This document is an Amendment (Amendment 0004) to a solicitation for the EIE439 Fuels Management and Laboratory Facility project at Eielson Air Force Base. The amendment extends the proposal due date to June 6, 2025, at 2:00 PM AKDT and provides several technical modifications. Key changes include revised drawings for multiple architectural and structural sheets (A-311, A-102, A-601, A-403, A-201, A-602, S-503, S-102), updates to specification sections (00 22 11, 01 45 04.00 29, 10 51 13, 10 28 13), and modifications to locker specifications, toilet accessories, and other building details.
The amendment also increases the offeror acceptance period from 60 to 90 days and includes a Bid Inquiry Contractor Report with 137 inquiries covering various technical aspects such as electrical systems, mechanical specifications, structural details, environmental considerations, and construction management questions. The point of contact for this amendment is MAJ Raven S. Donelson, reachable at 907-753-5611. The solicitation remains for the replacement of an existing 1,615 SF facility with a new 4,014 SF facility that will include laboratory spaces, ready rooms, administrative offices, and supporting infrastructure.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT BY TITLE/LOCATION: EIE439 FUELS MANAGEMENT AND LABORATORY FACILITY
1. This amendment provides changes to the solicitation as indicated on the continuation pages of this document.
2. THE PROPOSAL DUE DATE IS EXTENDED TO 06 JUNE 2025, 2:00PM AKDT.
3. Proposals shall be submitted in accordance w ith section 00 21 00, Para 1.12, Proposal Submittals
4.You are required to acknow ledge receipt of this amendment on the reverse side of the standard form 1442
All other terms and conditions outlined in the Solicitation remain the same
POC for this Amendment is MAJ Raven S. Donelson, 907-753-5611
1. CONTRACT ID CODE PAGE OF PAGES
J 1 53
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-May-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB25R0020
X 9B. DATED (SEE ITEM 11)
21-Apr-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-May-2025
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
2204 TALLEY AVENUE
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
Amendment #0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
Summary of Changes
a. The following drawings are substituted for the superseded documents/sections:
- Revised Drawing A-311 provided. (bidder inquiry 11357603)
- Revised Drawing A-102 provided. (bidder inquiry 11358172)
- Revised Drawing A-601 provided. (bidder inquiry 11358174)
- Revised Drawing A-403 provided. (bidder inquiry 11359392)
- Revised Drawings A-201 and A-602 provided. (bidder inquiry 11359398)
- Revised Drawing S-503 provided. (bidder inquiry 11359418)
- Revised Drawing S-102 provided. (bidder inquiry 11359423)
- Revised Drawing A-407 provided. (bidder inquiry 11359465)
b. The following drawings are added:
NONE
c. The following drawings are deleted:
- Drawings H-001 and H-101 dated 10.17.24 are deleted (bidder inquiries 11359351 and
11359496)
d. The following revised documents/sections are added/substituted for the superseded documents/sections: The identifier “AM#0004” appears before and after new and/or revised materials, except as noted below.
- Revised Section 00 22 11, Para 7.1.4, paragraph 1b provided to add 45-day pause in schedule for move in.
Page 13 of Section 00 22 11 is being replaced in its entirety
- Revised Section 01 45 04.00 29 Contractor Quality Control, Part 3.4.3 QC Personnel provided.
Page 6 of Section 01 45 04.00 29 is being replaced in its entirety
- Revised Section 10 51 13 provided which deletes paragraph 2.1.2. (bidder inquiries 11348524 and 11359395)
- Revised Section 10 28 13, paragraph 2.1.14 was provided. (bidder inquiry 11359392) and adding item numbers (“TA-##) to paragraphs 1.2, 2.1.3, 2.1.4, 2.1.5, 2.1.6, 2.1.7, 2.1.8, 2.1.9, 2.1.10, 2.1.11, 2.1.12, 2.1.13, and 2.1.14 for easier cross referencing to the item numbers indicated in the drawings.
e. The following sections are deleted:
NONE
f. Other:
- Bidder Inquiry Report (in its’ entirety)
- Proposal due date is extended to 6 JUN 2025, 2:00PM AKDT.
- The offeror acceptance period has increased by 30 from 60 to 90.
g. The following documents will be revised and issued at a later date as a separate amendment:
None
ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME
(End of Summary of Changes)
Section 00 22 11 Page 13
Section 00 22 11
7.1.4 The schedule submittal should include as a minimum:
1. Summary Schedule:
W911KB25R0020
EIE439
a. Overall Show the overall construction phase for the facilities, the site work and the utilities. Include any long lead items and any fast-tracking starts. It isn't necessary to show the detailed breakdown construction (e.g., by trades) of each facility, site work and utilities.
b. Show turnover of facility. The duration to complete the facility and turnover to include Red Zone, Government walk-through and final turnover. the government must consider the requirement for the Contractor Quality Control (CQC) completion inspection and the subsequent joint Contractor-Government turnover inspection. of new fuel lab. Additionally, include demo of existing Lab, showing a no less than 45 days pause between bldg. turnover and Demo start.
…AM#0004
c. Constraints: Offeror must demonstrate the capability and flexibility to plan and schedule the complete project to meet the proposed contract completion period.
Clearly identify any constraints on the schedules presented (e.g., labor or material availability, scheduled airfield exercises, utility outages, permits, weather, etc.).
Indicate the anticipated overall critical path on the schedule.
7.2 EVALUATION CRITERIA:
7.2.1 Summary Schedule: The Government will evaluate the summary schedule for construction. The length of the schedule must match the contract duration. If it is shorter than the proposed contract duration, it offers no advantage to the Government because it is non-binding, only representing a preliminary planned schedule. A schedule shorter than the contract duration may indicate the Offeror is placing additional risk on the Government for any delays between the scheduled completion date and the required contract completion period. Therefore, the Government believes that there is no valid need to shorten the schedule less than the contract duration. The Government will evaluate the schedule to assess the strength of understanding of the project scope, restrictions which must be considered in the schedule such as permitting and long lead items. The Government may take into account how well the summary schedule and other technical submittals supports the proposed duration, as well as use other information, such as but not limited to independent judgment concerning logic, constraints and typical construction durations. Inconsistencies between documents will be considered a weakness. The packaging plan should minimize risk to the Contractor and to the Government for tear-out and coordination for reviews.
AM#0004...
quality control and are International Code Council (ICC) certified as a Commercial Building Inspector. For Military Family Housing projects, ICC Residential Building Inspector certification is required in lieu of the Commercial Building Inspector certification.
AM#0004... 3.4.3 CQC Personnel
In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: civil, mechanical, electrical, structural , architectural, Design Quality Control Manager . These individuals or specialized technical companies are employees of the prime or subcontractor; are not intended to be full time; be responsible to the CQC System Manager; be physically present at the construction site during work on the specialized personnel's areas of responsibility; have the necessary education and/or experience in accordance with the experience matrix listed herein. These individuals may perform other duties but must be allowed sufficient time to perform their assigned quality control duties as described in the Quality Control Plan. have no other duties other than quality control.
