question and/or clarifications after the submission deadline.
Questions will not be accepted by telephone and must be submitted by e-mail.
5. INCORPORATION OF PROPOSAL.
Portions of the Contractor's Technical Proposal, as negotiated and accepted by the Government, may be incorporated by reference into the resultant contract. Some or all of the information furnished by the Contractor may be subject to disclosure under the Freedom of Information Act. For this reason the Contractor shall identify information contained in the proposal which the Contractor specifically does not want to be incorporated by reference.
Notwithstanding any rights the Government will receive under the contract to the data being protected under the solicitation, any request for information received under the Freedom of Information Act (5 U.S.C 552) for the resulting contract, including any portion of the proposal that was incorporated into the contract, will be reviewed in accordance with the FOIA statute. The Government will contact the Contractor to identify what information, if any, contained in the contract should be withheld from release to the public. The Contractor will then have to demonstrate that the information is a (1) a trade secret or (2) confidential, commercial information. In case of the latter, the Contractor would have to demonstrate, in detail, that disclosure would (1) impair the Government’s ability to obtain necessary information in the future or (2) cause substantial harm to the Contractor.
Any changes in these arrangements are to be submitted to the Contracting Officer in advance for approval. In the event of any conflict or ambiguity between the Contractor's Technical Proposal and the Government's Performance Work Statement, the PWS takes precedence.
ADDENDUM TO 52.212-4
1. PERFORMANCE WORK STATEMENT
1.1 Introduction. This contract provides for Improved Grounds - Landscaping Maintenance services to areas located on the US Army Soldier System Center in Natick, Massachusetts. The goal is to support mission accomplishment by providing well maintained grounds for users and visitors to the installation. To meet this goal, close coordination is required between the Contractor and Contracting Officer’s Representative (COR) to efficiently provide grounds maintenance while minimizing disruptions to operations within facility areas and meeting security requirements. Specific areas receiving grounds maintenance under this contract may be changed as facilities are built, use of facilities changes, and facilities are taken out of service. Grounds Maintenance activities will typically occur during the eight month growing period of April through November, however, services may be required by the Government earlier than April, or extend beyond November, depending on weather and ground conditions. If required, the contract will be modified accordingly.
1.1.1 The Government intends for this contract to be a performance based contract.
1.1.2 Organization of the Performance Work Statement (PWS)
1.1.2.1. Sections:
1.1 Introduction
1.2 Scope of Work
1.3 General Information
1.4 Quality Control and Performance Assessment
1.5 Specific Tasks for Improved Grounds Maintenance
1.6 Government Furnished Property, Equipment, Supplies, and Services
1.7 Contractor Furnished Equipment, Supplies, and Services
1.1.2.2. Technical Exhibits:
Technical Exhibit (TE) 1 - Tasks and Frequencies Technical Exhibit (TE) 2 - Installation Land Use Summary
1.1.2.3. Appendices
Appendix A - Deliverables Schedule of Reports Appendix B - Applicable Publications and Forms Appendix C - Definitions Appendix D - Acronyms
1.1.2.4. Licenses, Permits and Bonds. The Contractor shall provide at his own expense all licenses, permits and bonds as required by the State, Counties and Municipalities through where he will operate in the transport and disposal of the solid waste removed under the terms of this contract.
1.2. Scope of Work.
1.2.1. The Contractor shall provide all personnel, management, administrative support, labor, equipment, tools, supplies, transportation, and other items and services necessary to perform Improved Grounds Maintenance as defined in this Performance Work Statement (PWS) except as specified in Section 1.6 as Government furnished. The Contractor shall perform grounds maintenance to the standards in this contract and in a manner that will maintain a satisfactory area condition and present a clean, neat, and professional appearance.
1.2.2. All work performed by the contractor shall be in accordance with all applicable laws, regulations (including AR 420-1), and commercial practices.
