About this file

Draft 1423s

View the file

Other files

File Type Posted
A07_-_Solicitation_(Amendments).docx DOCX document
A07_-_Solicitation_Q As.xlsx XLSX spreadsheet
A01_-_Salient_Characteristics.doc DOC document
A07_-_Executive_Summary_Solicitation.docx DOCX document
A07_-_Solicitation_(Amendments).docx DOCX document
Questions_and_Answers_Solicitation_W911QX-16-T-0004.docx DOCX document
A01_-_Salient_Characteristics.doc DOC document
A07_-_Evaluation_Criteria_(LPTA).doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Template last updated 02/27/2015

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: MISC

D. SYSTEM/ITEM

HWCVD System

E. CONTRACT/PR NO.

10729145

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Scientific and Technical Reports

3. SUBTITLE

Pre-Installation Acceptance Tests Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80711A

5. CONTRACT REFERENCE

C.7.1

6. REQUIRING OFFICE

RDRL-SEE-I

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

TBD

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

BLK16

14.

DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION BLK16

Draft
Final
Reg
Repro

16. REMARKS

BLK 4: IN ADDITION TO PAPER COPIES, EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.

BLK 12: THE CONTRACTOR SHALL DELIVER THE PRE-INSTALLATION ACCEPTANCE TESTS REPORT NLT ONE (1) WEEK OF THE ACCEPTANCE TESTING.

BLK 13: THE CONTRACTOR SHALL DELIVER THE REVISED PRE-INSTALLATION ACCEPTANCE TESTS REPORT NLT ONE (1) WEEK AFTER COR REVIEW

RDRL-SEE-I REPORT COPY TO BE SENT TO:

U.S. ARMY RESEARCH LABORATORY

RDRL-SEE I (William Benard)

2800 POWDER MILL RD.

ADELPHI, MD 20783-1197

RDRL-SEE-I
1
2
1

15. TOTAL

2
1

G. PREPARED BY

William Benard

H. DATE

7/8/15

I. APPROVED BY

Fatimata Diallo

J. DATE

DD FORM 1423-1, FEB 2001

PREVIOUS EDITION MAY BE USED.

Page 1 of 5 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: MISC

D. SYSTEM/ITEM

HWCVD System

E. CONTRACT/PR NO.

10729145

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Scientific and Technical Reports

3. SUBTITLE

Post-installation Acceptance Tests Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80711A

5. CONTRACT REFERENCE

C.7.2

6. REQUIRING OFFICE

RDRL-SEE-I

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

TBD

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

BLK16

14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION BLK16

Draft
Final
Reg
Repro

16. REMARKS

BLK 4: IN ADDITION TO PAPER COPIES, EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.

BLK 12: THE CONTRACTOR SHALL DELIVER THE POST-INSTALLATION ACCEPTANCE TESTS REPORT NLT ONE (1) WEEK AFTER THE POST-INSTALLATION TESTING.

BLK 13: THE CONTRACTOR SHALL DELIVER THE REVISED POST-INSTALLATION ACCEPTANCE TESTS REPORT NLT ONE (1) WEEK AFTER COR REVIEW

RDRL-SEE-I REPORT COPY TO BE SENT TO:

U.S. ARMY RESEARCH LABORATORY

RDRL-SEE I (William Benard)

2800 POWDER MILL RD.

ADELPHI, MD 20783-1197

RDRL-SEE-I
1
2
1

15. TOTAL

2
1

G. PREPARED BY

William Benard

H. DATE

7/8/15

I. APPROVED BY

J. DATE

Page 2 of 5 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ___X___ OTHER:

D. SYSTEM/ITEM

HWCVD System

E. CONTRACT/PR NO.

10729145

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Scientific and Technical Reports

3. SUBTITLE

System Schematic Drawings/Operation Manual

4. AUTHORITY (Data Acquisition Document No.)

DI-ILSS-80872

5. CONTRACT REFERENCE

C.7.2

6. REQUIRING OFFICE

RDRL-SEE-I

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

TBD

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

BLK16

14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION N/A

Draft
Final
Reg
Repro

16. REMARKS

BLK 4: MANUAL SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.

BLK 12: THE CONTRACTOR SHALL DELIVER THE SYSTEM SCHEMATIC DRAWINGS/OPERATION MANUAL AT THE TIME OF DELIVERY.

RDRL-SEE-I REPORT COPY TO BE SENT TO:

U.S. ARMY RESEARCH LABORATORY

RDRL-SEE I (William Benard)

2800 POWDER MILL RD.

ADELPHI, MD 20783-1197

RDRL-SEE-I

15. TOTAL

G. PREPARED BY

William Benard

H. DATE

7/8/15

I. APPROVED BY

J. DATE

Page 3 of 5 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: MISC

D. SYSTEM/ITEM

HWCVD System

E. CONTRACT/PR NO.

10729145

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Scientific and Technical Reports

3. SUBTITLE

Consumable Parts and Materials List

4. AUTHORITY (Data Acquisition Document No.)

DI-ILSS-80867

5. CONTRACT REFERENCE

C.7.2

6. REQUIRING OFFICE

RDRL-SEE-I

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

TBD

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

BLK16

14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION N/A

Draft
Final
Reg
Repro

16. REMARKS

BLK 4: IN ADDITION TO PAPER COPIES, EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.

BLK 12: THE CONTRACTOR SHALL DELIVER THE CONSUMABLE PARTS AND MATERIALS LIST AT THE TIME OF DELIVERY.

RDRL-SEE-I REPORT COPY TO BE SENT TO:

U.S. ARMY RESEARCH LABORATORY

RDRL-SEE I (William Benard)

2800 POWDER MILL RD.

ADELPHI, MD 20783-1197

RDRL-SEE-I

15. TOTAL

G. PREPARED BY

H. DATE

7/8/15

I. APPROVED BY

J. DATE

Page 4 of 5 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collecton of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: MISC

D. SYSTEM/ITEM

HWCVD System

E. CONTRACT/PR NO.

10729145

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Scientific and Technical Reports

3. SUBTITLE

Factory Settings List

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80652

5. CONTRACT REFERENCE

C.7.2

6. REQUIRING OFFICE

RDRL-SEE-I

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

TBD

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

BLK16

14.

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION N/A

Draft
Final
Reg
Repro

16. REMARKS

BLK 4: EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FILE TRANSFER PROTOCOL (FTP), CD-ROM AND DVD-ROM.

BLK 12: THE CONTRACTOR SHALL DELIVER THE FACTORY SETTINGS AT THE TIME OF DELIVERY.

RDRL-SEE-I REPORT COPY TO BE SENT TO:

U.S. ARMY RESEARCH LABORATORY

RDRL-SEE I (William Benard)

2800 POWDER MILL RD.

ADELPHI, MD 20783-1197

RDRL-SEE-I

15. TOTAL

G. PREPARED BY

H. DATE

7/8/15

I. APPROVED BY

J. DATE

Page 5 of 5 Pages

EXHIBIT A – ATTACHMENT 1

ARMY RESEARCH LABORATORY

Report Title Goes Here

Any Subtitles Go Here

By Some Author and Another Author

Month XXXX

Prepared by

Whatever Technology Corporation

0000 Research Drive

Anywhere, ST 20006-1000

Under contract

W911QX-15-D-0017

DISTRIBUTION STATEMENT GOES HERE

EXHIBIT A – ATTACHMENT 2

The findings in this report are not to be construed as an official Department of the Army position unless so designated by other authorized documents.

Citation of manufacturer's or trade names does not constitute an official endorsement or approval of the use thereof.

DESTRUCTION NOTICE: For classified documents, follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual, Chapter 5, Section 7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

File details come from the government source that posted it. Updated .