Experience Matrix
Area Qualifications
Civil Graduate Civil Engineer or Construction Manager with 4 years experience in the type of work being performed on this project or technician with 5 yrs related experience
Mechanical Graduate Mechanical Engineer with 4 yrs experience or person with 5 years of experience supervising mechanical features of work in the field with a construction company
Electrical Graduate Electrical Engineer with 4 years related experience or person 5 years of experience supervising electrical features of work in the field with a construction company
Structural Graduate Civil Engineer (with Structural Track or Focus) or Construction Manager with 4 years experience or person 5 years of experience supervising structural features of work in the field with a construction company
Architectural Graduate Architect with 4 years experience or person with 5 years related experience
...AM#0004
3.4.4 Additional Requirement
In addition to the above experience and education requirements the Contractor Quality Control CQC System Manager and Alternate CQC System Manager are required to have completed the "Construction Quality Management (CQM) for Contractors" course. If the CQC System Manager does not have a current certification, obtain the CQM for Contractors course certification within 90 days of award. If the CQC Manager Certificate
SECTION 01 45 04.00 29 Page 6
SECTION 10 51 13
PHENOLIC LOCKERS
05/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A568/A568M (2019a) Standard Specification for Steel, Sheet, Carbon, Structural, and
High-Strength, Low-Alloy, Hot-Rolled and
Cold-Rolled, General Requirements for
ASTM A653/A653M (2022) Standard Specification for Steel
Sheet, Zinc-Coated (Galvanized) or
Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A924/A924M (2022a) Standard Specification for General
Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM A1008/A1008M (2021a) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength
Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable
ASTM B456 (2017; R 2022) Standard Specification for
Electrodeposited Coatings of Copper Plus
Nickel Plus Chromium and Nickel Plus
Chromium
ASTM D6386 (2016a) Standard Practice for Preparation of Zinc (Hot-Dip Galvanized) Coated Iron and Steel Product and Hardware Surfaces for Painting
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-PRF-22750 (2014; Rev G; Notice 1 2019) Coating, Epoxy, High Solids
MIL-PRF-23377 (2012; Rev K) Primer Coatings: Epoxy, High
Solids
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FS AA-L-00486 (Rev J) Lockers, Clothing, Steel
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for
Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Types; G
Location; G
Installation
Numbering system
SD-03 Product Data
Material
Locking Devices
Lock Control Chart
Handles
Finish
Locker components
Assembly instructions
SD-04 Samples
Color chips; G
1.3 DELIVERY, HANDLING, AND STORAGE
Deliver lockers and associated materials in their original packages, containers, or bundles bearing the manufacturer's name and the name of the material. Protect from weather, soil, and damage during delivery, storage, and construction.
1.4 FIELD MEASUREMENTS
To ensure proper fits, make field measurements prior to the preparation of drawings and fabrication. Verify correct location
1.5 QUALITY ASSURANCE
1.5.1 Color Chips
Provide a minimum of three color chips, not less than 3 inches square, of each color indicated.
Government may request performance-characteristic tests on assembled lockers. Tests and results must conform to FS AA-L-00486. Lockers not conforming will be rejected.
PART 2 PRODUCTS
2.1 TYPES
Locker must have the following type and size in the location and quantities indicated. Locker finish colors will be as scheduled.
AM#0004...
2.1.1 Double-Tier
Double-tier lockers must be as follows:
Type DTL-1: Double-tier locker 15 inches wide, 15 inches deep, and 72 inches high, attached to 6-inch high legs
Type DTL-2: Double-tier locker 15 inches wide, 18 inches deep, and 72 inches high, attached to 6-inch high legs
Type DTC-1: Double-tier locker 15 inches wide, 15 inches deep, and 72 inches high, attached to a 6-inch high closed base
Type DTC-2: Double-tier locker 15 inches wide, 18 inches deep, and 72 inches high, attached to a 6-inch high closed base
Type DTW-1: Double-tier locker 15 inches wide, 15 inches deep, and 72 inches high, without base
Type DTW-2: Double-tier locker 15 inches wide, 18 inches deep, and 72 inches high, without base
...AM#0004
2.2 MATERIAL
2.2.1 Phenolic Panels
Material shall be solid Phenolic with a high pressure melamine matte finish surface made as an integral part of the core material. Laminated surfaces are not acceptable. Surface and edges shall be non-porous and shall not support fungus or bacteria. Phenolic material shall Meet or exceed the requiremetns for ClassB Flame Spread Rating and Smoke Developed calculatedaccording to ASTM E84.
2.2.2 Finish
2.2.2.1 Color
indicated in Section 09 06 00 SCHEDULE FOR FINISHES
2.3 COMPONENTS
2.3.1 Built-In Locks
FS AA-L-00486. Provide locking devices as a padlock eye in the door latching mechanism.Submit Lock Control Chart showing each lock required for the project, the locker identification plate number, and the lock combination.
2.3.2 Coat Hooks
FS AA-L-00486, chromium plated.
2.3.3 Hanger Rods
FS AA-L-00486.
2.3.4 Door Handles
FS AA-L-00486. Provide zinc alloy or steel handles with a chromium coating.
2.3.5 Doors
FS AA-L-00486, not less than 0.0598 inch thick steel sheet.
2.3.5.1 Hinges
In addition to the requirements of FS AA-L-00486, provide 5-knuckle hinges, minimum 2 inches high. Fabricate knuckle hinges from not less than 0.0787 inch thick steel sheet. A full height piano hinge may be provided if standard with the manufacturer. Weld or bolt hinges to the door frame.
Weld, bolt, or rivet hinges to the door.
2.3.5.2 Latching Mechanisms
FS AA-L-00486.
2.3.6 Latch Strikes
FS AA-L-00486. Fabricate from not less than 0.0787 inch thick steel sheet, except latch strike may be continuous from top to bottom and fabricated as part of the door framing.
2.3.7 Silencers
FS AA-L-00486.
2.3.8 Back and Side Panels, Tops, and Bottoms
FS AA-L-00486, not less than 0.0474 inch thick steel sheet.
2.3.9 Shelves
FS AA-L-00486. Fabricate from not less than 0.0598 inch thick steel sheet.
2.3.10 Base Panels
FS AA-L-00486.
2.3.11 Legs
Provide lockers without legs, as indicated.
2.3.12 Number Plates
FS AA-L-00486. Aluminum . Provide consecutive numbers as indicated in the drawings..
2.3.13 Fastening Devices
Provide bolts, nuts, and rivets as specified in FS AA-L-00486.
PART 3 EXECUTION
3.1 ASSEMBLY AND INSTALLATION
Assemble lockers according to the locker manufacturer's instructions.
Align lockers horizontally and vertically. Secure lockers to wall and base with screws as indicated. Bolt adjacent lockers together. Adjust doors to operate freely without sticking or binding and to ensure they close tightly.
3.2 NUMBERING SYSTEM
Install number plates on lockers consecutively as indicated .
3.3 FIELD QUALITY CONTROL
3.3.1 Testing
Government may request performance-characteristic tests on assembled lockers in accordance with FS AA-L-00486. Lockers not conforming will be rejected.
3.3.2 Repairing
Remove and replace damaged and unacceptable portions of completed work with new.
3.3.3 Cleaning
Clean surfaces of the work, and adjacent surfaces soiled as a result of the work, in an approved manner. Remove equipment, surplus materials, and rubbish from the site.
-- End of Section --
SECTION 10 28 13
TOILET ACCESSORIES
08/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI Z535.4 (2011) Product Safety Signs and Labels
ASTM INTERNATIONAL (ASTM)
ASTM F2285 (2004; R 2016; E 2016) Standard Consumer
Safety Performance Specification for
Diaper Changing Tables for Commercial Use
ASTM G21 (2015; R 2021; E 2021) Standard Practice for Determining Resistance of Synthetic
Polymeric Materials to Fungi
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-STD-1691 (1994; Rev F) Construction and Material
Schedule for Military Medical and Dental
Facilities
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for
Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Product Schedule
Submit product Schedule indicating types, quantities, sizes, and installation locations by room for each toilet accessory item required. Identify locations using room designations indicated on the drawings.
SD-03 Product Data
Recycled content for stainless steel toilet accessories; S
AM#0004...
Item A5030 (TA-09)Bench, Shower
Item A5080 (TA-07)Dispenser/Trash Receptacle, Paper Towel, SS, Semi-recessed
Item A5090 (TA-14) Disposal, Sanitary Napkin, SS, Surface Mounted
Item A5109 (TA-01,02,03)Grab Bar, 1-1/4 inch Dia., SS, 2 Wall, W/C
Accessible
Item A5110 (TA-10)Grab Bar, 1-1/4 inch Dia., SS, 2 Wall, Shower Use
Item A5135 (CA-01)Shelf, Utility W/ Mop/Broom Holders, SS, Surf
Mntd
Item A5170 (TA-12)Rod, Shower Curtain, 1 inch Diameter, W/Curtain
& Hooks
Item A5175 (TA-06)Soap Dispenser, SS, Surface Mounted
Item A5195 (TA-04)Dispenser, Toilet Tissue, SS, 1-Roll, Surface
Mntd
Item A5200 Dispenser, Toilet Tissue, SS, 2-Roll, Surface Mntd
Item A5205 (TA-11)Bar, Towel, 1 inch Diameter, SS, Surface Mounted
Item A5081 (TA-15)Dispenser, Paper Towel, SS, Semi-recessed
...AM#0004
Submit catalog numbers, literature, data sheets, construction details, profiles, anchoring and mounting requirements ,including cutouts in other work and substrate preparation, ,electrical characteristics, and other pertinent data for each toilet accessory item to evaluate function, materials, dimensions and appearance.
SD-10 Operation and Maintenance Datafor each toilet accessory.
Item A5030 Bench, Stall, Shower, Built In
Submit Data Package 1 for each toilet accessory item , and Data
Package 2 for each electrical toilet accessory item, in accordance with Section 01 78 23 OPERATIONS AND MAINTENANCE DATA.
1.3 DELIVERY, STORAGE, AND HANDLING
Wrap toilet accessories for shipment and storage, then deliver to the jobsite in manufacturer's original packaging, and store in a clean, dry area protected from construction damage and vandalism.
1.4 WARRANTY
Provide manufacturer's warranty to repair or replace defective materials and workmanship for a period of one year from date of final acceptance of the work..
PART 2 PRODUCTS
2.1 ACCESSORY ITEMS
Provide toilet accessories where indicated in accordance with
Contractor-provided product schedule. Conform to the requirements for accessory items specified herein which are based on MIL-STD-1691 Joint
Schedule Numbers (JSN). Provide each accessory item complete with the necessary mounting plates of sturdy construction with corrosion resistant surface.
Provide stainless steel products listed herein manufactured from materials containing a minimum of 50 percent recycled content. Provide data identifying percentage of recycled content for stainless steel toilet accessories.
2.1.1 Anchors and Fasteners
Provide corrosion-resistant anchors and fasteners capable of developing a restraining force commensurate with the strength of the accessory to be mounted and suited for use with the supporting construction. Provide tamperproof design fasteners with finish to match the accessory. Provide fasteners proposed for use for each type of wall construction and mounting.
2.1.2 Finishes
Except where noted otherwise, provide the following finishes on metal:
Metal Finish
Stainless steel No. 4 satin finish
AM#0004...
2.1.3 Item A5030 (TA-09)Bench,Shower, Wall mounted shower seat. Frame made of 18 gauge stainless steel with satin finish. Seat made of one piece of 1/2 inch thick nonporous solid phenolic with slots to permit water to drain, secured to frame with stainless steel carriage bolts and acorn nuts. Mounting hardware included. Seat to support a minimum static load of 250 pounds. Hinge seat to fold up when not in use. Seat complies with ADA guidelines.
Approximate size: 34 inches wide by 22 inches deep by 1/2 inch thick.
2.1.4 Item A5080 (TA-07)Dispenser, Paper Towel and Trash Receptacle, SS, S
Semi-recessed
Surface mounted unit constructed of stainless steel with satin finish, welded construction, and have full length piano hinge, tumbler lock, refill indicator. Unit has smooth corners, free of burrs and sharp edges. Unit has a capacity of 400 single fold paper towels.
Approximate size: 18 inches wide by 30 inches high by 6 inches deep.
semi-recessed.
2.1.5 Item A5090 (TA-14)Disposal, Sanitary Napkin, SS, Surface Mounted
Surface mounted sanitary napkin receptacle. Unit made of stainless steel with satin finish and all welded construction. Unit has piano hinge attached at the top and an integral finger depression for opening. For use with disposable paper liners, available separately. Unit may be attached to wall or toilet partition.
Approximate size: 7 inches wide by 4 inches deep by 10 inches high.
2.1.6 Item A5109 (TA-01,02,03)Grab Bar, 1-1/4 Inch Diameter, SS, 2 Wall, W/C Accessible
Grab bar of 1-1/4 inch diameter satin finish stainless steel with peened gripping surface for use in toilet stall/room. Snap-on flange covers for concealed mounting are stainless steel and equipped with two screw holes for attachment to wall. Grab bars designed to meet and exceed ADA requirements for structural strength. Grab bars designed to withstand loads of 900 pounds when properly installed. Clearance from wall to grab bar is 1-1/2 inches to meet ADA and ANSI codes.
2.1.7 Item A5110 (TA-10)Grab Bar, 1-1/4 Inch Diameter, SS, 2 Wall, Shower
Use
Grab bar of 1-1/4 inch diameter satin finish stainless steel with peened gripping surface. Snap-on flange covers for concealed mounting stainless steel. Bent ends of tubing pass through the flanges and are Heliarc welded for maximum strength. Grab bars designed to meet and exceed ADA requirements for structural strength. Grab bars designed to withstand loads of 900 pounds when properly installed. Clearance from wall to grab bar is 1-1/2 inches to meet ADA and ANSI codes.
2.1.8 Item A5135 (CA-01)Shelf, Utility W/ Mop/Broom Holders, SS, Surf
Mounted
Surface mounted mop/broom holder with shelf made of 18 gauge stainless steel with all exposed surfaces in satin finish. Unit has shelf 8 inches deep with shelf support brackets of satin finish stainless steel welded to mounting base, and a minimum of 3 hooks/3 holders. Mop holders have spring-loaded rubber cams and hold mop or broom handle with a diameter between 5/8 inch and 1 inch.
Approximate size: 36 inches wide by 8 inches deep.
2.1.9 Item A5170 (TA-12)Rod, Shower Curtain, 1 Inch Diameter, W/Curtain &
Hooks
Shower Curtain Rod with concealed mounting. Shower curtain rod made of satin finish stainless steel, 1 inch diameter, with flanges included, and have white vinyl shower curtain, 72 inches high, and stainless steel curtain hooks. Shower curtain has corrosion resistant grommets, reinforced heading, and treated with antibacterial and flame retardant agents. Shower hooks are stainless steel. Length as indicated on drawings.
2.1.10 Item A5175 (TA-06)Soap dispenser, SS, Surface-mounted
Surface mounted heavy duty stainless steel soap dispenser. Exposed surfaces to be satin finish.
Approximate size: 7 inches wide by 5 inches high by 2-3/4 inches deep.
2.1.11 Item A5195 (TA-04)Dispenser, Toilet Tissue, SS, 1-Roll, Surface
Mounted
Concealed surface mounted single roll toilet tissue dispenser of satin finish stainless steel. Spindle to be free-spinning for non-controlled delivery, chrome-plated high impact resistant plastic and equipped with heavy-duty internal spring. Unit accommodates standard core toilet paper roll up to 5-1/2 inches diameter. Mounting hardware included.
