About this file

This document is an environmental requirements checklist for a federal contract opportunity to replace 250VDC rectifiers and associated equipment. The contract requires replacing five 250VDC rectifiers and associated transformers in various buildings, installing new cable and conduit as needed for AC and DC terminations. The solicitation is issued by the Department of the Army Materiel Command Contracting Command Detroit Arsenal. Offerors must comply with Service Contract Labor Standards wage determinations and designate an environmental compliance designee. The statement of work and David Fischer listed as contracting officer representative are incorporated by reference.

View the file

Other files for this federal contract opportunity

Other files attached to Replace 250VDC Rectifiers & Associated Equipment, newest first.
File Type Posted
SK-002-DJF-20220721_R0_B110 Plan Elevation View 1A3.pdf PDF
W911PT23Q0044 - Solicitaiton.pdf PDF
UFGS 33 71 02 - Underground Electrical Distribution.pdf PDF
UFGS 26 05 19.10 10 - Insulated Wire and Cable.pdf PDF
26 05 53 - Identification For Electrical Systems.docx DOCX document
03 01 00 - CONCRETE Slabs-Pads-Small Jobs.docx DOCX document
SK-005-DJF-20220721_R0_B35 PlanElevation View 3B2.pdf PDF
SK-006-DJF-20220721_R0_B35 Substation OneLine 3B2.pdf PDF
UFGS 03 30 00 - Cast-In-Place Concrete.pdf PDF
UFGS 26 05 00.00 40 - Common Work Results for Electrical.pdf PDF
26 05 26 - Grounding And Bonding For Electrical Systems.docx DOCX document
SK-004-DJF-20220721_R0_B110 DC Rectifier3 Cables.pdf PDF
UFGS 26 23 00_Low-Voltage Switchgear.pdf PDF
9PW239_QASP Over 150k_Rev.0_Signed.pdf PDF
SK-001-DJF-20220721_R1_B135 PlanElevation View - 1B4.pdf PDF
SK-003-DJF-20220721_R0_B110 Substation OneLine 1A3.pdf PDF
UFGS 02 41 00 - Demolition.pdf PDF
UFGS 26 00 00.00 20 - Basic Electrical Materials and Methods.pdf PDF
33 70 02 - Underground Electric Duct Banks.docx DOCX document
26 05 05 - General Provisions For Electrical Systems.docx DOCX document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS

(Identify Section Location)

N/A

6. Reporting Noncompliance

7. Verification of National Environmental Policy Act Documents

8. Conformance with Environmental Management System

9. Assignment of Environmental Compliance Designee (ECD)

10. Competency Training for Contractor Personnel

11. Generation of Solid Waste

12. Generation of Hazardous Waste

13. Use of Hazardous Materials

14. Prevention of Storm Water Pollution

15. Low Impact Design

5. Inspection of Work Sites

APPENDIX 1

Environmental Requirements Package Review Checklist Cover Sheet

SECTION I

Purpose

Purpose of checklist cover sheet: To document the review of the requirements Performance Work Statement (PWS), packages and any applicable source selection evaluation criteria for environmental protection matters.

AMC requirement: Inclusion of a signed Environmental Requirements Package Review Checklist Cover Sheet is required in all packages, except for:

1. Supply contracts under the simplified acquisition level threshold ($150,000)

2. Supply contracts that do not involve the purchase of hazardous materials (HM) requiring a Safety Data Sheet (SDS)

IAW 29 CFR 1910.1200

3. Parts contracts that do not involve the purchase of HM requiring a SDS IAW 29 CFR 1910.1200

4. Field ordering officer actions

5. Government Purchase Card purchases.

Mandatory review and signature: The organization must review each requirements package prior to submission to the supporting contracting activity to include coordination with other staff as appropriate per Section II below. The Requiring Activity's Action Officer of a requirement PWS package must complete and sign the Checklist Cover Sheet as well as coordinate with appropriate subject matter experts (SMEs) as necessary to evaluate Section II prior to submitting the package to the supporting contracting activity.

SECTION II

Performance Work Statement (PWS)

If there is specific language in the requirements PWS package that addresses the requirement related to the standard provision, then check "PWS. Note: At a minimum all contracts that meet the threshold specified in Section I must meet or exceed the environmental requirements contained in Section III - Performance Work Statement Requirements unless exempted a position of authority such as Director of Engineering & Public Works or equivalent position thereof.

Performance Work Statement (PWS) Requirements

1. Compliance with Environmental Laws and Regulations

2. Compliance with Green Procurement Requirements

3. Compliance with License and Certification Requirements

4. Notification of Federal and State Regulators

16. Use of Pesticides

17. Protection of Worksite Resources

18. Prevention of Spills

19. Protection of Sensitive Areas

SECTION III

Performance Work Statement (PWS) Requirements

1. Compliance with Environmental Laws and Regulations: Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of-Forces Agreement. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR).

20. Corrective Action for Noncompliance

21. Noise

22. Mercury Materials

2. Compliance with Green Procurement Requirements: Contractor shall follow Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) and Army Contracting Command Quick Guide (https://acc.aep.army.mil/accapps/ACCMAP/Documents/Quick-Guide-for-Sustainable-Procurement.docx) for acquisition of building materials and products and select materials that have a long life cycle; the least toxic materials; recyclable materials; materials that are resource-efficient; materials with the maximum recycled content; materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse.

3. Compliance with License and Certification Requirements: Contractor shall obtain all license and certification required by Federal, State, and Local environmental laws and regulations necessary to adhere to the specifications of this contract. The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority and/or agency as necessary to adhere to the specification of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws and/or regulations shall be considered a contract deliverable upon award.

4. Notification of Federal and State Regulators: Contractor shall immediately notify the Designated Government Representative (DGR) and COR of the arrival on site of any Federal, State, and/or DoD environmental regulator or enforcement agent and/or the receipt of any correspondence from a Federal or State environmental agency.

5. Inspections of Work Sites: Contractor shall submit to potential Federal, State, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements. If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality.

6. Reporting Noncompliance: Contractor shall immediately report any nonconformance and/or noncompliance with applicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies to the COR and DGR.

23. Universal Waste / e-Waste Management

24. Pollution Prevention / Hazardous Waste Minimization

PWS requirements reflected in Section III are not all inclusive. They are meant to be used as supplemental information to Section II and PWS examples to be modified.

7. Verification of National Environmental Policy Act Documents: Contractor shall obtain from the COR or DGR, a copy of AMC's National Environmental Policy Act Policy and 32 CFR 651 which addresses actions to be taken by contractor. These documents include but is not limited to the analysis-associated decision document of an Environmental Impact Statement and Record of Decision; Environmental Assessment and Finding of No Significant Impact or Notice to Proceed; or Record of Environmental Consideration on the proposed contract actions prior to commencement of such actions.

8. Conformance with Environmental Management System: Contractor shall take the necessary actions to identify, monitor, and control those contract operations and activities that pose risk of contamination, or can negatively impact the natural and/or human environment.

9. Assignment of Environmental Compliance Designee (ECD): Contractor shall appoint an ECD for all contract work periods exceeding 180 consecutive days. Contractor shall appoint a primary and alternate ECD for each production, shop or work area that uses and/or stores hazardous materials and/or generates hazardous wastes. Contractor ECDs shall monitor implementation of all environmental regulatory requirements, report all environmental noncompliance to the work site supervisor, correct all environmental noncompliance, and verify implementation of directed actions to correct identified environmental noncompliance. Contractor shall have at least one ECD on duty at all times at each shop or work area.

Contractor shall require all personnel designated as ECDs to complete the initial ECD training through the installation or Major Subordinate Command (MSC) environmental compliance point of contact within 15 days of the start of contract performance. Contractor personnel appointed as ECDs may perform other duties provided they do not prevent the performance of ECD duties. Contractors may request a waiver of this requirement through the COR and DGR, if using and/or storing very small quantities of hazardous materials.

10. Competency Training for Contractor Personnel: Contractor shall not allow personnel to perform any activities and/or tasks on AMC installations without proper and adequate qualifications or job competency training. In the event of any identified noncompliance, the Contractor shall, if requested, provide proof of contract personnel training or qualification (individual name, training/qualification type, training/qualification certificate, and date of training/qualification) to perform those contract activities associated with the identified noncompliance.

11. Generation of Solid Waste: Contractor shall remove from the installation and dispose of all solid waste generated, which cannot be recycled to an approved and permitted off-post disposal facility.

11.1. Contractor shall make every effort to divert construction, demolition debris, and all other solid waste to comply with the Army Integrated Solid Waste Management Policy.

11.2. Prior to removing any waste from the installation for disposal, the Contractor shall coordinate with the installation Qualified Recycling Program (QRP) Manager, DGR, and COR to arrange for recyclable materials to be removed and diverted from the waste stream.

11. 3. Submit in writing the quantities of waste removed and recycled to the DGR and/or COR on a monthly basis. The submittal shall include the date of disposal/recycling, the disposal/recycling facility, the types of material disposed/recycled and the quantities of materials disposed/recycled by weight.

11. 4. The Contractor shall establish a program to promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials.

11. 5. The Contractor shall make maximum effort to reduce and prevent waste.

12. Generation of Hazardous Waste: Contractor shall assign all hazardous waste management responsibilities to the appointed ECD. Contractor shall contact the DGR and/or COR to obtain technical assistance from the Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous waste storage and disposal requirements. Contractor shall properly profile all waste generated as part of this contract to determine if any waste is hazardous waste as defined by 40 CFR. Contractor shall accumulate hazardous waste prior to disposal shipment in a satellite accumulation point at or near the point of generation or in a less-than-90-day site, in accordance with Federal, State, Army, and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement or Status-of-Forces Agreement. The Contractor shall properly package the hazardous waste and complete the hazardous waste manifest, then take the manifest to DGR for approval and signature prior to removing any hazardous waste from the installation. Contractor shall contact DGR to obtain the installation’s hazardous waste EPA ID number for the hazardous waste manifest. The Contractor shall notify the DGR 24 hours prior to removing any hazardous waste from the installation. The contractor shall remove and dispose of manifested hazardous waste generated by contract activities from the installation, to an approved off-post permitted hazardous waste disposal facility. The DGR shall assist contractors with profiling their waste upon request.

13. Use of Hazardous Materials: Contractor shall assign all hazardous materials management responsibilities to the appointed ECD. Contractor shall contact the DGR or COR to obtain technical assistance from Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous material storage, issue, use, and disposal requirements. Contractor shall submit to the COR and/or DGR a hazardous material inventory. The hazardous material inventory will be submitted 30 days prior to commencement of work for contracts that exceed 180 consecutive days. The inventory list will contain the hazardous material type and maximum quantities of materials anticipated to be stored on-site.

The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. The Contractor shall maintain copies of Safety Data Sheets for all hazardous materials used and stored on-site during performance of the contract. Contractor shall not supply or deliver any hazardous materials or chemicals to an installation that are listed on EPA toxic chemical list without prior written approval from DGR and/or COR.

14. Prevention of Storm Water Pollution: The Contractor shall perform, track, participate, implement, and comply with storm water pollution prevention minimum control measures, protocols, and best management practices (BMP) and ensure that water quality standards are not violated in accordance with all regulations and policies as applicable to the Pollutant Discharge Elimination System general permit requirements. Applicable permits include:

1) The installation’s Small Municipal Separate Storm Sewer System (MS4) Permit;

2) The Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activities (MSGP); and,

3) All Construction Activity Storm Water permits minimum control measures include, but not limited to:

• Public Education and Outreach on Storm Water Impacts

• Public Involvement and Participation

• Illicit Discharge Detection and Elimination

• Construction Site Storm Water Run-off Control

• Post Construction Storm Water Management in New Development and Redevelopment

• Pollution Prevention/Good Housekeeping for Municipal Operations Contractors will comply with the MSGP permit when the activity is identified as a permitted industrial activity. BMPs include, but are not limited to:

• Practicing spill prevention and good housekeeping.

• Installing and managing erosion and sediment control.

• Meeting the requirements of the MS4 permit.

• Contractors will obtain permit coverage for construction activities disturbing over one acre of land (total acreage is cumulative across all portions of the project). BMPs include, but are not limited to:

• Preparing and implementing a site-specific Storm Water Pollution Prevention Plan (SWPPP) as outlined in the permit and prior to any soil disturbance.

• Installing and managing erosion and sediment control.

• Make available, upon request, permit associated documentation.

• Practicing spill prevention and good housekeeping.

• Meeting the requirements of the MS4 permit.

• Schedule inspections and provide corrective actions for noted deficiencies.

15. Storm Water Management Low Impact Design/Development (LID): The Contractor shall perform, track, participate, implement, and comply with Section 438 of the Energy Independence and Security Act; Executive Order 13514; and the DOA memorandum (2010) for full implementation of low impact design/development (LID) techniques to restore predevelopment hydrology to the maximum extent technically feasible for both new and renovation construction projects regardless of size. In support of LID, Contractors will adhere to installation landscape codes and the guidance found in the Installation Design Guide concerning Low Impact Design/Development for storm water management. The following LID practices include, but are not limited to:

• Restoring predevelopment hydrology to the maximum extent technically feasible

• Promoting natural removal of pollutants such as nutrients, oil and grease, and sediments from storm water

• Managing rainfall at the point where it falls

• Meeting the requirements of the MS4 permit

• Important Note: Utilization of permanent retention/detention ponds is prohibited without authorization from the Installation Planning Division.

21. Noise: Make the maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during the designated times.

Pile-driving operations shall be coordinated through the DGR and COR.

22. Mercury: Mercury is prohibited, unless specified otherwise, and with the exception of mercury vapor lamps and fluorescent lamps. Dumping of mercury-containing materials and devices such as mercury vapor lamps, fluorescent lamps, and mercury switches, in rubbish containers is prohibited. Remove without breaking, pack to prevent breakage, and transport out of the activity in an unbroken condition for disposal as directed. Immediately report to the DGR and COR instances of breakage or mercury spillage. Clean mercury spill area to the satisfaction of the Contracting Officer.

Cleanup of a mercury spill shall not be recycled and shall be managed as a hazardous waste for disposal.

20. Corrective Action for Noncompliance: Contractor shall when given a verbal and/or written notice of environmental noncompliance or nonconformance by the COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken.

19. Protection of Sensitive Areas: Contractor shall comply with all installation designated sensitive and/or off-limit area restrictions. Sensitive areas are generally demarked indicating what activities (e.g., driving, digging, foot traffic) are prohibited. The Contractor shall also adhere to the following installation sensitive areas requirements:

19.1. Cultural Resources Sites: Do not excavate, remove, damage, or otherwise deface any archeological resource located on public lands.

19.2 Endangered Species Habitats: Do not initiate any action that may disturb, endanger, or damage to any degree the habitat of a threaten and endangered species.

19.3 Wetlands: Do not excavate or take any action that could fill or damage any wetland unless working under a project specific Corps of Engineers 404 permit. Wetlands include streams, riparian areas, bogs, marshes, and swamps.

16. Use of Pesticides: Contractor shall submit the type and quantity of regulated pesticides to be applied, the application purpose, and location to the DGR and COR for approval 10 working days prior to the initial application. The Contractor shall submit the actual quantities applied (DD1532 or equivalent) to the DGR and COR within 2 working days (48 hours) after each approved application. The Contractor shall utilize Integrated Pest Management (IPM) technology and procedures in strict compliance with all applicable Federal, State, Army, and installation regulations, to include the installation's integrated pest management plan. Pesticide applicators shall be certified and licensed in accordance with the State where work is being performed and/or Department of Defense regulations. The Contractor shall provide evidence of personnel licenses and certifications to the Contracting Officer and the DGR prior to the initial application of pesticides. Only those pesticides registered with the US Environmental Protection Agency (EPA) and approved by Army Materiel Command Pest Management Consultant shall be utilized and then only in strict accordance with product labeling.

The installation reserves the right to prohibit and limit the amount and type of pesticides used.

17. Protection of Work Site Resources: Contractor shall confine all activities to areas defined by the drawings and specifications. Prior to the beginning of any work, the Contractor shall identify any land resources to be preserved within the work area. Except in areas indicated on the drawings or specified to be cleared, the Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms. The Contractor shall provide effective protection for land and vegetative resources at all times. Prior to site clearing and grubbing, the Contractor shall coordinate harvesting of saleable timber with the DGR and/or COR. Contractor shall notify the DGR and/or COR if any trees are required to be disposed or removed. The Contractor is not authorized to remove or dispose of any tree greater than 6 inches in diameter unless permission has been granted in writing by the DGR or COR.

18. Prevention of Spills: Contractor shall adopt the installation's Spill Prevention Control and Countermeasures Plan (SPCC) if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils-lubricants, or other restricted items. In case of a spill, the person in control of the spill site or their designated representative shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely);

secure the spill site; restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department).

Date

24. Pollution Prevention / Hazardous Waste Minimization: Minimize the use of hazardous materials and the generation of hazardous waste. Consult with the Environmental Office for suggestions and to obtain a copy of the installation's pollution prevention/hazardous waste minimization plan for supporting waste minimization goals.

23. Universal Waste / e-Waste Management: Universal waste including but not limited to some mercury containing building products such florescent lamps, mercury vapor lamps, high pressure sodium lamps, CRTs, batteries, aerosol paint containers, electrical equipment containing PCBs, and consumed electronic devices, shall be managed in accordance with applicable environmental law and installation instructions.

At a minimum document any deviation and/or exemption from environmental requirement PWS in Section IV

SignatureReviewer: First & Last Name / Rank or Grade

SECTION IV

Remarks

SECTION V

Certification

Checklist Cover Sheet: I have reviewed the requirements PWS package and with due diligence completed the Environmental Requirements Package Review Checklist Cover Sheet.

Sheet1

PWS Identify Section Location1 Compliance with Environmental Laws and Regulations: Appendix C
NA1 Compliance with Environmental Laws and Regulations:
PWS Identify Section Location2 Compliance with Green Procurement Requirements: Appendix C
NA2 Compliance with Green Procurement Requirements:
PWS Identify Section Location3 Compliance with License and Certification Requirements: Appendix C
NA3 Compliance with License and Certification Requirements:
PWS Identify Section Location4 Notification of Federal and State Regulators: Appendix C
NA4 Notification of Federal and State Regulators:
PWS Identify Section Location5 Inspection of Work Sites: Appendix C
NA5 Inspection of Work Sites:
PWS Identify Section Location6 Reporting Noncompliance: Appendix C
NA6 Reporting Noncompliance:
PWS Identify Section Location7 Verification of National Environmental Policy Act Documents: Appendix C
NA7 Verification of National Environmental Policy Act Documents:
PWS Identify Section Location8 Conformance with Environmental Management System: Appendix C
NA8 Conformance with Environmental Management System:
PWS Identify Section Location9 Assignment of Environmental Compliance Designee ECD: Appendix C
NA9 Assignment of Environmental Compliance Designee ECD:
PWS Identify Section Location10 Competency Training for Contractor Personnel: Appendix C
NA10 Competency Training for Contractor Personnel:
PWS Identify Section Location11 Generation of Solid Waste: Appendix C
NA11 Generation of Solid Waste:
PWS Identify Section Location12 Generation of Hazardous Waste: Appendix C
NA12 Generation of Hazardous Waste:
PWS Identify Section Location13 Use of Hazardous Materials: Appendix C
NA13 Use of Hazardous Materials:
PWS Identify Section Location14 Prevention of Storm Water Pollution:
NA14 Prevention of Storm Water Pollution: X
PWS Identify Section Location15 Low Impact Design:
NA15 Low Impact Design: X
PWS Identify Section Location16 Use of Pesticides:
NA16 Use of Pesticides: X
17 Protection of Worksite Resources: 1. General
18 Prevention of Spills: Appendix C
19 Protection of Sensitive Areas: Appendix C
20 Corrective Action for Noncompliance: Appendix C
21 Noise: Appendix C
22 Mercury Materials: Appendix C
23 Universal Waste eWaste Management: Appendix C
24 Pollution Prevention Hazardous Waste Minimization: Appendix C
At a minimum document any deviation andor exemption from environmental requirement PWS in Section IVRow1: None.
Reviewer First Last Name Rank or GradeRow1: David Fischer / GS-12
SignatureRow1:
DateRow1: 28NOV22
Text1: X
Text2:
Text3:
Text4:
Text5:
Text6:
Text7:
Text8:
2022-11-28T15:08:42-0500
FISCHER.DAVID.J.1023676822

File details come from the government source that posted it. Updated .