1.2.3. Scheduled Improved Grounds Maintenance Services.
1.2.3.1. Technical Exhibit (TE) 1 identifies the specific tasks and frequencies requested. The Contractor shall be notified in writing what capability level of work will be required for the particular service type. See TE 1 for capability levels.
1.2.4. Project Improved Grounds Maintenance Services. The project services listed in TE 1 will be provided by the Contractor based on the pricing established by this contract.
1.2.4.1 Some project service requirements identified during the contract period may be above and beyond any regularly-scheduled improved grounds maintenance services (i.e. special events, visits by dignitaries, etc.).
1.2.5. Installation-Specific Improved Grounds Maintenance Services. Specific services will be provided based on the task list on TE 1. These services will address installation specific requirements.
1.2.6. The Contracting Officer reserves the right to add and/or delete areas receiving service and thereby may increase or decrease services throughout the life of this contract.
1.2.6.1. The Contracting Officer reserves the right to make contract adjustments as a result of area closures, emergencies, etc.
1.2.7. Cease Operations. The Government has the right to cease operations at any time due to weather conditions.
1.2.8. Holiday and Unsafe Weather or Other Delays. Work delays due to Federal holidays, unsafe weather conditions, and/or other causes beyond the Contractor's control (including access to work areas, vehicles in parking lots overhanging curbs in grass areas) shall not constitute grounds for continued nonperformance.
Contractor is responsible for all tasks and maintaining these areas in a timely manner and shall notify the Contracting Officers Representative (COR) of problems regarding access to work areas. Rainfall is not adequate reason for additional days in the performance period. For unsafe weather conditions, delays are only acceptable if the area to be serviced was recently flooded or there are safety concerns due to imminent lightning. Flooded areas should be avoided and noted for COR concurrence, and serviced appropriately when safe to do so. Any work performed beyond normal duty hours and/or non-scheduled days shall be performed at no additional cost to the Government and shall be coordinated with the COR.
1.2.9. Daily Progress Reports. The Contractor shall provide to the COR a list of the areas where the services performed the previous day(s) are ready for inspection. Areas ready for inspection will be inspected the day after being serviced, with the exception of areas serviced on Friday and Saturday, which will be inspected on the following workday. Services that do not conform to the contract requirements shall be re-performed within 24 hours after the COR provides verbal or written notification of defect.
1.3. General Information.
1.3.1. Personnel
1.3.1.1. Project Manager. The Contractor shall provide a Project Manager who shall be responsible for the overall management, coordination, and performance of work under this contract. The name of this person and alternate(s) who shall act for the Contractor when the manager is absent shall be designated in writing to the Contracting Officer. During the manager’s absence, the alternate will exercise the same authority as the Project Manager.
1.3.1.1.1. The Project Manager shall be fully qualified in the management and coordination of this contract. The Project Manager shall have a minimum of three (3) years of experience in the supervision of personnel providing grounds maintenance services.
1.3.1.1.2. The Project Manager, or alternate, shall be available by commercial telephone or cellular telephone during normal duty hours, Monday through Friday, excluding Federal holidays. The Contractor shall provide phone numbers for normal duty hours and after-hours to the Contracting Officer and the Contracting Officer’s Representative (COR) for the Project Manager and alternate(s). Pagers, beepers, and answering machines are not an acceptable means of communication.
1.3.1.2. Quality Control. The Project Manager will be responsible for overall quality control management. The Contractor shall develop and maintain an effective Quality Control Plan (QCP) in accordance with CDRL A002 to ensure services are performed in accordance with (IAW) this PWS.
The QCP shall be forwarded to and accepted by the Contracting Officer. The Quality Control Plan shall be effective for the life of the contract. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of deficiencies. The Contractor’s QCP is the means by which the Contractor assures that the work complies with the requirement of the contract.
1.3.1.3. The Government has the right to restrict the employment under the contract of any contractor employee, or prospective contractor employee, who is identified as a potential to the health, safety, security, general well being, or operational mission of the installation or its population.
