This is a Standard Form 30 (Amendment of Solicitation/Modification of Contract) issued by the U.S. Army Anniston Army Depot for solicitation W911KF26QA049. Amendment 0001, effective August 28, 2026, provides responses to eight industry questions regarding a 5-ton bridge crane installation in Building 129 and extends the solicitation closing date. The amendment clarifies key requirements: no site visits are permitted; the crane is for indoor use only and does not require explosion-proof ratings; contractors are responsible for complete removal and demil of the existing crane with staging outside the building for ANAD Recycle pickup; Building 129 access includes a 16'W x 16'H roll-up door with specific internal runway clearances (19.3'W x 11.75'H on middle columns, 18.4'W x 11.75'H on left side columns), and badge/visitor escort requirements apply for Anniston Army Depot access. Regarding hoist specifications, the revised Statement of Work Section 3.2.1 clarifies that wire rope hoists meeting lift speed requirements of 25/8 fpm are acceptable alternatives to chain hoists. Progress payments prior to final installation and acceptance are not authorized.
The response due date has been extended from September 3, 2026 to September 8, 2026 at 10:00 AM CDT. No additional questions will be accepted after this amendment, and all other terms and conditions remain unchanged.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification):
1.The purpose of this amendment is to provide responses to industry questions, and issue a revised Statement of Work (SOW) reflecting clarifications and updates resulting from those questions, and extend the solication closing date
2. Industry Questions: 5 TON Bridge Crane- BLDG 129
Question 1- Site Visit: Will prospective contractors be permitted to conduct a site visit prior to submitting pricing? If so, please provide the process and point of contact for scheduling a visit.
Answer 1#- No site visit will be conducted for this solicitation.
Question 2-Hazardous/Explosive Environment: Is the crane system required to be explosion-proof, spark-resistant, or otherwise rated for a hazardous/classified environment?
Answer2#- No, indoor use.
Question 3-Existing Crane Removal: Please confirm whether the contractor is responsible for physically dismantling and removing the existing 5-ton bridge crane in addition to coordinating its disposition in accordance with the SOW.
Answer3#- Yes, demil. See revised SOW 3.6.6. -The contractor shall be responsible for removal and demil of existing crane and stage outside the building for ANAD Recycle pickup.
Question 4-Site/Building Access: Please provide any known physical access limitations or clearances that should be considered for delivery and installation, including applicable door/gate dimensions, overhead clearances, or other restrictions for bringing crane components and installation equipment into Building 129. Please also advise of any special contractor personnel, vehicle, equipment, badging, or escort requirements for access to Anniston Army Depot.
Answer4#- Bldg. 129 roll up door dimensions; 16'W X 16'H -See SOW 2.0 for room dimensions.
Side access to inside existing runway structure is 19.3'W X 11.75'H on middle columns and 18.4'W X 11.75'H on left side columns. Dynos are staged inside of runway. Images can be provided if needed. Badge and visitor escort required from Visitor Control Center.
Question 5-Would the government accept a wire rope hoist that meets the lift speed requirements over a chain hoist that does not meet the lift speed requirements?
W911KF26QA0490001
Answer5#- Yes, please see revised SOW, 3.2.1
Question 6- There's really not a 5 ton electric chain hoist in the market that can achieve the 25/8 fpm speed called out. We can either go with a wire rope that will, or quote an electric chain that would be slower. Can you confirm?
Answer 6#- Please see revised SOW, 3.2.1
Questions 7- Payment/Contract Financing: Due to the significant equipment fabrication and material costs associated with the 5-ton bridge crane, please confirm whether progress payments, performance-based payments, commercial financing payments, or other milestone payments will be authorized prior to final installation and acceptance. If authorized, please identify the applicable payment/financing clause and allowable payment milestones.
Answer 7#- No, progress payments will not be allowed.
Question 8- .The specification had a chain hoist says chain hoist at a lifting speed of 25/8 FPM which is normal for a 5-Ton Crane. But I do not know any 5-Ton Chain Hoist that goes at that speed. the top speed for a 5-Ton chain hoist I see is about 11 FPM. We can get that 25/8 Speed with a wire rope hoist. Do you have a chain hoist model/brand in mind. Please clarify.
Answer 8#- Please see revised SOW, 3.2.1
3. The solicitation closing date is extended to 08 Sepetmeber 2026 at 10:00 AM CDT
4. No additional questions will be accepted.
5. All other terms and conditions remain unchanged.
Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date
03 Sep 2026 08 Sep 2026
W911KF26QA0490001
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0001 |
| EffDate: 28 AUG 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W911KF |
| AdmCode: |
| IssuedBy: W6QK ACC ANAD |
ACC ANNISTON ARMY DEPOT, 7 FRANKFORD AVE
ANNISTON, AL 36201-4199
UNITED STATES
ZENA JOHNSON, EMAIL: ZENA.S.JOHNSON.CIV@ARMY.MIL TELEPHONE: 520-669-6059
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W911KF26QA049 |
| SolDate: 13 AUG 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: HEATHER P. ROBINSON |
| ContDate: |
| CODate: 27 AUG 2026 |