Technical_Information_Questionnaire_(TIQ).pdf
PDF 202 KB Posted
- Attached to
- CNC Laser Cutting Machine Federal contract opportunity
- Solicitation number
- W911KF-19-R-0278
About this file
Technical Information Questionnaire (TIQ)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911KF-19-R-0278-0004.pdf | ||
| W911KF-19-R-0278-0002__edited_Questions_and_Answers.pdf | ||
| W911KF-19-R-0278-0003.pdf | ||
| W911KF-19-R-0278-0002.pdf | ||
| W911KF-19-R-0278-0002_Questions_and_Answers.pdf | ||
| W911KF-19-R-0278-0001_Amendment.pdf | ||
| SITE_LAYOUT_BLDG_145.pdf | ||
| Contractor_Request_for_Waiver_Non-EPA_Items.pdf | ||
| Evidence_of_Authority_To_Sign_Offers.pdf | ||
| Request_for_Technical_Literature.pdf | ||
| Contractor_Affirmative_Procurement_Report.pdf | ||
| DD_Form_1664_Data_Item_Description.pdf | ||
| Statement_of_Work_(SOW).pdf | ||
| DD_Form_1423_Contract_Data_Requirements_List.pdf | ||
| SioanForm380-2_Personal_Data_Questionnaire.pdf | ||
| W911KF-19-R-0278_Solicitation.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5
Company CAGE Code POC Name
POC Telephone POC E-Mail
– Technical Information Questionnaire (TIQ)
The following TIQ is intended to aid in the determination of whether the proposed equipment is technically acceptable and is capable of meeting the performance requirements outlined in the Solicitation. Failure to provide a response to each of the questions listed in this TIQ and provide substantiating data may result in rejection of the offeror’s proposal. Every question must be supported with substantiating data. Substantiating data can be in the form of test reports or contractor certifications. The equipment offered must meet ALL of the capabilities and requirements as described in Solicitation W911KF-19-R-0278 and below.
Please answer every question below indicating via an “X” in the “Yes” or “No” column.
Substantiating data shall also be provided with this completed TIQ document. The substantiating data for questions shall come as commercial literature or specification sheets as well as contractor testing data in the form of a report.
Item # Yes No FACTOR
Proposal Location of Substantiating Data
1 3.1 Salient Features 2 3.1.1 Computer Numerical Control (CNC 3 3.1.1.1 Operator Controls 4 3.1.1.2 Control Center:
5 3.1.1.3 Remote Control Pendant 6 3.1.1.4 Functions and Applications
7 3.1.1.4.1 Programming Function, Technology and Applications
8 3.1.2 Programmable Axes 9 3.1.3 Laser
10 3.1.3.1 Material Cutting Capacities 11 3.1.4 Cutting Head 12 3.1.4.1 Nozzle Changer 13 3.1.5 Cutting Table 14 3.1.6 Chiller System 15 3.1.7 Dust Collection System 16 3.1.8 Safety Equipment 17 5.2 Installation 18 5.2.1.1 Floor Space
Contractor’s Signature Date
File details come from the government source that posted it.