1.3.1.4. Personnel Roster. The Contractor shall provide a roster of personnel who will perform services under this contract to the Contracting Officer and COR, no later than ten (10) workdays prior to commencing work. Personnel roster shall include the employee’s full name and position to be held.
Personnel roster shall be updated and provided to the COR within ten (10) calendar days if personnel changes occur. The personnel roster shall identify any personnel assigned to provide Improved Grounds Maintenance Services in special security areas. If required, the Government will perform a National Agency Check (NAC) on these personnel.
1.3.1.4.1. Personnel Security Requirements. The Contractor shall comply with Government personal identity verification procedures implemented in Homeland Security Presidential Directive (HSPD) – 12, Office of Management and Budget (OMB) Guidance M-05-24, and Federal Information Processing Standards Publication (FISP PUB) number 201.
https://www.dhs.gov/homeland-security-presidential-directive-12.
1.3.1.5. The Contractor personnel shall meet the following requirements:
1.3.1.5.1. All Contractor Managers and Crew Leaders shall be legal residents of the United States and shall able to read, write, speak, and understand English.
1.3.1.5.2. The Contractor employees shall be legal residents of the United States, qualified, possess the skills, knowledge, and training to satisfactorily perform the services required by the contract and shall be physically able to do the assigned work.
1.3.1.5.3. Personnel performing work under this contract shall remain employees of the Contractor and not be considered employees of the Government.
1.3.1.6. The Contractor personnel operating any vehicle in performance of this contract shall have current, valid driver’s licenses.
1.3.1.7. Identification of Personnel. Each employee shall have a clearly readable picture for identification. This installation issues a Government issued badge and/or gate pass.
1.3.1.7.1. At all times during contract performance, contractor name and company logo shall be visible on either contractor equipment or worn as outer wear on a shirt or vest by contractor personnel.
1.3.1.8. Appearance of Personnel. Contractor personnel shall present a neat and professional appearance at all times. Contractor personnel shall remain fully clothed at all times while performing under this contract. Offensive pictures, sayings, tank tops, tee shirts, shorts, and spandex or similar fabric worn as outerwear are strictly prohibited.
1.3.1.9. Conduct of Personnel. Contractor personnel’s conduct shall not reflect discredit upon the Garrison or the Department of the Army. The Contractor shall remove any employee from the jobsite for reasons of misconduct, security, or found to be or suspected to be under the influence of alcohol, drugs, or other incapacitating agents. The removal of such a person from the job site shall not relieve the Contractor of the requirement to provide sufficient personnel to perform adequate and timely
1.3.1.10. The Contractor shall not employ any person who is an employee of the United States Government, if the employment of that person would create a conflict of interest, nor shall the contractor employ any person who is an employee of the Department of the Army, either military or civilian, unless such person seeks and receives approval in accordance with the Department of the Army, Standards of Ethical Conduct Rules.
1.3.1.11. Post Regulations. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance.
1.3.1.12. Contractor Notification. The Contractor shall be notified by the COR to perform the necessary services requested. As a general rule, the Contractor shall be notified one week prior to any requested work to be performed. For special events and Very Important Person (VIP) visits, the Contractor shall receive a three (3) working day notice for services.
1.3.2. Security
1.3.2.1. Installation Access and Control. This installation is a closed post with access restrictions. All vehicles and personnel are subject to search and seizure of contraband and/or unauthorized Government property. Contractor vehicles (Contractor-owned and personal), Contractor personnel, and their personal property shall be subject to inspections and searches upon entering or leaving the Installation as authorized in AR 190-5. Search and seizure provisions of AR 190-22 shall also apply to Contractor personnel accessing this installation in performance of this contract. The Contractor may be subject to installation closure exercises that may have an impact on performance.
1.3.2.2. Physical Security. The Contractor shall be responsible for safeguarding all Government property provided to the Contractor. At the close of each work period, Government areas, equipment, and materials shall be secured.
1.3.2.3. Restricted Access Areas. Compliance by the Contractor shall be mandatory for security access requirements to designated restricted areas. Work in restricted areas shall be cleared by the Contractor with the Government’s Security officer for that area. The Contractor shall submit a roster of employees requiring access to those areas within ten (10) days after contract award. The list shall include the employee name, date of birth, driver’s license number, and state. The Contractor shall coordinate with the COR for contractor employees to complete additional safety training for working in and around potentially hazardous areas.
1.3.3. Hours of Operation.
1.3.3.1. The Contractor shall perform work under this contract between 7:30 a.m. and 5:00 p.m. (local time), Monday through Friday, excluding legal public holidays.
1.3.3.2. Project Improved Grounds Maintenance (Special Events, Routine, and Emergency) shall be performed when ordered.
1.3.3.3. Work may be performed during non-operating hours when approved by the COR. The Contractor shall submit a written request to the Contracting Officer a minimum of two (2) working days in advance when requesting to perform work on days other than Monday through Friday. The written request shall state the type of work, areas where the work will be performed, and hours of performance.
1.3.3.4. The Government reserves the right to orally re-schedule contracted operations throughout the period of performance of this contract. When possible, the Contracting Officer or COR will notify the Contractor a minimum of twenty-four (24) hours prior to implementation of required re-scheduling of contracted operations. Verbal schedule changes may be issued to the Contractor, when in the opinion of the Contracting Officer, continued operation of servicing equipment could cause damage to Government property.
1.3.3.5. The Government reserves the right to assign specific hours of operation to certain areas due to security and military missions, and to change the status of secure areas due to mission changes.
1.3.3.6. Any changes in hours of operation will be effective three (3) working days after Contractor notification.
1.3.3.7. Contractor’s personnel will be allowed access to areas under contract to perform scheduled service or project work subject to the limitations in this contract.
1.3.4. Conservation of Utilities. The Contractor shall instruct employees in utilities conservation practices.
1.3.5. Safety Requirements.
1.3.5.1. The Contractor shall maintain records of accidents and shall report to the Contracting Officer and Contracting Officer’s Representative (COR) any accident resulting in death, traumatic injury, occupational disease, or property damage within 24 hours of each occurrence while performing services under this contract.
1.3.5.2. Reporting of Fire and Safety Hazards. The Contractor shall train his personnel to recognize fire and safety hazards and encourage personnel in the performance of their duties to report fire, safety hazards, and unsafe conditions to their supervisor. The Contractor shall take corrective action to remedy reported deficiencies in accordance with the terms of this contract. The Contract Officer and/or COR shall be notified within one hour of unsafe deficiencies beyond the terms of this contract.
1.3.5.3. Environment and Occupational Safety and Health Administration (OSHA). The Contractor shall comply with all local, state, and federal environmental and occupational safety laws, rules, and regulations. The Contractor shall notify the Contracting Officer or COR verbally and in writing of any apparent conflict between compliance with such local, state and federal laws, rules and regulations, and compliance with the requirements of the contract. The Contractor shall be liable for all fines, penalties, and costs which result from violations of, or failure to comply with, all such local state, or federal laws, rules, and regulations. All unsafe acts or conditions fostered by the Contractor or Contractor personnel may be grounds for the Contracting Officer or COR to halt all Contractor performance with a commensurate deduction of monies due the Contractor until such unsafe conditions are corrected. The Contractor shall take due caution not to endanger personnel during performance of this contract. Upon discovery of any hazard, including fire or oil and/or hazardous material spill, the Contractor shall immediately notify the Contracting Officer or COR and the DPW- Environmental Health Office (EHO) and shall perform all actions described in Section 1.11 Protection of the Environment.
1.3.5.4. Equipment Safety.
1.3.5.4.1. All equipment used in the performance of this contract shall be kept intact and in good condition at all times. The Contractor shall comply with OSHA requirements and pertinent provisions of the publication, “Safety and Health Requirements”, EM 385-1-1, Department of the Army, Corps of Engineers.