A01_-_DD1423.doc
DOC document 164 KB Posted
- Solicitation number
- W911QX-16-T-0004
About this file
Draft 1423s
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A07_-_Solicitation_(Amendments).docx | DOCX document | |
| A07_-_Solicitation_Q As.xlsx | XLSX spreadsheet | |
| A01_-_Salient_Characteristics.doc | DOC document | |
| A07_-_Executive_Summary_Solicitation.docx | DOCX document | |
| A07_-_Solicitation_(Amendments).docx | DOCX document | |
| Questions_and_Answers_Solicitation_W911QX-16-T-0004.docx | DOCX document | |
| A01_-_Salient_Characteristics.doc | DOC document | |
| A07_-_Evaluation_Criteria_(LPTA).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Template last updated 02/27/2015
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: MISC
D. SYSTEM/ITEM
HWCVD System
E. CONTRACT/PR NO.
10729145
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
Pre-Installation Acceptance Tests Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711A
5. CONTRACT REFERENCE
C.7.1
6. REQUIRING OFFICE
RDRL-SEE-I
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
TBD
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
BLK16
14.
DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION BLK16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4: IN ADDITION TO PAPER COPIES, EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.
BLK 12: THE CONTRACTOR SHALL DELIVER THE PRE-INSTALLATION ACCEPTANCE TESTS REPORT NLT ONE (1) WEEK OF THE ACCEPTANCE TESTING.
BLK 13: THE CONTRACTOR SHALL DELIVER THE REVISED PRE-INSTALLATION ACCEPTANCE TESTS REPORT NLT ONE (1) WEEK AFTER COR REVIEW
RDRL-SEE-I REPORT COPY TO BE SENT TO:
U.S. ARMY RESEARCH LABORATORY
RDRL-SEE I (William Benard)
2800 POWDER MILL RD.
ADELPHI, MD 20783-1197
| RDRL-SEE-I |
| 1 |
| 2 |
| 1 |
15. TOTAL
| 2 |
| 1 |
G. PREPARED BY
William Benard
H. DATE
7/8/15
I. APPROVED BY
Fatimata Diallo
J. DATE
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED.
Page 1 of 5 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: MISC
D. SYSTEM/ITEM
HWCVD System
E. CONTRACT/PR NO.
10729145
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
Post-installation Acceptance Tests Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711A
5. CONTRACT REFERENCE
C.7.2
6. REQUIRING OFFICE
RDRL-SEE-I
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
TBD
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
BLK16
14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION BLK16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4: IN ADDITION TO PAPER COPIES, EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.
BLK 12: THE CONTRACTOR SHALL DELIVER THE POST-INSTALLATION ACCEPTANCE TESTS REPORT NLT ONE (1) WEEK AFTER THE POST-INSTALLATION TESTING.
BLK 13: THE CONTRACTOR SHALL DELIVER THE REVISED POST-INSTALLATION ACCEPTANCE TESTS REPORT NLT ONE (1) WEEK AFTER COR REVIEW
RDRL-SEE-I REPORT COPY TO BE SENT TO:
U.S. ARMY RESEARCH LABORATORY
RDRL-SEE I (William Benard)
2800 POWDER MILL RD.
ADELPHI, MD 20783-1197
| RDRL-SEE-I |
| 1 |
| 2 |
| 1 |
15. TOTAL
| 2 |
| 1 |
G. PREPARED BY
William Benard
H. DATE
7/8/15
I. APPROVED BY
J. DATE
Page 2 of 5 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ___X___ OTHER:
D. SYSTEM/ITEM
HWCVD System
E. CONTRACT/PR NO.
10729145
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
System Schematic Drawings/Operation Manual
4. AUTHORITY (Data Acquisition Document No.)
DI-ILSS-80872
5. CONTRACT REFERENCE
C.7.2
6. REQUIRING OFFICE
RDRL-SEE-I
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
TBD
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
BLK16
14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4: MANUAL SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.
BLK 12: THE CONTRACTOR SHALL DELIVER THE SYSTEM SCHEMATIC DRAWINGS/OPERATION MANUAL AT THE TIME OF DELIVERY.
RDRL-SEE-I REPORT COPY TO BE SENT TO:
U.S. ARMY RESEARCH LABORATORY
RDRL-SEE I (William Benard)
2800 POWDER MILL RD.
ADELPHI, MD 20783-1197
RDRL-SEE-I
15. TOTAL
G. PREPARED BY
William Benard
H. DATE
7/8/15
I. APPROVED BY
J. DATE
Page 3 of 5 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: MISC
D. SYSTEM/ITEM
HWCVD System
E. CONTRACT/PR NO.
10729145
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
Consumable Parts and Materials List
4. AUTHORITY (Data Acquisition Document No.)
DI-ILSS-80867
5. CONTRACT REFERENCE
C.7.2
6. REQUIRING OFFICE
RDRL-SEE-I
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
TBD
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
BLK16
14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4: IN ADDITION TO PAPER COPIES, EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.
BLK 12: THE CONTRACTOR SHALL DELIVER THE CONSUMABLE PARTS AND MATERIALS LIST AT THE TIME OF DELIVERY.
RDRL-SEE-I REPORT COPY TO BE SENT TO:
U.S. ARMY RESEARCH LABORATORY
RDRL-SEE I (William Benard)
2800 POWDER MILL RD.
ADELPHI, MD 20783-1197
RDRL-SEE-I
15. TOTAL
G. PREPARED BY
H. DATE
7/8/15
I. APPROVED BY
J. DATE
Page 4 of 5 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: MISC
D. SYSTEM/ITEM
HWCVD System
E. CONTRACT/PR NO.
10729145
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
Factory Settings List
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80652
5. CONTRACT REFERENCE
C.7.2
6. REQUIRING OFFICE
RDRL-SEE-I
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
TBD
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
BLK16
14.
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4: EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.
BLK 12: THE CONTRACTOR SHALL DELIVER THE FACTORY SETTINGS AT THE TIME OF DELIVERY.
RDRL-SEE-I REPORT COPY TO BE SENT TO:
U.S. ARMY RESEARCH LABORATORY
RDRL-SEE I (William Benard)
2800 POWDER MILL RD.
ADELPHI, MD 20783-1197
RDRL-SEE-I
15. TOTAL
G. PREPARED BY
H. DATE
7/8/15
I. APPROVED BY
J. DATE
Page 5 of 5 Pages
EXHIBIT A – ATTACHMENT 1
ARMY RESEARCH LABORATORY
Report Title Goes Here
Any Subtitles Go Here
By Some Author and Another Author
Month XXXX
Prepared by
Whatever Technology Corporation
0000 Research Drive
Anywhere, ST 20006-1000
Under contract
W911QX-15-D-0017
DISTRIBUTION STATEMENT GOES HERE
EXHIBIT A – ATTACHMENT 2
The findings in this report are not to be construed as an official Department of the Army position unless so designated by other authorized documents.
Citation of manufacturer's or trade names does not constitute an official endorsement or approval of the use thereof.
DESTRUCTION NOTICE: For classified documents, follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual, Chapter 5, Section 7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
File details come from the government source that posted it. Updated .