Information Requested for W911KF-19-R-0278
1. Please provide photos and/or available drawings of the foundation?
Answer: There is no special foundation for the existing equipment at the proposed location.
The area proposed is standard shop floor with concrete approximately eight (8) inches thick.
See Reference Layout.
2. Could you send me photos of the machine and the area around it?
Answer: No photos are allowed to be taken on the Anniston Army Depot.
3. Please provide weights and dims on this system?
Answer: The equipment and its supporting components occupies a space of approximately 28 feet long x 20 feet wide.
4. Where is said system to be re-located?
Answer: The equipment will be decommissioned, removed from the building to an identified location outside of the current building or loaded on a truck.
5. Is said system to be re-installed for use? If so, will utility services be required?
Answer: No. The equipment will not be re-installed. Service for this equipment will not be required.
6. Information requested -- age of foundation; floor thickness; is there any rebar in the foundation?
Answer: The addition was constructed in 1995-96 timeframe. Please see the attached Building construction layout.
7. If it is determined that a new foundation is required, will dust protection be required.
Answer: Yes. If any construction is required that will create dust and debris in the areas surrounding the location and adjacent equipment will need to be protected from dust and debris.
8. How thick is the concrete floor?
Answer: The area is standard shop floor approximately eight (8) inches thick. Please see the attached Layout for references.
Information Requested for W911KF-19-R-0278
9. Nitrogen system - will contractor be able to tap into the existing line or will a new gas line be required?
The contractor will be able to tap into the existing line at building 145.
The SOW requests a nitrogen generator to be quoted as an option for this project. It will have to be determined depending on the proposed equipment requirements if the existing Nitrogen supply is used.
10. Rigging equipment -- are there any special crane or equipment requirements/restrictions?
Answer: The Equipment to be removed is a STRIPPIT PUNCHING AND SHEARING MACHINE CNC
LASER, Model Number: 1250 MXP 30 with PRC 2200 watt Laser.