The contractor shall provide all necessary personnel, equipment, tools, materials, and services to perform preventative maintenance, repairs, and technical support for the specified X-ray machines. The PWS details the scope of work, required maintenance activities, repair procedures, and parts replacement. It also outlines quality control and assurance requirements, security protocols, and deliverables the contractor must provide. The period of performance for this contract will be up to six months.
Text of this file
PERFORMANCE WORK STATEMENT (PWS)
INDUSTRIAC S9X3000 X-RAY MACHINE & 450 kV CR & LINAC (CAAA) NDT SERVICE
LETTERKENNY MUNITIONS CENTER (LEMC) & CRANE ARMY AMMUNITION ACTIVITY (CAAA)
General: This is a requirement to have an INDUSTRIAC S9X3000 & 450 kV CR NDT Equipment, located at LEMC, Chambersburg PA, serviced (PM or repairs) as described within this Performance Work Statement. This shall also include the INDUSTRIAC 3MVX002400 X-Ray Machine located at Crane Army Ammunition Activity (CAAA) in Indiana.
Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, quality control and other items and non-personal services necessary to perform service, maintenance, and repairs to an INDUSTRIAC S9X300 X-Ray machine and INDUSTRIAC 3MVX002400 X-Ray Machine located at CAAA, and a 450 kV CR as defined in this PWS, except as specified in Paragraph 3.0 as Government Furnished. The contractor shall perform to the standards in this contract and may use subcontracting opportunities. All preventative maintenance and repairs will be documented and sent via e-mail to the Contract Officer’s Representative (COR) Monica Dean, 717-267-9577, monica.r.dean.civ@mail.mil, or Jason Straley, 717-267-5241, jason.w.straley@army.mil, and to the Technical Point of Contact (TPOC), Elizabeth Michael, 717-267-5401, elizabeth.a.michael.civ@mail.mil, or CAAA TPOC Lara Zilafro, 812-854-1543, lara.e.zilafro.civ@mail.mil within 24 hours of the action of a repair or preventative maintenance.
Background: Letterkenny Munitions Center (LEMC), on or around March 2010, purchased an INDUSTRIAC S9X3000 X-Ray Machine, on or around 2015 purchased a 450 kV CR X Ray machine. These machines have exceeded the warranty period and due to the overall cost of the machines, requires services, maintenances and potentially repairs to remain operational. The machines are currently operational and are not exhibiting any evidence of mechanical malfunction or failure. These machines are of industrial grade and strength and have the capacity to internally photograph munitions and their respective parts. The LINAC machine, located at CAAA, is like the INDUSTRIAC machine located at LEMC.
| Period of Performance (PoP): The Period of Performance shall be up to six (6) months. |
| General Information: |
| Quality Control (QC): The contractor shall develop and maintain an effective QC program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QC program is how it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary which refers to the requirements listed in 5.3. |
| Quality Assurance (QA): The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)). |
Recognized Holidays: The following are recognized US holidays. The contractor shall not perform services on these days:
| New Year’s Day |
| Martin Luther King, Jr.’s Birthday |
| President’s Day |
| Memorial Day |
| Independence Day |
| Juneteenth Day |
| Labor Day |
| Columbus Day |
| Veteran’s Day |
| Thanksgiving Day |
| Christmas Day |
Place and Performance of Services The contractor shall provide services between the hours of 0730 and 1530 on Monday through Thursday, and even potentially Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at building 5250 inside LEMC, or at the designated location inside CAAA, monitored by the COR or the TPOC. The contractor shall always maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Also, while on site at LEMC or CAAA, the contractor is responsible for the performance and conduct of his employees.
Security Requirements: Contractor personnel performing work under this contract are required to have a specific security level. The contractor personnel will be escorted and always monitored while at LEMC or CAAA by the COR or TPOC.
Physical Security: The contractor shall safeguard all Government property that is being diagnosed or repaired. At the close of each work period, Government facilities, equipment and materials shall be secured.
Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government.
These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
2.0 Definitions and Acronyms:
CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
CONTRACTING OFFICER (KO). A person with authority to enter, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.
Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor if that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
DELIVERABLE. Anything that can be physically delivered and includes non- manufactured things such as meeting minutes or reports.
KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
| PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property. |
| QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards. |
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
| QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of a product or service shall meet contract requirements. |
| SUBCONTRACTOR. One that enters a contract with a prime contractor. The Government does not have privities of contract with the subcontractor. |
WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.
WORK WEEK. Monday through Friday, unless specified otherwise.
2.2 ACRONYMS:
| AFARS | Army Federal Acquisition Regulation Supplement AR | Army Regulation | |
| CAAA | Crane Army Ammunition Activity | ||
| CFR | Code of Federal Regulations | ||
| CONUS | Continental United States (excludes Alaska and Hawaii) COR | Contracting Officer Representative | |
| COTS | Commercial-Off-the-Shelf | ||
| DA | Department of the Army | ||
| DD250 | Department of Defense Form 250 (Receiving Report) DD254 | Department of Defense Contract Security Requirement List DFARS | Defense Federal Acquisition Regulation Supplement |
| DOD | Department of Defense | ||
| FAR | Federal Acquisition Regulation | ||
| KO | Contracting Officer | ||
| LEMC | Letterkenny Munitions Center | ||
| NDT | Non-Destructive Testing | ||
| POC | Point of Contact | ||
| PRS | Performance Requirements Summary | ||
| PWS | Performance Work Statement | ||
| QA | Quality Assurance | ||
| QAP | Quality Assurance Program | ||
| QASP | Quality Assurance Surveillance Plan | ||
| QC | Quality Control | ||
| QCP | Quality Control Program | ||
| TE | Technical Exhibit | ||
| TPOC | Technical Point of Contact |
Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the facilities, equipment, materials, and/or services listed below:
| Facilities: The Government will furnish the necessary workspace for the contractor staff to provide the support outlined in this PWS. While in this workspace the contractor will be escorted and monitored while completing the actions outlined in this PWS. |
| Utilities: The Government will provide the contractor with access to basic utilities, including electricity and lighting. The contractor shall instruct employees in utilities conservation practices. |
Equipment: The Government will NOT provide any equipment, tools, or services to assist in the repairs or the replacement of parts during the repairs.
Contractor Furnished Property, Materials, Equipment (CFP/M/E):
General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
Contact: The contractor shall provide an e-mail address, name and telephone number for repair assistance and scheduling during regular business hours and for phone technical support and troubleshooting suggestions.
Tools/Equipment: The contractor shall provide all test equipment, tools, and other special equipment necessary to repair or install replacement parts on the INDUSTRIAC 9X3000, 450 kV CR and LINAC. When parts are installed then re-calibration will be necessary according to the original equipment manufacturer.
Requirements: The contractor shall:
| PRVENTATIVE MAINTENANCE: Conduct an annual preventative inspection to cover the following points on the unit: |
| Industriac/LINAC |
| GUN FILAMENT VOLTAGE |
| GUN FILAMENT CURRENT |
| MAG FILAMENT VOLTAGE |
| MAG FILAMENT CURRENT |
| THY FILAMENT VOLTAGE |
| HV (kV) |
| HV (mA) |
| VAC COLTAGE (kV) |
| VAC CURRENT (uA) |
| ION CHAMBER PS VOLTAGE |
| TUNE CHAMBER |
| ION CHAMBER CURRENT (DOSE RATE) |
| HEAD TEMP (DEGREE FAHRENHEIT) |
| MOD TEMP (DEGREE FAHRENHEIT) |
| TCU OPERATIONS |
| 450 kV CR |
| Check DR system performance, errors logs, and perform a computer backup to VJ Technologies program files, data files, and user files. |
| Check computer processor fan, inner cables, PCBs, chassis filters, outer cables, clean surface, clean inside and clean all connection plugs. |
| Check system against any mechanical damage. |
| Check mains voltage to system with voltmeter. |
| Maintenance the Cathode HV Cable, tube side and generator side, clean HV cable and socket, adjust the gap and re-grease. |
| Maintenance the Anode HV Cable, tube side and generator side, clean HV cable and socket, adjust, the gap and re-grease. |
| Verify that all X-ray cables are tighten. |
| Check oil level in cooler and check cooler for leaks. |
| Check oil hoses against leakage on the system. |
| Verify system operations are normal after service. |
During the preventative maintenance visits the machines will be calibrated at the above listed points to the manufacturer’s specified levels that will be provided by the Government TPOC. All preventative maintenance will be documented, and a copy will be provided to the Government TPOC within 5 calendar days of the inspection. This report will also contain any recommendations that would increase machine efficiency and minimize downtime. The contractor shall provide materials/parts for any minor repairs during the preventative maintenance visits and install or replace this defective material/part while on site for the visit. Additional repair costs and/or visits to conduct the repairs will have to be authorized by both the COR and the TPOC. The cost of this PM visit shall include all travel, administrative and other type costs.
REPAIRS: The contractor shall be contacted when the COR or TPOC determine that one of the machines in 1.1 require service support. If the COR has determined that the contractor has not repaired a machine back to operational condition in a timely manner or an ongoing problem continues to re-occur without resolution, the contractor shall bring in an OEM technician or an OEM trained technician to correct the failure. OEM labor shall be billed as actual per the Repair Resolution CLIN instructions. Funding for OEM labor will be allocated on individual delivery orders for the following items:
| Industriac |
| Main Thyratron (Normal/Standard Type) |
| Magnetron 5.5 Unit |
| High voltage power supply (Spellman Type) |
| Accelerator structure (includes gun and target) |
| TCU |
| Computer Control System (Currently a touch screen HP) |
| All other control/metering and power supply components |
| 450 kV CR |
| Repair existing Digital Flat Panel Detector, Perkin Elmer 1620AN1 or replace, if necessary, with new FPD that is equivalent or better. Replacement shall include necessary accessories (Power Supply, Video A/D Card, Data Cable, etc.) |
5.2.2.3 Power Supply Perkin Elmer XRD EP
| High Resolution Acquisition and Review Workstation |
| ASTM Flat Panel Compliance Module |
| 1Z9FW52 Workstation – Cn-0ymyh1-74261 Monitor & Greyscale Monitor |
| Software upgrades as required or necessary (DOCONDE, VI3 Software) |
| Lead Shielding on the system |
| LINAC |
| Main Thyratron (Normal/Standard Type) |
| Magnetron 5.5 Unit |
| High voltage power supply (Spellman Type) |
| Accelerator structure (includes gun and target) |
| TCU |
| Computer Control System (Currently a touch screen HP) |
| All other control/metering and power supply components |
Repairs – General repairs scheduled within a 24-hour window of the reported issue, according to the sections of the unit described in 5.2. This does not include emergency or immediate repairs. The contractor shall also supply all technical telephone support to aid in troubleshooting and correction of machine faults and problems at no additional cost to the Government. If the contractor is unable to answer question, they shall provide an OEM POC at no additional cost to the Government. The cost of the repair will be calculated per day of repair, and this will include all necessary employees, travel costs, administrative costs and other overhead type cost. The contractor shall propose the cost per repair request, which will not include parts and/or materials at both LEMC and/or CAAA site.
PARTS: The contractor shall provide all necessary parts for all work performed under this contract on section 5.1 and 5.2. The COR shall approve all parts that cost more than fifty dollars ($50) each that are parts required by services performed under paragraphs 5.1 and 5.2. Repair parts shall be billed as actual cost without any sort of markup. This shall not be construed to mean that the contractor has exclusive rights to supply all parts needed to perform the service and/or PM. The Government reserves the right to procure parts required for maintenance performed in-house by most advantageous means.
TRAINING: The contractor shall provide any training requested by the government to promote the testing level certification or operation abilities of the operator at either LEMC or CAAA locations on site. This could include NDT Level testing or certification, or operation after an upgrade or update to the NDT equipment occurs.
TECHNICAL EXHIBIT 1
Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
PWS
Paragraph Task Performance Standard Acceptable Quality Levels
(AQL)
Surveillance Method / By Whom
5.1 and 5.2 Requirements The contractor shall perform repairs/PM within the established timeframes.
The contractor shall perform repairs within the established timeframes 100% of the time each month by conducting tests and documenting the results.
0 defect rate Periodic Inspection – COR and TPOC will review monthly all repair and preventative maintenance documents.
TECHNICAL EXHIBIT 2
Deliverables Schedule
Deliverable Frequency Number of Copies Medium /Format Submit To
1.4.1 Quality
Annually in AUG
TPOC
and COR E-Mail elizabeth.a.michael.civ@mail.mil monica.r.dean.civ@mail.mil jason.w.straley.civ@army.mil
5.1 & 5.2 Requirements 5 days after preventative maintenance
TPOC
and COR E-Mail elizabeth.a.michael.civ@mail.mil monica.r.dean.civ@mail.mil jason.w.straley.civ@army.mil
Other files
| File | Type | Posted |
|---|---|---|
| Contract Notes.pdf | ||
| RFP W911N2-25-R-0002 released.pdf | ||
| Sole Source Synopsis W911N2-25-R-0002.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .