W911KF-19-R-0278-0002_Questions and Answers

1. Please provide photos and/or available drawings of the foundation?

Answer: There is no special foundation for the existing equipment at the proposed location.

The area proposed is standard shop floor with concrete approximately eight (8) inches thick.

See Reference Layout.

2. Could you send me photos of the machine and the area around it?

Answer: No photos are allowed to be taken on the Anniston Army Depot.

3. Please provide weights and dims on this system?

Answer: The equipment and its supporting components occupies a space of approximately 28 feet long x 20 feet wide.

4. Where is said system to be re-located?

Answer: The equipment will be decommissioned, removed from the building to an identified location outside of the current building or loaded on a truck.

5. Is said system to be re-installed for use? If so, will utility services be required?

Answer: No. The equipment will not be re-installed. Service for this equipment will not be required.

6. Information requested -- age of foundation; floor thickness; is there any rebar in the foundation?

Answer: The addition was constructed in 1995-96 timeframe. Please see the attached Building construction layout.

7. If it is determined that a new foundation is required, will dust protection be required.

Answer: Yes. If any construction is required that will create dust and debris in the areas surrounding the location and adjacent equipment will need to be protected from dust and debris.

8. How thick is the concrete floor?

Answer: The area is standard shop floor approximately eight (8) inches thick. Please see the attached Layout for references.

9. Nitrogen system - will contractor be able to tap into the existing line or will a new gas line be required?

The SOW requests a nitrogen generator to be quoted as an option for this project. It will have to be determined depending on the proposed equipment requirements if the existing Nitrogen supply is used.

10. Rigging equipment -- are there any special crane or equipment requirements/restrictions?

Answer: The Equipment to be removed is a STRIPPIT PUNCHING AND SHEARING MACHINE CNC

LASER, Model Number: 1250 MXP 30 with PRC 2200 watt Laser.

SCALE:

DRAWN BY:

DESIGNED BY:

FILE DRAWER NO.

SHEET NO. OF

DATE:

PLAN NO.

IED

APPROVAL

CHECKED BY

DPW DM DAO DSP DPA

DOIM DLES DOC FAC.

ENGR.

AMMO.

SURV.

SAFETY CHEM.

SURETY

FIRE

CH.

IND.

HYG.

APPROVED

D A

T E

R E

V I S I O

N B

Y B

Y Anniston Army Depot Anniston, Alabama

DR

FE-416-95

5 9

AS NOTED

INDUSTRIAL ENGINEERING DIVISION

DIRECTOR of PRODUCTION ENGINEERING

MED

Rebecca Cleveland

DIVISION CHIEF

DRM

Building 145

Machining Facility

Sections and Details (2)

NOT TO SCALE

BRIDGE CRANE DETAIL

1" = 1'-0"

NEW ADDITION

SECTION THRU

2" MINIMUM

A P

P R

O X

CONTROL PENDANT

1/2

3" MIN. CLEARANCE

LINE

CLEARANCE

2" MIN.

2'-3"

OF HOOK TRAVEL

APPROX. LIMIT

CL RAIL

A P

P R

O X

30 September 95

FINISH

8" THICK WITH MONOLITHIC

NEW CONCRETE SLAB

SEE TECHNICAL PROV.

NEW 2 TON BRIDGE

(TWO REQUIRED)

FOR SPECIFICATIONS

ADEQUATELY SUPPORT LOADING REQ'D

BE DESIGNED BY THE CONTRACTOR TO

CRANE RAIL SUPPORTS/COLUMNS SHALL

WITH NEW METAL BUILDING COLUMNS

CRANE RAIL SUPPORTS INTEGRATED

ELEVATION

BUILDING FINISHED FLOOR

ELEVATION OF ORIGINAL

FLOOR ELEVATION TO MATCH

NEW ADDITION FINISHED

(REMAIN)

ORIGINAL BLDG. 145

WALL PANELS OF

EXISTING EXTERIOR

BUILDING 145

ORIGINAL STRUCTURE

ADDITION.

AT TRANSITION TO NEW

THROUGH-WALL FLASHING

INSTALL CONTINUOUS

BEHING D.S. AS REQ'D

ADDITION ROOF. PROVIDE BRACING

D.S. WILL DISCHARGE ONTO NEW

AND INSTALL ELBOW SUCH THAT

CUT OFF EXISTING DOWNSPOUTS

GUTTER

EXISTING

SEAM ROOF

EXISTING STANDING

BUILDING MFG.

SIZE AS PER METAL

GIRTS- SPACING,

15' HIGH

LINER PANELS APPROX.

NEW INTERIOR WALL

OF ORIGINAL BUILDING)

(MATCH CONFIGURATION

EXTERIOR WALL PANELS

INSULATION

CURB

CONCRETE

CRANE (TWO REQUIRED)

TWO-TON BRIDGE

AS PER METAL BLDG. MFG.

PURLINS- SPACING AND SIZE

ROOF PANELS

NEW STANDING SEAM

INSULATION

DOWNSPOUTS

NEW GUTTER AND

E A

V E

OR NEW CONCRETE

EXISTING HARDSTAND

NEW 30# ASCE RAIL (MIN.)

(SIZE AS REQ'D)

NEW CHANNEL

(SIZE AS REQUIRED)

NEW CRANE BEAM

50'-0" CL TO CL OF RAIL

CONCRETE

NEW

FLOOR

Questions and Answers for W911KF-19-R-0278
FE-416-95 Bldg 145 Addn Sheet 5 PMD-Default-000 PMD