Approximate size: 7-3/4 inches wide by 2 inches high by 4 inches deep.
2.1.12 Item A5200 Dispenser, Toilet Tissue, SS, 2-Roll, Surface Mounted
Concealed surface mounted, double roll, toilet tissue dispenser of stainless steel. Unit holds and dispenses two standard 5-1/4 inch diameter rolls of toilet tissue. Spindles are free-spinning for non-controlled delivery, chrome-plated plastic equipped with heavy-duty internal springs.
Approximate size: 7 inches diameter by 4 inches deep.
2.1.13 Item A5205 (TA-11)Bar, Towel, 25 mm (1 inch) Diameter, SS, Surface
Mounted
Surface mounted satin finish stainless steel towel bar of 1 inch diameter.
Support posts fabricated of heavy solid cast brass with satin finish.
Stainless steel set screw keeps bar from rotating in posts. Clearance between towel bar and wall is 1-1/2 inches.
2.1.14 Item A5081 (TA-15)Dispenser, Paper Towel, SS, Semi-recessed
Surface mounted unit constructed of stainless steel with satin finish, welded construction, and have full length piano hinge, tumbler lock, refill indicator. Unit has smooth corners, free of burrs and sharp edges. Unit has a capacity of 400 single fold paper towels.
Approximate size: 18 inches wide by 8 inches high by 6 inches deep.
semi-recessed.
...AM#0004
PART 3 EXECUTION
3.1 INSTALLATION
Do not install items that show visual evidence of biological growth.
Provide the same finish for the surfaces of fastening devices exposed after installation as the attached accessory. Provide oval exposed screw heads.
Install accessories at the location and height indicated. Protect exposed surfaces of accessories with strippable plastic or by other means until the installation is accepted. After acceptance of accessories, remove and dispose of strippable plastic protection. Coordinate accessory manufacturer's mounting details with other trades as their work progresses. Use sealants for brackets, plates, anchoring devices and similar items in showers (a silicone sealantsealant specified in Section
07 92 00 JOINT SEALANTS) as they are set to provide a watertight installation. After installation, thoroughly clean exposed surfaces and restore damaged work to its original condition or replace with new work.
3.1.1 Recessed Accessories
Fasten accessories with wood screws to studs, blocking or rough frame in wood construction. Set anchors in mortar in masonry construction. Fasten to metal studs or framing with sheet metal screws in metal construction.
3.1.2 Surface Mounted Accessories
Mount on concealed backplates, unless specified otherwise. Conceal fasteners on accessories without backplates. Install accessories with corrosion-resistant fasteners as required by the construction. Install backplates in the same manner, or provide with lugs or anchors set in mortar, as required by the construction. Fasten accessories mounted on gypsum board and plaster walls without solid backing into the metal or wood studs, or to backplates secured to metal studs.
3.2 CLEANING
Clean material in accordance with manufacturer's recommendations. Do not use alkaline or abrasive agents. Take precautions to avoid scratching or marring exposed surfaces.
-- End of Section --
Bid Inquiry Contractor Report All Inquiries
Project: Fuel Management and Lab Facility (DESC2503) Review: EIE439 Fuels Mgmt & Lab Fae (00001) (sorted by CommentlD ) Displaying 137 inquiries.
I Id II Discipline II Sheet II Detail II Spec 11130828311 Contracting II None II None II None
I I I
Comment Classification: UNCLASSIFIED (U)
Can the site visit time be changed to 11 :00 am to accomodate contractors arriving in Fairbanks at 9:00 am. Flight delays are quite common recently.
On: Apr 23 2025.
IIGovernment Response .. AMD 1 was issued on 25 APR 2025 On: May 07 2025 llcurrent Request Status: Request Closed
Information for this report is procurement sensitive.
11131093611 Electrical II II II 26 20 00 Comment Classification: UNCLASSIFIED (U)
26 20 00 Interior Distribution System specification lists MC (Metal Clad) Cable within the product data and execution, it is acceptable for use within the walls and the homerun is a appropriate sized raceway?
On: Apr 24 2025.
Government Response. . Correct. Metal Clad cable may be used for branch circuit wiring in concealed, dry locations other than homeruns. Homeruns shall be building wire in raceway. Metal Clad cable used for branch circuit wiring from a light switch to the light fixture shall include a neutral conductor. On: May 07 2025
I I llcurrent Request Status: Request Closed Information for this report is procurement sensitive.
11131365611 Electrical II ED101 II A1 II
I I I
Comment Classification: UNCLASSIFIED (U)
General sheet note 1 on ED101 state to provide temporary power. Please state voltage, amperage, and phase required.
On: Apr 25 2025.
IIGovernment Response .. Service is 1 OOA, 208V, 30 On: May 07 2025 llcurrent Request Status: Request Closed
Information for this report is procurement sensitive.
11131367111 Electrical II E101 II A1 II Comment Classification: UNCLASSIFIED (U)
There is an underground electrical service shown on ED101 to be partially demolished, and then reconnected on E101. See general sheet note #8 on E101. What does this feed and what duration is allowed for a power outage for this particular feeder?
On: Apr 25 2025. D Government Response. . the line is from previous temp utilities. Please follow outages and durations as spelled out in the RFP. On: May 23 2025
I llcurrent Request Status: Request Closed
I Information for this report is procurement sensitive.
11132190011 Mechanical II 11 11 Comment Classification: UNCLASSIFIED (U)
23 07 00
Reference Tables 1 and 2: What materials and thicknesses are required for pipe insulation on steam and steam condensate piping?
On: Apr 30 2025.
D Government Response .. Steam pipe: Mineral Fiber, 1.5" thick. Steam Condensate: Mineral Fiber 1.5" thick On:
May 14 2025
I I
I I I I
I I
I I I
I I
It's indicated on the SF1442 that offers need to remain valid for 60 days.
Assume an Award Date of July 15th (assuming this date project completion date would be 7/15/2027) .
KTR immediately begins execution of preconstruction submittals, specifically the SAP. Per specification section 02 61 13 the KTR is to allow 90 days for the SAP. Assuming 20 calendar days for submittal preparation and the 90 day review period no onsite work (excavation) could begin until 11/2/2025. This is not an optimal time to begin excavation for a new building. It is possible, but it would be very costly for the project in additional temporary heat for earthwork and concrete construction (to get the building enclosed).
If construction did commence in November of 2025 the new facility would not be completed for turnover for at least 14 months (optimistic scenario). After its completion the KTR is required to account for 180 day move in period (See Projnet Response 11331029). Based on the following durations it only leaves 10 days to complete the work associated with Phase 2 (reference G-
102) of the project.
120 Day Preconstruction Submittals & SAP approval (July 15th - November 12th) 420 Day (14MTHS) New Construction Completion (November 12th - January 7th 2027) 180 Day Occupant Move Period (January 8th - July7th 2027) PHASE 2 (July 8th - October 6th 2027)
On: May 28 2025.
DI IGovernment Response. . Duration from turnover to demo is a 45 day move in period. The current 730 days is not anticipated to be extended at this time On: May 28 2025
I I llcurrent Request Status: Request Closed Information for this report is procurement sensitive.
Report Complete
Patent 11/892,984 ProjNet property of ERDC since 2004.
