Amendment 0002.pdf
PDF 196 KB Posted
- Attached to
- ISO 14001 Federal contract opportunity
- Solicitation number
- W911KF23Q0036
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 Statement of Work (7-17-23).pdf | ||
| 2022-2025 ISO 14001-2015 Certification.pdf | ||
| W911KF23Q0036 0001.pdf | ||
| Attachment 1 Statement of Work_Updated 6-26-2023.pdf | ||
| W911KF23Q0036.pdf | ||
| Attachment 3 Wage Determination.pdf | ||
| Attachment 4 DD1423.pdf | ||
| Attachment 1 Statement of Work.pdf | ||
| Attachment 2 Evidence of Authority.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See page tw o.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jul-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KF23Q0036
X 9B. DATED (SEE ITEM 11)
05-Jun-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jul-2023
CODE
ACC-ANAD
ANNISTON ARMY DEPOT
7 FRANKFORD AVENUE, BLDG 35
ANNISTON AL 36201-4199
W911KF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KF23Q0036
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT NOTES
1. The purpose of this amendment is to provide revised answers to contractor questions, attach a revised statement of work, provide a copy of the ISO 14001‐2015 certification, and to extend the closing date of the solicitation.
2. The answers to questions 1‐6 and 9 have been revised. The answers are below.
3. The revised statement of work has added as an attachment to the solicitation post. Document is name Attachment 1 Statement of Work (7‐17‐23).
4. The 2022‐2025 ISO 14001‐2015 Certification has been added as an attachment to the solicitation.
5. The solicitation closing date has been extended to 24 July 2023 at 10 am Central Standard Time.
6. All other terms and conditions remain unchanged.
Revised Answers
1. Section 2.4 of the SOW requires a gap analysis report. Such a report is provided by consultants and not accredited Certification Bodies (CBs). The Audit Report contains all nonconformances, observations, and areas of conformance. The SOW should be revised to remove the gap analysis report.
Please see Section 2.4 of the amended SOW. The requirement of a gap analysis report has been removed.
2. Section 2.5 of the SOW indicates a “Master Lead Auditor”. There is no such term in our industry. Auditors are Certified as Lead, Auditor, or Provision Auditor. The SOW must be revised to remove this term.
Please see Section 2.5 of the amended SOW. The reference to a Master Lead Auditor has been removed.
3. Section 2.5.1 is overly restrictive and is not relevant to the ISO 14001 certification. Federal installations including ANAD are not required to comply with state or local environmental laws or regulations. Federal laws apply.
Please see Section 2.5.1 of the amended SOW. ANAD is subject to and must comply with all state environmental laws and regulations, which are managed by the Alabama Department of Environmental Management (ADEM). Consequently, significant experience with Alabama environmental laws and regulations is essential in assessing ANAD’s environmental management system in conjunction with an ISO 14001 environmental management system surveillance audit.
4. Section 2.5.3 is overly restrictive and limits fair and open competition. This requirement is not necessary for an auditor to perform ISO 14001 certification audits.
Please see Section 2.5.3 of the amended SOW. The Resource Conservation and Recovery Act (RCRA) is the most significant governing environmental regulation that ANAD must follow and has the highest risk to ANAD’s operating industrial base. Consequently, significant experience with RCRA is essential in assessing ANAD’s environmental management system in conjunction with an ISO 14001 environmental management system surveillance audit.
5. Section 2.5.4 is overly restrictive and limits fair and open competition. This requirement is not necessary for an auditor to perform ISO 14001 certification audits.
Please see Section 2.5.4 of the amended SOW. The Clean Water Act (CWA) is one of the primary governing environmental regulations that ANAD must follow, and ANAD must comply with National Pollutant Discharge Elimination System (NPDES) permit requirements. Consequently, significant experience with environmental water programs to include water quality, wastewater, stormwater, CWA and NPDES permits is essential in assessing ANAD’s environmental management system in conjunction with an ISO 14001 environmental management system surveillance audit.
W911KF23Q0036
6. Section 2.5.5 is overly restrictive and limits fair and open competition. This requirement is not necessary for an auditor to perform ISO 14001 certification audits.
Please see Section 2.5.5 of the amended SOW. ANAD’s industrial operations include low-level radiation and radioactive waste storage that have a potential environmental impact. Consequently, significant experience with radioactive waste storage facility environmental regulatory compliance is essential in assessing ANAD’s environmental management system in conjunction with an ISO 14001 environmental management system surveillance audit.
9. Please provide a copy of the current ISO 14001 certificate issued to ANAD. The certificate is a public document and not subject to FOIA. Please do not respond that this certificate is not needed at this time or that it will be provided post award. All CBs must verify the authenticity of a certificate at the time of bidding.
A copy of the current ISO 14001 certificate issued to ANAD is provided as an attachment to the amended Solicitation.
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 06-Jul-2023 10:00 AM to 24-Jul-2023 10:00 AM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .