Q: Can we visit WVA to inspect the current Guide Bore machine?
A: A site visit will be held on Tuesday, 6 August 2019 at 10:00 AM. Pre-registration is required and must be completed by COB Friday, 2 August. Please refer to Amendment 0001 for more information.
Q: Are all of the clauses listed in the SF1449 applicable to this Solicitation? Our System for Award Management (SAM) registration is current and up-to-date. Do we need to fill in all questions as found in pages 1-100?
A: The clauses are all applicable to the Solicitation based on what the Government is buying and the terms it requires for this particular purchase, but some clauses will only apply to certain types of successful offerors at award (e.g. large businesses, foreign-owned business concerns).
While many clauses are included in full-text, others are included by reference. The full text of any referenced clause is available at https://acquisition.gov/ .
Offerors should review the SF1449 document in its entirety, and fill in all blank areas relevant to its company and proposed terms. Many blanks are self-explanatory, but offerors are welcome to contact the Contract specialist for guidance.
Some of the fill-in clauses are redundant with SAM.gov, but current acquisition regulations require us to include them on the SF1449 as well.
Q: What is the purpose of Exhibit A, CDRLs, DD1423? Do we need to fill in anything?
A: The Contract Data Requirements List (CDRL) identifies information products the Government must receive in the course of Contract performance (e.g. manuals and reports). The DD1423 lists all of these items in one place, contains a reference to the standardized document that describes their format, and tells offerors how and where to deliver them.
For copies of the standardized documents, visit https://quicksearch.dla.mil/qsSearch.aspx
Offerors do not need to take any action on Exhibit A, CDRLs, DD1423 as part of its proposal. The contract awardee will be responsible for providing the CDRL items.
Q: This Solicitation is labeled as a Boring Machine, but Exhibit A, CDRLs, DD1423, refers to a Broaching Machine. Is this a typo?
A: WVA is buying several pieces of equipment at this time (they're easy to find if you search for "W911PT" on FedBizOpps) all of which broach or bore in some way, so the Solicitations all use this same version of Exhibit A, CDRLs, DD1423.
Solicitation W911PT-19-R-0023 is definitely for a Guide Bore Machine. Fortunately, Exhibit A, CDRLs, DD-1423 just contains the requirement for data to be provided on a particular topic as it relates to the machine being delivered under the Contract, such as CDRL A001, for Asbestos and Mercury-Free Certifications.
For more specific information on the required content of these deliverable data items for the Guide Bore Machine, please refer to Exhibit B, Specifications.
Q: Will Progress Payments or other forms of contract performance financing be offered?
A: Not at this time.
Q: Has the Arsenal ever bored a barrel this long (42 feet) on one of its Century Guide Bore machines?
A: No.
Q: Should I size the boring bar for the 6.085 max bore size, knowing we have to rough to 5.916) or is there a possibility that a larger bore will be done on this machine? That may require a larger diameter boring bar.
A: The boring bar should be sized to 6.085 max bore size. WVA has no plans for the production of larger bores on this machine at this time.
Q: Our company is currently refurbishing a Cincinnati Guide Bore. It has a completely different control operation than the Century machine that this spec is based on. Cincinnati made up a bunch of "setup" process steps which it sends the machine through before boring. Century did not, and it uses a different Encore controller. Which way is WVA expecting the control to act? Cincinnati way, Century way, or a combination of the two?
A: WVA prefers the Cincinnati way, as it allows the operator more control over the boring of the tube. WVA is open to new ideas as this part of the system is 20 years old, and is analog, with is now outdated. Proposed deviations from the spec must be noted in the Compliance Sheet submitted with the proposal, and include justification for the deviation. Please refer to SF1449 Section L, Instructions to Offerors, for more information.
Q: Who exactly is doing the foundation? It's a little unclear. Par. 3.1.30.2 states the contractor is responsible for all costs of install and is responsible to tear out the wood block floor and do existing concrete preparation. Par. 3.1.17.9 says the contractor needs to provide the Arsenal with foundation drawings that WVA can hand over to a general contractor for construction of the foundation. In reference to spec par. 6.5, yes this machine will need a "special foundation". 10 inches is not enough concrete depth to maintain alignments and dissipate the cutting forces, and will need troughs for wiring and plumbing as well.
A: If the successful offeror’s machine requires a special foundation, WVA will pay for a third-party general contractor to construct the foundation to the offeror’s specifications. The Contractor is responsible for hold-down installation and grouting.
Q: Is the machine required to do counter boring?
A: Yes.
Q: What heads or tooling do we need to include for counter boring?
A: WVA uses the same head for rough boring and finish boring, by changing the seat on the head to change the boring diameter.
Q: For the cutting head specified in Exhibit B Paragraph 3.2.4.6, what diameter size do we need to provide?
A: WVA requires a head that can be used to cut a rough counter bore diameter of 5.916” +.005”, then and change over and cut a finish diameter to 6.085” +.005”.
Q: What heads are required with the machine? Do we need two heads, one for roughing and one for finishing? Please clarify what type of head is required and if we need to provide two with the machine.
A: WVA requires one head suitable for both roughing and finishing operations. Offerors shall propose the appropriate number of heads required for the proposed machine design.