FINISH FLOOR
0' - 0"
T.O. PLATE @
GRIDLINE
10' - 8"
C
B.O. FOOTING
-2' - 0"
CONCRETE FOOTING,
SEE STRUCTURAL
DRAWINGS
SPLIT FACE CMU
TYPICAL WALL ASSEMBLY EX-2
1" AIR SPACE
SELF-ADHERING AIR BARRIER
8" ICF WITH ENERGY STICK INSERT, SEE
STRUCTURAL DRAWINGS FOR
REINFORCEMENT
1-5/8" METAL STUD
GWB
STANDING SEAM INSULATED
METAL ROOF PANEL
TYPICAL ROOF ASSEMBLY
METAL ROOF DECK, SEE
STRUCTURAL DRAWINGS
STEEL BEAMS, SEE
STRUCTURAL DRAWINGS
A-501
F7
TYPICAL SOFFIT ASSEMBLY
(SEE A1/A-311)
4' - 9"
A-501
F1
A-502
A1
4' - 0"
2 LAYERS 4" RIGID INSULATION, TYP.
RIGID INSULATION, SEE J1/A-502
FOR LOCATIONS AND THICKNESS
5' - 0"
SLOPE 1/4" PER FT
CONCRETE SIDEWALK, SEE
CIVIL DRAWINGS.
FINISH FLOOR
0' - 0"
B.O. FOOTING
-2' - 0"
MECHANICAL
PLATFORM
9' - 0"
TYP. ROOF ASSEMBLY, SEE
A1/A-311
ARCTIC HOOD, SEE
MECHANICAL DRAWINGS
CONCRETE FOOTING, SEE
STRUCTURAL DRAWINGS
CONCRETE SIDEWALK,
SEE CIVIL DRAWINGS
EXTERIOR WALL ASSEMBLY EX-2,
SEE A1/A-311: (UP TO 10' - 0")
TYP. EXTERIOR WALL
ASSEMBLY EX-3
(ABOVE 10'-0")
METAL SIDING
AIR SPACE W/ VERT. 7/8"
HAT CHANNELS
WEATHER BARRIER
8" ICF WITH 2" ENERGY INSERT,
SEE STRUCTURAL DRAWINGS FOR
REINFORCEMENT
1-5/8" METAL STUD
GWB
A-501
A6
3' - 0"
A-503
F14
A-503
K14
A-503
B14
A-701
A10
SLOPE 1/4" PER FT
A-502
A1
FINISH FLOOR
0' - 0"
T.O. PLATE @
GRIDLINE
10' - 8"
C
B.O. FOOTING
-2' - 0"
CONCRETE FOOTING, SEE
STRUCTURAL DRAWINGS
GRADE,
SEE CIVIL
STANDING SEAM INSULATED
METAL ROOF PANEL
TYPICAL ROOF ASSEMBLY
METAL ROOF DECK, SEE
STRUCTURAL DRAWINGS
STEEL BEAMS, SEE
STRUCTURAL DRAWINGS
SPLIT FACE CMU
TYPICAL WALL ASSEMBLY EX-2
1" AIR SPACE
SELF-ADHERING AIR BARRIER
8" ICF WITH ENERGY STICK INSERT, SEE
STRUCTURAL DRAWINGS FOR
REINFORCEMENT
1-5/8" METAL STUD
GWB
A-501
F7
TRIPLE-PANE FIBERGLASS WINDOW
PRECAST CONCRETE SILL
TYPICAL SOFFIT ASSEMBLY
VAPOR RETARDER
3/4" PLYWOOD SHEATHING
4" EIFS
4' - 9"
A-504
L1
A-504
A1
A-504
G1
4' - 0" 0' - 4 3/8"
SLOPE 1/4" PER FT
A-502
A1
A-501
F1
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A u to d e s k D o c s
/2 .0
U
S A
C E
E
IE
F u e ls
M a n a g e m e n t
L a b /2
.0
U
S A
C E
E
IE
F u e ls
M a n a g e m e n t L a b R
.r v t
/2 /2
:4
:4
A
M
A-311
T Y
P
IC
A L E
X T
E R
IO
R
W A
L L S
E C
T
IO
N S
E
IE
L S
O N
A
IR
F O
R C
E B
A S
E A
L A
S K
A D
IS
T
R
IC
T A
N C
H O
R A
G E
A
L A
S K
A
S S
C H
E L L
S S
C H
E L L
D M
O O
R E
O C
T O
B E
R
W K
B R
R T
A
F U
E L S
M A
N A
G E
M E
N T
A N
D L
A B
O R
A T
O R
Y F
A C
IL
IT
Y
E
IE
F T
Q W
RTA
3/4" = 1'-0"
A14
TYPICAL WALL SECTION
3/4" = 1'-0" A8
TYPICAL WALL SECTION AT GABLE2'1' 4'0
SCALE: 3/4" = 1'-0"
3/4" = 1'-0"
A1
TYP. WALL SECTION
sschell Text Box sschell Text Box sschell Text Box sschell Cloud sschell Cloud sschell Cloud sschell Text Box sschell Text Box
REVISED IN ACCORDANCE WITH AMMENDMENT 004 05/29/2025
sschell Text Box sschell Text Box sschell Text Box
A
B
C
1 42
A1
A-301
H1
A-302 ____________________________________________________ A1
A-302
H1
A-301
8' - 0"AFF
8' - 0"AFF
10' - 0"AFF
10' - 0"AFF
8' - 0"AFF
14' - 6"
EXPOSED TO
STRUCTURE
RELITES ABOVE
10' - 0"AFF
SLOPE
SLOPE
10' - 0"AFF
10' - 0"AFF
10' - 0"AFF10' - 0"AFF
10' - 0"AFF
10' - 0"AFF
10' - 0"AFF
8' - 0"AFF
8' - 0"AFF
8' - 0"AFF
12' - 0"AFF
10' - 0"AFF
10' - 0"AFF
10' - 0"AFF
8' - 0"AFF
8' - 0"AFF
8' - 0"AFF
10' - 0"AFF
10' - 0"AFF
10' - 0"AFF
10' - 0"AFF
10' - 0"AFF
10' - 0"AFF
10' - 0"AFF
10' - 0"AFF
EXPOSED TO
STRUCTURE
A8
A-314
A1
A-313
8' - 0"AFF
10' - 0"AFF
8' - 0"AFF
4" / 1'-0"
10' - 0"AFF
A1
A-303
H1
A-303
H1
A-301
2' X 2' ACT
LIGHT FIXTURE
MECHANICAL DEVICE
GYPSUM WALL
BOARD
CEILING PLAN LEGEND
ACOUSTIC
SEPARATION,
CONTINUE TO
STRUCTURE ABOVE.
SEE C4, C5/A-701
1-HR FIRE WALL,
CONTINUE TO
STRUCTURE ABOVE.
SEE C4, C5/A-701
WALL MOUNTED
EXIT LIGHT, SEE
ELECTRICAL
DRAWINGS
EXTENT OF RELITES
ABOVE
EIFS
REFLECTED CEILING PLAN KEYNOTE LEGEND
GENERAL NOTES:
WALLS EXTEND 0'-6" ABOVE CEILINGS UNLESS NOTED
OTHERWISE.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A u to d e s k D o c s
/2 .0
U
S A
C E
E
IE
F u e ls
M a n a g e m e n t
L a b /2
.0
U
S A
C E
E
IE
F u e ls
M a n a g e m e n t L a b R
.r v t
/2 /2
:4
:3
A
M
A-102
F
IR
S T
F L O
O R
R E
F L E
C T
E D
C E
IL
IN
G P
L A
N
E
IE
L S
O N
A
IR
F O
R C
E B
A S
E A
L A
S K
A D
IS
T
R
IC
T A
N C
H O
R A
G E
A
L A
S K
A
S S
C H
E L L
S S
C H
E L L
D M
O O
R E
O C
T O
B E
R
W K
B R
R T
A
F U
E L S
M A
N A
G E
M E
N T
A N
D L
A B
O R
A T
O R
Y F
A C
IL
IT
Y
E
IE
F T
Q W
RTA
1/4" = 1'-0"
A1
FIRST FLOOR REFLECTED CEILING PLAN
1 1-HOUR HORIZONTAL ASSEMBLY
2 PROJECTOR MOUNT FOR GFGI PROJECTOR, SEE
ELECTRICAL DRAWINGS
3 PROJECTOR SCREEN
4 EIFS SOFFIT
5 FUME HOOD EXHAUST, COORDINATE WITH
MECHANICAL DRAWINGS
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
PLAN NORTH
sschell Text Box F6, F10 sschell Cloud sschell Text Box sschell Text Box
REVISED IN ACCORDANCE WITH AMMENDMENT 004 05/29/2025
sschell
M1
M1A
M4F1
UL# U465
5/8" TYPE X GYPSUM WALL BOARD, EACH SIDE
5/8" TYPE X NOISE-REDUCING GYPSUM WALL
BOARD EA. SIDE
3-1/2" GLASS FIBER INSULATION
M1F1A
UL U465
STC 56
STC 55 MIN.
SIM TO GA WP 1011
M1F1
5/8" TYPE X GYPSUM WALL BOARD
5/8" TYPE X NOISE-REDUCING GYPSUM
WALL BOARD
3-1/2" GLASS FIBER INSULATION
5/8" TYPE X GYPSUM WALL BOARD
M5A
6" METAL STUDS AT 16" O.C.
5/8" TYPE X GYPSUM WALL BOARD
M5
5/8" TYPE X GYPSUM WALL BOARD, EACH SIDE
5/8" TYPE X GYPSUM WALL BOARD
3-1/2" GLASS FIBER INSULATION
PARTITION TYPES
3-5/8" METAL STUDS AT 16" O.C.
3-5/8" METAL STUDS AT 16" O.C.
3-5/8" METAL STUDS AT 16" O.C.
3-5/8" METAL STUDS AT 16" O.C.
3-5/8" METAL STUDS AT 16" O.C.
3-5/8" METAL STUDS AT 16" O.C.
UL# U465
M2A
5/8" TYPE X NOISE-REDUCING GYPSUM WALL
BOARD EA. SIDE
3-1/2" GLASS FIBER INSULATION
STC 55 MIN.
SIM TO GA WP 1011
4" METAL STUDS AT 24" O.C.
M2F1A
UL U465
STC 56
5/8" TYPE X GYPSUM WALL BOARD
5/8" TYPE X NOISE-REDUCING GYPSUM
WALL BOARD
3-1/2" GLASS FIBER INSULATION
4" METAL STUDS AT 24" O.C.
5/8" TYPE X GYPSUM WALL BOARD
M6
1-5/8" METAL STUDS AT 16" O.C.
HORIZONTAL ASSEMBLY
MH-1
UL# I501
4" METAL STUDS @ 24" O.C.
3 LAYERS TYPE X GYPSUM WALL BOARD
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A u to d e s k D o c s
/2 .0
U
S A
C E
E
IE
F u e ls
M a n a g e m e n t
L a b /2
.0
U
S A
C E
E
IE
F u e ls
M a n a g e m e n t L a b R
.r v t
/2 /2
:4
:3
A
M
A-601
P A
R T
IT
IO
N T
Y P
E S
E
IE
L S
O N
A
IR
F O
R C
E B
A S
E A
L A
S K
A D
IS
T
R
IC
T A
N C
H O
R A
G E
A
L A
S K
A
S S
C H
E L L
S S
C H
E L L
D M
O O
R E
O C
T O
B E
R
W K
B R
R T
A
F U
E L S
M A
N A
G E
M E
N T
A N
D L
A B
O R
A T
O R
Y F
A C
IL
IT
Y
E
IE
F T
Q W
RTA
sschell Text Box *NOTE: PROVIDE STRUCTURAL PLYWOOD PLYWOOD SHEATHNG WHERE INDICATED IN STRUCTURAL DRAWINGS. PLYWOOD TO BE INSTALLED VERTICALLY OR HORIZONTALLY BELOW GWB.
sschell Text Box *NOTE: PROVIDE STRUCTURAL PLYWOOD PLYWOOD SHEATHNG WHERE INDICATED IN STRUCTURAL DRAWINGS. PLYWOOD TO BE INSTALLED VERTICALLY OR HORIZONTALLY BELOW GWB.
sschell Cloud sschell Cloud sschell Text Box sschell Text Box sschell Text Box sschell
REVISED IN ACCORDANCE WITH AMMENDMENT 004 05/29/2025
TA-04
TA-14
TA-06
TA-13
TA-05
SOLID SURFACE
COUNTERTOP, SS-1
PLASTIC LAMINATE
APRON, PL-1
1' - 6"
1' - 3"
2' - 6"
BASE AS SCHEDULED
TA-01 GRAB BAR 36"
TA-02 GRAB BAR 42"
TA-03 GRAB BAR 18"
TA-04 TOILET TISSUE DISPENSER
TA-05 SEAT COVER DISPENSER
TA-06 SOAP DISPENSER
TA-07 SEMI-RECESSED WASTE RECEPTACLE
AND PAPER TOWEL DISPENSER
TA-08 SHOWER SOAP DISPENSER
TA-09 ADA SHOWER SEAT
TA-10 GRAB BAR 24"
TA-11 TOWEL BAR
TA-12 SHOWER CURTAIN ROD
TA-13 FRAMED MIRROR UNIT 4' H X 2' -6" W
TA-14 SANITARY NAPKIN DISPOSAL UNIT
ACCESSORIES LEGEND
CUSTODIAL ACCESSORIES LEGEND
CA-01 UNIT SHELF WITH MOP & BROOM
HOLDER
UNLESS OTHERWISE NOTED, DIMENSIONS AND
CALLOUTS ARE TYPICAL IN BOTH ROOMS
FOR ITEMS NOT NOTED OR DIMENSIONED SEE
TYPICAL MOUNTING HEIGHTS
B
A-403H12
L9
L13
H8
A-403
D12 A-403
L1
D16
A9
A13
L5
H1
H5
TOILET
TOILET
ADA TOILET
SHOWER
HALL
JANITOR
ELECTRICAL
ROOM
TELECOMM
ROOM
MOP SINK, SEE
MECH. DWGS.
CA-01
TA-01
TA-05
TA-02
A-403
L9
L13
H8
H12
A-403
D8
TA-04
TA-14
TA-05
TA-06
TA-13
TA-04
TA-14
TA-05
TA-03
TA-04
TA-14
TA-06
TA-13
TA-11
TA-10
TA-08
TA-12
TA-03
TA-09
TA-13
TA-06
A-701
K1
M1AM1A
M1AM1A
M1A M1A
M1A
M1 M1
M1F1AM2F1A
M4M4
M1AM1A
M2A
M1A
M1A
M1A
M2A
M2F1A
M4 M1A
M1A
M1A
M2A
M2F1A
M1F1AM1F1A
TA-07
TA-07
TA-07
TA-03
TA-02
TA-04
TA-14
TA-01
TA-13
TA-06
TA-05
SOLID SURFACE
COUNTERTOP, SS-1
PLASTIC LAMINATE
APRON, PL-11' - 6"
ACCESS DOOR FOR
MANIFOLD, SEE
MECHANICAL DRAWINGS.
PAINT TO MATCH
ADJACENT FINISH.
TA-09
T-2 TYP.
TA-03
T-1 TYP.
TA-12
SHOWER HEAD
SEE MECH. DWGS.
SHOWER VALVES/
CONTROLS, SEE
MECH. DWGS.
TA-08
TA-10
GFGI BENCH
ACCESS DOOR FOR
MANIFOLD, SEE
MECHANICAL
DRAWINGS. PAINT
TO MATCH
ADJACENT FINISH
AND ALIGN WITH
TILE PATTERN.
GFGI BENCH
TA-11
TA-09
TA-12
CA-01PT
WCP
UTILITY SINK, SEE
MECHANICAL DWGS.
CONDENSATE LINE
PENETRATION, SEE MECH.
DWGS. FIRESTOP AT WALL
AND SEAL AT WCP, PROVIDE
ESCUTCHEON.
BASE AS SCHEDULED
TA-07
1' - 6"
TA-07
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A u to d e s k D o c s
/2 .0
U
S A
C E
E
IE
F u e ls
M a n a g e m e n t
L a b /2
.0
U
S A
C E
E
IE
F u e ls
M a n a g e m e n t L a b R
.r v t
/2 /2
:4
:1
A
M
A-403
E N
L A
R G
E D
R E
S T
R O
O M
P L A
N A
N D
I N
T E
R
IO
R E
L E
V A
T
IO
N S
E
IE
L S
O N
A
IR
F O
R C
E B
A S
E A
L A
S K
A D
IS
T
R
IC
T A
N C
H O
R A
G E
A
L A
S K
A
S S
C H
E L L
B W
IL
L
IA
M S
D M
O O
R E
O C
T O
B E
R
W K
B R
R T
A
F U
E L S
M A
N A
G E
M E
N T
A N
D L
A B
O R
A T
O R
Y F
A C
IL
IT
Y
E
IE
F T
Q W
RTA
3/8" = 1'-0" L9
TOILET 117 - NORTH
3/8" = 1'-0" H12
TOILET 117 - WEST
3/8" = 1'-0"
H8
TOILET 117 - SOUTH
NORTH
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
3/8" = 1'-0"
A1
RESTROOM AND SHOWER PLANS
3/8" = 1'-0" D12
ADA TOILET 120 - NORTH
3/8" = 1'-0"
D16
ADA TOILET 120 - EAST
3/8" = 1'-0" A9
ADA TOILET 120 - SOUTH
3/8" = 1'-0" L1
SHOWER 116 - NORTH
3/8" = 1'-0"
L5
SHOWER 116 - EAST
3/8" = 1'-0" H1
SHOWER 116 - SOUTH
3/8" = 1'-0"
H5
SHOWER 116 - WEST
3/8" = 1'-0" D8
JANITOR 118 - NORTH
3/8" = 1'-0" A13
ADA TOILET 120 - WEST
3/8" = 1'-0" L13
TOILET 117 - EAST
sschell Text Box
REVISED IN ACCORDANCE WITH AMMENDMENT 004 05/29/2025
sschell Text Box
TA-15 PAPER TOWEL DISPENSER
sschell Cloud sschell Text Box sschell
FINISH FLOOR
0' - 0"
FLOOR PLAN
0' - 0"
T.O. PLATE @
GRIDLINE
10' - 8"
1 42
B.O. FOOTING
-2' - 0"
A1
A-301 ____________________________________________________ H1
A-302 ____________________________________________________ A1
A-302
A1
A-313
1 3 2
A1
A-504
TYP
G1
A-504
TYP
L1
A-504
TYP
A1
A-303
TYP.
TYP.
16 TYP.
TYP.
TYP.
L14
A-504
SIM
L7
A-504
A7
A-504
A14
A-504
SIM
F14
A-504
SIM
____________________________________________________ F7
A-504
SIM
XXX
FINISH FLOOR
0' - 0"
T.O. PLATE @
GRIDLINE
10' - 8"
A B
C
B.O. FOOTING
-2' - 0"
H1
A-301
Xxx Xxx
L7
A-504
L14
A-504
SIM
A7
A-504
A14
A-504
SIM
F7
A-504
SIM
F14
A-504
SIM
XXX
H1
A-303
A-502
J11
TYP.TYP.
K14
A-503
SIM
B14
A-503
SIM
F14
A-503
SIM
EXTERIOR ELEVATION KEYNOTE LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A u to d e s k D o c s
/2 .0
U
S A
C E
E
IE
F u e ls
M a n a g e m e n t
L a b /2
.0
U
S A
C E
E
IE
F u e ls
M a n a g e m e n t L a b R
.r v t
/2 /2
:4
:4
A
M
A-201
E A
S T
A N
D S
O U
T H
E X
T E
R
IO
R E
L E
V A
T
IO
N S
E
IE
L S
O N
A
IR
F O
R C
E B
A S
E A
L A
S K
A D
IS
T
R
IC
T A
N C
H O
R A
G E
A
L A
S K
A
S S
C H
E L L
S S
C H
E L L
D M
O O
R E
O C
T O
B E
R
W K
B R
R T
A
F U
E L S
M A
N A
G E
M E
N T
A N
D L
A B
O R
A T
O R
Y F
A C
IL
IT
Y
E
IE
F T
Q W
RTA
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
1/4" = 1'-0"
H1
SOUTH ELEVATION
1/4" = 1'-0" A1
EAST ELEVATION
1 SPLIT FACE CMU
2 TRIPLE GLAZED FIBERGLASS WINDOW TYP.
3 ALUM. STOREFRONT, SEE DOOR SCHEDULE
4 DOOR, SEE DOOR SCHEDULE
5 ARCTIC HOOD, SEE MECHANICAL DRAWINGS
6 EIFS
7 INSULATED METAL ROOF PANEL
8 PREFINISHED METAL FLASHING
9 PREFINISHED METAL BASE FLASHING
10 VTR, SEE MECHANICAL DRAWINGS
11 PRECAST CONCRETE SILL
12 LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
13 STEEL BRACE W/ "DARK BRONZE" HIGH
PERFORMANCE COATING, SEE STRUCTURAL
DRAWINGS
14 GRADE OR CONCRETE WALK, SEE CIVIL DRAWINGS
15 MECHANICAL EQUIPMENT, SEE MECHANICAL AND
CIVIL DRAWINGS
16 CORRUGATED METAL SIDING
17 VENT, SEE MECH. DRAWINGS
18 SIGN, SEE SCHEDULE
19 FUME HOOD FLUE, SEE MECHANICAL DRAWINGS.
20 RANGE HOOD EXHAUST, SEE MECHANICAL
DRAWINGS
sschell Text Box sschell Cloud sschell Text Box sschell Cloud sschell Text Box
(NOT USED)
sschell Cloud sschell Text Box sschell Text Box sschell Text Box sschell Text Box sschell
DOOR TYPES
S C
H E
D U
L E
P E
R D
O O
R
SCHEDULE
PER DOOR
S C
H E
D U
L E
P E
R D
O O
R
S C
H E
D U
L E
P E
R D
O O
R
S C
H E
D U
L E
P E
R D
O O
R
S C
H E
D U
L E
P E
R D
O O
R
SCHEDULE
PER DOOR
SCHEDULE
PER DOOR
SCHEDULE
PER DOOR
SCHEDULE
PER DOOR
SCHEDULE
PER DOOR
WOOD SINGLE FLUSH B WOOD FULL LITE C HM UNEVEN FLUSH D HALF LITE E FULL LITE F WOOD NARROW LITE
SCHEDULE
PER DOOR
6" 6"
6" 6"
1' - 10" 6"
FRAME TYPES
S C
H E
D U
L E
P E
R D
O O
R
SCHEDULE
PER DOOR
S C
H E
D U
L E
P E
R D
O O
R
S C
H E
D U
L E
P E
R D
O O
R
S C
H E
D U
L E
P E
R D
O O
R
SCHEDULE
PER DOOR
SCHEDULE
PER DOOR
HOLLOW METAL 2 HOLLOW METAL 3 HOLLOW METAL
MASONRY OPENING
4 HOLLOW METAL
MASONRY OPENING
5 HOLLOW METAL
" 2 " 4
2" 2" 3' - 0" 2"2" 2" 2" 2" 2" 2"
5' - 8"
S-2 I-1
S-2 S-2
I-1
S C
H E
D U
L E
P E
R D
O O
R
SCHEDULE
PER DOOR
4' - 8"5' - 4"
6 HOLLOW METAL
S C
H E
D U
L E
P E
R D
O O
R
7 HOLLOW METAL
S-2
0' - 2" 0' - 2" 1' - 6" 0' - 2"
S C
H E
D U
L E
P E
R D
O O
R
8 HOLLOW METAL
S-2
0' - 2" 0' - 2" 1' - 10" 0' - 2"
S C
H E
D U
L E
P E
R D
O O
R
SEE PLAN FOR WALL
TYPE
METAL "C"
STUD
HOLLOW METAL
DOOR FRAME
DOOR, PER
SCHEDULE
HOLLOW METAL
SIDELITE PER SCHEDULE
SEE PLAN
FOR WALL TYPE
METAL "C" STUD
GLAZING STOP
SEE PLAN FOR WALL
TYPE
METAL STUDS
HOLLOW METAL
FRAME
GLASS PER DOOR
SCHEDULE
GLAZING STOP
CONCRETE SLAB
SEE STRUCTURAL
HOLLOW METAL
SIDELITE FRAME
PER SCHEDULE
METAL STUD
TRACK FASTENED
TO SLAB
GLASS PER DOOR SCHEDULE
GENERAL NOTES
1. REFER TO SPECIFICATIONS FOR HARDWARE GROUPS
2. THE DOOR SWING SHOWN ON THE FLOOR PLANS INDICATE THE HAND OF THE DOOR ONLY. DOORS SHALL
SWING TO THE MAXIMUM EXTENT (BEYOND 90 DEGRESS) WHERE NOT OBSTRUCTED BY ADJACENT WALLS.
3. SEE FINISH SCHEDULE AND FINISH SPECIFICATIONS FOR PAINT AND STAIN REFERENCES.
4. SEE SHEET A-603 FOR GLASS TYPES.
LEGEND
HM HOLLOW METAL
IHM INSULATED HOLLOW METAL
PT PAINT
ST STAIN
TBHM THERMALLY BROKEN HOLLOW METAL
WD WOOD
SEE PLAN FOR WALL
TYPE
METAL STUDS
HOLLOW METAL
DOOR FRAME
DOOR, PER
SCHEDULE
HOLLOW METAL
DOOR FRAME
PER SCHEDULE
HOLLOW METAL
DOOR
PER SCHEDULE
CONCRETE SLAB
SEE STRUCTURAL
/4
T
Y P
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A u to d e s k D o c s
/2 .0
U
S A
C E
E
IE
F u e ls
M a n a g e m e n t
L a b /2
.0
U
S A
C E
E
IE
F u e ls
M a n a g e m e n t L a b R
.r v t
/2 /2
:4
:3
A
M
A-602
D O
O R
S C
H E
D U
L E
A N
D D
E T
A
IL
S
E
IE
L S
O N
A
IR
F O
R C
E B
A S
E A
L A
S K
A D
IS
T
R
IC
T A
N C
H O
R A
G E
A
L A
S K
A
S S
C H
E L L
J E
D W
A R
D S
D M
O O
R E
O C
T O
B E
R
W K
B R
R T
A
F U
E L S
M A
N A
G E
M E
N T
A N
D L
A B
O R
A T
O R
Y F
A C
IL
IT
Y
E
IE
F T
Q W
RTA
DOOR SCHEDULE
DOOR
NUMBER
SIZE
T y p e M a rk
DOOR FRAME DETAIL
HARDWARE
GROUP Fire Rating COMMENTSWIDTH HEIGHT M
A T
E R
IA
L
F
IN
IS
H
G L A
S S
T Y
P E
M A
T E
R
IA
L
F
IN
IS
H
HEAD JAMB SILL
101-1 3' - 0" 7' - 10" E IHM FF I-1 5 TBHM FF L7,L14/A-504 F7,F14/A-504 A7,A14/A-504 1.0
101-2 3' - 0" 7' - 0" B WD ST S-2 8 HM PT M16,M13/A-6
J16,J13/A-602 F16,F13/A-60
6.0
103-1 3' - 0" 7' - 0" D WD ST S-2 1 HM PT M16/A-602 J16/A-602 F16/A-602 11.0
105-1 3' - 0" 7' - 0" A WD ST - 1 HM PT M16/A-602 J16/A-602 F16/A-602 9.0
106-1 3' - 0" 7' - 0" B WD ST S-2 2 HM PT M16,M13/A-6
J16,J13/A-602 F16,F13/A-60
11.0
107-1 3' - 0" 7' - 0" B WD ST S-2 2 HM PT M16,M13/A-6
J16,J13/A-602 F16,F13/A-60
11.0
109-1 3' - 0" 7' - 10" E IHM PT I-1 6 TBHM PT L7,L14/A-504 F7,F14/A-504 A7,A14/A-504 1.0
109-2 3' - 0" 7' - 0" B WD ST S-2 7 HM PT M16,M13/A-6
J16,J13/A-602 F16,F13/A-60
6.0
110-1 3' - 0" 7' - 0" B WD ST S-2 7 HM PT M16/A-602 J16/A-602 F16/A-602 11.0
111-1 5' - 8" 7' - 0" C IHM PT - 3 TBHM PT K7/A-503 F7/A503 B7/A-503 4.0 2'-8"/3'-0" LEAFS
112-1 3' - 0" 7' - 0" B WD ST S-2 7 HM PT M16/A-602 J16/A-602 F16/A-602 11.0
113-1 3' - 0" 7' - 0" D WD ST S-3 1 HM PT M16/A-602 J16/A-602 F16/A-602 7.0 45MIN. REMOVE PAINT FROM DOOR AND JAMB AT CENTER HINGE FOR DIRECT
CONTACT FOR GROUNDING HARDWARE. COORDINATE WITH
ELECTRICAL DRAWINGS.
114-1 3' - 0" 7' - 0" F IHM PT I-1 4 TBHM PT K7/A-503 F7/A503 B7/A-503 2.0 REMOVE PAINT FROM DOOR AND JAMB AT CENTER HINGE FOR DIRECT
CONTACT FOR GROUNDING HARDWARE. COORDINATE WITH
ELECTRICAL DRAWINGS.
114-2 3' - 0" 7' - 0" F WD ST S-2 4 HM PT K1/A-503 F1/A503 F16/A-602 8.0 REMOVE PAINT FROM DOOR AND JAMB AT CENTER HINGE FOR DIRECT
CONTACT FOR GROUNDING HARDWARE. COORDINATE WITH
ELECTRICAL DRAWINGS.
116-1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .