Machine Technical Specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U. S. Army Watervliet Arsenal Watervliet, NY Equip Engr Spec# 18-18-3416 Date: 12 February 2019

One New Guided Boring Machine for Large Gun Tubes

Table of Contents

1. Scope

1.1 Abbreviated Description

1.2 Functional Description of the Process

2. Applicable Standards and Publications

3. Requirements

3.1 General Requirements

3.2 Specific Requirements

3.3 Controls/Control Systems

3.4 Requirements for Demonstration of Conformance

4. Quality Assurance Provisions

4.1 Responsibility for Inspection

4.2 Preliminary Acceptance Inspection

4.3 Government Participation

4.4 Reinspection Provisions

4.5 Post Inspection Procedures

4.6 Final Acceptance Inspection

4.7 Warranty

5. Preservation, Packaging and Delivery Instructions

6. Instructions for Preparing Technical Offers

SPECIFICATION #18-18-3416

1. Scope:

Abbreviated Description and Specification Accuracy Information. This specification describes one new Guided Boring Machine (“machine”) used for large-caliber gun tube production. This guided boring machine control can follow the theoretical boring centerline. The control can drive the boring head to maintain bore center line to outside diameter concentricity.

See attachments D, E and F for a general description of a similar machine and guide system presently in use at Watervliet Arsenal (WVA). Where any specifications on existing equipment at WVA are provided in this Solicitation, these are provided for reference only and the Government cannot guarantee the accuracy of this information. Offerors are encouraged to submit questions in response to this solicitation if there appears to be a disconnect between this reference information and any stated material requirements.

1.1 Functional Description of the Process: This section contains a general description of how WVA’s current guided boring machines operate. This information is included for reference only. WVA cannot guarantee the accuracy of this information.

1.1.1. BORING HEAD: In the guided boring head both the front and rear support is obtained by the use of hydrostatic bearings. Each bearing has four pockets where hydraulic oil is supplied maintaining an oil film around the complete periphery of the bearing. This oil film is approximately .005" thick and will accommodate small variations in bore diameters. The cutting tools derive their position in the bore from the hydrostatic bearings. In the bore guidance head, the front and rear bearings must function independently from the rest of the boring bar to allow for correction of the head. Both bearing supports with their bearing pockets are rigid and act with a fulcrum pin. It is from this position that the boring head guidance is derived. The front bearing pockets are variable and control changes in the direction of the head with respect to the rear bearing pockets and allow for corrective moves of the head and tools to the actual centerline. Both the front and rear bearing are able to withstand the cutting forces of the boring operation and provide a solid base for the machining action.

1.1.2. STARTING BUSHING; The fundamental purpose of the starting busing is to supply an accurate means of supporting the boring head until it has traveled sufficiently into the tube for the bore diameter to take over the support of the head. Eight pressure gages are used to check the pressure at each of the eight bearing pockets in the bayonet. These gages show bearing pocket pressures only when the boring head is located in the starting busing. The starting bushing is also used to check tool setting prior to boring by employing a readout gage and an LVDT (Linear Voltage Differential Transducer). The LVDT converts linear motion of the core of the transducer into an output voltage or signal which can be read on a meter to show the amount of movement (shift). The tool setting is checked by aligning the cutting tool closest to the operator, with the sensing button of the LVDT located within the Starting Bushing. This aligning cannot be visually observed, but the operator can perform the alignment by watching the readout which is electrically connected to the LVDT. The rear tool insert is offset approximately .003” in relation to the front insert to allow for head float to accommodate the change in cutter location as it traverses down the bore.

The front end of the starting bushing is equipped with a seal ring assembly which provides a seal between the tube face and the Starting Bushing. This seal is used to prevent pressure loss in the hydrostatic bearings as they pass into the tube. The clamping force between the Starting Bushing and the tube face is regulated by a pressure controlled limit switch located at the top of the starting bushing. This force is set at approximately 400 pounds.

1.1.3. Detecting Runout: If a tube can be bored so as to follow the actual centerline of the machine, it will have a straight bore. If a tube is rotated within the confines of a machine centerline while the bore wanders into an eccentric position, the head producing the bore will be moving in an orbital pattern. A sensitive electronic device called an accelerometer is used to detect this orbital variation or motion. The sweep of the accelerometer depends on the amount of orbital path and the number of revolutions per minute of the headstock spindle. The accelerometer is basically a pendulum that the larger and more rapid the throw, the higher the pendulum will swing. The output of this device is a voltage commensurate with pendulum swing from 0 to 10V. The accelerometer is located in the bayonet between the hydrostatic bearings and will produce a voltage signal when it detects an eccentric path. An accelerometer has been used to detect runout on all bore guidance machines to date.

1.1.4. Hydraulic Guidance System: The hydraulic oil used in the guidance system is the same oil used in the machine as a coolant. Before the coolant oil can be used in the guidance system it must be thoroughly filtered and temperature regulated to ensure a constant viscosity which is necessary to obtain predictable control at the hydrostatic bearings. The temperature regulation is accomplished by using two pumps which supply a thermostatically controlled.

Pneumatically activated temperature mixing valve. One pump supplies the mixing valve with warm fluid which is taken from the oil going into the refrigeration system. The other pump supplies colder oil which is taken from the oil coming out the refrigeration system. Once the oil is regulated to temperature by the mixing valve it passes through one of two banks of 10 micron filters. The oil next passes through a variable volume supply pump which control the amount of oil supplied to the hydrostatic bearings. The volume of this pump is regulated by an adjustable swash plate. An independent hydraulic system provides the pilot pressure for a servo valve which regulates the swash plate. An assist pump is used to supply a constant hydraulic pressure against the swash plate to help control its location, the output of the variable volume main supply pump is passed on to the boring slide by means of the power track and piping through the boring bar. Once the oil reaches the boring slide it is directed into two paths. One path is to follow a 5/8" line into the boring bar and feeds all eight hydrostatic bearing pockets with a constant fluid pressure. The second path is used for actual control of the boring head. When following this path the oil first goes through an intensifier pump to increase the pressure. A pressure greater than the constant oil pressure in the bearing pockets is required for guiding the head. The oil is next passed through a 10 micron filter and on to a servo valve. This servo valve receives its signal through the electronics from the accelerometer in the Boring Head. Initially, the control system was designed for the servo valve to regulate the pressure on both the left and right pockets of the front hydrostatic bearing.

A servo valve regulates fluid to the right pocket of the front Hydrostatic bearing. The oil line which was originally to regulate the left pocket on the front bearing is now used to monitor the oil pressure at that pocket. The servo valve is continually receiving a signal from the accelerometer and there is constant control of the boring head by the servo valve. The servo valve is set up such that it can add high pressure controlled oil to the pocket or it can allow the static pressure which is supplied to the pocket to be drained to tank. Whichever is needed for correcting the Boring Head. When both control pockets are operating, one pocket is receiving the high pressure control oil while the other control pocket is having the static pressure drained off.

1.1.5. Monitoring the Guided boring operation: The boring of a tube is a blind operation. The operator cannot see the cutting taking place and, therefore, a means of monitoring certain aspects of the cutting have been built into the bore guidance system. Earlier bore guidance machines used LVDTS as a sensing device for monitoring. The latest boring head uses inductive sensors (proximity probes) instead of the LVDT’s. This type of sensor is designed to obtain its readings without touching the bore and, in this case, reads through an oil film. The operator's console is equipped with four readouts and a recorder which is used for monitoring and recording of bore diameter, offset, runout, and bearing pressure. Each readout has limit setting capabilities which can be set at the control panel. If any of the readouts exceed the limits which are set, the boring feed will automatically shut off.

1.1.6. Bore diameter: The monitoring of bore diameter is accomplished by using two inductive sensors which are mounted on the boring head vertically and diametrically opposed just behind the vertical cutting plane of the cutting tools. When the Boring Head is completely within the tube the limits on the readout are set at +/ - .oo3". During the transition from the starting bushing to the tube it may be necessary to expand these limits.

1.1.7. Offset: Offset is a term used to describe the location of the boring head with respect to the bore in which it is riding. To measure offset, inductive sensors are located in the Boring Head. Normally the offset will vary only .00075" which indicates that the correction is taking place. The maximum parameters of offset will range from + / - .005” shall be manually adjustable within that range.

1.1.8. Runout: The runout of the boring head is monitored by using the output signal from the accelerometer. The readout will be manually set to stop the boring feed if the run out exceeds + /- .025” from centerline of rotation. The maximum parameters for the runout will be adjustable by the operator.

1.1.9. Bearing Pressure: The 1/4" line from the left front bearing pocket is connected to a pressure transducer and is used for monitoring bearing pressure. The readout will be furnished with two scales. The first scale will be manually adjustable for initial start-up and range from 0 to 50 psi. The second scale will also be manually adjustable for normal boring, range from 100 'ld 250 psi. A two position switch or other means of changing ranges shall be console mounted. Normal bearing pressure for standard (on-size) boring operation is 150 psi.

2. Applicable Standards and Publications All work performed and procedures followed in association with this project shall meet or exceed all applicable and current Watervliet Arsenal, OSHA, local, state, and federal government codes and laws relative to fire, safety, environmental, and electrical issues. The quality of all work performed and material provided shall meet or exceed the latest applicable industry standards and engineering practices for this type of equipment and its intended function.

2.1 The Following Publications Apply to the latest Revision

• NAS 966

• ISO 1708 AND 230-2

• NFPA 79

• IEC 60204-1

• ANSI/ASME B5

• ANSI B11

• ANSI/ISO 12100

2.2 Watervliet Drawings: Hydrostatic Bore Guidance System for the Century Detroit presently in use will be provided for reference toward new machine at point of award for which a confidentiality clause shall be signed. The following apply complete with Drawing List G3124C:

• Start Bushing Assembly

• Boring Bar

• Hydrostatic Guide Boring Head Assembly

• Proximity Probe Calibrating Device

• Seal Ring Assembly

• Probe Calibrator

• Potting Fixture

• Servo vale Manifold

• Coolant Manifold Adapter

• Solenoid Operated Brake

• Inductive Probe

• Servo pump control

• Cutting head

3. Requirements. All requirements are mandatory from the standpoint of intended function.

Wherever a specific requirement would force an offeror to depart from his standard practice or configuration, the arsenal will accept, for evaluation, alternative offers for achieving the intended function. Any such alternative offers must be accompanied by sufficient technical information to allow the evaluator to reach a definite conclusion that the alternative is equal to or better than that specified.

3.1 General Requirements:

3.1.1 Design and Engineering. The machine shall be designed and engineered in accordance with latest standards recognized or adopted by the Association for Manufacturing Technology (formerly the National Machine Tool Builders Association). The design and engineering shall incorporate only concepts, systems, materials, and new components which have been proven in prior use.

3.1.2 Materials. Materials incorporated in the construction of the machine shall be of sound and uniform quality, free from defects and shall conform in specification, heat treatment, and suitability.

3.1.3 Construction. All parts of the machine shall be new and unused and shall be constructed so as to be capable of withstanding all forces encountered during operation to its maximum rated capacity. The structure and assembly of the machine and its components shall be sufficiently rigid that workpiece finish and accuracy are not impaired by machine vibrations.

3.1.3.1 Construction of Major Components. All major machine components such as beds, saddles shall be casted in iron.

3.1.3.2 Alignment Retention. All machine components, including columns, heads, and ways which are separately assembled, whose alignments determine the squareness and parallelism of machine geometry shall be provided with a positive means for retaining alignments and regaining them in the event of accidental dislocation.

3.1.4. Slideway Design and Construction Precision ways which guide and bear the rated design loads shall adhere to the hardness criteria shown in the following examples of acceptable way systems.

A. Integral cast iron ways shall be hardened to RC 50 to RC 54 to a depth of .200 inch or more.

B. Hardened and ground steel ways for mating with Turcite, Rulon or other such low friction forgiving materials shall be hardened within the range of RC 55 to RC 62.

3.1.4.1 Replaceable Ways. If the machine being offered is portrayed as having replaceable ways, the assembly of the way bars to the machine frame shall be such that finish ground ways are fastened to a precision ground or scraped surface to permit field replacement without additional grinding.

3.1.4.2 Way Wipers. All way systems, regardless of type shall be equipped with wipers designed to prevent intrusion of foreign material. Wipers shall be adjustable to compensate for wear. Wipers shall also be easily removable and replaceable.

3.1.5 Workmanship. Completed machines shall conform to the manufacturer's engineering drawings and to standards recognized or adopted by the Association for Manufacturing Technology.

3.1.5.1 Shimming. A shim is herein defined as an unplanned insert whose presence, dimension and shape do not appear on the engineering drawings and which cannot, therefore, be reproduced from those drawings. Shims, as defined above, shall not be incorporated in this machine.

3.1.6 Maintainability. All parts subject to wear, distortion, or failure and all parts which require periodic adjustment shall be readily and safely accessible for repair, replacement, or adjustment as applicable. Instructions for maintenance and adjustments shall be clear, concise, and definite in application.

3.1.7 Interchangeability. All parts bearing the same part number shall be functionally interchangeable.

3.1.8 General Electrical Characteristics. The electrical system shall conform, in quality, safety and performance, to all industry electrical standards.

3.1.8.1 Applicable Power Source. The power source to which the machine will is connected furnishes a nominal 480 volts, 3 phase, 60 Hz AC. However, the machine shall be tolerant enough of line fluctuations to operate normally at source voltages ranging from 432 to 504 volts. No internal or external transformers will be acceptable to convert to lower supply voltage. See Attachment C

3.1.8.2 Electrical Safety Devices. The machine and its equipment shall be protected with circuit breakers which comply with NEMA standards for thermal magnetic types and shall have a minimum interrupting capacity of 25,000 RMS symmetrical amperes for 480 volt, 3-phase system. Breaker terminals shall be UL listed as suitable for the type of conductors provided. Plug-in circuit breakers or current-limiting fuses are not acceptable.

3.1.8.3 Conversion Equipment. If DC or reduced voltage AC is required to meet any specified requirement for machine components, the necessary conversion or transformation equipment shall be furnished with the machine by the contractor.

3.1.8.4 Motors. All motors shall be of the optimum type and horsepower rating to meet intended application and usage based on accepted engineering practice. Under normal operation of the machine throughout its specified range and capacity, no motor shall be operating at overload, and all motors shall be equipped with thermal overload protection. All motors shall be housed in enclosures of the appropriate NEMA type for the class and severity of service and shall be properly balanced. Each motor shall bear an identification plate containing the identity of the manufacturer, the model, serial number, input voltage, amperage, horsepower, phase, frequency and frame or mounting. All AC unidirectional motor housings shall bear a directional arrow to indicate proper rotation direction when correctly wired. All AC motors rated at 25 HP or greater shall be equipped with a "soft start" mechanism which provides for reduced voltage starting.

Note: All motors are to be permanently lubricated and sealed unless the contractor can substantiate that this feature cannot be offered by two (2) or more major motor manufacturers.

3.1.8.5 Operator Control Voltage. All electrical controls meant for use by the operator of the machine shall carry 120 volts AC maximum.

3.1.8.6 Utility Outlet. The machine shall be provided with a dual-receptacle 3-wire utility outlet fully wired and equipped to deliver 120-volt single-phase AC power at up to 20 amperes, based upon 480-volt 3-phase input. This outlet shall be protected by a ground-fault interrupter and shall be externally mounted and easily accessible. An electrical "noise" suppression device shall be provided.

3.1.9 Safety and Environmental Features. The contractor shall review the environmental requirements documented in Appendix G and comply as applicable.

3.1.9.1 Protection of Machine Operator. Protection of the machine operator and other personnel shall be accomplished in accordance with all pertinent Arsenal, State, Federal, and local regulations.

3.1.9.2 Protection of the Machine. The proposed control system shall be fully equipped with the devices, software, and configuration necessary to prevent self-damage in the event of component malfunctions, power failures, expended consumables, incorrect consumables, and operator errors.

3.1.9.3 Noise Levels. The government's preference is to achieve noise levels not in excess of 80 dba. Noise levels shall be measured under load during the test of conformance to specified ranges and capacities. Noise levels in the vicinity of the machine, even if not meeting the desired 80 dba, shall, under no circumstances, exceed a maximum of 85 dba when measured by a properly calibrated sound level meter set for "A" weighting and slow response. "Vicinity of the Machine" is further defined as an imaginary line completely surrounding the machine at a distance not exceeding one meter from the nearest point on the machine. The maximum noise level limit shall apply at the operator's console, even if the console lies inside the one-meter envelope. Techniques such as sound level averaging or exposure time weighting shall not be used in meeting this requirement. Any shields, baffles, enclosures or other devices required to bring the machine into conformance with this noise level requirement shall be furnished by the contractor. Any such devices shall not interfere with the proper operation of the machine and shall be designed to preserve the visibility needed for safe operation and ease of maintenance.

3.1.9.4 Ozone Depleting Substances Section 326 of Public Law 102-484 precludes the Dept. of Defense from awarding any contract that directly or indirectly requires the use of a class 1 ozone-depleting substance within the government specification or standards set forth in the contract. Attachment #B is a list of the restricted Class I CFC's and Halons. All shall be replaced by new functionally equivalent substances or systems, that are approved for use by the Environmental Protection Agency (EPA) and have an "Ozone-Depletion-Potential" (ODP) rating of zero. Material Safety Data sheets (MSDS) shall be submitted for approval to Watervliet Arsenal at the time of the submission of proposal.

Definition: Ozone-Depletion-Potential (ODP). The relative capacity of a substance, per unit weight, for destroying the earth's stratospheric ozone layer, in comparison with CFC-11, CFC-12 and CFC- 114, each having been assigned an ODP of 1.00.

Note: Offerors are responsible to obtain and adhere to the most current list of prohibited substances as of the date of the submission of bids or proposals.

3.1.9.5 Asbestos and Mercury Free Certification. All materials utilized in the system shall be certified as asbestos and mercury free unless substitute materials do not exist.

This certification shall be provided prior to machine delivery.

3.1.9.6 Material Safety Data Sheets. The offeror shall provide Watervliet Arsenal with all material safety data sheets at the time of the submission of his proposal.

3.1.9.7 Lead-Free and Chromium-Free Paint Certification. All paints and primers applied to the system shall be certified as lead free and chromium-free. Lead based paint is paint that contains more than six one-hundredths of one percent (0.06%) lead by weight. This certification shall be provided prior to machine delivery.

3.1.9.8 PCB-Free Certification. To the extent that the machine may have been charged with lubrication and hydraulic fluids at the contractor's plant for preliminary acceptance inspection (see section 3.4), these fluids shall not contain Polychlorinated Biphenyl’s (PCB’s).

The machine and its equipment shall be certified as PCB-free prior to being shipped.

3.1.9.9 Lockout/Tagout Procedures. The manufacturer is required to provide the proper control of hazardous energy (lockout/tagout) per OSHA 29 CFR 1910.147. This information be incorporated into the maintenance manual. The control of hazardous energy sources includes electrical, pneumatic, hydraulic, chemical, mechanical, UV, electromagnetic and thermal.

3.1.10 Identification Plate. A corrosion-resistant metal plate shall be securely attached to the machine in a visible location in the vicinity of the operator's workstation. This plate shall bear, as a minimum, the information called for as follows, with space at the bottom for one additional line of information to be applied by the government.

Nomenclature Manufacturer's name Model Manufacturer's Serial Number Power Input (voltage, phase, frequency, and total amps) Government Contract Number Date of Manufacture

3.1.11 Lubrication. The machine shall be equipped to provide sufficient lubrication to every moving part where lubrication is essential to prevent damage. Slideways shall be lubricated by an automatically cycled distribution system such as that manufactured by Trabon Inc. or equal. Gearboxes or transmission cases shall be lubricated by the wet-sump splash method. Spindle bearings shall be lubricated by recirculating pressure spray systems. Systems of the foregoing types are considered automatic systems and they shall be equipped to be fail safe to the maximum extent possible. Any sensors or other devices used to detect the presence (or absence) of lubrication shall be accessible for test or replacement without major disassembly.

Manual lubrication methods (e.g. Grease fittings, oil cups.) are permissible for lubrication points not practically served by automatic systems. For non-recirculating automatic systems (such as slideway lubrication), the reservoirs shall be sized to provide lubrication reserve equivalent to 80 operating hours and shall be located at floor level. For recirculating automatic systems (such as pressure spray), easily cleanable or replaceable filtration devices shall be provided. Wet-sump type systems shall be equipped with means to confirm proper oil level. Sight gages, if used, shall be of the external standing tube type rather than the flush-mounted porthole type. Standing tube sight gages shall be protected against accidental breakage.

3.1.11.1 Lubrication Plate. A lubrication plate (or plates) shall be permanently fastened to the machine and shall clearly indicate the type and viscosity of lubricant and the service interval for all automatic and manual lubrication reservoirs and fittings. The plate shall include a simple diagram which depicts the physical location of all lubrication points on the machine structure.

3.1.11.2 Lubricants, Hydraulic Fluids, Oils and Coolants. Watervliet Arsenal established a standardized list of lubricants, hydraulic fluids, oils and coolants. The contractor is requested to choose the required lubricants, hydraulic fluids, oils and coolants from Attachment “A”, enclosed or where designated (*see note) approved industry/commercial equivalents.

If a substitute is required, the contractor shall provide justification which shall include the manufacturer, type and specification number as well as the reason for the substitution.

3.1.12 Hydraulic System. The hydraulic system shall be appropriately sized and powered for the intended application and shall conform to industry standards. The system shall incorporate cleanable or replaceable filtration devices to ensure fluid cleanliness. Reservoirs shall be equipped with easily visible gages to indicate fluid level. If duty cycle of the system under maximum usage will cause the hydraulic fluid to exceed 120 degrees Fahrenheit in temperature, a suitable heat exchanger shall be provided to maintain fluid temperature at or below this level. The system shall be protected against overpressure as well as under pressure.

System pressure in any hydraulic device shall be as low as is practical for the intended application but shall not exceed 3000 PSI in any case. In any system which utilizes hydraulics to produce thrust or direct linear motion, anti-surge devices or circuits shall be incorporated to ensure uniformity of motion under varying loads. These devices or circuits shall be adjustable.

All reservoirs shall be easily accessible for cleaning and flushing.

3.1.13 Painting. All exterior machine surfaces shall be painted except where bright metal is required for machine function or to otherwise adhere to the requirements of this specification.

Paint shall be chromium-free and lead-free. Quality and manner of application shall be such as to afford protection throughout the normal life of the machine. Offerors shall provide the Government with a list of available "semi-gloss" paint colors, from which the Government will choose if the proposal is selected for award. Danger areas shall be painted red and caution areas shall be painted yellow in accordance with OSHA Standard 1910.144. Appropriate warning signs, tags, or emblems will be affixed to respective areas of the machine in accordance with OSHA Standard 1910.145.

3.1.14 Machine Hold Down and Leveling. The machine base shall be provided with sufficient and properly located holes for positive hold-down when operating at full rated capacity. In addition, for each hole in the machine base, the contractor shall provide a set of his recommended hold-down and leveling hardware.

Note: All hold-down and leveling hardware shall be delivered 30-days prior to scheduled delivery of the machine.

3.1.15 Reserved.

3.1.16 Handwheel Rotation. Where power feed and rapid traverse of a machine component is provided or specified, associated handwheels or cranks, if any, shall not rotate when power feed or rapid traverse is engaged.

3.1.17 Technical Data. All data shall be in the English language and shall be furnished in accordance with the quantities, formats and delivery dates below. All data shall be packaged and delivered separately from the machine itself marked to the attention of the Technical POC.

a. Foundation Drawings, Standard or Special (see note): Shall be complete in all construction detail to permit pricing and construction by a general contractor prior to machine delivery. Foundation drawings shall be furnished as soon as possible after contract award, not to exceed 30 days following award. All drawings shall be dimensioned in English units. One reproducible hardcopy and one electronic copy on CD in AutoCAD .dwg or .dxf format shall be provided. AutoCAD drawings shall not utilize the color yellow or any other colors that cannot be made readily visible when plotted out in color. When drawings are finalized the contractor shall certify the accuracy of the drawings by providing a stamped and signed hard copy of the drawings to the Watervliet Contracting Officer.

If a special foundation (see note) is required and the vendor/contractor refuses to provide the detailed drawings required then this shall be grounds for disqualification from further consideration in the machine tool procurement. Vendor proposals submitted shall be clear in their response to this requirement.

Note: Typical floor thickness at Watervliet is 8”-10”. A special foundation is one which exceeds thickness, load bearing capability and vibration insulation of Watervliet Arsenal's standard monolithic concrete flooring of 1,000 pounds per square foot load rating and one which requires a specific thickness, specifically-shaped excavations for example coolant housings, chip conveyors, electrical circuits and conductors.

The soil (sub-straight) for a foundation is assumed to be medium dense gravel or medium dense gravel and sand with a minimum bearing capacity of 4,000 PSF. Should the contractor disturb the soil below the yet to be constructed concrete foundation then the contractor shall compact the disturbed soil to achieve at least 2,000 pounds per square foot (PSF) bearing capacity.

Important: See instruction par. 6.5

Foundation Drawings details shall include at least:

1) At least one drawing shall depict an over-lay top view of the machine foundation outline, machine general arrangement drawing (including all ancillary equipment) and the anchor bolt whole pattern.

2) The foundation drawings shall include 100% complete foundation details necessary for Watervliet Arsenal to directly hand over to a General Contractor for construction (e.g. complete foundation dimensions, rebar locations, rebar size, rebar pattern, concrete PSI requirements, and load bearing specs).

b. Machine and Equipment Floor Plan: A digitized machine and equipment floor plan in AutoCAD shall be provided on a CD. This plan shall contain the dimensioned bolt-hole pattern of the holddown bolts for the machines. This AutoCAD drawing(s) shall also contain information that indicates the type, magnitude, and connection points of all plant utilities (electrical power, air, water) required to operate the machine. This data shall be furnished as soon as possible after contract award, not to exceed 60 days following award, along with the contractor’s completed APPENDIX C. One reproducible hardcopy and one electronic copy on CD in AutoCAD.

c. Catalog of Standard Tooling and Accessories shall be furnished no later than 30 days after award of contract. For offers of foreign built machine tools (i.e., machines built outside the United States, its possessions or Canada), the catalog shall set forth U.S. domestic sources of supply. (two copies)

d. Non-Standard (special) Tooling and Accessories. To the extent that this specification requires the development of unique tooling and accessories not generally available commercially, a set of drawings and specifications sufficiently complete to permit manufacture of such tooling and accessories shall be furnished at the time of machine delivery. Dimensional information shall be in English units. One reproducible hardcopy and one electronic copy on CD in AutoCAD Release 2004 or later.

e. Installation Instructions and Drawings containing all necessary information to install the equipment. This shall include a drawing containing the certified dimensioned locations of all equipment mounting/holddown holes. This data shall be furnished as soon as possible after contract award, no later than 60 days after award. One reproducible hardcopy and one electronic copy on CD in AutoCAD Release 2004 or later.

f. Lubrication Diagram or Instruction. To be delivered to the technical POC at time of machine delivery. One reproducible hardcopy and one electronic copy on CD in AutoCAD Release 2004 or later.

g. Operating Instructions. Machine and control system operating instructions shall be in provided in separate manuals from other technical data provided. These instructions/manuals shall include a clear description of the functions on the control system operator’s panel. To be delivered to the technical POC at time of machine delivery. (Four Hard and Two Electronic copies)

h. Maintenance and Troubleshooting Instructions for all machine and control systems.

This material shall also include the machines mechanical assembly drawings. To be delivered at time of machine delivery. Two copies minimum of the Maintenance and Troubleshooting Instructions. Two reproducible hardcopies and one electronic copy on CD in AutoCAD Release 2004 or later or PDF of the machines mechanical assembly drawings.

i. Electrical and hydraulic schematics and lubrication Drawings. These schematics must clearly portray all electrical and hydraulic and Lubrication ties to their respective main systems.

To be delivered to the technical POC at time of machine delivery. These schematics and drawings must reflect the machine as delivered and installed. If there is a discrepancy, the Contractor shall develop and deliver an “as built” set of schematics before final acceptance can occur. (Two hard copies and Two electronic copies)

j. Repair Parts Catalog. This catalog shall encompass every replaceable part in the machine and shall include appropriate identification and original equipment manufacturers part numbers and ordering data. Items which can normally be purchased locally may be so indicated provided they are sufficiently described. The repair parts catalog shall include illustrations which clearly locate parts within larger sub-assemblies. To be delivered to the technical POC at time of machine delivery. (two copies)

k. Programming Manuals. CNC programming manuals shall be supplied. These manuals shall include, or be supplemented by, a clear summary of the control functions actually implemented and usable on the system offered or specified. To be delivered to the technical POC at time of machine delivery. One Fanuc CD-ROM Manual and two Operation and Fanuc Handbooks.

l. Software Documentation and Recovery Media. The offeror shall provide two paper hardcopies and Two electronic copies (CDs, and preferably a flash card if control is equipped) of all final system software and ladder logic developed to control and interface the new control/drives with the existing machine tool. The media provided shall allow the Government to restore machine control systems following an accidental erasure, power surge, or other data corruption event. The Contractor shall furnish final revision software to the technical POC as part of the final acceptance process.

3.1.18 Training Required. The contractor shall provide the formal training outlined in the Table below for Arsenal personnel. All instructions and materials shall be in English, and shall occur at Watervliet Arsenal. The quality of the training shall be such that at the conclusion of the specified training time, each individual within their assigned category shall be capable of repairing or operating the machine to its productive capacity.

Table 3.1.18 – Watervliet Personnel Training

Type of training Number of persons When required Training location

Machine operation 4 During or after machine performance testing

On site 5 working days

Mechanical maintenance

2 During startup On site 1 work day

Hydraulic maintenance

(if applicable)

2 During startup On site 1 work day

Electrical maintenance 2 During startup On site 1 work day

Drives (if applicable)

2 During startup On site

Programming training (if applicable)

2 During startup On site

Note: For all types of training, the associated technical data (see 3.1.17) shall be on hand at the time of instruction and its use and interpretation shall be covered during the training. A training schedule showing the hours of training for each person under their assigned category, shall be sent in with proposals for review.

3.1.19 Repair/Replacement Parts and Service. The offeror shall also agree to provide parts and service for the contracted equipment within 72 hrs of notification of a problem.

Watervliet Arsenal recognizes that it may be hard to fulfill this requirement for major machine components. If the requirement cannot be adhered to, the offeror shall notify Watervliet Arsenal’s POC within two business days and shall provide a delivery schedule to be approved by Watervliet Arsenal’s POC. The offeror further agrees, as part of the contract, to store complete ordering data to include specifications, engineering drawings and other information for the contracted machine tools/parts. This data shall be stored within the U.S. or Canada and be sufficient in detail to permit successful acquisition of the parts and associated repair service. In the event of a national emergency the U.S. Government reserves the right to obtain the data and use it to support operation of the machine tool(s) purchased under this contract.

Note: The offeror shall supply a list of recommended spare machine parts as an option with the offer.

3.1.20 Pneumatic Requirements. If air is needed for any machine operation or function, the machine shall be fully equipped with all necessary piping, valving, etc., fully installed to the point of connection to which the Arsenal will connect shop air. Available shop air at the Arsenal is 80 psi and if higher or lower pressure is needed at the machine, the machine shall be fully equipped with the devices needed to modify the 80 psi supply pressure. The machine shall also be equipped with devices to remove the normal moisture and other contaminants usually present in shop air supplies. Normal moisture is defined as that moisture produced when air at a relative humidity of 75% has been compressed to 80 psig. An external compressor is not acceptable.

3.1.21 Control of Cutting Fluids. If the machine is equipped with a coolant system, the contractor shall ensure that the machine is designed and equipped to prevent coolant from escaping the confines of the machine or leaking to the floor when producing workpieces of a size within the machine's normal working range. If the coolant reservoir is part of the foundation, the coolant shall be contained in a leak proof metallic or nonmetallic liner.

3.1.22 Special Tools. If any element of machine operation or maintenance requires the use of specially designed tools, these tools shall be provided with the machine and shall become the property of the Government.

3.1.23 Site Conditions. The machine covered by this specification will be installed in general machine shop space and there will be no environmental conditioning. Temperatures will range from 65 degrees F. To 95 degrees F. and relative humidity will range from 20% or less to 95%. On any given day, the temperature in the machine shop may change as much as 4 degrees F per hour. These are the conditions under which the machine is expected to perform as specified, and the contractor shall be responsible for supplying whatever is required to meet the specified performance. The only permissible exception is positioning accuracy for numerically controlled machines. For this performance factor, allowances may be made for the effects of temperature fluctuation.

3.1.24 Heat Exchange Equipment. Heat exchange equipment shall be furnished with the machine wherever it is needed to keep operating temperatures within design or specified limits. Any heat exchange equipment using water as the heat exchange medium shall be fully recirculating and shall not require the continuing input and discharge of Arsenal water supply.

Waste water systems of any type are not acceptable. Furthermore, it is the Arsenal's preference to avoid heat exchange equipment making use of the refrigeration cycle, and refrigeration systems of any kind are not acceptable unless design or specified temperature limits cannot be achieved without them. If a refrigeration system is absolutely necessary, the contractor shall ensure that it operates properly using a refrigerant having an ozone depletion potential of zero.

The contractor shall be responsible for identifying and providing such a refrigerant and its material safety data sheet. R22 REFRIGERANT IS NOT PERMITTED.

3.1.25 Chip Removal. The machine shall include a Pre-Conveyor to drag out the vast majority of the heavy chips from the coolant before it arrives to the Vacuum Filter. This conveyor shall be placed at floor level, with coolant provided from the machine tool. It will overflow coolant and remaining steel fines into at side mounted overflow box, housing an immersed filter supply pump that will pump the coolant to the Vacuum filter. A magnetic drum type separator for removing sludge loading from the vacuum filter to reduce disposable of media usage, improve filter efficiency and further extend coolant life shall be provided. It will be mounted to the top of the filter tank and will be complete with a magnetic rotation drive and scraper assembly.

3.1.26 Primary Filtration: Historically, sludge and swarf have presented major issues when boring bark from the ID of canon tubes. The machine shall be designed to mitigate these problems to the maximum extent practicable. The machine shall feature a vacuum-type filtration system of approximately 3000 gallons at operating level. This type of system shall be provided with roll type media with magnetic separator and scraper for filtration. The spent media re-winder shall automatically rewind spent roll media as it is discharged from the vacuum filter.

3.1.27 Secondary Filtration. Shall be provided to 10 micron at present WVA uses a vessel filled with canister type filters. Large vessel consists of 48 6”x 24” canisters.

3.1.28 Guidance Filtration. Guidance system needs to be pre-filtered to 5 micron, at the present time WVA has been using a bank of 5 Pall filters.

3.1.29 Elapsed Time Meter. The machine shall be fitted with a meter to measure operating time of the spindle drive. The time totalizing meter shall be of the non-resetting type and shall have a range of 0 to 99,999 hours in increments of 1 hour. 1-hour being the least significant digit. Upon reaching the maximum accumulative hours the meter readout shall automatically revert to zero and continue to totalize time. The meter shall be designed to prevent the entrance of dust and moisture and shall be mounted to withstand shock and vibration generated by the equipment. The meter shall be located as to be readily visible but not subject to abuse relative to the operating environment of the equipment. Time meters resident in the numerical control unit are not acceptable.

3.1.30 Machine Installation, Startup and Testing.

3.1.30.1 Work to be Performed by the Arsenal. This project is classified as a turnkey with the contractor being responsible for all-work associated with the installation unless otherwise stated. Upon receipt of the required installation floor plan Watervliet Arsenal will clear the intended installation site prior to delivery of the machine. After placement of the machine by the contractor/riggers, Watervliet Arsenal will run utilities to first points of connection. However, if the installation instructions supplied by the contractor are incomplete or insufficiently detailed, installation work will stop and the contractor will be required to dispatch a service engineer. Installation will resume upon his arrival and continue under his guidance.

Note: If installation instructions and electrical are not delivered at or before the times specified (see 3.1.17), the Government reserves the right to forestall delivery and/or final acceptance testing of the machine by an amount of time equal to the delay in receipt of instructions, drawings or schematics.

3.1.30.2 Work to be Performed by the Contractor. This project is classified as a turnkey with the contractor being responsible for all-work associated with the installation. The

Contractor shall be solely responsible for costs associated with skidding and shipment, rigging and installation at WVA. The contractor is responsible for the removal of wood block flooring and existing concrete preparation. Grouting for machine hold downs shall be the contractor’s responsibility regardless of foundation type. The contractor shall also provide competent English-speaking service personnel to install the machine, rough and finish level the machine, startup, and conduct the acceptance tests specified in section 4. The contractor personnel shall remain until the machine activation and testing have been successfully completed. Watervliet Arsenal personnel will not provide assistance for installation, diagnosis, troubleshooting, or repair of the equipment during activation and testing.

Once requirements of paragraph 4.1 and 4.2 have been completed contractor personnel shall coordinate the shipment of the machine to Watervliet. Contractor personnel shall arrange for rigging services to off load the machine and contractor personnel shall be on-site at Watervliet when the machine arrives and is off loaded. The Contractor shall ensure any outside rigging services only use certified chain hoists, with all rigging slings tagged and certified for the weights being lifted. Contractor personnel shall supervise the placement of the machine on the installation site by the rigging service. Arsenal forklifts and Arsenal personnel are typically not available to assist with installation. All forklifts used shall be propane powered forklifts and equipped with a roll cage and backup signal. Operators of forklifts shall have and be able to produce valid forklift licenses. Arsenal overhead pendant cranes (within load capacities) may be used by the contractor/rigging service for the installation if the contractor provides written certification to the WVA representative that all contractor/rigger personnel are qualified, through either formal training or experience per OSHA, to operate pendant controlled overhead cranes. Crane capacity within each building is limited (2, 5, 10, or 15 tons). The Contractor shall provide alternate lifting means if installation tasks exceed these capacities.

Contractor personnel shall also adhere to the WVA requirements to wear OSHA approved safety glasses and safety shoes while in the manufacturing shop areas. The contractor shall provide all equipment and materials necessary for the installation of the machine.

IMPORTANT: Under normal circumstances the contractor will be allowed to work as long as is desired during normal work days. Contractor work outside Watervliet’s normal work days cannot be guaranteed. Watervliet is on a condensed work schedule. Normal work hours/days for this schedule are four 9-hour workdays (Friday off) one week and four 9-hour days, one 8-hour day (Friday) the following week. Contractor work on the Friday off and weekends cannot be guaranteed. Foreign National contractor personnel require escort, which may restrict installation site availability based on Watervilet’s ability to provide the escort..

If the contractor requests Watervliet Arsenal to ship misc. material via UPS, FedEx or by other similar carrier then the contractor shall provide a bill of lading and address label or a return shipping label from carrier and coordinate with the Arsenal POC.

3.2 Machine Specific Requirements:

3.2.1 Machine Tool Description: The machine tool covered by this specification shall be one New Guide Bore (machine). See attachments D, E and F for a general description of the machine and guide system. This guided boring machine control can follow the theoretical boring centerline. The control can drive the boring head to maintain bore center line to outside diameter concentricity. The machine is used to guide bore 155mm canon barrels 42’ long rough and finish bore.

3.2.2 Required Characteristics. Watervliet requires the machine to possess the following features. The machine shall meet or exceed each characteristic unless otherwise stated.:

Counter-Boring ...........................................................3/4” to 8” Rapid Rate ...................................................................150” per MIN.

Chuck 4 jaw .....................................