Attachment 1 Statement of Work_Updated 6-26-2023.pdf
PDF 92 KB Posted
- Attached to
- ISO 14001 Federal contract opportunity
- Solicitation number
- W911KF23Q0036
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| Attachment 1 Statement of Work (7-17-23).pdf | ||
| 2022-2025 ISO 14001-2015 Certification.pdf | ||
| W911KF23Q0036 0001.pdf | ||
| Attachment 4 DD1423.pdf | ||
| W911KF23Q0036.pdf | ||
| Attachment 3 Wage Determination.pdf | ||
| Attachment 1 Statement of Work.pdf | ||
| Attachment 2 Evidence of Authority.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
ISO 14001:2015 Surveillance Audit At Anniston Army Depot, Alabama
1.0 Introduction
This Scope of Work will encompass ISO 14001:2015 audits and registrations for Anniston Army Depot (ANAD). Registration shall include audits and reports and one Gap Assessment. The scope of registration includes heavy track vehicle maintenance and fabrication only.
1.1 Scope Changes
The Contractor shall not proceed with any verbal or written change(s) to the scope of work from sources other than the Contracting Officer, who will provide changes in writing.
1.2 Background
Anniston Army Depot (ANAD) is an Army installation with heavy industrial operations that initially achieved International Organization for Standardization (lSO) 14001:2004 Environmental Management System (EMS) certification in December 2007 and has maintained their certification since that time. Currently, the high-risk environmental footprint installation employs approximately 4200 individuals. ANAD is the only army depot capable of performing maintenance on heavy-tracked combat vehicles and their components. There is an industrial complex in the southeastern portion of ANAD where the audit would focus. ANAD is over 15,000 acres, however, the area that contains approximately 60 buildings that would be included in the audit are within a 1,500-acre area.
2.0 Contractor Requirements
2.1 The contractor shall be accredited to ISO 17021 by an accreditation body which is a member of the International Accreditation Forum (IAF) and whose scope of membership includes management system certification. The scope of the contractor’s accreditation shall include ISO 14001.The contractor shall provide a copy of their Certificate of Accreditation with the contractor's proposal.
2.2 To maintain ANAD’s ISO 14001:2015 certification, the contractor shall perform a surveillance audit twice per year, except during the reassessment year. During the reassessment year, the contractor shall perform one surveillance audit and one reassessment audit. The contractor shall conduct one gap assessment during the base year at the time of a surveillance audit. The contractor shall conduct the audits during the months of April and October. The activities being audited will include Army Industrial Activities such as assembly, disassembly, welding, machining, painting, de-painting, chemical cleaning, steam cleaning, vehicle maintenance, engine testing, and the wastewater treatment plants. The certification includes activities associated with heavy track vehicle maintenance and fabrication. Audits conducted by the contractor shall include both a document review and a field audit of actual operations. The contractor shall provide actual copies of previous ISO 14001:2015 surveillance, assessment, and gap audits conducted by the bidder. The audits shall specifically demonstrate they were conducted on Army industrial activities as stated above. The audits shall identify the specific location and date they were conducted.
2.3 The contractor shall perform a reassessment audit every 3 (three) years to maintain ANAD’s ISO 14001:2015 certification. The reassessment audits to maintain ISO 14001:2015 certification shall be conducted during October 2025 and October 2028.
2.4 The contractor shall provide an Audit Plan, an Audit Report, an Audit Closing Meeting Presentation and a Gap Assessment Report in accordance with ISO 14001:2015 standards. The results of the audit shall include identified non-conformances, opportunities for improvement and positive practices using the 14001:2015 standard. The contractor shall provide actual copies of previous ISO 14001:2015 audit plans, audit reports, audit closing meeting presentation, and gap assessment reports conducted by the bidder. The audits shall specifically demonstrate they were conducted on Army industrial activities as stated above. The audits shall identify the specific location and date they were conducted.
2.4.1 The Audit Plan shall be received no later than six weeks prior to each audit and shall include:
1) Documents to be reviewed
2) Length of audit
3) Areas to be visited during the audit
4) Tentative audit schedule that shall identify the date and times that each audit activity or process to be audited will occur, including an opening meeting, closing meeting and a daily debrief.
2.4.2 The Audit Report (final) shall be received within 10 calendar days after each audit.
In addition, a draft copy of the Audit Report shall be received no later than two hours prior to the closing meeting of each audit and shall include:
1) Identified non-conformances
2) Applicable elements of the ISO 14001:2015 standards
3) Suggested corrective actions
4) Identified opportunities for improvement
5) Identified positive practices
2.4.3 The Closing Meeting Presentation in PowerPoint or Adobe format shall be received no later than two hours prior to the closing meeting of each audit and shall include:
1) Identified non-conformances
2) Identified opportunities for improvement
3) Identified positive practices
4) Registration recommendation
5) Path Forward
2.4.4 Gap Assessment Report (final) shall be received within 10 calendar days after the Gap Assessment Audit. In addition, a draft copy of the Gap Assessment Report shall be received at the conclusion of the Gap Assessment Audit. The Gap Assessment Report shall include:
1) Identified vulnerabilities
2) Applicable elements of the ISO 14001:2015 standards
3) Recommendations to meet requirements
2.5 The contractor shall provide a Registered Environmental Manager with the National Registry of Environmental Professionals, ISO 14001-2015 Exemplar Global Certified Lead Auditor OR the International Registry of Certificated Auditors (IRCA) ISO 14001:2015 EMS Lead Auditor, preferably a Master Lead Auditor, to perform surveillance and reassessment audits. Proof of certification for the Lead Auditor shall be provided with the contractor's proposal. In addition:
2.5.1 The contractor’s lead auditor shall have a minimum of 10 (ten) years of experience with Alabama Department of Environmental regulations with proof including references provided with the contractor's proposal.
2.5.2 The contractor’s lead auditor shall have a minimum of 10 (ten) years of federal compliance experience with Department of Defense Industrial Complexes with proof including references provided with the contractor's proposal.
2.5.3 The contractor’s lead auditor shall have a minimum of 15 (fifteen) years of Resource Conservation and Recovery Act (RCRA) experience with proof of experience provided with the contractor's proposal.
2.5.4 The contractor’s lead auditor shall have a minimum of 10 (ten) years of environmental water program experience to include Water Quality, Wastewater, Stormwater and National Pollutant Discharge Elimination System (NPDES) permit experience with proof of experience provided with the contractor's proposal.
2.5.5 The contractor’s lead auditor shall have a minimum of 10 (ten) years of radioactive waste storage facility regulatory experience with proof of experience provided with the contractor's proposal.
2.5.6 The contractor’s lead auditor for this activity is considered key personnel. Key personnel shall be required to have performance ratings and disclose any negative CPARs ratings and/or customer complaints with documentation provided in the contractor's proposal.
2.6 Schedule and Deliverables
Base Year: 2 November 2023 – 1 November 2024 2 Audit Plans 2 Surveillance Audits
2 Audit Reports 2 Closing Meeting Presentations (PowerPoint or Adobe format) 1 Gap Assessment 1 Gap Assessment Report
Option Year 1: 2 November 2024 – 1 November 2025 2 Audit Plans 1 Surveillance Audit 1 Reassessment Audit
Option Year 2: 2 November 2025 – 1 November 2026
2 Surveillance Audits
Option Year 3: 2 November 2026 – 1 November 2027
2 Surveillance Audits 2 Audit Reports 2 Closing Meeting Presentations (PowerPoint or Adobe format)
Option Year 4: 2 November 2027 – 1 November 2028 2 Audit Plans 1 Surveillance Audit 1 Reassessment Audit