BOOK 3 - EIE439 - Drawings.pdf
PDF 41 MB Posted
- Attached to
- EIE439 Fuels Management and Laboratory Facility
- Solicitation number
- W911KB25R0020
About this file
This file is a comprehensive set of architectural and engineering drawings for the EIE439 Fuels Management and Laboratory Facility project at Eielson Air Force Base, Alaska. The project involves demolishing the existing 1,615 square foot Building 3242 and constructing a new 4,014 square foot facility with multiple functional spaces, including a laboratory, ready room, administrative offices, fuels control center, restrooms, locker rooms, conference rooms, classrooms, operations maintenance room, emergency eye wash and shower, and bulk storage room.
The detailed drawings, prepared by the U.S. Army Corps of Engineers Alaska District, cover multiple disciplines including architectural, structural, civil, mechanical, electrical, fire protection, plumbing, and telecommunications. The solicitation number is W911KB25R0020, and the project is set for Ready to Advertise (RTA) status as of October 30, 2024. The drawings provide comprehensive technical specifications, including building layout, technical systems integration, safety compliance, hazardous materials management, and detailed construction requirements across various building systems and components.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL
READY TO ADVERTISE (RTA)
EIE439
FUELS MANAGEMENT AND
LABORATORY FACILITY
EIELSON, ALASKA
BOOK 3
DRAWINGS
SOLICITATION NUMBER: W911KB25R0020
JANUARY 2025
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A u to d e s k D o c s /2
.0
U
S A
C E
E
IE
F u e ls
M a n a g e m e n t
L a b
/2
.0
U S
A C
E E
IE
F u e ls
M a n a g e m e n t
L a b R
.r v t
/1
/2
:1 :1
P
M
G-001
C O
V E
R S
H E
E T
E
IE
L S
O N
A
IR
F O
R C
E B
A S
E A
L A
S K
A D
IS
T
R
IC
T A
N C
H O
R A
G E
A
L A
S K
A
S S
C H
E L L
S S
C H
E L L
D M
O O
R E
O C
T O
B E
R
W K
B R
R T
A
F U
E L S
M A
N A
G E
M E
N T
A N
D L
A B
O R
A T
O R
Y F
A C
IL
IT
Y
E
IE
F T
Q W
ALASKA DISTRICT
W911KB25R0020
OCTOBER 30 2024
EIELSON AIR FORCE BASE
FUELS MANAGEMENT AND LABORATORY FACILITY
EIE439 (FTQW 177801)
BLDG 3242
RTA
PROJECT MANAGER
ARCHITECTS ALASKA, INC
HAZMAT ENGINEER
EHS-ALASKA, INC
CIVIL ENGINEER
ENTERPRISE ENGINEERING, INC.
LANDSCAPE ARCHITECT
CORVUS DESIGN
ARCHITECT
ARCHITECTS ALASKA, INC
STRUCTURAL ENGINEER
BBFM ENGINEERS
FIRE PROTECTION ENGINEER
INTUITIVE ENGINEERING
SERVICES, LLC
MECHANICAL ENGINEER
RSA ENGINEERING, INC.
PLUMBING ENGINEER
RSA ENGINEERING, INC.
ELECTRICAL ENGINEER
RSA ENGINEERING, INC.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A u to d e s k D o c s /2
.0
U
S A
C E
E
IE
F u e ls
M a n a g e m e n t
L a b
/2
.0
U S
A C
E E
IE
F u e ls
M a n a g e m e n t
L a b R
.r v t
/1
/2
:1 :1
P
M
G-002
S H
E E
T I
N D
E X
E
IE
L S
O N
A
IR
F O
R C
E B
A S
E A
L A
S K
A D
IS
T
R
IC
T A
N C
H O
R A
G E
A
L A
S K
A
S S
C H
E L L
S S
C H
E L L
D M
O O
R E
O C
T O
B E
R
W K
B R
R T
A
F U
E L S
M A
N A
G E
M E
N T
A N
D L
A B
O R
A T
O R
Y F
A C
IL
IT
Y
E
IE
F T
Q W
RTA
GENERAL
G-001 COVER SHEET
G-002 SHEET INDEX
G-003 LIFE SAFETY PLAN NOTES
G-004 LIFE SAFETY PLAN
G-005 CODE COMPLIANCE SITE PLAN
G-101 VICINITY MAPS
G-102 SITE PHASING PLAN
HAZARDOUS MATERIALS
H-001 HAZARDS ABATEMENT, GENERAL AND SHEET NOTES
H-101 HAZARDS ABATEMENT, BUILDING 3242 AND MOVEABLE STORAGE BUILDING
SHEET
NUMBER SHEET TITLE
CIVIL
V-101 TOPOGRAPHIC SURVEY
C-001 NOTES, LEGEND, AND ABBREVIATIONS
CD101 SITE DEMOLITION PLAN
C-101 SITE PLAN
C-102 SITE GRADING AND DRAINAGE PLAN
C-103 SERVICE UTILIDOR PLAN AND PROFILE
C-301 CIVIL SITE SECTIONS
C-501 CIVIL DETAILS 1
C-502 CIVIL DETAILS 2
LANDSCAPE
L-101 LANDSCAPE PLAN
STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES
S-101 FOUNDATION PLAN
S-102 CANOPY AND MEZZANINE FRAMING PLAN
S-103 ROOF FRAMING PLAN
S-501 FOUNDATION DETAILS
S-502 FRAMING DETAILS
S-503 FRAMING DETAILS
S-601 SCHEDULES
STRUCTURAL SITE
SS001 STRUCTURAL GENERAL NOTES - UTILIDOR
SS501 UTILIDOR PLAN AND SECTIONS
SS502 UTILIDOR DETAILS
ARCHITECTURAL
A-001 ARCHITECTURAL ABBREVIATIONS, DRAWING CONVENTIONS, AND GENERAL NOTES
AD101 BUILDING 3242 DEMOLITION PLAN
A-101 FIRST FLOOR PLAN
A-102 FIRST FLOOR REFLECTED CEILING PLAN
A-103 MECHANICAL PLATFORM FLOOR PLAN & REFLECTED CEILING PLAN
A-104 ROOF PLAN
A-201 EAST AND SOUTH EXTERIOR ELEVATIONS
A-202 WEST AND NORTH EXTERIOR ELEVATIONS
A-301 BUILDING SECTIONS
A-302 BUILDING SECTIONS
A-303 TYPICAL AIR BARRIER EXTENTS
A-311 TYPICAL EXTERIOR WALL SECTIONS
A-312 WALL SECTIONS
A-313 WALL SECTIONS
A-314 WALL SECTIONS
A-401 INTERIOR ELEVATIONS & TYPICAL MOUNTING HEIGHTS
A-402 INTERIOR ELEVATIONS
A-403 ENLARGED RESTROOM PLAN AND INTERIOR ELEVATIONS
A-404 ENLARGED LABORATORY PLAN AND INTERIOR ELEVATIONS
A-405 INTERIOR ELEVATIONS
A-406 INTERIOR ELEVATIONS
A-407 ELEVATION FINISH CONCEPTS
A-501 EXTERIOR DETAILS
A-502 EXTERIOR DETAILS
A-503 EXTERIOR DETAILS
A-504 EXTERIOR DETAILS
A-601 PARTITION TYPES
A-602 DOOR SCHEDULE AND DETAILS
A-603 WINDOW TYPES AND SCHEDULE
A-604 ROOM FINISH SCHEDULE
A-605 SIGN PLAN AND SCHEDULE
A-701 INTERIOR DETAILS
A-702 INTERIOR DETAILS
A-703 INTERIOR DETAILS
A-704 SIGN DETAILS
A-705 INTERIOR DETAILS
FIRE PROTECTION
F-001 FIRE PROTECTION COVER PAGE
F-101 FIRE PROTECTION FLOOR PLAN
F-102 MEZZ.FIRE PROTECTION FLOOR PLAN
FA-001 FIRE ALARM NOTES PLAN
FA-002 FIRE ALARM /MNS MATRIX
FA-101 FIRE ALARM PLAN
SHEET
NUMBER SHEET TITLE
PLUMBING
P-001 PLUMBING LEGEND, LOGIC AND ABBREVIATIONS
P-201 UNDERFLOOR PLUMBING PLAN
P-202 PLUMBING PLAN
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-901 WASTE AND VENT ISOMETRICS
P-902 PLUMBING ISOMETRIC
MECHANICAL
M-001 MECHANICAL LEGENDS, LOGIC AND ABBREVATIONS
M-101 MECHANICAL DEMOLITION PLAN
M-200 MECHANICAL SITE PLAN
M-201 RADIANT FLOOR HEATING PLAN
M-202 HEATING PLAN
M-203 VENTILATION PLAN
M-204 MECHANICAL ROOF PLAN
M-301 ENLARGED SECTIONS
M-302 ENLARGED SECTIONS
M-303 ENLARGED SECTIONS
M-401 ENLARGED MECHANICAL PLANS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-701 CONTROL SCHEMATICS
M-702 CONTROL SCHEMATICS
M-703 POINT SCHEDULES AND SEQUENCES
M-704 POINT SCHEDULES AND SEQUENCES
M-705 POINT SCHEDULES AND SEQUENCES
M-706 POINT SCHEDULES AND SEQUENCES
ELECTRICAL
ED101 ELECTRICAL SITE DEMOLITION PLAN
E-001 LEGEND, SCHDULES, ABBRIVIATIONS, AND FIXTURE SCHEDULE
E-101 ELECTRICAL SITE PLAN
E-102 LIGHTING PLAN
E-103 POWER PLAN
E-104 GROUNDING PLAN
E-401 ENLARGED ELECTRICAL PLANS
E-501 POWER ONE-LINE DIAGRAM
E-502 LIGHTING DETAILS
E-503 POWER DETAILS 1
E-504 POWER DETAILS 2
E-505 POWER DETAILS 3
E-601 PANEL SCHEDULES
E-602 PANEL SCHEDULES
TELECOM
T-001 TELECOM LEGEND
T-101 SIGNAL PLAN
T-501 COMMUNICATION DETAILS
REFERENCED CODES/STANDARDS
APPLICABLE CODES:
UFC 1-200-01, GENERAL BUILDING REQUIREMENTS, CHANGE 3, FEB.2024
UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES, CHANGE 6, MAY 2021
UFC 4-010-01 DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, CHANGE 12, JULY 2022
UFC 4-021-01 MASS NOTIFICATION SYSTEMS, CHANGE 1, JAN. 2010
UFC 4-310-03 DOD FUELS LABORATORY STANDARDS, AUG. 2020
INTERNATIONAL BUILDING CODE (IBC), 2021
NFPA 1 UNIFORM FIRE CODE, 2024 (FOR FIRE DEPT. VEHICLE ACCESS ROADS)
NFPA 13 INSTALLATION OF SPRINKLER SYSTEMS, 2022
NFPA 24 PRIVATE FIRE SERVICE MAINS, 2022
NFPA 25 INSPECTION, TESTING AND MAINTENANCE OF WATER-BASED FIRE PROTECTION SYSTEMS, 2020
NFPA 45 - STANDARD ON FIRE PROTECTION FOR LABORATORIES USING CHEMICALS, 2024
NFPA 70 NATIONAL ELECTRICAL CODE, 2023
NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE, 2025
NFPA 80 FIRE DOORS AND OTHER OPENING PROTECTIVES, 2025
NFPA 80A RECOMMENDED PRACTICE FOR PROTECTION OF BUILDINGS FROM EXTERIOR FIRE EXPOSURES, 2022
NFPA 90A AIR-CONDITIONING AND VENTILATING SYSTEMS, 2024
NFPA 101 LIFE SAFETY CODE, 2024
NFPA 400, HAZARDOUS MATERIALS CODE, 2022
2021 IBC BUILDING HEIGHT, AREA AND CONSTRUCTION TYPE
ANALYSIS
CHAPTER 5- HEIGHTS AND ALLOWABLE AREAS
CONSTRUCTION TYPE: II-B (SECTION 602 AND 603)
NON-SEPARATED MIXED USE AND OCCUPANCY; GROUP B (INCLUDING SMALL ASSEMBLY SPACE PER 303.1.2 AND LAB PER 304.1.
(BUSINESS-304.1) AND MECHANICAL ROOM (311.2)
BUILDING AREA:
TOTAL BUILDING: 4,002 SF ( B)
TABLES 504.3, 504.4 AND 506.2 (WITH AUTOMATIC SPRINKLER SYSTEM)
GROUP; CONSTRUCTION TYPE; HEIGHT LIMIT; ALLOWABLE # OF STORIES ABOVE GRADE; ALLOWABLE GROSS AREA PER FLOOR
B II-B, 75 FEET 4 92,000 SF (NO FRONTAGE INCREASE)
ACTUAL: BUILDING NUMBER OF STORIES IS 1, HEIGHT IS 17 FEET AND FLOOR AREA IS 4,002 SF . BUILDING COMPLIES WITH IBC FOR NUMBER OF STORIES, HEIGHT AND AREA. THIS FACILITY COMPLIES WITH THE MOST STRINGENT HEIGHT AND AREA LIMITATIONS FOR (B
OCCUPANCY).
NOTE: THE PROJECT INCLUDES AN EQUIPMENT PLATFORM USED EXCLUSIVELY FOR ACCESS, VIA ALTERNATING TREAD DEVICE, TO MECHANICAL EQUIPMENT. THIS IS COMPLIANT WITH IBC 505; I.E. LESS THAN 2/3 THE AREA OF THE ROOM IT IS IN PER 505.3.1.
EQUIPMENT PLATFORMS ARE NOT CONSIDERED AS A PORTION OF THE FLOOR BELOW PER 503.3.
ACCESSORY SPACES (508.2):
FIRST FLOOR: ROOMS; MECHANICAL ROOM (111), 118 (JANITOR), 130 (ELECTRICAL), 131 (OUTDOOR STORAGE),132 (TELECOM), ARE
ACCESSORY TO B OCCUPANCY.
ROOMS 111, 118, 130, 131, 132 TOTAL FLOOR AREA = 371 SF
TOTAL AREA FIRST FLOOR = 4002 SF
COMBINED FLOOR AREA OF THE ACCESSORY SPACES ARE LESS THAN 10% OF THE FIRST FLOOR GROSS AREA (9.3%)
BUILDING COMPLIES WITH ACCESSORY SPACE REQUIREMENTS OF IBC
CHAPTER 6 - TYPES OF CONSTRUCTION
TABLE 601 FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS FOR CONSTRUCTION TYPE II-B
PRIMARY STRUCTURAL FRAME 0
BEARING WALLS EXTERIOR 0
NON-BEARING WALLS EXTERIOR 0
NON-BEARING WALLS INTERIOR 0
FLOOR CONSTRUCTION AND SECONDARY NUMBERS 0
ROOF-CONSTRUCTION AND SECONDARY MEMBERS 0
TABLE 705.5 FIRE RESISTANCE RATING OF EXTERIOR WALLS BASED ON SEPARATION DISTANCE
FIRE SEPARATION DISTANCE EXCEEDS 10 FT ON ALL SIDES
FIRE SEPARATION TYPE OF CONSTRUCTION B
10 ≤ X ≤ 30FT II-B 0
NFPA 45; ANALYSIS
CLASS C CHEMICAL MAQ-PER TABLE 9.1.1(b) (450SF LAB)
OPEN USE
CLASS 1 LIMITS; 9 GAL.
COMBINED 1,II,IIIA; 18 GAL
USE AND STORAGE
CLASS 1 LIMITS; 18 GAL.
COMBINED 1,II,IIIA; 36 GAL
UFC 4-310-03; REQUIREMENTS
1-HR FIRE BARRIER AT LAB
EXIT DOORS TO BE OUTSWINGING
FUME HOOD REQUIRED
SPILL CONTAINMENT PROVIDED WITH RECESSED FLOOR
2021 NFPA 101 LIFE SAFETY ANALYSIS
CLASSIFICATION OF OCCUPANCY
CHAPTER 6 - CLASSIFICATION OF OCCUPANCY AND HAZARD OF CONTENTS
BUSINESS OCCUPANCY WITH INCIDENTAL SPECIAL PURPOSE INDUSTRIAL, STORAGE, ASSEMBLY (NOTE: IN BRACKETS BELOW AS FOLLOWS): SPECIAL PURPOSE INDUSTRIAL [SPI], STORAGE [S], ASSEMBLY [A] AND BUSINESS [B] -THESE ARE BRACKETED FOR OCCUPANT LOAD CALCULATIONS AS THESE SPACES ARE CONSIDERED
PART OF MAIN OCCUPANCY PER NFPA 101.
CLASSIFICATION OF HAZARD OF CONTENTS: ORDINARY HAZARD CONTENTS. LABORATORY ASSUMED TO INCLUDE HIGH HAZARD CONTENTS (§6.2.2.4).
*HAZARDOUS MATERIAL LOCKERS ARE PLANNED IN LAB TO STORAGE OF TEST SAMPLES.
THE FOLLOWING ROOMS ARE CONSIDERED INCIDENTAL (NFPA §101 6.1.14.1.3):
FIRST FLOOR: ROOMS; 113 (LAB) [I], 118 (JANITOR)[S], 130 (ELECTRICAL) [SPI], 131 (OUTDOOR STORAGE) [S], 132 (TELECOM) [SPI], 111 MECHANICAL [SPI].
FIRE-RATED AND SMOKE-RATED BARRIERS AND PARTITIONS
NO SMOKE RATED PARTITIONS ARE REQUIRED IN THIS FACILITY
(1) 1-HOUR FIRE BARRIER SHALL SEPARATE THE LABORATORY FROM THE REMAINDER OF THE BUILDING PER §38.3.2.2(1) NFPA 101.
(2) OUTDOOR STORAGE-1-HOUR RATED SEPARATION. (RATING REQUEST FROM GOVT FOR STORAGE OF FUEL CANS.): NFPA 24; 6.2.9 ITEM (6) REQUIRMENT, THE MECHANICAL ROOM
WILL HAVE A 1-HOUR FIRE-RATED BARRIER SEPARATED FROM REST OF THE FIRST FLOOR, AS THE FIRE SPRINKLER CONTROL VALVES ARE LOCATED WITHIN BUILDING, DIRECTLY
ACCESSIBLE FROM THE EXTERIOR.
(3) MECHANICAL MEZZANINE SPACE TO BE SEPARATED FROM RM 112 BELOW BY HORIZONTAL- 1-HR FLOOR/CEILING ASSEMBLY.
(4) NO FLOOR SMOKE BARRIERS REQUIRED TO SEPARATE STORIES - SINGLE STORY.
(5) VERTICAL PENETRATIONS THROUGH RATED FLOOR/CEILING ASSEMBLY ARE TO BE PROTECTED.
(6) CORRIDOR PROTECTION:
A. FULLY SPRINKLER BUILDING: CORRIDORS ARE NOT REQUIRED TO HAVE RATED FIRE BARRIERS 38.3.6.1(3).
(7) OPENING PROTECTIVES: NFPA 101 TABLE 8.3.3.2.2 MINIMUM FIRE RATINGS FOR OPENING PROTECTIVES IN FIRE RESISTANCE-RATED ASSEMBLIES AND FIRE-RATED GLAZING
MARKINGS
*EXIT ACCESS AND COMPONENTS EXCEED MINIMUM REQUIREMENTS SET FORTH IN THIS SECTION.
7.3 CAPACITY OF MEANS OF EGRESS - REFERENCE INDIVIDUAL G-SHEET FOR OCCUPANT LOAD NUMBERS AND CALCULATIONS
7.3.3 EGRESS CAPACITY (TABLE 7.3.3.1 CAPACITY FACTORS)
OCCUPANT LOAD: BUSINESS - 150 SF/PERSON, LABORTORY - 100 SF/PERSON, MECHANICAL - 500 SF/PERSON.
EXIT CAPACITY AND WIDTH
BUSINESS USE - 2 DOORS, 36 INCHES EACH, 0.2 IN./PERSON, 360-PERSON CAPACITY
LABORATORY - 2 DOORS, 36 INCHES EACH, 0.4 IN./PERSON, 180-PERSON CAPACITY
MINIMUM 2 MEANS OF EGRESS REQUIRED (§7.11.4).
STORAGE ROOM - 2 DOORS, 36 INCHES EACH, 0.2 IN./PERSON, 360-PERSON CAPACITY
DOORS MINIMUM 32-INCH IN EXIT PATHWAY (NFPA 101 §7.2.1.2.3.2)
TRAVEL DISTANCE: BUSINESS OCCUPANCY WITH SPRINKLERS 300 FEET PER NFPA 101 §38.2.6.3. LABORATORY TRAVEL DISTANCE 75 FEET, 2 EXIT MINIMUM (§7.11.1 AND §7.11.4).
COMMON PATH OF TRAVEL: 100 FEET NFPA 101 §38.2.5.3.1
DEAD-END CORRIDORS: DEAD-END CORRIDORS MAXIMUM 20 FEET (50 FEET SPRINKLERED) NFPA 101 §38.2.5.2.1/38.2.5.2.2.
*EXIT ACCESS AND COMPONENTS MEET MINIMUM REQUIREMENTS SET FORTH IN THIS SECTION.
7.4.1.1 NUMBER OF MEANS OF EGRESS- THE NUMBER OF MEANS OF EGRESS FROM ANY BALCONY, EQUIPMENT PLATFORM, STORY OR PORTION THEREOF SHALL BE NOT LESS THAN TWO, EXCEPT PERMITTED IN CHAPTERS 11 THROUGH 43. PER 42.2.4.2(2). IN ORDINARY HAZARD STORAGE OCCUPANCIES, A SINGLE MEANS OF EGRESS SHALL BE PERMITTED FROM ANY STORY OR SECTION, PROVIDED THAT THE EXIT CAN BE REACHED WITHIN THE DISTANCE PERMITTED AS COMMON PATH OF TRAVEL PER A MAXIMUM TWO-STORY, SINGLE TENANT SPACE OR BUILDING PROVIDED THAT BOTH OF THE FOLLOWING CRITERIA ARE MET: (1) THE BUILDING WILL BE PROTECTED THROUGHOUT BY AN APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH 9.7.1.1 (1). (2) THE TOTAL TRAVEL TO THE OUTSIDE DOES OT
EXCEED 100 FT.
EXIT SIGNAGE:
NFPA 101 7.10.1.5.2 REQUIRES NEW SIGN PLACEMENT SHALL BE SUCH THAT NO POINT IN AN EXIT ACCESS CORRIDOR IS IN EXCESS OF THE RATED VIEWING DISTANCE OR
100 FT, WHICHEVER IS LESS, FROM THE NEAREST SIGN.
INTERIOR FINISH, CONTENTS, AND FURNISHINGS
INTERIOR WALL AND CEILING FINISH SHALL BE CLASS A OR CLASS B IN EXITS AND IN EXIT ACCESS CORRIDORS, AND SHALL BE CLASS A, CLASS B, OR CLASS C IN OTHER
AREAS. §38.3.3.2. LOCKERS ARE INTERIOR FINISH PER §10.2.1.3.
INTERIOR FLOOR FINISH IN EXIT ENCLOSURES SHALL BE CLASS I OR CLASS II. §38.3.3.3.2 INTERIOR FLOOR FINISH SHALL COMPLY WITH 10.2.7.1 OR 10.2.7.2, AS APPLICABLE. §38.3.3.3.3.
*EXIT ACCESS AND COMPONENTS MEET OR EXCEED MINIMUM REQUIREMENTS SET FORTH IN THIS SECTION
COMPONENT
WALLS AND
PARTITIONS (HR)
FIRE DOOR
ASSEMBLIES (HR)
DOOR VISION PANEL
MAX SIZE (SQ. IN.)
DOOR VISION PANEL
MARKING
SIDE LIGHT/TRANSOM
RATING (HR)
FIRE RATED
WINDOWS (HR)
FIRE RATED
WINDOWS MARKING
SIDE LIGHT/TRANSOM
MARKING
FIRE BARRIERS 1 3/4 MAX. SIZE TESTED D-H-45 OR D-H-W-45 3/4 D-H-W-45 3/4 W-30
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
US Army Corps of Engineers
(5
) 8
-1
5.
U
SA
C E
EI
E4
F ue ls
M an ag em en t L ab R
_d et ac he d.
rv t
5/
/2
3:
P
M
G-003
LI
FE
S
AF
ET
Y
PL
AN
N O
TE
S
EI
EL
SO
N
A
IR
F O
R C
E
BA
SE
AL
AS
KA
D
IS
TR
IC
T
AN
C H
O R
AG
E, A
LA
SK
A
S.
S
C H
EL
L
S.
S
C H
EL
L
D . M
O O
R E
JU
LY
W
KB
D
FU
EL
S M
AN
AG
EM
EN
T
AN
D L
AB
O
R
AT
O R
Y
FA
C
IL
IT
Y
EI
E4
100%
D R
EA
D
Y
TO
A D
VE
R
TI
SE
/3
0/
RTA
Name
150 SF
OCC LOAD:Room_Occupant_Load
LIFE SAFETY ROOM TAG
W/ AREA:
ROOM AREA
OCCUPANT LOAD
ROOM NUMBER
ROOM NAME
FIRE/SMOKE WALL - 1 HR
FIRE/SMOKE RATING
LIFE SAFETY LEGEND:
EXIT ACCESS TRAVEL
DISTANCE
DISTANCE EXIT SIGN / DIRECTION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINETFEC
FE
# OCC
EXIT DISCHARGE
OCCUPANT LOAD AT DISCHARGE
ROOMS; 130 (ELECTRICAL) [SPI], 132 (TELECOM) [SPI], 111 MECHANICAL [SPI]
131 (OUTDOOR STORAGE) [S] - 1 HOUR SEPARATION
HATCH
ROOM 113; LAB (INDUSTRIAL) - 1 HOUR SEPARATION
BUSINESS - (NO HATCH)
HIDDEN HATCH FOR DRAWING (SEE FIRST FLOOR PLAN)
FIRE ALARM CONTROL PANEL
FACP
A
B
C
1 42
OPEN
TO
BELOW
WALLS BELOW, SHOWN
FOR REFERENCE
81 SF
MECHANICAL
PLATFORM
MECH/STORAGE
OCC LOAD:1
PATH OF
TRAVEL:42FT
(HIDDEN)
SEE FLOOR PLAN BELOW
NOTE:HORIZONTAL
SEPARATION
FROM BELOW
R
EF
A
B
C
1 42
FE
FEC
FEC
OCC
OCC
OCC
OCC
MIN
EMERGENCY SHOWER AND
EYEWASH
450 SF
LAB
OCC LOAD:5
74 SF
QAC
OCC LOAD:1
203 SF
MECHANICAL ROOM
OCC LOAD:2
106 SF
DISTRO
1/150
OCC LOAD:2
169 SF
FSC
1/150
OCC LOAD:2
96 SF
SECTION CHIEF
1/150
OCC LOAD:1
121 SF
CHIEFS OFFICE
1/150
OCC LOAD:1
83 SF
SECTION CHIEF
1/150
OCC LOAD:1
65 SF
SIPR
1/150
OCC LOAD:1
82 SF
TRAINING OFFICE
1/150
OCC LOAD:1
82 SF
SUPER-INTENDENT
1/150
OCC LOAD:1
47 SF
SHOWER
41 SF
TOILET
40 SF
TOILET
46 SF
ADA-ABA
TOILET
59 SF
TELECOMM
ROOM
OCC LOAD:1
60 SF
ELECTRICAL ROOM
OCC LOAD:1
24 SF
OUTDOOR STORAGE
OCC LOAD:1
25 SF
JANITOR
OCC LOAD:1
335 SF
CONFERENCE/
TRAINING
1/15
OCC LOAD:23
83 SF
SECTION CHIEF
OCC LOAD:1
FE
FEC
TKO OFFICER
1 OCC 1 OCC 1 OCC
346 SF
READY ROOM
OCC LOAD:24
COMMANDER'S
OFFICE
KITCHEN
MECH/STORAGE
INDUSTRIAL
(LAB)
1/15
EXIT ACCESS TRAVEL: 51FT
PATH OF
TRAVEL:31FT
MECH/STORAGE
DEAD END COOR:34FT
C O
M M
O N
P
AT
H
TR
AV
EL
: 3 0F
T
D
EA
D E
N D
C O
O R
:1 3F
T
EX
IT
A C
C
ES
S
TR
AV
EL
: 3 8F
T
EX
IT
A C
C
ES
S
TR
AV
EL
: 7 0F
T
FE
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
US Army Corps of Engineers
(5
) 8
-1
5.
U
SA
C E
EI
E4
F ue ls
M an ag em en t L ab R
_d et ac he d.
rv t
5/
/2
3:
P
M
G-004
LI
FE
S
AF
ET
Y
PL
AN
EI
EL
SO
N
A
IR
F O
R C
E
BA
SE
AL
AS
KA
D
IS
TR
IC
T
AN
C H
O R
AG
E, A
LA
SK
A
S.
S
C H
EL
L
S.
S
C H
EL
L
D . M
O O
R E
JU
LY
W
KB
D
FU
EL
S M
AN
AG
EM
EN
T
AN
D L
AB
O
R
AT
O R
Y
FA
C
IL
IT
Y
EI
E4
100%
1/8" = 1'-0"A1 FIRST FLOOR LIFE SAFETY PLAN
1/8" = 1'-0"
J1 MECH. PLATFORM LIFE SAFETY PLAN
0 4' 8' 16'
SCALE: 1/8" = 1'-0"
PLAN NORTH
PLAN NORTH
AREA (SF) FUNCTION/USAGE IBC IBC-OCC NFPA 101 NFPA OCC
690.5 ASSEMBLY(ACCESSORY) 15 46
1919.0 BUSINESS 150 13
450.8 INDUSTRIAL (LAB) 100 5
450.9 MECH/STORAGE 300 2
3512 65
(SF/OCC)(SF/OCC)
0 4' 8' 16'
SCALE: 1/8" = 1'-0"
D R
EA
D
Y
TO
A D
VE
R
TI
SE
/3
0/
100%RTA
FIRE RISER ROOM
BFP FORWARD
FLOW TEST VALVES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A
D E
S
IG
N /1
/2
B
D E
S
IG
N /2
/2
G-005
C O
D E
C O
M P
L
IA
N C
E S
IT
E
P L A
N
E
IE
L S
O N
A
IR
F O
R C
E B
A S
E A
L A
S K
A D
IS
T
R
IC
T A
N C
H O
R A
G E
A
L A
S K
A
D e s ig n e r
B W
IL
L
IA
M S
C h e c k e r
J U
L Y
W K
B D
F U
E L S
M A
N A
G E
M E
N T
A N
D L
A B
O R
A T
O R
Y F
A C
IL
IT
Y
E
IE
1" = 10'-0"A1
CODE COMPLIANCE SITE PLAN
FIRE PROTECTION CODE NOTES
1. UFC 3-600-01, 9-1.3: DIMENSIONS AND FIRE LANES AND
TURNAROUNDS MUST COMPLY WITH NFPA 1.
2. UFC 3-600-01, 9-3.5.8: ALL PARTS OF A BUILDING'S
EXTERIOR MUST BE WITHIN 350 FT OF A HYDRANT
WITH CONSIDERATION TO ACCESSIBILITY AND
OBSTRUCTIONS.
3. UFC 3-600-01, 9-3.5.8.4: HYDRANT MUST BE LOCATED
WITHIN 150 FT OF FIRE DEPARTMENT CONNECTION.
