NEW Questions and Answers – Solicitation W911PT-19-R-0023
NEW GUIDE BORE MACHINE FOR WVA
FROM SITE VISIT OF 6 AUG 2019
Version 2 updated 12 Aug 2019
The following questions/concerns were asked during the initial pre-conference to the site visit at Watervliet Arsenal. This pre-conference was held in Headquarters Building 10, 2nd Floor Procurement Conference room, Watervliet Arsenal, Watervliet NY 12189.
Q: Is the Guide Bore machine used for counterbore capabilities?
A: Yes. Counterboring is required for full length of machine, using rough and finished size heads. See page 3 of this document for Cutting Head requirements.
Q: Is Cast Iron a requirement for the headstock or is a weldment allowed.
A: Cast Iron is required and the specification will be updated to clarify this issue. All major components shall be casted in iron no major components can be a weldment. Note: All vendors concurred this was not restrictive and any machine tool manufacture could met this requirement and would provide a better quality headstock for longevity. Accordingly, paragraphs 3.1.3.1, 3.2.4.5, 3.2.4.7, 3.2.4.11 and 3.2.4.12 of the specification will be updated accordingly.
Q: A concern was raised over the inclusion of Attachment E and F of Specification 18-18-3416 titled “ACCELEROMETER CONDITIONER and “CIRCUIT DESCRIPTION” and “ENC 1443 Inductive Probe Module”. All vendors attending the site visit stated that this information was not necessary to be provided in the specification to provide a proposal as they will all be procuring the guide boring system from the OEM.
A: Attachment E and F and all references to these attachments will be deleted from the specification.
Q: Will this machine only be used for 155mm max boring size.
A: No. 6” – 8” however, this was just an inquiry. No change to specification required.
The following questions/concerns were asked at the post/closing conference after visiting the WVA shop floor and viewing the existing Guide Bore machine (circa 1950).
Q: Is there a limitation on the footprint (length and width of new machine).
A: No.
Q: Is there is Gear Box in the Headstock.
A: No.
Q: Is the max RPM called out in specification.
A: Not required as the max torque is identified in specification. The combination of drive rating and headstock gearing shall permit achieving full rated continuous horsepower and torque beginning at 50 rpm of headstock spindle and at any and all speeds above 50 rpm to 300 RPM.
Q: The Feed Rate in paragraph 3.2.3 of specification of “0.005 to .070” IPM or more” appears to be a typo.
A: Correct. The Feed Rate of 0.005 to .070” IPM should read “1/2" to 4" IPM or higher”.
Q: What is the repeatability requirement?
A: It was industry standard, however, it was recommended to update specification for clarification purposes. Paragraph 3.2.3 of specification will be updated to add a Position Accuracy and Repeatability section to read:
· Positioning Accuracy and Repeatability.
The machine shall be operated under CNC control and laser tested for positioning accuracy. Positioning accuracy shall be tested at intervals specified by Watervliet machine inspectors. Before correction directional readings will be supplied along with the corrected.
The following tolerances shall apply:
Boring bar travel Z axis................... ± .0005” Change to ± .0025" Repeatability................................... ± .0003” Change to ±.0025"
Q: Can the Government provide any information on the composition of steel forgings that will be used for the Guide Bore? This is important for the coolant system.
A: 4340 gun steel hardened RC38-42, for finish bore. Important Note: The barrel is swaged first before boring which changes the molecular properties of the steel in the bore.
Q: Paragraph 3.2.4.6 Cutting Head states: One cutting head to be supplied with machine. Please clarify as this is inconsistent with information provided at Site Visit conference.
A: Paragraph 3.2.4.6 will be updated to read as follows:
Cutting Head. Two cutting heads shall be supplied with machine. One head for rough boring 5.9.16” +.005” and one for finish boring 6.085” +.005”
GERARD S MANGIONE
Chief of the Contracting Office Army Contracting Command - Warren (WVA) CCTA-HDW/Bldg. 10 1 Buffington Street Watervliet, NY 12189-4000 gerard.s.mangione.civ@mail.mil 518-266-5439