Questions and Answers for W911QX27QA002.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
Removal and Replacement of existing Culligan water treatment systems located at various facilities on Spesutie Island
Solicitation number
W911QX27QA002
Issued by

About this file

This is a Questions and Answers document for solicitation W911QX27QA002, addressing technical inquiries regarding the removal and replacement of existing Culligan water treatment systems at 14 building locations on Spesutie Island, Aberdeen Proving Ground, Maryland. The Q&A document provides critical technical specifications that inform bidders on site conditions and system requirements, including: maximum required flow rate of 8-12 gallons per minute at each location, raw-water source identified as well water, required finished-water quality meeting Safe Drinking Water Act standards, facility pipe size of 1 inch at the treatment-system connection point, available feed-water pressure of 30-50 PSI, and confirmation that existing electrical power is sufficient for the new systems with local drain availability. The document references that existing-system model/capacity data, site-specific layouts, photographs, and dimensions are available in an attachment posted in Amendment 1. Water analysis for the 14 individual building locations is noted as not applicable to the inquiry response.

This Q&A document supports the RFQ issued by the Department of the Army Materiel Command, Army Contracting Command Aberdeen Proving Ground (NAICS 238220, Class Code J046), which is set aside 100% for small businesses with a $19 million size standard. The solicitation requires offers within three business days of posting, with delivery and installation mandated within fourteen calendar days of contract award. The contractor must provide all labor, supervision, materials, and equipment necessary to complete the water treatment system replacement per the Performance Work Statement dated October 5, 2026. Amendment 2 officially released these vendor Q&A responses and extended the proposal due date to allow adequate time for quote submission.

View the file

Other files

File Type Posted
Medallist Softener.pdf PDF
Medallist Filter.pdf PDF
Combination Synopsis-Solicitation for Commerical Purchase (1).docx DOCX document
Provisions and Clauses Full Text Attachment.pdf PDF
ADLEPHI LOCAL INSTRUCTIONS.docx DOCX document
PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

QUESTIONSANSWERS
Water analysis for each of the 14 building locationsNot Applicable
Maximum required flow rate at each location8-12 gallons per minute
Any available existing-system model/capacity information, site-specific layouts, photographs, or dimensionsSee Attachment posted in Amendment 1
Raw-water source and water analysisWell water
Required finished-water qualityDrinking water quality standards enforced under the Safe Drinking Water Act
Facility pipe size at the treatment-system connection1 inch pipe
Available feed-water pressure30-50 PSI
Existing-system model/capacity data, layouts, photographs, and dimensionsSee Attachment posted in Amendment 1
Whether the existing electrical power is acceptable for supplying the new systemsYes, existing power supply is sufficient
Whether a drain is available and its flow capacityYes, local to drains

File details come from the government source that posted it. Updated .