W911N2-16-R-0055.pdf
PDF 445 KB Posted
- Attached to
- Compressor Maintenance
- Solicitation number
- W911N2-16-R-0055
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0003.pdf | ||
| W911N2-16-R-0055_U00002.pdf | ||
| 0001.pdf | ||
| MISC_DOCS_Compressor_List_by_Make_and_Model_REV1_PANRSA-16-R-0000-035970.xlsx | XLSX spreadsheet | |
| Compressor_Location_Map_W911N2-16-R-0055.xlsx | XLSX spreadsheet | |
| draft_PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W911N2-16-R-0055 25-Aug-2016
b. TELEPHONE NUMBER
717-267-9617
8. OFFER DUE DATE/LOCAL TIME
09:00 AM 16 Sep 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911N29. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
LAURA J. BUEHLER
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W25G1Q6152R001
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTING OFFICE - ACC
1 OVERCASH AVENUE, ATTN: CCAM-ALK, BLDG 2S
CHAMBERSBURG PA 17201-4150
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
717-2679834FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$7,500,000
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF83
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W911N2-16-R-0055
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001 1 Each Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance for Building 320 IAW the PWS, paragraph 5.
FOB: Destination
PURCHASE REQUEST NUMBER: W25G1Q6152R001
ESTIMATED
NET AMT
UNIT UNIT PRICE ESTIMATED AMOUNT
0002 1 Each Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 349 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
0003 1 Each Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 370 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
0004 1 Each Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 3810 IAW the PWS paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
0005 1 Each Mainteanance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 5311 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
0006 1 Each Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 5800 IAW the PWS, paragraph 5, UNIT UNIT PRICE ESTIMATED AMOUNT
0007 50,000 Hours Repair Labor
FFP
NTE $50,000. Do not price this CLIN. Labor to repair all equipment shown in the PWS, paragraph 5.1. and 5.3.
UNIT UNIT PRICE ESTIMATED AMOUNT
0008 100,000 Each Repair Parts
FFP
NTE $100,000. Do not price this CLIN. Repair parts for all equipment IAW the PWS paragaraph 5.1 and 5.3.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0009 1 Each Contractor Manpower Reporting
FFP
Contractor Manpower Reporing IAW PWS paragraph 5.5 and local clause L-16.
UNIT UNIT PRICE ESTIMATED AMOUNT
1001 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance for Building 320 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
1002 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 349 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
1003 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 370 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
1004 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 3810 IAW the PWS paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
1005 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 5311 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
1006 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 5800 IAW the PWS, paragraph 5, UNIT UNIT PRICE ESTIMATED AMOUNT
1007 52,500 Hours OPTION Repair Labor
FFP
NTE $52,500. Do not price this CLIN. Labor to repair all equipment shown in the PWS, paragraph 5.1. and 5.3
UNIT UNIT PRICE ESTIMATED AMOUNT
1008 100,000 Each OPTION Repair Parts
FFP
NTE $100,000. Do not price this CLIN. Repair parts for all equipment IAW the PWS paragaraph 5.1 and 5.3.
1009 1 Each OPTION Contractor Manpower Reporting
FFP
Contractor Manpower Reportng IAW PWS paragraph 5.5 and local clause L-16.
UNIT UNIT PRICE ESTIMATED AMOUNT
2001 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance for Building 320 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
2002 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 349 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
2003 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 370 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
2004 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 3810 IAW the PWS paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
2005 1 Each OPTION Mainteanance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 5311 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
2006 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 5800 IAW the PWS, paragraph 5, UNIT UNIT PRICE ESTIMATED AMOUNT
2007 55,125 Hours OPTION Repair Labor
FFP
NTE $55,125. Do not price this CLIN. Labor to repair all equipment shown in the PWS, paragraph 5.1. and 5.3.
UNIT UNIT PRICE ESTIMATED AMOUNT
2008 100,000 Each OPTION Repair Parts
FFP
NTE $100,000. Do not price this CLIN. Repair parts for all equipment IAW the PWS paragaraph 5.1 and 5.3.
2009 1 Each OPTION Contractor Manpower Reporting
FFP
Contractor Manpower Reporting IAW PWS paragraph 5.5 and local clause L-16.
UNIT UNIT PRICE ESTIMATED AMOUNT
3001 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance for Building 320 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
3002 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 349 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
3003 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 370 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
3004 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 3810 IAW the PWS paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
3005 1 Each OPTION Mainteanance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 5311 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
3006 1 Each OPTION Mainteanance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 5311 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
3007 57,881.25 Hours OPTION Repair Labor
FFP
NTE $57,881.25. Do not price this CLIN. Labor to repair all equipment shown in the PWS, paragraph 5.1. and 5.3.
UNIT UNIT PRICE ESTIMATED AMOUNT
3008 100,000 Each OPTION Repair Parts
FFP
NTE $100,000. Do not price this CLIN. Repair parts for all equipment IAW the PWS paragaraph 5.1 and 5.3.
3009 1 Each OPTION Contractor Manpower Reporting
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4001 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance for Building 320 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
4002 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 349 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
4003 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 370 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
4004 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 3810 IAW the PWS paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
4005 1 Each OPTION Mainteanance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 5311 IAW the PWS, paragraph 5.
UNIT UNIT PRICE ESTIMATED AMOUNT
4006 1 Each OPTION Maintenance
FFP
Monthly/Quarterly/Annual Preventative Maintenance in Bldg 5800 IAW the PWS, paragraph 5, UNIT UNIT PRICE ESTIMATED AMOUNT
4007 60,775.31 Hours OPTION Repair Labor
FFP
NTE $60,775.31. Do not price this CLIN. Labor to repair all equipment shown in the PWS, paragraph 5.1 and 5.3.
UNIT UNIT PRICE ESTIMATED AMOUNT
4008 100,000 Each OPTION Repair Parts
FFP
NTE $100,000. Do not price this CLIN. Repair parts for all equipment IAW the PWS paragaraph 5.1 and 5.3.
4009 1 Each OPTION Manpower Contractor Reporting
FFP
NOTES
1.System for Award Management (SAM). In accordance with FAR 4.1102, Offerors must be registered in SAM database in order to be eligible for contract award. No award will be made to an Offeror not Registered and showing an Active status. Registration can be accomplished at https://www.sam.gov/portal/public/SAM/#1.
2. Annual Representations and Certifications: In accordance with FAR 4.1201, Offerors shall complete electronic annual representations and certifications within SAM as part of required registration. No award will be made to an Offeror not Registered and showing a current/valid certification. Registration in this database must be kept current and can be accessed at https://www.sam.gov/portal/public/SAM/.
3. Questions. Questions regarding this solcitation shall be submitted in writing to the Contract Specialist at least 5 calendar days prior to the closing date. Questions submitted after this time will be answered at the discretion of the Contracting Officer. The Contract Specialist for this requirement is Laura Buehler, email Laura.J.Buehler.civ@mail.mil.
4. Award without discussions. The Government intends to award without discussions; therefore, Offerors should submit their best prices in their initial offer. IAW FAR provision 52.212-2, Evaluation-Commercial Items, Offerors must submit all information requested therein in order for the Government to determine technical acceptability. The Government reserves the right to conduct discussions if the Contracting Officer determines them to be necessary. Contractors must submit: Quality Control Plan, Certificates or licenses and Past Performance information. Contractors who fail to submit all required information shall be considered nonresponsive and shall not be considered for award.
5. Contractors not registered in SAM and showing a valid/current certification in the electronic annual representations and certifications must complete all solicitation clauses and provisions that require contractor information: FAR 52.204-17, FAR, 52.209-5, FAR 209-7, FAR 52.212-3 Alt 1, FAR 52.219-1 Alt 1, FAR 52.219-8, FAR 52.222-25. Contractors who fail to fill in all information requested shall be considered nonresponsive and shall not be considered for award.
6. Amendments. The Offeror shall submit the the Contracting Officer signed copies of all amendments issued to this solicitaiton. Failure to comply may cause your proposal to be rejected.
7. Period for Acceptance of Offers. The offeror agrees to hold the prices in its offer firm for 60 calendar days after solicitation closing date.
8. Contractor Compliance. The contractor shall not comply with any order, directive or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as part of this solicitation. Doing so places the contractor at risk of nonpayment.
9. Proposals. Proposals shall be signed by an authorized individual in accordance with FAR 4.102, Contractors Signature. Failure to comply may cause your proposal to be rejected. Offerors should mark each page of their proposal as “Proprietary Information” if they want it treated as Propritary Information under the Procurement Integrity Act.
10. Submit proposals. Proposals may be submitted via email to the Contract Specialist:
Laura.J.Buehler.civ@mail.mil, via fax: 717-267-9834 Attn: Laura Buehler, or mailed to the address in Block 9 on the front of the SF1449 Attn: Laura Buehler. Email is the perferred method for submittal.
WAGE DETERMINATION
Wage Determination 2015-2249, Revision 2, dated 12/29/2015 is hereby incorporated. Wage determination can be viewed at http://www.wdol.gov.
PWS
PERFORMANCE WORK STATEMENT (PWS)
FOR
Compressor System Services & Supplies
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, quality control and other items and non-personal services necessary to perform repair and preventative maintenance services for the compressor systems, blower systems and air dryer systems as defined in this PWS, except as specified in Paragraph
3.0 as Government Furnished. The contractor shall perform to the standards in this contract.
1.2 Background: As the equipment breaks down the contract shall be used to repair the items to get the equipment operational again per manufacture’s standards. Repairs shall be provided by the contractor on an as needed basis to all compressors listed in section 5. Preventative maintenance shall only be required for 6 compressors out of the entire listening. The compressors that shall be covered under this contract range from approximately 45 different types of makes and models.
1.3 Period of Performance (PoP): The Period of Performance shall be one Base Year of 12 months and four (4) 12-month option years. Period of Performance is identified in the solicitation and contract.
1.4.1 Quality Control (QC): The contractor shall develop and maintain an effective QC program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QC program is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). The QC plan shall be submitted to the Contracting Officer in the proposal. After acceptance of the QC Plan, the contractor shall obtain the KO's acceptance in writing of any proposed changes to its QC system.
1.4.2 Quality Assurance (QA): The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards shall be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).
1.4.3 Recognized Holidays: The following are recognized US holidays and the date for each can be found at the following website: http://www.opm.gov/Operating_Status_Schedules/fedhol/Index.asp . The contractor shall not perform services on these days:
1.4.3.1 New Year’s Day: January 1
1.4.3.2 Martin Luther King, Jr.’s Birthday: Third Monday in January
1.4.3.3 President’s Day: Third Monday in February
1.4.3.4 Memorial Day: Last Monday in May
1.4.3.5 Independence Day: July 4
1.4.3.6 Labor Day: First Monday in September
1.4.3.7 Columbus Day: Second Monday in October
1.4.3.8 Veteran’s Day: November 11
1.4.3.9 Thanksgiving Day: Fourth Thursday in November
1.4.3.10 Christmas Day: December 25
1.4.3.11. The Depot recognizes a regular closure day which occurs every other Friday. When an observed holiday falls on a Tuesday or a Thursday, the Depot's regularly scheduled closure day moves to the corresponding Monday or Friday. If the holiday falls on Saturday, the preceding Friday will be observed. If the holiday falls on Sunday, the following Monday will be observed.
1.4.4 Place and Performance of Services: The contractor shall provide services between the hours of 0600 - 1630 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
1.4.5 Security Requirements: Contractor and all associated sub-contractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.5.1 Physical Security: The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.5.2 iWATCH Training: The contractor and all associated sub-contractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the Contracting Officer’s Representative (COR), or KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each affected contractor employee and subcontractor employee, to the COR or to the KO, if a COR is not assigned, within 15 calendar days after completion of training.
iWATCH training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.
1.4.6 Conservation of Utilities: The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating any equipment used in the performance of this contract. NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified and qualified for the position in which they shall be serving. The contractor shall submit with the proposal a certificate or license certifying that the vendor is a certified and or licensed repair location for the manufactures listed in this PWS.
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with Federal Acquisition Regulations Subpart 42.5. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. Attendance is not limited to a physical meeting and may be conducted via telephone in lieu of a physical meeting. At these meetings, the Contacting Officer shall apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9 Contract Manager (CM): The contactor shall provide a CM who shall ensure performance under this contract.
The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO at the time of award. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.4.10 Identification of Contractor Employees: All contact personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The contractor shall also ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. All contractor personnel shall be required to obtain and wear badges, company uniforms with the performance of this contract.
1.4.11 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5.
The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI.
The contractor’s mitigation plan shall be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
2.0 Definitions and Acronyms:
2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5 DELIVERABLE. Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privities of contract with the subcontractor.
2.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
When day is referenced in this PWS it will be interpreted as business days.
2.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.
2.1.14. PARTS. A collective term that refers to any material, maintenance kit or log that is associated with the repair or Preventive maintenance (PM) of a piece of equipment identified within this PWS.
2.2 ACRONYMS:
AFARS Army Federal Acquisition Regulation Supplement AQL Acceptable Quality Level AR Army Regulation AT Antiterrorism CFP/M/E/S Contractor Furnished Property, Material, Equipment and Services CFR Code of Federal Regulations CM Contract Manager COB Close of business COR Contracting Officer Representative COTR Contracting Officer Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DPW Directorate of Public Works DOC Directorate of Contracting DOD Department of Defense DRMO Defense Reutilization and Marketing Office DRSK Directorate of Risk Management
EMR Equipment Manufacture Reference FAR Federal Acquisition Regulation FPCON Force Protection Condition FSC Federal Service Code GFP/M/E/S Government Furnished Property, Material, Equipment and Services HQDA Headquarters Department of Army IAW In accordance with KO Contracting Officer LEAD Letterkenny Army Depot OCI Organizational Conflict of Interest ODC Other Direct Costs OPSEC Operational Security OSHA Occupation Safety and Health Standard PA Pennsylvania PADEP Pennsylvania Department of Environmental protection PIPO Phase In/Phase Out POC Point of Contact POP Period of Performance PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SOP Standard Operating procedure TE Technical Exhibit UIC Unit Identification Code U.S.C United States Code
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government shall provide the facilities, equipment, materials, and/or services listed below:
3.1 Facilities: The Government shall not furnish the necessary workspace for the contractor staff to provide the support outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment.
3.2 Equipment: None
3.3 Materials: None
3.4 Services: None
3.5 Utilities: All utilities in the facility shall be available for the contactor’s use in the performance of this contract.
4.0 Contractor Furnished Property, Materials, Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
5.0 Requirements: The contractor shall:
5.1. Repair. The contractor shall provide repair services to the Government owned compressor systems, blower systems and air dryers listed below.
Building Building Type Compressor Serial Number EMR# HP CFM
1 Admin - LEAD 2010 Kaeser
CSD100S
1216 3753666 100 425
2 Supply - LEAD Dayton 3Z961 081491L 480096 10 35
11 Supply - LEAD ABAC Genisis 1475980013 7.5 22
13 Maintenance -
LEAD
Ingersoll-Rand
2036562 10 35
320 Supply - LEAD
#N 2004 Kaeser
CSD100S
1002 2263774 100 425
#S 2004 Kaeser
CSD100S
1005 2263777 100 425
321 Supply - LEAD 2011 Kaeser SX7.5 1052 4090816 7.5 28
349 Utility - LEAD
#1 2008 Kaeser
FSD350
1107 3306377 350 1522
#2 2005 Kaeser
ESD300
1006 2548998 300 1490
#4 2008 Kaeser
SFC315
1108 3306384 450 1953
#6 Ingersoll-Rand T30
S/N-1 30T798841 S/N-2 6020384
5 41632
Twin Motors Air Dryer Kaeser KADPS-
1324714-1 KADPS4100AA
-150-L2-4X- 0807-F
360 Utility - LEAD
#B-300 Kaeser EB420-C 3375 3928482 60 Rated Blower Speed 3,530
#B-350 Kaeser EB420-C 3376 3928483 60 Rated Blower Speed 3,530
361 Utility - LEAD Gardner-Denver Electra Saver II
S271949 Model-EBE990
25 110
363 Utility - LEAD 2007 Kaeser SM15 1076 3107939 15 53
370 Maintenance -
LEAD
#1 2009 Kaeser
SFC110
1278 3662119 150 629
#2 2009 Kaeser
CSD125
1073 3475694 125 566
#3 2009 Kaeser
CSD125
1249 3641133 125 566
Air Dryer Kaeser KADPS-
1278304-1 KADPS
2100AA-150-
L2-4X-0703-F
389 Maintenance -
LEAD
Ingersoll-Rand Model 2340
01026351 5 18
431 Supply - LEAD 2008 Kaeser
SM7.5
1008 3186147 8 24
Community support - LEAD
1983 Chicago Pneumatics P/N 20-912
91200-085 5 18
Supply - LEAD Champion Centurion II
D052651 15 45
Maintenance -
LEMC
Ingersoll-Rand Model 2475
5010803 7.5 26
2006 Kaeser
ASD25T
1077 2754053 25 112
Supply - LEMC 2011 Kaeser AirCenter SM10
1059 4139786 10 42
Curtis C100
16F82003 40 150
3238 Maintenance -
LEMC
Champion Model
OEH458EN6
107845 7.5 25
3239 Maintenance -
LEAD
2008 Kaeser SK15 1154 3398182 15 64
3261 Maintenance -
LEAD
Champion Advantage Series Model HR7D-12
S/N D072290 7.5 30/60 (Twin)
S3290 Supply - LEAD ATLAS Capco LS7.5 UTZ 45 2777 7.5 x’s
Supply - LEMC Ingersoll-Rand Model 242-5D
30T 650809 5 18
#1 2006 Kaeser
ASD25T
1025 25 115
#2 2007 Kaeser
CSD75T
1099 75 345
3626 Maintenance -
LEMC
2007 Kaeser
SM10T
1106 2858293 10 42
1958 Champion Model OEH 498
ENG
107342 7.5 26
Utilities -
Champion Model
OE 3610 ENG
108071 7.5 26
2009 Kaeser
CSD100ST
1038 3785410 100 417
3810 Maintenance -
#1 2005 Kaeser
CSD75T
1025 2498553 75 361
#2 2005 Kaeser
CSD75T
1028 2544824 75 361
2011 Kaeser
BSD50T
1367 4098115 50 236
Curtis C300
05E94001AP
75 300
5250 Maintenance -
#1
Emglo Model
335TV
676963 5 18
#2 2012 Kaeser AirCenter SM10
1261 4434558 10 42
5300 Maintenance -
#1 Ingersoll-Rand Model 2475
6013005 7.5 26
#2
Worthington Size 6/6/5X5
344-2 50 180
5311 Maintenance -
#1
KAESER BSD 50 1398 100 450
#2 Ingersoll-Rand Model H15T4X20
30T7736 70 20
Supply - LEMC Saylor-Beall 7-37-G14 MODEL 707 10 35
Quincy Model
QMT30ACA329F
86894
30 130
Supply
- LEMC
Champion Model CASRSA,R Series
D046657 30 110
2009 Kaeser
ASD30T
1277 3683927 30 132
5800 Maintenance -
LEAD
Rm 105 Champion Advantage Series Model
CASRSA37,
HRA25-12 ADV,
25H
S/N D062682 25 100
RM 303 Air Dryer
Kaeser TC 44
Rm 303 #1 Kaeser SX20 1234 4616441 20 88
RM 303 #2 Kaeser SX20 1231 4616438 20 88
5807 Maintenance -
LEAD
Ingersoll-Rand Model SSR UP6- 15-125
PY1972U0919
15 65
5.1.1 Quote for Services: The contractor shall provide a repair service quote to the COR on all repair services before the services are started. Once the quote is approved the COR shall notify the contractor to start.
5.1.1.1. The quote shall include a breakdown of labor and materials that shall be used for the repair, of the equipment that shall be worked on.
5.1.2. Upon notification from the COR the contractor shall have 48 hours to access and provide a quote for repairs for the damaged piece(s) of equipment. Upon quote approval the contractor shall have 24 hours to start the repair process unless the lead time for parts prohibits the vendor to start immediately. Lead time must be stated on the quote.
5.1.3 . Once repair services commence the Contractor shall continue with the repair in a continuous effort until the equipment is determined to be operable. Any repairs involving the equipment listed above are considered to be critical to the everyday operational duties.
5.1.4. Deductions to invoiced amounts due to lack of contract compliance on behalf of the Contractor shall require approval by the KO. Invoiced amounts for services that have not been rendered or have been rendered but are not in compliance with the standards set forth within this PWS shall not be paid.
5.2. Parts: The contractor is responsible for supplying all parts for the equipment listed in paragraph 5.1. The parts shall be itemized out on all quotes and invoices.
5.2.1. Repair parts shall be the manufacture’s recommended parts or equal. If the part is an “or equal” part it shall be stated on the quote as such and subjected to approval.
5.3. Preventive Maintenance (PM): Quarterly, and annual PM shall be performed on the air compressor systems for the following systems: Building 320, 349, 370, 3810, 5311, and 5800. The cost for the PM shall include the labor and materials needed to perform the PM.
Bldg # Owner Compressor Serial
Number Model # EMR# HP CFM
320 LEAD
2004 Kaeser
CSD100S
CSD 100S-125
psig/460V/3ph/60Hz 2263774 100 425
320 LEAD
2004 Kaeser
CSD100S
CSD 100S-125
psig/460V/3ph/60Hz 2263777 100 425
349 LEAD
Ingersoll-Rand T30 w/ Twin Motors
S/N-1 30T798841
S/N-2 6020384
T30/200/5.5V or T30/X/5.5V
5 41632
349 LEAD
2005 Kaeser
ESD300
ESD 300-
175psig/460V/3ph/60 Hz
2548998 300 1490
349 LEAD
2008 Kaeser
SFC315
1108 SFC 315 3306384 450 1953
349 LEAD
2008 Kaeser
FSD350
1107 FSD 350 3306377 350 1522
349 LEAD
Kaeser KADPS-
1324714-1 KAD PS 4100
KADPS4100
AA-150-L2-
4X-0807-F
370 LEAD
2009 Kaeser
SFC110
1278 SFC 110 3662119 150 629
370 LEAD
2009 Kaeser
CSD125
1073 CSD 125 3475694 125 566
370 LEAD
2009 Kaeser
CSD125
1249 CSD 125 3641133 125 566
370 LEAD
Kaeser KADPS-
1278304-1 KAD PS 2100
KADPS
2100AA-150-
L2-4X-0703- F
3810 LEMC
2005 Kaeser
CSD75T
1025 CSD 75T 2498553 75 361
3810 LEMC
2005 Kaeser
CSD75T
1028 CSD 75T 2544824 75 361
5311 LEMC
Ingersoll-Rand Model H15T4X20
30T7736 H15T4X20 70 20
5311 LEMC KAESER BSD 50 1398 BSD 50 100 450
5800 LEAD
Champion Advantage Series Model
CASRSA37,
HRA25-12 ADV,
25H
S/N D062682
CASRSA37, HRA25-
12 ADV, 25H
25 100
5800 LEAD Kaeser SX20 1234 SK 20 ? 4616441 20 88
5800 LEAD Kaeser SX20 1231 SK 20 ? 4616438 20 88
5800 LEAD Kaeser TC 44 1522 TC 44
5.3.1 Quarterly PM: The following actions shall be performed on a quarterly basis:
Compressors:
Lube motor bearings
Take voltage and AMP readings Air lance after coolers Change filter mats Check air filters and air lance if needed Inspect for leaks Check oil levels Check separator differential pressure Inspect and test internal drains Operational checks on valves Coupling inspections Temperature checks
Dryers and air treatment equipment Voltage and AMP readings Clean condensers on refrigerated air dryers Monitor full cycle on desiccant dryers for operations Check delta P on in line filters Check refrigerant pressures
Inspect mufflers on desiccant dryers Check condensate systems Inspect drain valves for operation Tank drain inspections
5.3.2 Annual PM: The following actions shall be performed on an Annual basis:
Compressors Perform quarterly PM Take oil samples for contamination levels Change oil Air filter Change air filter Change oil filter Change oil separator Clean and maintain internal drain valves Open and inspect minimum pressure check valve Perform maintenance on combination control vent valve Perform maintenance on anti- rumble valve Tighten all electrical connections Inspect and clean scavenger line Check inlet valve for seal blow by
Dryers and air treatment equipment Change in line filter elements and replace gaskets Change elements in condensate filters Perform maintenance on drain valves, cleaning and maintenance kits Replace mufflers on desiccant dryers Relief valve inspections on tanks
5.4 Waste: Waste generated by any repair or PM service shall be taken off Depot and disposed of properly by the contractor.
5.5 CONTRACTOR MANPOWER REPORTING (CMR): The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract.
The contractor shall completely fill in all the information in the format using the following web address https://Contractormanpower.army.pentagon.mil. The required information includes: (1) Contracting Office, KO, Contracting Officer’s Technical Representative (COTR) or also known as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub- Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.
6.0 Applicable Publications:
6.1 Publications applicable to this PWS are listed below: Documents applicable to this PWS are listed below as well as stated within the PWS. These documents are mandatory and the Contractor is obligated to follow them. Supplements and amendments to mandatory publications shall be considered to be in the full force and the responsibility of the Contractor. It is the Contractor’s responsibility to ensure that all mandatory publications are posted and up-to-date. It is the Contractor’s responsibility to ensure that all mandatory publications are addressed to all employees working on depot. Manuals are subject to change throughout the life of the contract. The contractor shall follow the latest addition to any regulation, pamphlet, law or memorandum.
6.2 Army Regulation and Pamphlets: All Army Regulations apply to any work performed on Depot and can be found at the following website http://www.whs.mil/library/mildoc.htm. A nonexclusive list includes AR 385- 10 Army Safety Program, and AR 385-55 Prevention of Motor Vehicle Accidents.
6.3 Other Manuals: All LEAD Regulations, Pamphlets, and Memorandums apply to any work performed on Depot. An nonexclusive list includes:
6.4 OSHA Part 1910- Occupational Safety and Health Standards can be found at http://www.osha.gov/index.html under Regulations / Standards.
6.5 Lead Pamphlet 385-4 Requirements for Security, Safety and Fire Prevention for Contractor’s Performing Work on LEAD.
6.6 LEAD Regulation 385-1 LEAD Safety and Occupational Health Program, Chg 4.
6.7 Other Rules and Regulations: The Contractor shall comply with all applicable federal, state and local laws, executive orders, rules and regulations applicable to its performance under this contract.
6.7.1 Local Rules and Regulations: The contractors, subcontractors, suppliers and their employees shall be governed by local, state and federal Laws along with installation rules and regulations. All the installation requirements are in the current issue of the pamphlet LEAD Reg 385-4 entitled "Security, Safety, and Fire Prevention for Contractors Performing Work on Letterkenny Army Depot, Chambersburg, PA”, Pamphlet 385-1 “LEAD Safety & Occupational Health Program”, and any additional requirements determined necessary by the KO shall be strictly complied with. Provisions for unescorted access into buildings are outlined in Chapter 2 of AR 190-16.
6.7.2 Permits: The Contractor is responsible for identifying, obtaining and renewing all permits from federal, state, local, or installation agencies to carry out the requirements specified in this contract or detailed on an individual task order.
6.7.3 Fire Regulations: The Contractor and their employees shall be required to comply with all installation regulations on fire prevention which are in effect or may be put in effect during performance of work under this contract. It is the Contractor’s responsibility to ensure that all mandatory publications are addressed to all employees working on Depot.
6.7.4 Safety Requirements: The Contractor shall abide by all rules, regulations, and pamphlets concerning safety on depot posted by local, state, and federal agencies. It is the Contractor’s responsibility to ensure that all mandatory publications are addressed to all employees working on depot. Disregarding safety regulations in the industrial area shall not be tolerated. The contractor shall be required to wear safety glasses and ear protection approved by the LEAD Safety Office in addition to any provisions listed in the safety regulations mentioned in this PWS.
6.7.4.1. Safety and Health Plan. The Contractor shall develop, document and implement an effective safety and health program for this contract, including a safety and health plan. The plan shall be submitted to KO for approval within thirty (30) days after contract award. A task/site specific accident prevention plan shall be developed/adapted to the services specified on the individual task orders.
6.7.5 Environmental Compliance: The Contractor shall comply with all Federal, State, and local regulations covering environmental protection. In case of a conflict among these laws and regulations, the most stringent law or regulation shall apply. If a Federal, State, or regulatory agency assesses any fine, penalty, or fee against the Government that is attributable to Contractor noncompliance with any environmental law or regulation, the Contractor shall indemnify the Government for the amount of the fine and other Government costs attributable to the violation (e.g., the cost of cleaning up a hazardous waste spill). In the event of Contractor noncompliance with any applicable environmental law or regulation, the KO shall determine whether the Government or the Contractor is responsible for abating or correcting the violation. This provision is not intended in any way to waive the Government’s rights under any other provision of this contract. The Contractor shall fully comply with current and future regulations, plans and changes.
Publication (Chapter / Page) Date of
Publication Mandatory or
Advisory Website
Army Regulations various Mandatory http://www.whs.mil/library /mildoc.htm
AR 385-10 Army Safety Program 27 Nov 2013 Mandatory http://armypubs.army.mil/e pubs/pdf/R385_10.PDF
AR 385-55 Prevention of Motor Vehicle Accidents 12 Mar 1987 Mandatory
AR 200-1 Environmental Protection and Enhancement
13 Dec 2007 Mandatory http://www.rubiconplannin g.com/ar-200-1.html
AR385-40 Accident Reporting and Records 18 Mar 2015 Mandatory www.army.mil/usapa/epub s/pdf/p385_40.pdf
LEAD Regulations, Pamphlets, and Memorandums various Mandatory None
Lead Pamphlet 385-4 Requirements for Security, Safety and Fire Prevention for Contractor’s Performing Work on LEAD
15 Mar 2011 Mandatory None
LEAD Regulation 385-1 LEAD Safety and Occupational Health Program, Chg 4, 18 Apr 2014 Mandatory None
OSHA Part 1910- Occupational Safety and Health Standards
Various Mandatory https://www.osha.gov/inde x.html
FAR Subpart 9.5 Mar 2005 Mandatory https://www.acquisition.go v/sites/default/files/current/ far/pdf/FAR.pdf
Vehicle code of the Commonwealth of Pennsylvania, Various Mandatory http://www.dmv.state.pa.us /vehicle_code/index.shtml
Standards of Conduct 14 Nov 2011
Mandatory https://www.federalregister .gov/articles/2011/11/14/20 11-29090/standards-of-
Publication (Chapter / Page) Date of Publication
Mandatory or Advisory
Website conduct Pennsylvania Air Pollution Control Act (PA Code, Title 35, Chapter 23- Air Pollution)
Mandatory http://www.actionpa.org/or dinances/35ps4012.html
ED 12088 Federal Compliance with Pollution Control Standards
13 Oct 1978 Mandatory
Title 25 PA Code Environmental Resources Chapter 260-270
10 Jan 2009 Mandatory http://www.pacode.com/se cure/data/025/chapter260a/ chap260atoc.html
40 Code of Federal Regulations (CFR) 10 Jun 2016 Advisory http://www.epa.gov/lawsre gs/search/40cfr.html
TECHNICAL EXHIBIT 1
Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
PWS Paragraph
Task
Performance Standard
AQL Surveillance Method / By Whom
5.1 The contractor shall perform
repairs within the established timeframes in subparagraphs
5.1.2, 5.1.3, 5.1.4.
The contractor shall perform restorative Repairs within the established timeframes 98% of the time.
2% failure to perform restorative Repairs within the established timeframes each month.
Periodic Inspection - COR shall review monthly work order logs.
5.3 The contractor shall perform
preventive maintenance IAW the PWS.
The contractor shall perform preventive maintenance 99% of the time.
1% failure to perform preventive maintenance.
Periodic Inspection - COR shall review monthly work order logs.
5.4 Generated waste removal The contractor shall perform waste removal 100% of the time.
0% failure to perform waste removal.
Periodic Inspection
5.5 CMR submission The contractor shall perform CMR
reporting 99% of the time.
1% failure to perform CMR reporting.
Periodic Inspection
TECHNICAL EXHIBIT 2
Deliverables Schedule
Deliverable Frequency Number of Copies
Medium/Format Submit To
1.4.1 - Quality Control With the proposal 1 Electronic Submission KO
1.4.5 - Security Requirements
Upon request 1 Electronic Submission COR/DRSK
1.4.5.2 - iWATCH Training within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance
1 Electronic Submission KO/COR/DRSK
1.4.7 - Special Qualifications
With Proposal 1 Electronic Submission KO
1.4.9 - Contract Manager
At the time of award 1 Electronic Submission KO
1.4.11 -Organizational Conflicts of Interest
Immediately once aware 1 Electronic Submission KO
5.1.1 - Quotes for repair services
Upon request
1 Electronic submission COR
5.3 Lead time (Parts) With quote 1 Electronic submission COR
5.5 – CMR Annually N/A Electronic Submission https://cmra.army.mil
6.7.4.1 - Safety and Health Plan
30 days from time of award
1 Electronic Submission COR
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .