SOW_Upgrade Replace Controls on Crane B214_REV1.docx
DOCX document 40 KB Posted
- Solicitation number
- W911PT-22-Q-0078
About this file
This statement of work and related federal contract opportunity require upgrading and replacing crane controls at the Watervliet Arsenal. The statement of work details the requirements to upgrade and replace control panels, contactors, resistors, brakes and wiring for crane B214. Additional work includes upgrading controls and replacing the trolley on crane B419, upgrading controls on crane B416, and furnishing and installing radio control systems on cranes B109 and B410. The contractor must coordinate access, supply all tools and materials, and complete work within 30 days of the notice to proceed. The solicitation is a 100% small business set-aside for the Department of the Army Materiel Command Contracting Command Detroit Arsenal. The site visit date is September 8, 2022 and the point of contact is Maria DeCrescenzo.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911PT22Q0078-00001.pdf | ||
| SOW_Furnish and Install Remotes Cranes B109 B410.docx | DOCX document | |
| SOW_Upgrade Replace Controls on Crane B416.docx | DOCX document | |
| SOW_Upgrade Replace Controls on Crane B214.docx | DOCX document | |
| SOW_Upgrade Replace Controls on Crane B419.docx | DOCX document | |
| SITE_VISIT INFORMATION PLEASE READ.doc | DOC document | |
| W911PT-22-Q-0078.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
UPGRADE/REPLACE CONTROLS ON CRANE B214
AT
Watervliet Arsenal Building 35
W16H1F2160011C, PR 78482443
Support Division (TAWV-ODR)
PART 1 GENERAL
1.01 Overview.
A. This Statement of Work (SOW) defines the effort required for the upgrade/replacement of control, enclosures and resistors for all crane functions on crane B214, BLDG 35, HIGH BAY
1.02 Hours of Operation.
1.03 General Requirements.
A. Work will be performed at the Watervliet arsenal facility, bldg. 35.
B. The contractor shall supply all tools, materials, supplies, equipment, labor, temporary utilities and supervision necessary for the complete execution of the requirements within the contract documents and requirements of this SOW.
C. The contractor shall, prior to submitting a proposal, review (i) all contract documents, and (ii) the project work site, and shall provide written notice to Contracting Specialist detailing any discrepancies that are found between the contract documents and the project work site.
1.04 Safety Requirements.
1.05 Period of Performance.
A. The contractor shall be required to (i) commence work under this contract within 7 calendar days after the date the contractor receives notice to proceed, (ii) prosecute the work diligently, and (iii) complete the entire work ready for use not later than [30] calendar days after notice to proceed was given. The time stated for completion shall include final cleanup of the premises.
1.06 Project Schedule.
1.07 Permits.
1.08 Equipment Identification.
1.09 Applicable Documents.
1.010 Submittals.
PART 2 PRODUCTS
2.01 General.
PART 3 ITEMS OF WORK
A. General.
The contractor shall coordinate with WVA personnel to gain access
B. Upgrade/Replace Controls for all crane functions (Trolley, Bridge) for Crane B214, Bldg 35, Watervliet Arsenal (WVA), NY C. Crane Manufacturer is P&H, S/N: 10985. Crane Capacity is 10 Ton Main Hoist. The contractor will be required to obtain any drawings they may require from a source (Kone Cranes) other than the WVA.
D. Contractor needs to be aware that due to age of crane, crane may contain asbestos wiring or insulation. Contractors will be responsible for removable/abatement of any asbestos found that will be affected by this upgrade.
E. Contractor will cover the cost of labor, equipment and materials for the upgrade/replacement of controls panels and cab controls.
F. Disconnect and remove all power and control wiring to control panels and cab master switches G. Hoist circuit controls have already been updated. Install new enclosures for all other functions that will not fit in existing room behind cab that currently contains old control systems.
H. Remove master switches I. Reuse magnetic disconnect J. Furnish and install appropriately sized contactors for 20 HP Bridge motor and 5 HP Trolley motor and plugging relays for both functions as needed.
K. Furnish and install accelerating resistors, dynamic braking resistors for crane functions as required.
L. Install new enclosures for all functions.
M. Install one (1) new console using flush mounted JR Merritt (or equal) controllers one (1) for each motion (bridge, trolley and main hoist) N. Upgrade/Replace contactors and wiring for other crane functions or replace with new panels depending on which is more economical. NEMA rated contactors mounted in NEMA 1 Indoor enclosures for crane functions (Bridge and Trolley). Ensure new controls provide the same range of controls as are no present (four functions, 5 speeds, etc). Upgrade/Replace contactors and wiring. The power source to which the crane is 250 VDC. However, the equipment shall be tolerant enough of line fluctuations to operate normally at source voltages ranging from 225 to 275 VDC.
O. Provide and install new resistors and all associated wiring and conduits as needed.
P. Install new 10” bridge brake GH506BAA2260N (provided by WVA), reuse existing brake drum.
Q. Install two (2) new 10” hoist brakes GH505BAA1211N and new brake drums BW10-214H (supplied by WVA).
R. Install ARC Suppressors on all coils of all functions.
S. Gear boxes are to be opened and checked for wear, any deficiencies are to be identified for possible repair/rebuild and the gear boxes resealed.
T. Motors are to be PDMA tested and deficiencies if any are to be identified, with the possibilities of motors be taken down for rebuild/repair. To be coordinated by contractor.
U. Test all functions for correct operation. All equipment shall be operated through a complete lift and lowering cycle and through a complete travel of the bridge and trolley to determine that the equipment shall perform smoothly and safely. Any defects shall be corrected by the contractor without any expense to the WVA.
V. Load Test 10 Ton hoist on Crane, test at 125%. Use Test Weight, not waterbags.
All work will be in accordance with the manufacturer’s specifications.
Equipment furnished shall, except as otherwise noted, comply in all respects with the requirements of the following standards:
| *CMAA | Crane Manufacturer’s Association of America | |
| Specifications for Top Running Bridge & Gantry Type Multiple |
Girder Electric Overhead Traveling Cranes - No. 70 (2010)
*ANSI/ASME
American National Standards Institute/American Society of Mechanical Engineers ANSI/ASME B30.2 - 201 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) OSHA Occupational Safety and Health Administration Part 1910.179 – Overhead and Gantry Cranes
| NEMA | National Electric Manufacturer’s Association |
| NEC | National Electric Code – 2014 |
*Compliance to this standard is limited to the extent such standard is incorporated into and made mandatory by OSHA regulations.
When work is complete, the crane will be turned over for any and all work will be inspected and accepted by the Government Requiring Activity Representative.
All crane equipment shall be operated through a complete lift and lowering cycle and through a complete travel of the bridge and trolley to determine that the equipment shall perform smoothly and safely. Any defects shall be corrected by the bridge crane provider without any expense to the Owner. Load testing the crane is NOT required given the nature of this project.
Contractor will provide:
SHOP DRAWINGS AND EQUIPMENT DATA
a. Manufacturer’s catalog data for radio remote control system.
b. Dimensional drawings and details for component installation.
c. Wiring schematics (As-built drawings).
OPERATIONS AND MAINTENANCE MANUALS
a. Equipment function, normal operating characteristics, and limiting conditions.
b. Assembly, installation, alignment, and maintenance instructions.
c. Guide to “troubleshooting”.
d. Parts list.
e. As-built drawing.
WARRANTY
Upon final acceptance of the systems, a Standard Commercial Warranty shall commence for duration of One Year, to include as a minimum, parts and labor for the duration of the warranty, at no cost to the Government. The one year period shall commence from the date of notification by the Contracting Officer of the final acceptance. Final acceptance is defined as the act of an authorized representative of the Government, by which the Government assumes ownership of existing supplies/equipment and/or approves specific services rendered, as partial or complete performance of the contract (i.e. testing, training, and delivery of all required technical documentation).
PROCUREMENT OF SPARE PARTS AND EQUIPMENT
The contractor shall provide a comprehensive list with pricing of consumables, spare parts kits available for purchase at the time of contract award.
Contract shall provide a list of suggested spares along with pricing and copies of all associated drawings and bill of material to include p/n and manufacturer.
PART 1 CLOSEOUT REQUIREMENTS
1.01 Cleanup of Work Site.
REMOVAL OF ALL EXCESS EQUIPMENT AND WASTE WILL THE RESPONSIBILITY OF THE CONTRACTOR
1.02 Final Repairs and Restoration to Work Site.
PART 2 APPENDICES
A. Consolidated List of Submittals B. Quality Assurance Surveillance Plan (QASP)
APPENDIX A: Consolidated List of Submittals
| Line |
| Item Submitted |
| Submittal Needed By |
| Submittal Reviewed By (Office) |
| 1 |
| Safety Data Sheets for Hazardous Materials (SDS) |
| NLT 7 Calendar Days After Award |
| Safety Office |
| 2 |
| Signed Contractor Asbestos Notification Form |
| NLT 7 Calendar Days After Award |
| Environmental Office |
| 3 |
| Signed Lockout/Tagout (LOTO) Notification Acknowledgement Record |
| NLT 7 Calendar Days After Award |
| Safety Office |
| 4 |
| Project Schedule |
| NLT 7 Calendar Days After Award |
| COR |
| 5 |
| Contractor Safety Plan (1.05.A.) |
| NLT 7 Calendar Days After Award |
| COR |
APPENDIX B: Quality Assurance Surveillance Plan (QASP)
PURPOSE
This Quality Assurance Surveillance Plan (QASP) will be used as a guide to Government Quality Assurance Personnel (QAP). It provides a systematic method to evaluate the services the contractor is required to furnish.
SURVEILLANCE PROCEDURES
Timeliness: Progress is maintained to assure compliance with completion time.
Quality: Conformance with statement of work and industry standards.
Tasks: Performed according to statement of work requirements.
Problem Resolution: Contractor submits deliverables in accordance with the contract and resolves any deficiencies identified by the government in the final submission. Following final submission, contractor resolves any additional deficiencies identified by the government and resubmits and or corrects within one week.
Delivery: Contractor submits each deliverable in accordance with the statement of work and terms of the contract.
PERFORMANCE AREAS
Management Responsiveness: Evaluate the adequacy of the contractor’s responsiveness and their ability to keep the government informed of work progress and provides for early problem identification and effective corrective action plans.
Schedule Control: Evaluate the contractor’s adherence to completion schedule.
Performance: The contractor will be evaluated as to the workmanship and adherence to the statement of work.
EVALUATION CRITERIA
(Outstanding). Indicates performance clearly exceeds contractual requirements. The area of evaluation contains few minor problems for which corrective actions appear highly effective.
(Satisfactory). Indicates performance clearly meets contractual requirements. The area of evaluation contains some minor problems for which the corrective actions appear satisfactory.
(Unsatisfactory). Indicates the contractor failed to satisfy contractual requirements and recovery is not likely in a timely manner. The area of evaluation contains serious problems for which the corrective actions were ineffective.
DOCUMENTATION
Documentation used to perform surveillance will consist of random government inspections and inspection records, as well as the evaluation of final work product delivery by the project COR/COTR.
RATING
Contractor will be given an overall rating of Outstanding, Satisfactory, or Unsatisfactory by the Government Technical point of contact or Contracting Specialist Representative, if appointed, 3 using the above evaluation criteria.
File details come from the government source that posted it. Updated .