23-Q-0025 Solicitation Amendment 1 Released.pdf

PDF 609 KB Posted

Attached to
NBC Component Test Stand for The Anniston Army Depot
Solicitation number
W911KF-23-Q-0025
Issued by

About this file

This is an amendment to a solicitation for a NBC Component Test Stand. The amendment provides an updated statement of work to include training and manual requirements. It also answers six questions from industry. Only five valves listed in the statement of work will be tested on the machine. Test procedures are provided in the statement of work. No other valves or items will be tested. Dielectric strength and insulation resistance testing are not required to be performed by the test stand. The amendment identifies the Department of the Army Materiel Command Contracting Command Detroit Arsenal as the agency. It does not provide a response date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See page tw o.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-May-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911KF23Q0025

X 9B. DATED (SEE ITEM 11)

27-Apr-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-May-2023

CODE

ACC-ANAD

ANNISTON ARMY DEPOT

7 FRANKFORD AVENUE, BLDG 35

ANNISTON AL 36201-4199

W911KF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KF23Q0025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 1 NOTES

1. The purpose of this amendment is to post an updated Statement of Work (SOW) and answers to Indsutry Questions. The SOW has been amended to include training and manual requirements.

2. Industry Question answers are as follows:

Question 1:

Attachment 1, the Statement of Work lists the following items to be tested:

Paragraph 7.8.1 Prioritization Regulating Valve P/N 12336875-1 Paragraph 7.8.2 Pressure Regulating Valve P/N 12336770-1 Paragraph 7.8.3 Anti-Ice Valve P/N 12336774 Paragraph 7.8.4 Temperature Valve P/N 12336775 Paragraph 7.8.5 Anti-Ice Servo Valve P/N 12336776

Are these the only part numbers/Valves to be tested on the test stand?

ANSWER: the five valves listed are the only components that will be tested on this machine.

Question 2:

If these are the only valves to be tested on the test stand, can you provide the DMWR,NMWR, and/or Technical Orders that have the applicable test procedures for these valves. These will help us properly size the test stand components and estimate the amount of software/programming required based on the relative complexity of the test procedures.

ANSWER: The DMWR has a distribution statement that does not allow release outside government use. The test procedures required are included in the SOW.

Question 3:

If there are other valves or items to be tested on the test stand can you also provide the applicable test procedures for those items.

ANSWER: No other valves will be tested.

Question 4: :

Is the test stand required to perform the Dielectric strength testing and the Insulation Resistance Testing?

ANSWER: No

Question 5:

If the test stand is required to perform the above dielectric strength and Insulation Resistance testing, is it sufficient for us to provide the meters/instruments and the test would be performed manually by the test operator. Or does that testing need to be automated as well?

ANSWER: N/A

Question 6: Current model numbers for the National Instruments (NI) chassis in the current NBC test stand:

PXI-1033

PXI-6254

PXI-6511

PXI-6704

PXI-GPIB

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 1 NOTES

3. The purpose of this amendment is to post an updated Statement of Work (SOW) and answers to Indsutry Questions. The SOW has been amendment to include training and manual requirements.

4. Industry Question answers are as follows:

Question 1:

Attachment 1, the Statement of Work lists the following items to be tested:

Paragraph 7.8.1 Prioritization Regulating Valve P/N 12336875-1 Paragraph 7.8.2 Pressure Regulating Valve P/N 12336770-1 Paragraph 7.8.3 Anti-Ice Valve P/N 12336774 Paragraph 7.8.4 Temperature Valve P/N 12336775

Paragraph 7.8.5 Anti-Ice Servo Valve P/N 12336776

Are these the only part numbers/Valves to be tested on the test stand?

ANSWER: the five valves listed are the only components that will be tested on this machine.

Question 2:

If these are the only valves to be tested on the test stand, can you provide the DMWR,NMWR, and/or Technical Orders that have the applicable test procedures for these valves. These will help us properly size the test stand components and estimate the amount of software/programming required based on the relative complexity of the test procedures.

ANSWER: The DMWR has a distribution statement that does not allow release outside government use. The test procedures required are included in the SOW.

Question 3:

If there are other valves or items to be tested on the test stand can you also provide the applicable test procedures for those items.

ANSWER: No other valves will be tested.

Question 4: :

Is the test stand required to perform the Dielectric strength testing and the Insulation Resistance Testing?

ANSWER: No

Question 5:

If the test stand is required to perform the above dielectric strength and Insulation Resistance testing, is it sufficient for us to provide the meters/instruments and the test would be performed manually by the test operator. Or does that testing need to be automated as well?

ANSWER: N/A

Question 6: Current model numbers for the National Instruments (NI) chassis in the current NBC test stand:

PXI-1033

PXI-6254

PXI-6511

PXI-6704

PXI-GPIB

(End of Summary of Changes)