WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

calls)

Solicitation/Contract Form Continuation

Ramp Tank ReplacementInstrument Name:

Product Service Code : R699

Project: Ramp Tank Replacement

SITE VISIT

DATE: 23 June 2026 @ 11:00am

LOCATION: 1 Buffington St. Watervliet, NY 12189 (Watervliet Arsenal)

FOR ACCESS INTO THE FRONT GATE PLEASE CONTACT Michael Gross, (571)588- WITH NAME(S) AND COMPANY REPRESENTED 9116, michael.e.gross28.civ@army.mil

AT LEAST A MINIMUM OF 24 HOURS IN ADVANCE OF SITE VISIT.

MEETING POINT IS THE FRONT GATE PARKING AREA JUST INSIDE THE MAIN

ENTRANCE. PLEASE PLAN TO ARRIVE AT LEAST 15 MINUTES EARLY TO ALLOW

TIME GETTING THROUGH THE GATE PROCESSING THROUGH THE VISITOR'S

CENTER.

TECHNICAL POINT OF CONTACT IS: Michael Baker @ (518) 860-3200

BACKUP POINT OF CONTACT ON-SITE IS: Joseph Pokrentowski @ 518-266-4738, joseph.s.pokrentowski.civ@army.mil

THIS IS THE ONLY SITE VISIT, ALTERNATE DATES AND/OR TIMES WILL NOT BE

GRANTED!

W911PT26QA064

A REAL ID-COMPLIANT DRIVER'S LICENSE OR SUPPLEMENTAL IDENTIFICATION

(PASSPORT, TWIC, ETC.) IS REQUIRED FOR ACCESS ONTO POST. ACCESS WILL BE

DENIED FOR ALL WHO DO NOT PRESENT A REAL ID.

SAFETY GLASSES ARE REQUIRED. SAFETY SHOES AND ANY OTHER APPROPRIATE

PERSONAL PROTECTIVE ITEMS ARE ALSO RECOMMENDED.

AS4002 - NOTICE OF WATERVLIET ARSENAL INFORMATION/REQUIREMENTS

(a) IMPORTANT DELIVERY/QUALITY REQUIREMENTS:

(1) ALL OFFERORS MUST CAREFULLY REVIEW THE DELIVERY REQUIREMENT IN THE REQUEST FOR QUOTE OR SOLICITATION. WHEN SUBMITTING AN OFFER/BID, PLEASE ENSURE THAT YOU CAN MEET

THE DELIVERY SCHEDULE.

(2) ON TIME DELIVERY IS VERY CRITICAL. THEREFORE, YOU MUST ADHERE TO THE DELIVERY

REQUIREMENTS INDICATED IN ANY RESULTANT AWARD. FAILURE TO COMPLY WITH THE

CONTRACTUAL DELIVERY SCHEDULE, MAY RESULT IN TERMINATION OF THE ORDER OR REQUIRE

CONSIDERATION IF THE GOVERNMENT ELECTS TO EXTEND DELIVERY. (NOTE: Non-availability of raw materials, subcontractor issues, scheduling conflicts, should be considered at the time you are submitting your offer /bid. They are not acceptable excuses for failing to meet the delivery after award).

(3) PROVIDING QUALITY PRODUCTS THAT CONFORM TO THE CONTRACT ARE JUST AS IMPORTANT AS

MEETING THE REQUIRED DELIVERY. DELIVERY OF NON-CONFORMING PRODUCTS RESULTS IN

DELIVERY DELAYS AND INCREASED COSTS TO THE ARSENAL.

(4) PAST PERFORMANCE FOR QUALITY AND DELIVERY MAY BE A MAJOR CONSIDERATION IN MAKING

DETERMINATIONS FOR FUTURE CONTRACT AWARDS.

NOTICE: Throughout this document we may use the terms "we" and "you", the term "we" means the government of the United States of America, and the term "you" means the contractor.

(b) WATERVLIET ARSENAL INFORMATION FOR CONTRACTORS:

"Watervliet Arsenal Information for Contractors" document is incorporated by reference in all solicitations and contracts. The full text version of the instructions is available at Internet address: https://www.wva.army.mil/docs /librariesprovider6/default-document-library/waic.pdf?sfvrsn=8b90f522_0

Upon request, the contracting officer will make its full text available."

POC - CONTRACT SPECIALIST/BUYER: Michael Gross

TELEPHONE NUMBER: 571.588.9116

E-MAIL ADDRESS: michael.e.gross28.civ@army.mil

CONTRACTOR DUNS NUMBER/CAGE CODE/FAX NUMBER:

Please provide the following information for your company.

VENDOR NAME: _________________________

VENDOR POC: __________________________

POC PHONE: ____________________________

E-MAIL ADDRESS (see note below): __________________________

DUNS NUMBER _______________________

CAGE CODE (if known) __________________

TAX ID NUMBER ________________________

VENDOR FAX NUMBER ________________

NOTE: Your e-mail address is required so that in the event you receive the resultant award, we can e-mail it to you. If we experience difficulties with e-mail, it will be data faxed.

(c) AWCF BULK FUND DOES NOT APPLY

(d) POSTERS:

(1) Contracts for Material, Supplies, Articles and Equipment Exceeding $15,000/Service Contract Labor Standards. Orders subject to these Acts require contractors to post WH Publication 1313, "Employee Rights on Government Contracts".

(2) Construction Orders. Orders for construction require contractors to post WH Publication 1321, "Employee Rights under the Davis Bacon" and the Office of Federal Contract Compliance poster on "Equal Employment Opportunity is the Law."

(3) These posters can be accessed electronically at http://www.dol.gov .

(4) Hard copies of the posters will be made available upon request to the contracting officer.

(e) PAYMENTS:

Any vendor that receives an award (except those paid by credit card or accommodation check) can view invoice payments made by DFAS at https://wawf.eb.mil/ using the "my invoice" system. You will be required to register in order to view payments. Payment information is maintained for 120 days from invoice payment. Vendors can find out when invoices have been paid by Electronic Funds Transfer (EFT), etc. This website can save valuable time and frustration over billing questions, and it is a free service.

(f) RELEASE OF INFORMATION:

The contractor shall not release or authorize release of DoD specifications; acceptance test results; information involving critical military technology; or any other information in which the DoD maintains proprietary rights or is otherwise confidential or classified. This restriction includes any endorsement by the Department of Army of a contractor. Release of information under the circumstances referenced above requires the prior written approval of the Contracting Officer responsible for this contract. It is the contractor's responsibility to be familiar with, and comply with the requirements of Chapter 7, page 22, paragraph 7-1, of AR 360-1 may be found at https://armypubs.

army.mil/epubs/DR_pubs/DR_a/ARN30105-AR_360-1-000-WEB-1.pdf

AS6311 - Electronic Contracting

(a) All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website (https://www. SAM.gov). When available electronically, Technical Data Packages (TDPs) will be provided to the contractor either as separate attachments that will be made available within SAM.gov or as links within the PIEE Solicitation Module.

(b) This solicitation requires any proposal, modification or revision/amendment submission via the Procurement Integrated Enterprise Environment (PIEE) - Solicitation Module. (See Section L for further information.)

PIEE Log in Page: https://piee.eb.mil/xhtml/unauth/home/login.xhtml

This will require offerors to be registered in PIEE and have the appropriate access/user role for the Solicitation module within PIEE. This may also require action on the part of offerors to request and obtain the appropriate access/user role for the Solicitation module in order to upload and submit any proposal, modification or revision /amendment. Offerors are required to review their PIEE module access immediately and initiate any necessary request(s) for the Solicitation module, which should be done as soon as possible, and well in advance of the solicitation closing date/time.

See the below for information regarding PIEE and the Solicitation Module:

Getting Started with PIEE:

https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/vendorRegister.xhtml https://pieetraining.eb.mil/wbt/portal/portal/Vendor_Registration.pdf

PIEE Solicitation Module Information and Web Training:

https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml https://pieetraining.eb.mil/wbt/sol/Solicitation_Registration.pdf https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml

Other helpful Info:

https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf

(c) Please pay close attention to the Issued By block location on the cover page of the solicitation closing date /time. The solicitation closing date/time is based on the local time of the location of the Issued By office. Offerors are responsible for submitting any proposal, modification or revision/amendment, so as to be received by the Government office designated in the solicitation by the date/time specified.

(d) It is the responsibility of the offeror to ensure any proposal, modification, or revision/amendment is received by the date and time specified on the cover page of this solicitation. If any proposal, modification, or revision /amendment was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late and will be handled in accordance with FAR 52.215-1 or FAR 52.212-1 (whichever is applicable to this solicitation). Proposal, modification, or revision /amendment is defined to mean ALL volumes or parts required in the solicitation and included in the electronic submission.

Note: Any proposal, modification, or revision/amendment size and content may impact the time it takes for submission. Therefore, offerors are strongly cautioned that adequate time should be allowed when submitting any proposal, modification, or revision/amendment.

(e) Solicitations may remain posted on www.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, offerors will no longer be able to submit electronic responses.

(f) Any award issued as a result of this solicitation will be distributed electronically. In the event of a Freedom of Information Act (FOIA) (5 USC (S) 552) request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released. In addition, in accordance with Executive Order 12600 (June 23, 1987), please be advised it is the Government's intention to also release the unit price(s) in response to any request under FOIA. Unit price is defined as the contract price per unit, or item purchased as it appears in Section B of the contract. Unit price does NOT refer to, nor does it include Cost or Pricing data or information. If an offeror objects to the release of the unit price(s) in the contract or contract modifications in the event of a FOIA request, the offeror must notify the Contracting Officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection, consistent with the provisions of FOIA. A release determination will be made in accordance with FOIA based on the rationale provided.

(g) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the APEX (formerly Procurement Technical Assistance Center (PTAC)) website at http://www.miapex.org/ to locate a regional center.

AS7316 - ALL OR NONE

Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.

(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.

(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS

SOLICITATION WILL BE DEEMED NONRESPONSIVE.

AS7526 - NOTICE OF ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION (FPCON)

The contractor is hereby notified that there is a potential impact on contractor performance during increased FPCON due to increased threat. During FPCONs Charlie and Delta, services may be discontinued / postponed due to the higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.

AS7527 - NOTICE OF RANDOM ANTITERRORISM MEASURES PROGRAM (RAMP)

In accordance with AR 525-13, Contractor personnel working on an Army installation, arsenal, base or other DoD facility (owned or leased by DoD/Department of the Army), are subject to participation in the installation RAMP (e.

g. vehicle searches, wearing of ID badges, etc.)

*** END OF NARRATIVE ***

Continuation of Supplies or Services and Prices/Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price

Amount

0001 RAMP TANK REPLACEMENT Contractor to provide labor, materials, equipment, and subcontractors for Ramp Tank Replacement at Watervliet Arsenal WVA, per Statement of Work 26ENV001. Service Contract Labor Standards, Wage Determination # 2015- 4143 latest revision applies and is incorporated. Period of Performance is 90 Calendar Days from receipt of Notice to Proceed (NTP). Contracting Officer's Representative (COR) will be Michael Baker. Pricing Arrangement: Firm Fixed Price CLIN only - Requisition Document Number

(MILSTRIP, DLMS, FEDSTRIP):

W16H1F605400NU

Product Service Code: R699 Pricing Arrangement: Firm Fixed Price

1 Lot

Continuation of Description

Performance Work Statement (PWS)

FOR

Ramp tank replacement

AT

Watervliet Arsenal

West Campus (Siberia)

Project #: 26ENV001

Safety & Environmental Division

Environmental Department (TAWV-XOS-E)

GENERAL

1.1 SUMMARY OF WORK

1.1.1 Project Description

a. This Performance Work Statement (PWS) defines the effort required for the Removal of Underground Storage Tank (UST #2), build up of a containment pad, and install of a structural building around the new containment pad, to meet all requirements of the NYS Department of Environmental Conservation (DEC). The structure shall be built so that no weather can impact the existing dumpster.

1.1.2 Location of Work

a. The exact location is between Building 141 and 152 (Marked UST #2).

1.1.3 Period of Performance

a. The contractor shall be required to (i) commence work under this contract within 7 calendar days after the date the contractor receives notice to proceed, (ii) prosecute the work diligently, and (iii) complete the entire work ready for use not later than [90] calendar days after notice to proceed was given. The time stated for completion shall include final cleanup of the premises.

1.1.4 Hours of Operation

a. Normal duty hours are 7:00 AM through 4:00 PM, Monday through Thursday, and 7:00 AM through 3:00 PM on Fridays. Federal holidays are non-work days. If a federal holiday falls on a Saturday or Sunday, the preceding Friday or following Monday is a work holiday.

1.2 SUBMITTALS

1.2.1 General Submittal Requirements

a. The contractor shall provide submittal documents via e-mail to the Contracting Officer for review and approval. Provide all physical (non-document) submittals (including but not limited to material swatches, samples, etc.) directly to the Contracting Officer for review and approval. All submittals require government approval unless otherwise explicitly stated.

b. The contractor shall reference APPENDIX A "Consolidated List of Submittals" for the complete list of required submittals.

1.2.2 Contractor Safety Plan

a. The contractor shall submit a safety plan which is specific to the work activity being performed under the scope of this project for Government review and approval.

1.2.3 Lockout / Tagout (LOTO) Acknowledgement

a. The Contractor shall sign and submit a "Lockout/Tagout (LOTO) Notification Acknowledgement Record" prior to working on or de-energizing any electrical equipment.

1.2.4 Project Schedule

a. The contractor shall create a project schedule and submit for Government review and approval.

b. The project schedule shall detail the phases of work and the overall timeline for the execution of the work. The contractor shall include delivery dates, appropriate milestones, and shall clearly detail any requirements for work performed outside of regular hours of operation.

1.3 GENERAL REQUIREMENTS

1.3.1 Watervliet Arsenal Information for Contractors (WAIC)

a. The contractor shall perform all work in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The contractor shall read and understand this document prior to submitting a proposal. The WAIC is publicly available at: http://www.wva.army.mil/Documents/Contracting/WAIC.pdf.

1.4 Utility Outage Requests and Utility Connection Requests

1.4.1 Schedule work to minimize outages. For utility outages and connections required during the execution of work that affect existing systems, coordinate schedule with COR.

Schedule utility outages and connections to minimize disruptions to the Government. No additional payment will be provided for utility outages and connections required to be performed outside the regular work hours.

a. The contractor shall notify the Contracting Specialist a minimum of two (2) business days before the contractor starts work. The contractor shall notify the COR a minimum of seven (7) business days before the shut-down of a utility or building service.

1.4.2 Safety Requirements

a. The contractor is required to provide the proper control of hazardous energy (lockout/tagout) per OSHA 29 CFR 1910.147.

b. The contractor shall inspect the project work site prior to starting work, and shall request a copy of the asbestos building inspection records to verify the location and description of known asbestos-containing materials.

1.5 ON-SITE PERMITS

1.5.1 Excavation (Dig Permit)

a. The clearance of buried utilities will be performed by the Government in advance of the Contractor performing subsurface work, unless otherwise explicitly stated.

b. The Contractor shall obtain a copy of the completed Utility Clearance Permit (WVA Form 420-2-E) from the COR prior to performing subsurface work. Verify existing utility locations indicated on contract drawings, within area of work.

1.5.2 Hot Work and Confined Space

a. Obtain permit for welding, burning, use of flame, or entry into confined space from WVA Fire Department by calling (518)266-5990 each day the permit is to be used.

1.6 APPLICABLE DOCUMENTS

1.6.1 Drawings

1.7 Underground storage tank Locations

1.7.1 Specifications

1.8 UFGS 33 61 13.19 - Valves, Piping and Equipment in Valve Manholes

1.8.1 References

a. The following references accompany this Statement of Work and are a part thereof.

i. Watervliet Arsenal Instructions for Contractors (WAIC).

ii. NFPA 70 - National Electric Code (NEC).

1.9 CONTRACTOR EQUIPMENT

1.9.1 Equipment Identification

a. The contractor shall create and affix a label to all large equipment, dumpsters, and other mobilized property, which is weather-resistant (laminated, or within a see-thru label hanger), securely affixed to the equipment or visible through a window, and which clearly displays the General Contractor's:

i. Company Name, POC Name (first, last), POC phone number, Project Number.

1.9.2 Waste Dumpster

a. The contractor shall place any waste dumpsters in a manner that does not interfere with thru-traffic.

b. Place waste dumpsters with a minimum of 33' clearance from any building.

The final location shall be coordinated with, and approved by the COR before any dumpsters are mobilized.

c. Cover all waste dumpsters when not in use, and before the end of each work shift. The cover shall be weather-tight.

d. The Contractor shall submit all Bills of Lading and Weight Slips associated with the disposal of all construction and demolition (C&D) debris to the Contracting Officer on a monthly basis. The contractor shall provide this information within ten (10) days of disposal of the waste.

PART 2 PRODUCTS

2.1 GENERAL

All work shall be in strict accordance with product manufacturer's instructions and specifications, including but not limited to manufacturer guidance for storage, staging, application, installation, and disposal of the product.

2.1.1 Hazardous Materials

a. The contractor shall submit Safety Data Sheets (SDS) for all hazardous materials to be used.

2.1.2 Asbestos, Mercury, Lead, PCB

a. Unless otherwise stated, all materials for this project shall be new. All products shall not contain any asbestos, mercury, chromium/lead paint, Class I Freon, and Polychlorinated Biphenyls (PCB), and shall state such on the manufacturer's original packaging.

2.1.3 DoD Green Procurement Program

a. All construction materials shall meet the applicable requirements of the DoD Green Procurement Program, specifically recycled content products, environmentally preferable products and services, biobased products, energy-and water-efficient products, alternate fuel vehicles and alternative fuels, products using renewable energy, and alternatives to hazardous or toxic chemicals as found at <http://www.acq.osd.mil /dpap/cpic/cp/docs/USA001967-08-DPAP.pdf>.

2.1.4 Paint

a. To meet the Affirmative Procurement Program (Federal Government's Buy Recycled Requirements) all paint used in the project shall adhere to the below listed requirements of the Comprehensive Procurement Guideline for recovered materials.

This applies only to interior latex paint, only if available at the time of the project.

i. Reprocessed Latex Paint (White, Off-White, Pastel Colors) shall contain 20% Post consumer content.

ii. Reprocessed Latex Paint (Grey, Brown Earth tones, and Other Dark Colors) shall contain 50-99% Post consumer content.

iii. Consolidated Latex Paint shall contain 100% Post consumer content.

PART 3 EXECUTION

3.1 ITEMS OF WORK

3.1.1 General Requirements

3.2 The Contractor shall furnish all labor, supervision, materials, supplies, transportation, tools, equipment, and other means necessary for performing and completing the removal of Underground Storage Tank (UST)#2, build up of a containment pad, and install of a structural building around the new containment pad.

a. The Contractor shall perform all services in a safe and workmanlike manner as per generally accepted industry standards, as well as coordinating all efforts with the COR and meeting with additional system personnel as appropriate.

3.3 Pits/vaults are considered confined spaces. Contractors working in Watervliet Arsenal confined spaces must provide their own air monitoring devices, harnesses, tripods and all other safety services/devices.

a. In addition, proper entry procedure must be followed in accordance with OSHA and Watervliet Arsenal health standards for permit required confined spaces. The Fire Department rescue line shall be used for emergency contact on the installation for immediate rescue efforts to take place.

b. Contractors must use the Watervliet Arsenal Form 385-17-E (Confined Space entry permit) and provide that form to the COR. They must also notify the Fire Department of all actions during the confined space projects. They also must ensure emergency notification sheet is always complete and visible onsite.

3.4 The Contractor shall provide a written plan on how they will Remove UST #2, Located between Building 141 and 152 (Marked UST #2).

3.5 The Contractor shall provide a "Work Plan" to implement the removal of the UST and cleaning, including steps and timeframe required for this work to be completed including a description of the specialized equipment being used. Contractor shall provide a detailed description of cleaning and inspection methods.

a. The Contractor shall provide notice to the COR every time they are onsite to include the location of all crews. The COR or their designated representative will periodically inspect the work and will always be available should issues arise. Contact numbers will be exchanged upon commencement of the work.

3.6 Prior to removal, the Contractor shall pump out tank full of water/oil and dispose of it.

3.7 The Contractor shall provide a site inspection and cleaning report upon removal of the

UST.

3.8 All removed storage tank, surrounding earthwork, concrete, and water / oil will require a manifest showing the final destination of waste. Waste manifests will be on a paper copy, provided as proof of destination.

3.9 Contractor will provide a structure for weather diversion, such as snow and rain, and have a load capacity rating assigned to it for the weather common in New York State. The structure will be made of steel, have a metal roof, and metal siding. Drawings of the structure will be provided for approval prior to execution. The structure will be designed to have double swing gates, allowing for storage of existing leased commercial dumpster, and allow for it to be removed and emptied by the waste management contractor (not included on this effort).

3.10 Upon completion of the erection of the structure, a total of 12 steel type bollards will be placed around the structure, allowing for the protection of the new structure.

3.11 An appropriate sized light shall be installed for safe operation of the fencing and dumpster. Electrical will be reworked and ran from existing power. Product will be submitted for review and approval.

3.12 All products and workmanship will be per appropriate code and commercially accepted practices.

3.13 Contractor will submit Tank Closure Report to New York State DEC when completed work is done. Report will include

a. Report will include the results of the Soil, vapor, or groundwater samples must be collected from the tank excavation area (walls and bottom) to screen for contamination.

b. Waste Manifests: Proof that all tank contents, liquids, and sludge were properly transported and disposed of.

c. Disposal Certificates: Receipts or certificates verifying the tank shell was scrapped or cleaned and disposed of properly.

d. Lab Results: Analytical data confirming that soil and groundwater meet NYSDEC standards.

e. Any photographic logs required per state, showing tank removal and excavation site (photos subject to OPSEC approval)

PART 4

4.1 CLOSEOUT REQUIREMENTS

4.1.1 Construction and Demolition Debris

a. The Contractor shall submit copies of all Bills of Lading and Weight Slips associated with the disposal of construction and demolition (C&D) debris and/or recycled materials, under this scope of work. Submit documentation per Appendix A, "Consolidated List of Submittals".

4.1.2 Cleanup of Work Site

a. The contactor shall clean all work areas daily and remove all tools, equipment, debris, materials, and all waste from the premises.

b. The contractor shall remove all debris from any remote holding locations, to include any excavation and concrete equipment chute cleanout debris.

c. The contractor shall remove their equipment from Watervliet Arsenal premises within five (5) working days after completion of project work.

4.1.3 Restoration of Work Site

a. The contractor shall repair any items, building surfaces, equipment or miscellaneous items which were damaged during the execution of this PWS. Items that cannot be repaired to restore original function or aesthetics shall be replaced in kind by the Contractor at no additional charge to the Government.

4.1.4 Warranty

a. The contractor shall provide a [1] year warranty from the date of government acceptance on any newly installed parts and workmanship.

PART 5 APPENDICES

5.1 Consolidated List of Submittals

APPENDIX A: Consolidated List of Submittals

Line Item Submitted Submittal Needed By Submittal Reviewed By (Office)

1 Safety Data Sheets for Hazardous Materials

(SDS)

NLT 7 Calendar

Days After Award

Safety Office

2 Signed Lockout/Tagout (LOTO) Notification

Acknowledgement Record

NLT 7 Calendar

Days After Award

Safety Office

3 Project Schedule NLT 7 Calendar

Days After Award

COR

4 Contractor Safety Plan NLT 7 Calendar

Days After Award

COR

5 Written Certified Test Results of the Samples of the oil and water

NLT 7 Days after results are available

COR

6 Electrical Light for Building Cut Sheet NLT 10 Calendar

Days after Award

COR

7 Steel Bollard Cut Sheets NLT 10 Calendar

Days after Award

COR

8 Cut Sheets for the Structure, swing gates, roof, etc. showing the load appropriate for

NYS weather

NLT 10 Calendar

Days after Award

COR

9 Solid Waste Reporting Log, Bills of Lading, Dump Slips for C&D Debris and Recycled

Materials

NLT the 10th Day of the Following Month, and at Project

Completion

Environmental Office

10 Proof of submission of Tank Closure Report and Acceptance by NYS DEC

NLT 30 Days after completion of project

COR

CS4002 - REQUEST FOR QUOTE RESPONSES

ALL RESPONSES MUST BE ELECTRONIC. YOU MUST SUBMIT YOUR QUOTE RESPONSES USING THE

FOLLOWING METHODS:

(a) Email to: Contract Specialist: michael.e.gross28.civ@army.mil

(b) Request for Quotes must be filled out completely and sent in its entirety to be considered responsive.

C. Submission of Recordable Injuries and Illness Cases (Dec 2012)

Watervliet Arsenal is pursuing OSHA Voluntary Protection Program (VPP) recognition. The VPP impacts all contractors whose employees cumulatively work more than 1000 hours per quarter within a calendar year at Watervliet Arsenal (herein referred to as "applicable contractors"). It is the contractor's responsibility to ensure its employees and managers are in full compliance with OSHA requirements and have a general understanding of VPP. Detailed information on VPP is available on the OSHA website at http://www.osha.gov/dcsp/vpp/index.html.

All contractors, whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of Watervliet Arsenal. Applicable contractors are required to annually submit to Watervliet Arsenal, ATTN: TAWV-XOS/ Safety Office, Bldg. 10, 1 Buffington Street, Watervliet, NY 12189-4050 or email: usarmy.watervliet.tacom.list.watesafety@army.mil the following documents (covering the previous calendar year quarters) by 15 January:

- Total Case Incidence Rate (TCIR)

- the number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.

- Days Away, Restricted, and/or Transfer Case Incident Rate (DART)

-Number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.

- OSHA Form 300A

Applicable contractors may submit the above immediately following the completion of a quarter, if desired.

W911PT26QA064

mailto:usarmy.watervliet.tacom.list.watesafety@army.mil

CS7520 - ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES

a. The contractor and all associated subcontractors' employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor must provide all information required to complete the required background check(s) to meet installation access requirements requested by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 "Personal Identity Verification of Contractor Personnel") as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

b. For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated Tier 1/T1 (formerly referred to as a National Agency Check with Inquiries/NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. An initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled T1 by the Centralized Suitability Service Center (CSSC).

c. For contractors that do not require CAC but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation /facility access and local security policies and procedures elsewhere in Section C titled as paragraph - Access to the Detroit Arsenal; Identifying Contractor Employees; Non-disclosure Statement; for OCONUS locations, refer to the Status of Forces Agreement and other theater regulations.

Requirements

PROJECT TITLE: RAMP TANK REPLACEMENT POJECT LOCATION: WATERVLIET ARSENAL

(WVA) WEST CAMPUS (SIBERIA) CONTRACTOR SHALL PROVIDE LABOR, MATERIALS,

EQUIPMENT, AND SUBCONTRACTORS TO COMPLETE THE RAMP TANK REPLACEMENT

AT WVA IN ACCORDANCE WITH (IAW) THE FOLLOWING DOCUMENTS INCORPORATED BY

REFERENCE: - 26ENV001 STATEMENT OF WORK (SOW) - Service Contract Labor Standards Wage Determination #2015-4143, LATEST REVISION

Bill to Party: W16H1F

Continuation of Packaging and Marking

DS7111 - HEAT TREATMENT AND MARKING OF WOOD PACKAGING MATERIALS

(a) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization's compliance program.

(b) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated.

All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

(c) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

Continuation of Inspection and Acceptance

Overall Contract Inspection/Acceptance Locations

0001 Inspection and Acceptance Location

Both Destination Instructions: I/A Destination IAW SOW.

DoDAAC: W911PT CountryCode: USA

W6QK ACC WVA

ACC WATERVLIET ARSENAL, 1 BUFFINGTON ST

WATERVLIET, NY 12189-4050

UNITED STATES

Continuation of Deliveries or Performance

FS4002 - DELIVERY INFORMATION

(a) Effective 1 March, 2020, all commercial carriers must request an appointment for delivery to Watervliet Arsenal through the Carrier Appointment System (CAS). Carriers can register for CAS at . In the event that a carrier is either unable to register for https://eta-teams.transport.mil/ CAS, or if CAS is down, carriers must call the transportation desk at 518-266-5858 to schedule an appointment

Note(s):

i. Late/early arrivals may be rescheduled to the next available appointment date.

ii. This will not apply to small package carriers such as FEDEX, UPS, or DHL.

(b) NOTICE: NORMAL DELIVERY HOURS FOR RECEIPT OF SUPPLIES AT WATERVLIET

ARSENAL ARE AS FOLLOWS:

Monday through Thursday Business Hours: 6:30 A.M. EST to 3:30 P.M. EST

Friday Business Hours: Every other Friday from 6:30 A.M. EST to 2:00 P.M. EST

Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2026 to be closed is January 09, 2026.

https://eta-teams.transport.mil/

BASED ON THE ABOVE, CONTRACTORS SHOULD CALL THE CONTRACT/PURCHASE

ORDER ADMINISTRATOR IN ADVANCE IF DELIVERY IS SCHEDULED FOR A FRIDAY TO

FIND OUT IF THE ARSENAL WILL BE OPEN FOR BUSINESS.

Also, when a federal holiday is normally observed on a Friday, the arsenal may be closed on the preceding Thursday. In these instances, please contact the contract/purchase order administrator in advance of delivery if Thursday delivery is anticipated to determine if the arsenal will be open for business.

THE ABOVE INFORMATION SHOULD BE NOTED WHEN SCHEDULING DELIVERIES AS

WATERVLIET ARSENAL WILL NOT BE LIABLE FOR ANY STORAGE, DEMURRAGE OR

SHIPPER LABOR COSTS INCURRED AS A RESULT OF CONTRACTOR ATTEMPTED

DELIVERIES ARRIVING DURING NON-BUSINESS HOURS.

(b) ITEM DESCRIPTION:

The material delivered hereon must be tagged or otherwise identified by placing the purchase order/contract number on the packing slip or it will be returned at the contractor's expense. If more than one item is involved, material must be segregated by item and must be tagged or otherwise identified by item number. National stock number, when applicable, must be shown on all vendor's documents, such as Bill of Lading, Notice of Shipment, delivery or packing slip, etc.

0001 Delivery Schedule From date of lead time event to completion of performance 90 Calendar Days

Date of Award Receipt

1 LotQuantity

Address and POC Place of Performance DoDAAC: W911PT CountryCode: USA

W6QK ACC WVA

ACC WATERVLIET ARSENAL, 1 BUFFINGTON ST WATERVLIET, NY 12189-4050

UNITED STATES

Period of Performance From 01 Aug 2026 To 31 Oct 2026

Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.203-3 Gratuities. 1984-04

52.203-6 Restrictions on Subcontractor Sales to the Government.

(Alternate I)

2020-06 Alternate I 2021-11

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.

2017-01

52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)

2026-02

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026- O0038)

2026-02

52.212-4 Terms and Conditions- Commercial Products and Commercial Services. (Deviation 2026-O0038)

2026-02

52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026- O0038)

2026-02

52.219-8 Utilization of Small Business 2026-02

Concerns. (Deviation 2026- O0038)

52.222-35 Equal Opportunity for Veterans.

(Deviation 2026-O0038)

2026-02

52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026- O0038)

2026-02

52.222-37 Employment Reports on Veterans. (Deviation 2026- O0038)

2026-02

52.222-40 Notification of Employee Rights Under the National Labor Relations Act. (Deviation 2026- O0038)

2026-02

52.222-41 Service Contract Labor Standards. (Deviation 2026- O0038)

2026-02

52.222-44 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment.

(Deviation 2026-O0038)

2026-02

52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)

2026-02

52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation 2026- O0038)

2026-02

52.222-90 Addressing DEI Discrimination by Federal Contractors.

(Deviation 2026-O0040, Revision 1)

2026-04

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.

2024-05

52.232-33 Payment by Electronic Funds Transfer-System for Award Management.

2018-10

52.232-40 Providing Accelerated Payments to Small Business Subcontractors.

2023-03

52.233-3 Protest after Award. (Deviation 2026-O0038)

2026-02

52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026-

2026-02

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials.

2011-09

252.203-7002 Requirement to Inform Employees of Whistleblower Rights.

2022-12

252.204-7004 Antiterrorism Awareness Training for Contractors.

2023-01

252.204-7018 Prohibition on the Acquisition of Covered Defense

2023-01

Telecommunications Equipment or Services.

252.204-7022 Expediting Contract Closeout. 2021-05

252.223-7008 Prohibition of Hexavalent Chromium.

2023-01

252.225-7012 Preference for Certain Domestic Commodities.

2022-04

252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.

2023-01

252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.

2023-06

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.

2018-12

252.232-7010 Levies on Contract Payments. 2006-12

252.243-7002 Requests for Equitable Adjustment.

2022-12

252.247-7023 Transportation of Supplies by Sea.

2024-10

FAR Clauses Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

52.219-14 Limitations on Subcontracting. 2026-02

(Deviation 2026-O0038)

Limitations on Subcontracting (Feb 2026) (Deviation 2026-O0038)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) , as used in this clause, means a first-tier subcontractor, Definition. Similarly situated entity including an independent contractor, that-

(1) Has the same small business program status as that which qualified the prime contractor for the award ( , for a small business set-aside contract, any small business concern, without e.g.

regard to its socioeconomic status); and

(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.

(c) This clause applies only to-Applicability.

(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(3) Contracts that have been awarded on a sole-source basis in accordance with sections 19.105, 19.106, 19.107, and 19.108;

(4) Orders expected to exceed the simplified acquisition threshold and that are set aside for small business concerns under multiple-award contracts, as described in 8.4 and 16.5;

(5) Orders, regardless of dollar value, that are set aside in accordance with sections 19.105, 19.106, 19.107, and 19.108 under multiple-award contracts, as described in 8.4 and 16.5; and

(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.

(d) An independent contractor shall be considered a subcontractor.Independent contractors.

(e) By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for-

(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;

(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;

(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or

(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.

(f) The Contractor shall comply with the limitations on subcontracting as follows:

(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause-

[ ] Contracting Officer check as appropriate.

X By the end of the base term of the contract and then by the end of each subsequent option period; or

By the end of the performance period for each order issued under the contract.

(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.

(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.

(1) In a joint venture comprised of a small business protege and its mentor approved by the Small Business Administration, the small business protege shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protege in the joint venture must be more than administrative functions.

(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.

(End of clause)

52.222-42 Statement of Equivalent Rates for Federal Hires.

2014-05

Statement of Equivalent Rates for Federal Hires (May 2014)

In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor ( ), this clause identifies the classes of service employees 29 CFR Part 4 expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.

5341 or 5332.

This Statement is for Information Only: It is not a Wage Determination

Employee Class Monetary Wage-Fringe Benefits

23370 - General Maintenance Worker $23.38 + $5.55 Fringe

(End of clause)

DFARS Clauses Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

252.232-7006 Wide Area WorkFlow Payment Instructions.

2023-01

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .