Amendment_2.pdf
PDF 26 KB Posted
- Attached to
- Universal Hydraulic Pump and Motor Test System Federal contract opportunity
- Solicitation number
- W911KF18Q0039
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911KF-18-Q-0039-0001.pdf | ||
| Attachment_1_Statement_of_Work_v1.pdf | ||
| Attachment_8__Wage_Determination.pdf | ||
| Attachment_6__Past_Performance_Questionnaire.pdf | ||
| Attachment_4__Contractor_Request_for_Waiver_Non-EPA_Items.pdf | ||
| Attachment_3__EPA_Guideline_Items.pdf | ||
| Attachment_10_DD_Form_1664_Data_Item_Description.pdf | ||
| Attachment_9_DD_1423_Contract_Data_Requirement_List.pdf | ||
| Attachment_7_Request_for_Technical_Literature.pdf | ||
| Attachment_5__Contractor_Affirmative_Procurement_Report.pdf | ||
| Attachment_2__Evidence_of_Authority_To_Sign_Offers.pdf | ||
| Attachment_1_Statement_of_Work.pdf | ||
| SOLICITATION,_W911KF-18-Q-0039,_9_May_2018.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See page tw o.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KF18Q0039
X 9B. DATED (SEE ITEM 11)
09-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jun-2018
CODE
ARMY CONTRACTING COMMAND - WARREN (ANAD)
ANNISTON ARMY DEPOT
7 FRANKFORD AVENUE, BLDG 35
ANNISTON AL 36201-4199
W911KF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KF18Q0039
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT NOTES
1. The purpose of this amendment is to answer questions and extend the closing date as follows:
a. The closing date has been extended from 11-Jun-2018 10:00 AM to 18-Jun-2018 10:00 AM.
b. The following questions were submitted and answers are as follows:
Question 1: Need to know flows for the motor test and displacement of the UUT. Usually they have pictorial diagrams of how they want things set ups as well.
Answer 1: There are two types of UUTs. One is a hydraulic pump, and the other is a hydraulic motor. In the case that multiple part numbers are given for a pump or motor, there is actually only one pump type and one motor type.
Multiple part numbers are given when there are multiple sources for the pump or motor.
UUT Displacements
To determine pump UUT displacement, I suggest using the speeds and flows from paragraph 3.2 in section 13.1 of the SOW. I calculated using all combinations of speed and flow and averaged the results. This gave me a displacement of 2.01 cubic inches which is close enough to the actual pump displacement.
The motor UUT displacement, 0.950 +/- 0.05 cubic inches, is given in paragraph 3.4.3 of section 13.2 of the SOW.
UUT Flows
To determine maximum motor UUT flowrate, I suggest calculating it from the motor UUT displacement and the highest speed given in the test procedure during a test step. The motor UUT displacement, 0.950 +/- 0.05 cubic inches, is given in paragraph 3.4.3 of section 13.2 of the SOW. The highest speed is given in paragraph 3.3.1 of section 13.2 of the SOW and is 4,800 +100/-0 RPM. The calculation results in a flow of 20.3 GPM.
Regarding hydraulic schematics of systems to test the pump UUT and motor UUT, we have these, but distribution is limited. We would not normally provide this regardless of distribution requirements, because we do not want to prescribe or dictate a specific design capable of meeting all SOW requirements. After contract award, the winning bidder will have access to our existing test stand, so they can review the design.
Question 2: Section 13 of the SOW: we need physical dimensions and performance characteristics (specifically displacement) for the UUT items listed in drawings #12287040 and 12285278. We understand that these drawings are not available but we cannot size the test stand and mounting interface hardware to connect the UUT items without this information.
Answer 2: Drawings 12287040 and 12285278 are source control drawings for the same pump from two different manufacturers. There is only one (1) pump design and one (1) motor design. We are not able to provide physical dimensions. I would assume the pump is similar in size and layout to a commercially available axial piston pump of the same displacement. Regarding displacement of the pump, please see my response to question 2 above suggesting calculation of displacement from speeds and flow rates given in the SOW.
Question 3: A written description is fine, assuming the shaft and flange (typically an SAE standard pattern) of the UUT components are detailed. If they are non-standard we will need specific details on the dimensions and configuration.
W911KF18Q0039
Answer 3: The drawings that will be provided after contract award provide sufficient detail to design a machine interface to the pump shaft and flange. I would assume that a custom design will be required.
Question 4: Also, same question on the hydraulic connection ports. Typically they are an SAE standard configuration. However, if they are non-standard we will need specific details on the connection.
Answer 4: The drawings that will be provided after contract award provide sufficient detail of the hydraulic port connections which are per MS33649.
2. All other terms and conditions remain unchanged.
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 11-Jun-2018 10:00 AM to 18-Jun-2018 10:00 AM.
(End of Summary of Changes)
File details come from the government source that posted it.