4. NFPA 1, 18.2.3.2.1: A FIRE APPARATUS ACCESS ROAD
SHALL EXTEND TO WITHIN 50 FT OF AT LEAST ONE
EXTERIOR DOOR THAT CAN BE OPENED FROM THE
OUTSIDE AND THAT PROVIDES ACCESS TO THE
INTERIOR OF THE BUILDING. UFC 3-600-01, 9.1: ACCESS
ROAD MUST TERMINATE NOT FURTHER THAN 33 FT
FROM AN EXTERIOR DOOR ACCESSIBLE FOR FIRE
DEPARTMENT INGRESS.
5. NFPA 1, 18.2.3.2.2: FIRE APPARATUS ACCESS ROADS
SHALL BE PROVIDED SUCH THAT ANY PORTION OF
THE FACILITY OR ANY PORTION OF AN EXTERIOR
WALL OF THE FIRST STORY OF THE BUILDING IS
LOCATED NOT MORE THAN 150 FT FROM FIRE
APPARATUS ACCESS ROADS AS MEASURED BY AN
APPROVED ROUTE AROUND THE EXTERIOR OF THE
BUILDING OR FACILITY.
6. NFPA 1, 18.2.3.2.2.1: WHERE BUILDINGS ARE
PROTECTED THROUGHOUT WITH AN APPROVED
AUTOMATIC SPRINKLER SYSTEM THAT IS INSTALLED
IN ACCORDANCE WITH NFPA 13, NFPA 13R, OR NFPA
13D, THE DISTANCE IN 18.2.3.2.2 SHALL BE PERMITTED
TO BE INCREASED TO 450 FT.
7. NFPA 1, 18.2.3.4.1.1: FIRE DEPARTMENT ACCESS
ROADS SHALL HAVE AN OBSTRUCTED WIDTH OF NOT
LESS THAN 20 FT.
8. NFPA 1, 18.2.3.4.2.1: THE TURNING RADIUS OF A FIRE
DEPARTMENT ACCESS ROAD SHALL BE AS APPROVED
BY THE AHJ.
10 10 20
1" = 10'-0
FEET
9/
/2
R
EA
D
Y
TO
A D
VE
R
TI
SE
D
100%RTA
M W
M W
M W
M W
M W
M W
M W
M W M
W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M
WM
W
M W
M W
M W
M W
M W
M W M
W
M W
M W M
W M
W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
M W
MAIN GATE
BORROW SITE
(MULLINS PIT)
CLEAN CONCRETE
DISPOSAL SITE
(SPRUCE LAKE)
HAUL ROUTE
FLIGHTLINE AVENUE
NEW RICHARDSON HIGHWAY 2
OLD RICHARDSON HIGHWAY
TRANSMITTER ROAD
HAUL ROUTE
QUARRY ROAD
MULLINS PITS
ROAD
BUILDING 3242
PROJECT
LOCATION
LAYDOWN AREA
(SEE SHEET G-102)
D
IV
IS
IO
N S
TR
EE
T
INDUSTRIAL DRIVE
SOIL STOCKPILE
LOCATION (NOTE 2)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
P:
\P
R O
JE
C
TS
\1
\C
AD
\C U
R R
EN
T\
G
EN
ER
AL
\E
IE
9-
G -1
.D
W G
:0
8:
A M
0/
/2
BR
AN
SO
N
M
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AL
AS
KA
D
IS
TR
IC
T
AN
C
H O
R
AG
E, A
LA
SK
A
O C
TO
BE
R
AN
SI
D
W
1K B2
4R
EI
EL
SO
N
A
IR
F O
R C
E
BA
SE
FU
EL
S
M
AN
AG
EM
EN
T
AN
D
L
AB
O R
AT
O
R Y
FA
C
IL
IT
Y
EI
E4
(F
TQ
W
1)
R
TA
C S
TR
EE
T, S
U
IT
E
AN
C H
O R
AG
E, A K
TE
L.
(9
) 5
-3
LI
C
EN
SE
AE
C C
EN
TE
RP
RI
SE
EN
GI
NE
ER
IN
G, IN
C.
RTA
REENIGNELANOISSEFORPDERETSIGER
Sadat Aliu
CE-13139
10/17/24
G-101
VI
C
IN
IT
Y M
AP
S
S.
A
LI
U
K.
M
AR
KE
L
K.
M
AR
KE
L
C . B
AS
SL
ER
EI
E4
-G
-1
.D W
G
EIELSON AFB
EIELSON AFB
FAIRBANKS
FORT WAINWRIGHT
CHENA
RIVER
HIGHWAY
RICHARDSON
AIRPORT
TANANA
RIVER
MAIN
GATE
NOME
FAIRBANKS
ANCHORAGE
JUNEAU
ALASKA
NORTH POLE
SCALE: 1" = 1000' 0' 1000' 2000'
EIELSON AFB MAP
PLAN
NORTH
TRUE N
A1
SCALE: NTS
ALASKA MAP TR
U
E N
PLAN
NORTH
L1 SCALE: NTS
AREA MAP TR
U
E N
PLAN
NORTH
L6
SHEET NOTES
1. THERE IS NO AC DISPOSAL SITE ON EIELSON AFB.
2. FINAL LOCATION OF SOIL STOCKPILES MUST BE COORDINATED WITH THE
CONTRACTING OFFICER.
PROJECT
SITE
V
EM
J
V
J
J
EM
J
Ex
Ex
E x
E x
E x
E x
XXXX
X X
X X
X
XXXXXXXX
X X
X
X
E x
E x
E x
E x
E x E x
E x E x
E x
E x
E x
Ex
Ex
E x E x
E x E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E
FL
IG
H
TL
IN
E
AV
EN
U E
BUILDING
SS xWx
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
T
\ \ \ \ \ \ \ \ \ \ \ \E
E
E
E
E
E
EXISTING MOBILE
STORAGE TRAILER
EXISTING MAIN
UTILIDOR
EXISTING SERVICE
UTILIDOR B3242
REFUELER
PARKING AREA
EXISTING SERVICE
UTILIDOR
BUILDING 3229
EXISTING
MH505
EXISTING
MH506A
EXISTING SERVICE
UTILIDOR B1206
BUILDING
NEW SERVICE
UTILIDOR
EXISTING EDGE
OF ASPHALT
PAVEMENT
NEW POL OPERATIONS AND
LABORATORY BUILDING
EXISTING
POWER POLE
EXISTING
BUILDING 3242
NEW TRANSFORMER
PAD
EXISTING CONCRETE
DRIVEWAY
NEW ASPHALT
DRIVEWAY
EXISTING HEADBOLT
HEATERS
NEW GENERATOR
PAD
APPROXIMATE
PROJECT LIMITSCONTRACTOR
LAYDOWN AREA
CONTRACTOR
LAYDOWN AREA
CONTRACTOR
LAYDOWN AREA
OVERALL PHASING NOTES
1. THE INTENT OF THE SITE PHASING PLAN IS TO ALLOW FOR BASE PERSONNEL TO
CONTINUE TO USE THE EXISTING BUILDING 3242 AND MOBILE STORAGE TRAILER
UNTIL THE NEW POL OPERATIONS AND LABORATORY BUILDING IS READY FOR
USE.
2. THIS SITE PHASING PLAN PROVIDES A GENERAL SEQUENCE FOR DEMOLITION AND
CONSTRUCTION. IT IS NOT ALL INCLUSIVE OF ALL PROJECT SCOPE ITEMS.
PREPARE A DETAILED PHASING PLAN AS PART OF THE PRE-CONSTRUCTION
SUBMITTALS TO BE APPROVED BY THE CONTRACTING OFFICER.
3. VEHICLE ACCESS AND PARKING FOR BUILDING 3242 MAY BE TEMPORARILY DOWN
DURING CONSTRUCTION. TEMPORARY PARKING FOR BASE PERSONNEL VEHICLES
IS AVAILABLE IN THE NEARBY FIRE STATION PARKING LOT TO THE SOUTHWEST OF
THE PROJECT SITE, AND AT THE POL OPERATIONS BUILDING TO THE SOUTH OF
THE PROJECT SITE. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER
OF ANY TEMPORARY PARKING REQUIREMENTS 14 DAYS PRIOR TO CLOSURE OF
BUILDING 3242 PARKING AND/OR DRIVEWAY.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
P:
\P
R O
JE
C
TS
\1
\C
AD
\C U
R R
EN
T\
G
EN
ER
AL
\E
IE
9-
G -1
.D
W G
:0
8:
A M
0/
/2
AL
IU
S
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AL
AS
KA
D
IS
TR
IC
T
AN
C
H O
R
AG
E, A
LA
SK
A
O C
TO
BE
R
AN
SI
D
W
1K B2
4R
EI
EL
SO
N
A
IR
F O
R C
E
BA
SE
FU
EL
S
M
AN
AG
EM
EN
T
AN
D
L
AB
O R
AT
O
R Y
FA
C
IL
IT
Y
EI
E4
(F
TQ
W
1)
R
TA
C S
TR
EE
T, S
U
IT
E
AN
C H
O R
AG
E, A K
TE
L.
(9
) 5
-3
LI
C
EN
SE
AE
C C
EN
TE
RP
RI
SE
EN
GI
NE
ER
IN
G, IN
C.
RTA
REENIGNELANOISSEFORPDERETSIGER
Sadat Aliu
CE-13139
10/17/24
G-102
SI
TE
P H
AS
IN
G P
LA
N
S.
A
LI
U
K.
M
AR
KE
L
K.
M
AR
KE
L
C . B
AS
SL
ER
EI
E4
-G
-1
.D W
G
SCALE: 1" = 20' 0' 20' 40'
SITE PHASING PLAN TR
U
E N
PLAN
NORTH
A1
PHASE 1
1. MAINTAIN EXISTING TRANSFORMER AND POWER TO EXISTING BUILDING 3242.
2. DEMOLISH POWER POLE, HEADBOLT HEATERS, AND ASPHALT PAVEMENT AS
NEEDED FOR NEW BUILDING CONSTRUCTION.
3. CONSTRUCT SERVICE UTILIDOR AND SERVICE UTILITIES.
4. CONSTRUCT POL OPERATIONS AND LABORATORY BUILDING.
PHASE 2
1. DEMOLISH EXISTING BUILDING 3242, OVERHEAD POWER FEED AND POLE MOUNT
TRANSFORMER, MOBILE STORAGE TRAILER AND ASSOCIATED SERVICE
UTILIDOR.
2. DEMOLISH EXISTING CONCRETE DRIVEWAY AND CONSTRUCT NEW ASPHALT
PAVEMENT DRIVEWAY AND CULVERT. CONSTRUCT ASPHALT PARKING LOT,
CURBS, AND SIDEWALKS.
3. PROVIDE ALL REMAINING PROJECT SCOPE ITEMS.
T
HID
AA
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
/1
5/
A
D
ES
IG
N
/1
6/
B
D
ES
IG
N
/2
4/
C
D
ES
IG
N
D
0% D
ES
IG
N
/3 0/
E R
TA
D
ES
IG
N
/3 0/
G :\G
R O
U
PS
H
AR
E
PR
O
JE
C
TS
\8
0\
E ie ls on E
IE
Fu el s
M gm t L ab
\8
3- C
AD
\8
3-
D W
G S\
-H az
-A ba te .d w g
/1
7/
:3 4:
P
M
H-001
H
AZ
AR
D
S
AB
AT
EM
EN
T
EI
EL
SO
N
A
IR
F O
R C
E
BA
SE
AL
AS
KA
D
IS
TR
IC
T
AN
C H
O R
AG
E, A
LA
SK
A
R . F
R
EN
C H
J.
L
AM
O
N T
R . F
R
EN
C H
O C
TO
BE
R
FU
EL
S
M
AN
AG
EM
EN
T
AN
D
L
AB
O R
AT
O
R Y
FA
C
IL
IT
Y
EI
E4
(F
TQ
W
1)
RTA
G
EN
ER
AL
A N
D S
H
EE
T N
O
TE
S
ESTIMATED HAZMAT QUANTITIES TO BE REMOVED (ENTIRE PROJECT)
NOTE: THESE QUANTITIES INCLUDE ALL OF THE KNOWN HAZARDOUS MATERIALS (EXCEPT FOR PCB BULK PRODUCTS, WHICH WERE PRESENT AT MOST ALL ORIGINAL SURFACES AND MATERIALS). A CURRENT RENOVATION PROJECT WHICH IS SCHEDULED TO REMOVE SOME, BUT NOT ALL OF THE HAZARDOUS MATERIALS PRESENT IN THE BUILDING IS ONGOING AND REMAINING QUANTITIES ARE NOT KNOWN AT THIS TIME. QUANTITIES LISTED WITH A * MAY VARY
DEPENDING ON THE CONTRACTOR'S MEANS AND METHODS.
1,400 SQUARE FEET OF CARPETING, VINYL ASBESTOS TILES, VINYL COMPOSITION TILES WITH ASBESTOS-CONTAINING BLACK MASTICS, MAY INCLUDE
MULTIPLE LAYERS.
400 LINEAR FEET OF COVE BASE WITH ASBESTOS-CONTAMINATED MASTICS LOCATED ON CONCRETE MASONRY UNIT WALLS . QUANTITIES OF COVE BASE MASTICS ON GYPSUM WALL BOARD ARE INCLUDED IN THE QUANTITIES FOR THE GYPSUM WALL BOARD.
2,675 SQUARE FEET OF GYPSUM WALLBOARD WITH ASBESTOS-CONTAINING JOINT COMPOUND, MAY INCLUDE MULTIPLE LAYERS OF GYPSUM, AND ALSO INCLUDES MARLITE WITH ASBESTOS-CONTAINING MASTIC, AND COVE BASE WITH ASBESTOS-CONTAMINATED MASTICS.
1 LOT ASBESTOS-CONTAINING GASKETS AND VALVE PACKINGS ON PIPING.
150 LINEAR FEET OF ASBESTOS-CONTAINING PIPE INSULATION .
10 SQUARE FEET OF ASBESTOS-CONTAINING INSULATION OR REMNANTS AT TANK AND HEAT EXCHANGER.
3 LIGHTS WITH ASBESTOS-CONTAINING HEAT SHEILDS AND ASBESTOS-CONTAINING WIRE INSULATION.
1,665 SQUARE FEET OF CONCRETE MASONRY UNIT WALLS AT EXTERIOR WITH ASSUMED ASBESTOS-CONTAINING VERMICULITE BLOCK FILL INSULATION.
100 SQUARE FEET OF ASBESTOS-CONTAINING LABORATORY COUNTERTOPS AND SINKS.
1 EACH LABORATORY FUME HOOD WITH ASSUMED ASBESTOS-CONTAINING COUNTER AND FUME HOOD LINING.
70 MERCURY-CONTAINING FLUORESCENT LAMPS AND COMPACT FLUORESCENT LAMPS.
5 SMOKE DETECTORS WITH RADIOACTIVE COMPONENTS.
3 EMERGENCY LIGHTS OR OTHER EQUIPMENT WITH UNIVERSAL WASTE BATTERIES.
1 MERCURY-CONTAINING THERMOSTATS.
2,300 SQUARE FEET OF METAL ROOFS WITH PENETRATION AND ROOF PANEL SEAM SEALANTS (ASSUMED).
3 EACH METALLIC LEAD VTR FLASHINGS.
250 LINEAR FEET OF ASBESTOS-CONTAINING SEALANTS AT WINDOWS AND DOORS.
1 EACH AIR CONDITIONING REFRIGERATION SYSTEM WITH OZONE DEPLETING SUBSTANCES.
1 EACH ELECTRIC FURNACE WITH ASSUMED ASBESTOS-CONTAINING WIRING & COMPONENTS.
1 EACH SELF-CONTAINED FIRE EXTINGUISHER WITH OZONE DEPLETING SUBSTANCES.
30 EACH ASBESTOS-CONTAINING HARD FITTINGS AT INSULATED PIPES IN THE MECHANICAL ROOM.
30* PLANAR SQUARE FEET OF UTILIDOR FLOOR AREA (NOT DEVELOPED SURFACE AREA) WITH ALL SURFACES IN THAT WORK AREA TO BE CLEANED
FOR DISCONNECT OF EXISTING UTILITIES AND CONNECTION OF NEW UTILITIES.
20* LINEAR FEET OF ASSUMED ASBESTOS-CONTAINING PIPE INSULATION IN UTILIDOR TO BE REMOVED FOR DISCONNECT OF EXISTING UTILITIES AND
CONNECTION OF NEW UTILITIES.
100* SQUARE FEET OF ASSUMED ASBESTOS-CONTAINING TARRY DAMPPROOFING AND UTILIDOR LID SEALANTS TO BE REMOVED OR DISTURBED FOR
DISCONNECT OF EXISTING UTILITIES AND CONNECTION OF NEW UTILITIES.
GENERAL HAZMAT NOTES
1. THE HAZARDS ABATEMENT PORTION OF THIS PROJECT INCLUDES THE DISTURBANCE AND/OR REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING MATERIALS, POLYCHLORINATED BIPHENYL (PCB) CONTAINING LIGHT BALLASTS, PCB BULK PRODUCTS, MERCURY-CONTAINING MATERIALS, LEAD-CONTAINING MATERIALS AND ITEMS CONTAINING RADIOACTIVE COMPOUNDS. THE PURPOSE OF THE HAZARDS ABATEMENT PORTION OF THE WORK IS TO REMOVE THESE MATERIALS FROM BUILDING 3242 AND THE ADJACENT MOVEABLE STORAGE BUILDING PRIOR TO DEMOLITION SO THAT PERSONNEL CAN SAFELY PERFORM THEIR WORK WITHOUT CREATING HAZARDS TO HEALTH OR THE ENVIRONMENT. BUILDING 3242 IS CURRENTLY UNDERGOING A RENOVATION PROJECT. NOTE THAT MATERIALS AND QUANTITIES WILL CHANGE FROM WHAT IS SHOWN HERE.
2. THE BUILDINGS ARE TO BE COMPLETELY DEMOLISHED. ALL EPA REGULATED ASBESTOS-CONTAINING MATERIALS (RACM) SHALL BE REMOVED FROM THE BUILDINGS PRIOR TO DEMOLITION (SEE 40 CFR 61). ALL CATEGORY I, NON-FRIABLE ACMS ARE NOT REQUIRED TO BE REMOVED BEFORE DEMOLITION UNLESS THEY ARE IN POOR CONDITION OR WILL BECOME FRIABLE DURING THE DEMOLITION PROCESS. ALL CATEGORY II, NON-FRIABLE ACMS ARE ALSO NOT REQUIRED TO BE REMOVED BEFORE DEMOLITION UNLESS THEY WILL BECOME CRUMBLED, PULVERIZED, OR REDUCED TO POWDER DURING THE DEMOLITION PROCESS. THE EPA MANUAL "DEMOLITION PRACTICES UNDER THE ASBESTOS NESHAP" PROVIDES GUIDANCE ON DEMOLITION METHODS RELATED TO CATEGORY I AND II NON-FRIABLE MATERIALS, UNLESS OTHERWISE REGULATED BY THE DISPOSAL SITE. IF ACM IS LEFT IN THE BUILDING DURING DEMOLITION, ALL DEMOLITION DEBRIS IS CONSIDERED ASBESTOS-CONTAMINATED AND MUST BE HANDLED AND DISPOSED OF IN ACCORDANCE WITH LOCAL LANDFILL, ALASKA DEC, OSHA AND EPA REGULATIONS.
3. ALL POTENTIALLY HAZARDOUS MATERIALS SUCH AS MERCURY-CONTAINING LAMPS AND THERMOSTATS, SELF ILLUMINATING EXIT SIGNS CONTAINING RADIOACTIVE COMPONENTS, METALLIC LEAD ITEMS, REFRIGERANTS, HEATING SYSTEM GLYCOL AND PCB CONTAINING BALLASTS MUST BE REMOVED FROM THE BUILDING PRIOR TO DEMOLITION AND ARE TO BE REMOVED AND DISPOSED OF PROPERLY. REFER TO SPECIFICATIONS AND THE CONTRACTOR'S APPROVED WORK PLAN FOR HAZARDOUS MATERIALS REMOVAL, DISTURBANCE, CLEARANCE, AND DISPOSAL PROCEDURES.
4. LEAD-BASED PAINTS (PAINT CONTAINING EQUAL TO OR GREATER THAN 1.0 mg/cm²) WERE IDENTIFIED DURING THE LIMITED LEAD TESTING SHOWN IN THE HAZMAT SURVEY, AND LEAD-BASED PAINTS MAY BE PRESENT AT OTHER LOCATIONS. LOW LEVELS OF LEAD FOUND BY XRF TESTING DOES NOT MEAN THE PAINTS ARE FREE OF LEAD, THE PAINTS MAY CONTAIN MEASURABLE AMOUNTS OF LEAD. LEAD-CONTAINING MATERIALS INCLUDE ALL PAINTED SURFACES, CERAMIC TILES, AND METALLIC LEAD, AS WELL AS LEAD-CONTAINING DUSTS. THIS IS NOT A LEAD ABATEMENT PROJECT, AND ALL TRADES WILL LIKELY DISTURB SOME LEAD-CONTAINING MATERIALS. CONTROL WORKER EXPOSURES USING LEAD-SAFE WORK PRACTICES AND CHOICE OF MEANS AND METHODS OF CONDUCTING THE WORK TO COMPLY WITH 29 CFR 1926.62 AND TO AVOID CONTAMINATION OF THE
WORK AREA AND SITE.
5. PCB-CONTAINING BULK PRODUCTS HAVE BEEN IDENTIFIED IN MATERIALS THROUGHOUT THE BUILDING (REFER TO HAZARDOUS MATERIALS ASSESSMENT), AND MATERIALS CONTAINING MORE THAN 1 ppm PCB'S ARE NOT CURRENTLY ALLOWED TO BE DISPOSED OF IN LANDFILLS IN ALASKA.
COORDINATE DISPOSAL WITH CHOSEN LANDFILL(S) PRIOR TO SUBMITTING BID.
6. PERFORM INITIAL AIR MONITORING TESTS ON ALL TASKS THAT DISTURB ASBESTOS OR LEAD-CONTAINING MATERIALS, DUST OR PAINT TO DETERMINE THE APPROPRIATE WORKER AND SITE PROTECTION PROCEDURES REQUIRED. DUE TO THE AGE OF THE BUILDINGS, METALLIC LEAD IS ASSUMED
PRESENT IN BELL AND SPIGOT PIPE JOINTS AND IN SOLDER ON COPPER PIPES.
7. SETTLED AND CONCEALED DUST ON ARCHITECTURAL, STRUCTURAL, ELECTRICAL AND MECHANICAL COMPONENTS THROUGHOUT THE PROJECT AREA(S) IS ASSUMED TO CONTAIN REGULATED AIR CONTAMINANTS INCLUDING ASBESTOS AND LEAD. WORK OF ALL TRADES MAY INCLUDE DISTURBANCE OF ASBESTOS AND LEAD AND MAY RESULT IN WORKER EXPOSURE TO ASBESTOS AND LEAD ABOVE THE OSHA ACTION LEVEL OR PERMISSIBLE EXPOSURE LIMITS FOR ASBESTOS OR LEAD IF PROPER WORK PRACTICES AND/OR ENGINEERING CONTROLS ARE NOT USED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CHOOSE APPROPRIATE WORKER AND SITE PROTECTION PROCEDURES SO THAT THEIR WORKERS ARE NOT EXPOSED ABOVE THOSE LIMITS AND THAT WORK IS PERFORMED IN ACCORDANCE WITH ALL APPLICABLE REGULATIONS. THE PRESENCE OF ASBESTOS OR LEAD IN DUSTS DOES NOT NECESSARILY MAKE THEM A HAZARD TO WORKERS OR A HAZARDOUS WASTE.
8. THE CONTRACTOR'S INDEPENDENT LABORATORY SHALL PROVIDE ALL INSPECTIONS, MONITORING, SAMPLING, ANALYSES AND REPORTING SERVICES AS SPECIFIED. CLEARANCE AIR MONITORING SHALL BE CONDUCTED IF THE BUILDING IS TO BE ENTERED BY NON-ASBESTOS WORKERS AFTER ASBESTOS ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION ON SAMPLING.
9. LOCATIONS OF MATERIALS SHOWN ON THESE DRAWINGS ARE SCHEMATIC AND APPROXIMATE. FIELD VERIFY AND COORDINATE CONSTRUCTION DETAILS, DIMENSIONS, WORK CONDITIONS, AND LOCATIONS WHICH WILL AFFECT THE REMOVAL OR DISTURBANCE OF HAZARDOUS MATERIALS.
HAZARDOUS MATERIALS MAY HAVE COME LOOSE AND FALLEN ONTO FLOORS, CEILINGS, CHASES, OR WALL CAVITIES. THE QUANTITIES SHOWN IN THE SHEET SUMMARY ARE APPROXIMATE AND MAY VARY DEPENDING ON THE CONTRACTOR'S MEANS AND METHODS. REQUIRE ALL TRADES TO COORDINATE WITH EACH OTHER AND TO CONDUCT THEIR WORK TO PREVENT WORKER EXPOSURE OR SITE CONTAMINATION, SEE DRAWINGS OF ALL DISCIPLINES FOR ADDITIONAL INFORMATION RELATING TO HAZARDOUS MATERIALS. IMMEDIATELY COMMUNICATE ALL DISCREPANCIES IN QUANTITIES TO THE OWNER. REFER TO HAZARDOUS MATERIALS ASSESSMENT FOR MORE INFORMATION ABOUT POTENTIALLY HAZARDOUS MATERIALS THAT ARE NOT SCHEDULED FOR DISTURBANCE BY THIS PROJECT. FURNISH ALL WORK AND MATERIALS REQUIRED FOR A FINISHED PROJECT AS DESCRIBED IN THE CONTRACT DOCUMENTS. QUANTITIES LISTED WITH A * MAY VARY DEPENDING ON THE CONTRACTOR'S MEANS AND METHODS. CONTRACTOR'S MEANS AND METHODS RESULTING IN ADDITIONAL MATERIALS REMOVAL SHALL NOT RESULT IN ADDED CONTRACT COSTS TO THE
OWNER.
10. BUILDINGS TO BE DEMOLISHED INCLUDE STORED MATERIALS AND CHEMICALS, SUCH AS PAINTS, CLEANING COMPOUNDS, THINNERS, SOLVENTS, ETC. THE FACILITY OWNER SHALL REMOVE ALL STORED MATERIALS TO INCLUDE HAZARDOUS MATERIALS PRIOR TO THE START OF TH E CONTRACT.
11. PROVIDE ALL WASTE TESTING, PACKAGING, HANDLING, TRANSPORTATION AND DISPOSAL. ALL COSTS FOR DISPOSAL SHALL BE BORNE BY THE CONTRACTOR. PERFORM TOXICITY CHARACTERISTIC LEACHING PROCEDURE (TCLP) TEST(S) OF WASTE(S) CONTAINING LEAD OR PAINTED WITH LEAD-CONTAINING PAINT TO CHARACTERIZE THE WASTE(S) AS HAZARDOUS OR NON-HAZARDOUS PRIOR TO DISPOSAL. PERFORM TOXICITY CHARACTERISTIC LEACHING PROCEDURE (TCLP) TEST(S) OF HEAT TRANSFER FLUIDS (GLYCOL OR WATER) IN HEATING SYSTEM TO CHARACTERIZE THE WASTE(S) AS HAZARDOUS OR NON-HAZARDOUS PRIOR TO DISPOSAL. COORDINATE REQUIREMENTS OF LANDFILL(S) REGARDING MATERIALS PACKAGING, HANDLING, AND DISPOSAL REQUIREMENTS PRIOR TO SUBMITTING BID.
12. THIS BUILDING IS SCHEDULED FOR A RENOVATION PROJECT, AND SOME OR MOST OF THE HAZARDOUS MATERIALS MAY BE REMOVED BY THAT PROJECT. QUANTITIES, LOCATIONS, ETC. WILL NEED TO BE VERIFIED AFTER THE COMPLETION OF THE RENOVATION.
NOTIFICATION OF POTENTIAL HAZARDS
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
HAZMAT LEGEND
REMOVE ASBESTOS-CONTAINING FLOORING MATERIALS, MULTIPLE LAYERS
REMOVE ASSUMED ASBESTOS-CONTAINING LABORATORY COUNTERS AND LAB HOODS
REMOVE ASBESTOS-CONTAINING INSULATION AT HEAT EXCHANGER AND EXPANSION TANK
REMOVE HORIZONTAL GYPSUM WALL BOARD WITH ASBESTOS-CONTAINING JOINT COMPOUND, OFTEN ABOVE ACOUSTIC
CEILINGS
REMOVE WINDOW OR DOORS WITH ASBESTOS-CONTAINING SEALANTS
REMOVE PIPING WITH ASBESTOS-CONTAINING INSULATION. MAY REPRESENT MULTIPLE PIPE RUNS
REMOVE VERTICAL GYPSUM WALL BOARD WITH ASBESTOS-CONTAINING JOINT COMPOUND, SOME ROOMS COVERED
WITH "MARLITE" WAINSCOT WITH ASBESTOS-CONTAINING MASTIC.
SHADED LINES INCLUDE REMNANT WALLS LOCATED ABOVE SUSPENDED ACOUSTIC CEILING TILES.
EMERGENCY LIGHTS OR OTHER BATTERY DEVICE WITH UNIVERSAL WASTE BATTERIES TO BE REMOVED.
MERCURY CONTAINING THERMOSTATS TO BE REMOVED.
MERCURY CONTAINING HIGH INTENSITY DISCHARGE LAMP WITH ASSUMED PCB BALLAST.
LIGHT OR ELECTRIC FURNACE WITH ASBESTOS-CONTAINING WIRING INSULATION. LIGHTS ALSO HAD
ASBESTOS-CONTAINING HEAT SHIELD
R
TA
W
1K B2
5R
H
ID
T
A
A
A
HID
A
T
HID
AA
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
/1
5/
A
D
ES
IG
N
/1
6/
B
D
ES
IG
N
/2
4/
C
D
ES
IG
N
D
0% D
ES
IG
N
/3 0/
E R
TA
D
ES
IG
N
/3 0/
G :\G
R O
U
PS
H
AR
E
PR
O
JE
C
TS
\8
0\
E ie ls on E
IE
Fu el s
M gm t L ab
\8
3- C
AD
\8
3-
D W
G S\
-H az
-A ba te .d w g
/1
7/
:3 4:
P
M
H-101
EI
EL
SO
N
A
IR
F O
R C
E
BA
SE
AL
AS
KA
D
IS
TR
IC
T
AN
C H
O R
AG
E, A
LA
SK
A
R . F
R
EN
C H
J.
L
AM
O
N T
R . F
R
EN
C H
O C
TO
BE
R
W
KB
D
R
TA
FU
EL
S M
AN
AG
EM
EN
T
AN
D L
AB
O
R
AT
O R
Y
FA
C
IL
IT
Y
EI
E4
(F
TQ
W
1)
RTA0 2' 4' 8'
SCALE: 1/4" = 1'-0"
1/4" = 1'-0" A1
HAZARDS ABATEMENT BUILDING 3242 AND MOVEABLE STORAGE BUILDING
NORTH
H
AZ
AR
D
S
AB
AT
EM
EN
T
BU
IL
D
IN
G
AN
D
M O
VE
AB
LE
ST
O R
AG
E
BU
IL
D
IN
G
HAZMAT LEGEND
REMOVE ASBESTOS-CONTAINING FLOORING MATERIALS, MULTIPLE LAYERS
REMOVE ASSUMED ASBESTOS-CONTAINING LABORATORY COUNTERS AND LAB HOODS
REMOVE ASBESTOS-CONTAINING INSULATION AT HEAT EXCHANGER AND EXPANSION TANK
REMOVE HORIZONTAL GYPSUM WALL BOARD WITH ASBESTOS-CONTAINING JOINT COMPOUND, OFTEN ABOVE ACOUSTIC
CEILINGS
REMOVE WINDOW OR DOORS WITH ASBESTOS-CONTAINING SEALANTS
REMOVE PIPING WITH ASBESTOS-CONTAINING INSULATION. MAY REPRESENT MULTIPLE PIPE RUNS
REMOVE VERTICAL GYPSUM WALL BOARD WITH ASBESTOS-CONTAINING JOINT COMPOUND, SOME ROOMS COVERED
WITH "MARLITE" WAINSCOT WITH ASBESTOS-CONTAINING MASTIC.
SHADED LINES INCLUDE REMNANT WALLS LOCATED ABOVE SUSPENDED ACOUSTIC CEILING TILES.
EMERGENCY LIGHTS OR OTHER BATTERY DEVICE WITH UNIVERSAL WASTE BATTERIES TO BE REMOVED.
MERCURY CONTAINING THERMOSTATS TO BE REMOVED.
MERCURY CONTAINING HIGH INTENSITY DISCHARGE LAMP WITH ASSUMED PCB BALLAST.
LIGHT OR ELECTRIC FURNACE WITH ASBESTOS-CONTAINING WIRING INSULATION. LIGHTS ALSO HAD
ASBESTOS-CONTAINING HEAT SHIELD
2 3 13 14
THROUGHOUT
TYPICAL
THROUGHOUT
TYPICALTYPICAL
THROUGHOUT
13 14
THROUGHOUT
9 AT UTILIDOR, NOT SHOWN.
COORDINATE WITH OTHER TRADES.
7 2
8 6 10 TYPICAL
THROUGHOUT
1 1718
ABOVE CEILING3
ABOVE CEILING3
34 5
SHEET KEY NOTES
HAZARDS ABATEMENT DRAWINGS DO NOT SHOW ALL DETAILS OF WORK REQUIRED. ALL TRADES SHALL EXAMINE DRAWINGS OF OTHER TRADES AND COORDINATE WITH EACH OTHER TO DETERMINE EXTENT, TIMING AND LOCATIONS OF MATERIALS AFFECTED BY THE PROJECT. NOTE THAT BUILDING 3242 IS CURRENTLY UNDERGOING RENOVATION, AND THE MATERIALS AND QUANTITIES SHOWN HERE WILL CHANGE.
1 REMOVE ALL FLOORING, INCLUDING CARPETING, VINYL ASBESTOS TILE, VINYL COMPOSITION TILE, CARPET, AND COMPLETELY REMOVE ASBESTOS-CONTAINING OR CONTAMINATED MASTIC, INCLUDING UNDER WALLS SCHEDULED FOR DEMOLITION. LOCATIONS OF DIFFERENT TYPES AND MULTIPLE LAYERS OF ACM NOT SHOWN SHOWN BY LEGEND, REFER TO SHEET SUMMARY.
2 REMOVE COVE BASE WITH ASBESTOS-CONTAMINATED MASTIC THROUGHOUT THE BUILDING, NOT SHOWN HERE. QUANTITIES INCLUDED AS PART OF SQUARE FOOTAGE OF GYPSUM WALL BOARD, QUANTITIES ONLY CALLED OUT WHERE ATTACHED TO CEMENT MASONRY UNITS.
3 REMOVE GYPSUM WALL BOARD ON WALLS AND CEILINGS WITH ASBESTOS-CONTAINING JOINT COMPOUND.
4 REMOVE "MARLITE" WAINSCOT WITH ASBESTOS-CONTAINING MASTICS. QUANTITIES INCLUDED AS PART OF SQUARE FOOTAGE OF GYPSUM
WALL BOARD.
5 REMOVE ASBESTOS-CONTAINING "MAG" AND "AIRCELL" INSULATION AND PIPING. PIPING IS EXPOSED AND CONCEALED ABOVE CEILINGS AND INSIDE WALLS. REMOVE ASBESTOS-CONTAINING HARD-FITTINGS, GASKETS AND VALVE PACKINGS, ETC.
6 REMOVE ASBESTOS-CONTAINING SEALANTS AT WINDOWS AND DOORS, AND VARIOUS PENETRATIONS THROUGHOUT.
7 REMOVE ASBESTOS-CONTAINING INSULATION AND HARD FITTINGS AND/OR REMNANTS OF ASBESTOS-CONTAINING INSULATION AND HARD FITTINGS FROM HEAT EXCHANGER, EXPANSION TANK. AND PIPING. PIPING ALSO ASSUMED TO BE CONCEALED WITHIN WALLS AND ATTIC
SPACE.
8 REMOVE ASBESTOS-CONTAINING HEAT SHIELDS AND ASBESTOS-CONTAINING HIGH TEMPERATURE WIRE INSULATION FROM LIGHT
FIXTURES.
9 AS-BUILT INFORMATION ON UTILIDOR AND PIPING WAS NOT AVAILABLE. REMOVE DUST AND DEBRIS FROM UTILIDOR AND REMOVE ASSUMED ASBESTOS-CONTAINING PIPE INSULATION AS REQUIRED TO COMPLETE THE DISCONNECTION AND RE-CONNECTION OF UTILITIES AS SHOWN BY OTHER TRADES. REMOVE AND DISTURB ASSUMED ASBESTOS-CONTAINING TARRY DAMPPROOFING AT UTILIDOR AS NEEDED.
REPAIR AND APPLY BRIDGING ENCAPSULANT TO ALL BREAKS IN INSULATION JACKET ON PIPING TO REMAIN. ENCAPSULATE ALL SURFACES WHERE WORK TAKES PLACE. UTILIDOR IS A CONFINED SPACE, BUT NOT A PERMIT REQUIRED CONFINED SPACE, COORDINATE ACCESS WITH
OCCUPATIONAL SAFETY GROUP.
10 VERIFY PRESENCE AND REMOVE ASSUMED ASBESTOS-CONTAINING VERMICULITE "BLOCK FILL" IN CONCRETE MASONRY UNIT WALLS.
11 VERIFY PRESENCE AND REMOVE ASSUMED ASBESTOS-CONTAINING LAB COUNTER-TOPS AND SINKS.
12 VERIFY PRESENCE AND REMOVE ASSUMED ASBESTOS-CONTAINING TARRY DAMP-PROOFING OF FOUNDATION WALLS AND UNDERFLOOR SLAB. NOT SHOWN HERE, BUT ASSUMED TO BE PRESENT AT FOUNDATION WALLS, AND UNDERSIDE OF FLOOR SLAB.
13 VERIFY PRESENCE AND REMOVE ASSUMED ASBESTOS-CONTAINING SEALANTS AND UNDERLAYMENT OF CORRUGATED METAL ROOFING
AND METALLIC LEAD ROOF VTR FLASHINGS.
14 REMOVE FLUORESCENT LIGHT FIXTURES WITH PCB-CONTAINING BALLASTS AND MERCURY-CONTAINING LIGHT TUBES. REMOVE
THERMOSTATS, SWITCHES AND OTHER ELECTRICAL DEVICES CONTAINING MERCURY.
15 REMOVE HID LIGHT FIXTURES WITH ASSUMED PCB-CONTAINING BALLASTS AND MERCURY-CONTAINING HIGH INTENSITY DISCHARGE LAMPS.
16 REMOVE EXIT SIGNS, EMERGENCY LIGHTS, FIRE ALARM SYSTEM, ETC. WITH UNIVERSAL WASTE BATTERIES. RECYCLE OR PROPERLY
DISPOSE OF BATTERIES.
17 REMOVE SMOKE DETECTORS WITH RADIOACTIVE COMPONENTS,OR RETURN UNITS TO MANUFACTURER FOR PROPER REUSE OR DISPOSAL.
18 REMOVE REFRIGERATION UNIT WITH OZONE DEPLETING SUBSTANCES. COORDINATE POSSIBLE SALVAGE WITH OWNER.
19 REMOVE ELECTRIC FURNACE WITH ASSUMED ASBESTOS-CONTAINING WIRING INSULATION AND COMPONENTS
20 REMOVE SELF-CONTAINED FIRE EXTINGUISHER WITH OZONE DEPLETING SUBSTANCES.
NOTIFICATION OF POTENTIAL HAZARDS
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
W
KB
R
AA
US Army Corps of Engineers ®
SHEET ID
U S
A
R M
Y
C
O R
P
O
F
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
C
N
S O
L I C
I T
A T
I O
N
N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
F i l e a t h
P l o t
D a t e
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A
D
E S
I G
N
B
D
E S
I G
N
C
D
E S
I G
N
D
D
E S
I G
N
E R
E S
I G
N
G G
R O
U P
S H
A R
E
P
R O
J E
C T
S
E i e l s o n
E
I E
F u e l s
M g m t
L a b
C
A D
D
W G
S F i n a l D w g s
H a z A b a t e d w g
A
M
H-001
H A
Z A
R D
S
A
B A
T E
M E
N T
E I E
L S
I
R
B
S
E
A L
A S
K
S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
R
F
R E
N C
H
J
L
A M
O N
T
R
F
R E
N C
H
O C
T O
B E
R
F U
E L
S
M
A N
A G
E M
E N
T
A
L
B
O R
A T
O R
Y
F
A C
I L
I T
Y
E I E
F
T Q
W
RTA
G E
N E
R A
L
A
H E
T
E S
ESTIMATED HAZMAT QUANTITIES TO BE REMOVED (ENTIRE PROJECT)
NOTE: THESE QUANTITIES INCLUDE ALL OF THE KNOWN HAZARDOUS MATERIALS (EXCEPT FOR PCB BULK PRODUCTS, WHICH WERE PRESENT AT MOST ALL ORIGINAL SURFACES AND MATERIALS). THE PROJECT BUILDINGS HAVE NOT BEEN SURVEYED AFTER THE RENOVATION PROJECT WHICH REMOVED SOME, BUT NOT ALL OF THE HAZARDOUS MATERIALS PRESENT IN THE BUILDING. LOCATIONS AND QUANTITIES LISTED ARE BASED ON CONVERSATIONS WITH PROJECT MANAGERS AND THE ABATEMENT COMPANY, AND LIMITED PHOTOGRAPHS, AND MAY VARY. QUANTITIES LISTED WITH A * MAY VARY DEPENDING
ON THE CONTRACTOR'S MEANS AND METHODS.
350 SQUARE FEET OF CARPETING, VINYL ASBESTOS TILES, VINYL COMPOSITION TILES WITH ASBESTOS-CONTAINING BLACK MASTICS, MAY INCLUDE
MULTIPLE LAYERS.
400 LINEAR FEET OF COVE BASE WITH ASBESTOS-CONTAMINATED MASTICS LOCATED ON CONCRETE MASONRY UNIT WALLS .
450 SQUARE FEET OF GYPSUM WALLBOARD WITH ASBESTOS-CONTAINING JOINT COMPOUND, MAY INCLUDE MULTIPLE LAYERS OF GYPSUM, AND ALSO INCLUDES MARLITE WITH ASBESTOS-CONTAINING MASTIC, AND COVE BASE WITH ASBESTOS-CONTAMINATED MASTICS.
1 LOT ASBESTOS-CONTAINING GASKETS AND VALVE PACKINGS ON PIPING.
10 SQUARE FEET OF ASBESTOS-CONTAINING INSULATION REMNANTS AT EXPANSION TANK.
3 LIGHTS WITH ASBESTOS-CONTAINING HEAT SHIELDS, GASKETS AND ASBESTOS-CONTAINING WIRE INSULATION.
1,665 SQUARE FEET OF CONCRETE MASONRY UNIT WALLS AT EXTERIOR WITH ASSUMED ASBESTOS-CONTAINING VERMICULITE BLOCK FILL INSULATION.
xxx SQUARE FEET OF CONCRETE FOUNDATION WALLS AND FLOOR SLAB WITH ASSUMED ASBESTOS-CONTAINING TARRY DAMP-PROOFING.
16 MERCURY-CONTAINING FLUORESCENT LAMPS AND COMPACT FLUORESCENT LAMPS.
5 SMOKE DETECTORS WITH RADIOACTIVE COMPONENTS.
3 EMERGENCY LIGHTS OR OTHER EQUIPMENT WITH UNIVERSAL WASTE BATTERIES.
2 MERCURY-CONTAINING THERMOSTATS.
2,300 SQUARE FEET OF METAL ROOFS WITH UNDERLAYMENT, PENETRATION AND ROOF PANEL SEAM SEALANTS (ASSUMED).
3 EACH METALLIC LEAD VTR FLASHINGS.
120 LINEAR FEET OF ASBESTOS-CONTAINING SEALANTS AT DOORS.
1 EACH AIR CONDITIONING REFRIGERATION SYSTEM WITH OZONE DEPLETING SUBSTANCES.
1 EACH ELECTRIC FURNACE WITH ASSUMED ASBESTOS-CONTAINING WIRING & COMPONENTS.
1 EACH LABORATORY FUME HOOD WITH ASSUMED ASBESTOS-CONTAINING COUNTERTOP AND INTERIOR BAFFLES, ETC.
1 EACH SELF-CONTAINED FIRE EXTINGUISHER WITH OZONE DEPLETING SUBSTANCES.
30* PLANAR SQUARE FEET OF UTILIDOR FLOOR AREA (NOT DEVELOPED SURFACE AREA) WITH ALL SURFACES IN THAT WORK AREA TO BE CLEANED
FOR DISCONNECT OF EXISTING UTILITIES AND CONNECTION OF NEW UTILITIES.
20* LINEAR FEET OF ASSUMED ASBESTOS-CONTAINING PIPE INSULATION IN UTILIDOR TO BE REMOVED FOR DISCONNECT OF EXISTING UTILITIES AND
CONNECTION OF NEW UTILITIES.
100* SQUARE FEET OF ASSUMED ASBESTOS-CONTAINING TARRY DAMPPROOFING AND UTILIDOR LID SEALANTS TO BE REMOVED OR DISTURBED FOR
DISCONNECT OF EXISTING UTILITIES AND CONNECTION OF NEW UTILITIES.
GENERAL HAZMAT NOTES
1. THE HAZARDS ABATEMENT PORTION OF THIS PROJECT INCLUDES THE DISTURBANCE AND/OR REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING MATERIALS, POLYCHLORINATED BIPHENYL (PCB) CONTAINING LIGHT BALLASTS, PCB BULK PRODUCTS, MERCURY-CONTAINING MATERIALS, LEAD-CONTAINING MATERIALS AND ITEMS CONTAINING RADIOACTIVE COMPOUNDS. THE PURPOSE OF THE HAZARDS ABATEMENT PORTION OF THE WORK IS TO REMOVE THESE MATERIALS FROM BUILDING 3242 AND THE ADJACENT MOVEABLE STORAGE BUILDING PRIOR TO DEMOLITION SO THAT PERSONNEL CAN SAFELY PERFORM THEIR WORK WITHOUT CREATING HAZARDS TO HEALTH OR THE ENVIRONMENT. BUILDING 3242 HAS UNDERGONE A RECENT RENOVATION PROJECT, AND SOME OF THE MATERIALS LISTED HERE HAVE BEEN CONCEALED BY NEW FINISHES, ETC.
2. THE BUILDINGS ARE TO BE COMPLETELY DEMOLISHED. ALL EPA REGULATED ASBESTOS-CONTAINING MATERIALS (RACM) SHALL BE REMOVED FROM THE BUILDINGS PRIOR TO DEMOLITION (SEE 40 CFR 61). ALL CATEGORY I, NON-FRIABLE ACMS ARE NOT REQUIRED TO BE REMOVED BEFORE DEMOLITION UNLESS THEY ARE IN POOR CONDITION OR WILL BECOME FRIABLE DURING THE DEMOLITION PROCESS. ALL CATEGORY II, NON-FRIABLE ACMS ARE ALSO NOT REQUIRED TO BE REMOVED BEFORE DEMOLITION UNLESS THEY WILL BECOME CRUMBLED, PULVERIZED, OR REDUCED TO POWDER DURING THE DEMOLITION PROCESS. THE EPA MANUAL "DEMOLITION PRACTICES UNDER THE ASBESTOS NESHAP" PROVIDES GUIDANCE ON DEMOLITION METHODS RELATED TO CATEGORY I AND II NON-FRIABLE MATERIALS, UNLESS OTHERWISE REGULATED BY THE DISPOSAL SITE. IF ACM IS LEFT IN THE BUILDING DURING DEMOLITION, ALL DEMOLITION DEBRIS IS CONSIDERED ASBESTOS-CONTAMINATED AND MUST BE HANDLED AND DISPOSED OF IN ACCORDANCE WITH LOCAL LANDFILL, ALASKA DEC, OSHA AND EPA REGULATIONS.
3. ALL POTENTIALLY HAZARDOUS MATERIALS SUCH AS MERCURY-CONTAINING LAMPS AND THERMOSTATS, SMOKE DETECTORS WITH RADIOACTIVE COMPONENTS, METALLIC LEAD ITEMS, REFRIGERANTS, HEATING SYSTEM GLYCOL AND PCB CONTAINING BALLASTS MUST BE REMOVED FROM THE BUILDING PRIOR TO DEMOLITION AND ARE TO BE REMOVED AND DISPOSED OF PROPERLY. REFER TO SPECIFICATIONS AND THE CONTRACTOR'S APPROVED WORK PLAN FOR HAZARDOUS MATERIALS REMOVAL, DISTURBANCE, CLEARANCE, AND DISPOSAL PROCEDURES.
4. LEAD-BASED PAINTS (PAINT CONTAINING EQUAL TO OR GREATER THAN 1.0 mg/cm²) WERE IDENTIFIED DURING THE LIMITED LEAD TESTING SHOWN IN THE HAZMAT SURVEY, AND LEAD-BASED PAINTS MAY BE PRESENT AT OTHER LOCATIONS. LOW LEVELS OF LEAD FOUND BY XRF TESTING DOES NOT MEAN THE PAINTS ARE FREE OF LEAD, THE PAINTS MAY CONTAIN MEASURABLE AMOUNTS OF LEAD. LEAD-CONTAINING MATERIALS INCLUDE ALL PAINTED SURFACES, AND METALLIC LEAD, AS WELL AS LEAD-CONTAINING DUSTS. THIS IS NOT A LEAD ABATEMENT PROJECT, AND ALL TRADES WILL LIKELY DISTURB SOME LEAD-CONTAINING MATERIALS. CONTROL WORKER EXPOSURES USING LEAD-SAFE WORK PRACTICES AND CHOICE OF MEANS AND METHODS OF CONDUCTING THE WORK TO COMPLY WITH 29 CFR 1926.62 AND TO AVOID CONTAMINATION OF THE WORK AREA AND SITE.
5. PCB-CONTAINING BULK PRODUCTS HAVE BEEN IDENTIFIED IN MATERIALS THROUGHOUT THE BUILDING (REFER TO HAZARDOUS MATERIALS ASSESSMENT), AND MATERIALS CONTAINING MORE THAN 1 ppm PCB'S ARE NOT CURRENTLY ALLOWED TO BE DISPOSED OF IN LANDFILLS IN ALASKA.
COORDINATE DISPOSAL WITH CHOSEN LANDFILL(S) PRIOR TO SUBMITTING BID. PREVIOUS RENOVATION PROJECT REMOVED THE MAJORITY OF INTERIOR FINISHES, AND RE-INSULATED THE EXTERIOR WALLS AND UNDERSIDE OF THE ROOF WITH SPRAY-APPLIED INSULATING FOAM. ALL ORIGINAL FINISHES SHOWN HEREIN TO HAVE ASBESTOS, EXTERIOR PAINT, REMNANT INSULATION, ETC. SHALL BE ASSUMED TO HAVE MORE THAN 1ppm PCB'S. PCB-CONTAINING BULK PRODUCTS SHALL BE SEGREGATED FROM NEWER MATERIALS TO MINIMIZE HAZARDOUS WASTE DISPOSAL. PCB BULK PRODUCT PAINT IS IN POOR CONDITION ON THE EXTERIOR AND SURROUNDING SOIL , SIDEWALKS AND GRASS SHALL HAVE PCB PAINT CHIPS REMOVED AND DISPOSED OF.
6. PERFORM INITIAL AIR MONITORING TESTS ON ALL TASKS THAT DISTURB ASBESTOS OR LEAD-CONTAINING MATERIALS, DUST OR PAINT TO DETERMINE THE APPROPRIATE WORKER AND SITE PROTECTION PROCEDURES REQUIRED. DUE TO THE AGE OF THE BUILDINGS, METALLIC LEAD IS ASSUMED
PRESENT IN BELL AND SPIGOT PIPE JOINTS AND IN SOLDER ON COPPER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .