Final Bidder Inquiries.pdf
PDF 394 KB Posted
- Solicitation number
- W911KB21B0006
About this file
This document summarizes bidder inquiries for a federal contract solicitation to repair a groin structure. The solicitation seeks a contractor to transport and place up to 100,000 tons of Class IV riprap on the toe and slope of the Tanana Sill groin near North Pole, Alaska by October 31st, 2022. The contractor must provide all labor, equipment, materials and supervision for the project. The document addresses 32 inquiries from potential bidders relating to rock source testing, specifications, safety requirements, and logistics. The responses clarify requirements for rock gradation and quality, debris removal, schedule, and coordination with the U.S. Army Corps of Engineers Alaska District office.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| W911KB21B0006 Amendment 2.pdf | ||
| W911KB21B0006 Amendment 1.pdf | ||
| W911KB21B0006- CHL026-PLANS.pdf | ||
| W911KB21B0006.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled Unclassified Information (CUI) Only
Bid Inquiry Contractor Report All Inquiries
Project: Repair Tanana Sill Groin Review: CHL026 Bidder Inquiry (00001) (sorted by CommentID ) Displaying 32 inquiries.
Id Discipline Sheet Detail Spec
9329212 Civil 015000-3.3.2
Comment Classification: Controlled Unclassified Information (CUI) the referenced specification any haul roads constructed other than at the stockpile location must be removed. If the contractor needs to spread gravel on the surface of the existing groin rip-rap to facilitate access, will that gravel require removal?
On: Jul 15 2021.
Government Response. . The placement of gravel on the existing groin riprap will be permitted and the gravel may remain upon completion of the project. See Amendment #1. On: Jul 22 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9329214 Civil Safety
Comment Classification: Controlled Unclassified Information (CUI)
Will existing haul roads require construction of safety berms equal to 1/2 of the wheel height?
On: Jul 15 2021.
Government Response. . Haul roads must comply with the requirements the USACE Safety and Health Manual EM385-1-1. Please review to determine what conditions apply to this project. On: Jul 22 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9329218 Civil Payment
Comment Classification: Controlled Unclassified Information (CUI)
What are the tolerances for construction, and are there any penalties for out of tolerance work?
On: Jul 15 2021.
Government Response. . The groin crest must be widened by a minimum of 17 feet, ripap must be placed to the existing river ground level and the groin slope must be no steeper than 1.5H:1V. Construction that exceeds the minimum requirements as a result of placing the quantity of riprap in the bid schedule will be acceptable with no payment penalty. Note that excavation around the groin nose is not required. On: Jul 22 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9332898 Civil 353119-2.4.1
Comment Classification: Controlled Unclassified Information (CUI)
Assuming my riprap test results meet the specifications for this project, will the following gradation be acceptable?
50% weighing 2000 pounds or more 15% weighing up to 400 pounds 35% weighing 400 up to 2000 pounds
All angular well-graded stone
On: Jul 19 2021.
Government Response. . The provided riprap gradation is ambiguous and not considered acceptable as it is currently written. It is not clear from the gradation information provided how much material actually weights 400 pounds or less with the statement of 35% weighing 400 up to 2000 pounds. That statement
Page 1 of 8ProjNet: Logged In User
7/30/2021https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl...
implies 35% could be 400 pounds and that does not meet the Class IV riprap gradation requirement for the project. On: Jul 22 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9334329 Civil C-301
Comment Classification: Controlled Unclassified Information (CUI)
During the site visit it was mentioned that woody and silt debris would require removal from the existing rock slope prior to placement of rip rap. This requirement is not mentioned in the plans or specifications. The downstream end, particularly around the bull nose, has filled in with silt to approximate elevation 508. Please clarify whether this will be required, the extents, and how this work will be measured and paid as much is below the water surface and not visible.
On: Jul 20 2021.
Government Response. . Debris removal is addressed in Section 35 31 19 however removal of debris below the water surface will not be required. At the nose of the groin, the toe of the revetment is the surface of the ground so the riprap will placed on the silt. On: Jul 22 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9335723 Civil 35 31 19-3.1
Comment Classification: Controlled Unclassified Information (CUI)
The referenced specification indicates each sample of class IV riprap must be approximately 54 tons. Please clarify whether this minimum sample size applies only to gradation testing and not quality.
On: Jul 21 2021.
Government Response. . 54 Tons is the sample size to be used for the gradation testing. Additional rock quality tests samples sizes are provided under 2.2.1.1 Rock Quality Tests and referenced in ASTM documentation. On: Jul 22 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9335727 Civil 35 31 19-2.2.1.1d
Comment Classification: Controlled Unclassified Information (CUI)
The referenced specification requires testing to be conducted on aggregate meeting Grading 1. What is Grading 1?
On: Jul 21 2021.
Government Response. . Reference ASTM C535 Table 1 Gradings of Test Samples, for Grading 1 material/sample requirements. On: Jul 22 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9336217 Civil n/a N/A Section
Comment Classification: Controlled Unclassified Information (CUI)
It was mentioned at the site visit the Hydrographic survey will be provided to the bidder. Will that survey in fact be released to the bidders?
Can a coy of the site visit sign in sheet be released to the bidders.
On: Jul 21 2021.
Government Response. . Contact information for the hydrographic survey and a copy of the sign in sheet provided as part of Amendment 0001. On: Jul 22 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9336230 Civil n/a N/A 35 31 19 - 2.2.1.1
Comment Classification: Controlled Unclassified Information (CUI)
Page 2 of 8ProjNet: Logged In User
Given the remote location and the volume of rock required for the job as well as the specification requirements, material sources need to be tested prior to bid in order to determine if they are an acceptable source. These test take time to obtain results. Additionally, there are several questions that have not been answered.
Please extend the bid date to allow for evaluation of answers when they are released as well as time to obtain test results on available sources.
On: Jul 21 2021.
Government Response. . There are no plans to extend the bid date at this time. On: Jul 26 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9337177 Survey Section 31 09 13.00 29 Item 1.6
Comment Classification: Controlled Unclassified Information (CUI)
Item 1.6 states that at least one member of the field survey crew conducting the control survey and subsequent hydrographic and topographic field work must document at least three years of experience in surveying civil works projects (e.g. dams, levees, embankments, erosion control features, etc.) similar to this contract.
Is the three year requirement an absolute? Given the lack of long term projects of this type in Alaska, it may be diffcult to find anyone with those specific qualifications.
And secondly, are ther other types of experience that could be substituted (ie Construction, Control network surveys, Quantity Surveys, et cetera)?
Thanks.
(Attachment: Tanana_Sill_Groin_Repair_IFB-p176.pdf) On: Jul 22 2021.
Government Response. . Three years of survey experience on civil works projects is required however the qualifications can be met by other types of surveys such as construction surveys and quantity surveys.
On: Jul 22 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9338802 Civil 353119-2.4
Comment Classification: Controlled Unclassified Information (CUI)
I own a very large rock formation consisting entirely of quartzite, 69 miles from this project site. Recent test results consistently show an LA abrasion of 19 and a Specific gravity of 2.63. All the stone is block shaped, with flat sides.
Bidders on this project are telling me that the COR will reject my rock based on the 2.63 specific gravity. Is this true?
On: Jul 23 2021.
Government Response. . The rock provided for this project must meet the requirements of Section 35 31
19. On: Jul 29 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9338861 General Section 00 72 00 - CONTRACT CLAUSES; Clause 52.217-7 OPTION
FOR INCREASED QUANTITY
Comment Classification: Controlled Unclassified Information (CUI)
If base bid and all options are not awarded at the same time. Please indicate how soon after award of the base bid, the options will be awarded and still be expected to be completed by the Oct 31, 2022 deadline?
On: Jul 23 2021.
Government Response. . Options that can be funded will be awarded with the base items however per FAR 52.217-7, options may be exercised until 30 April 2022. On: Jul 26 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9338863 General Section 00 72 00 - CONTRACT CLAUSES; Clause 52.217-7 OPTION
FOR INCREASED QUANTITY
Comment Classification: Controlled Unclassified Information (CUI)
Page 3 of 8ProjNet: Logged In User
If base bid and all options are not awarded at the same time. Please clarify in what order the options are to be awarded, and what the added duration to the period of performance will be for each.
On: Jul 23 2021.
Government Response. . The order of the options exercised, if any, will be determined based on the available funding. Per FAR 52.217-7, options may be exercised no later than 30 April 2022 and with no extension to the period of performance unless agreed to otherwise. On: Jul 26 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9341318 Contracting Amendment 1
Comment Classification: Controlled Unclassified Information (CUI)
Is there a second page for the site visit sign in? I know that Vince Abbas with Qayaq was there but he does not show on the sheet provided.
On: Jul 26 2021.
Government Response. . There was only one site visit sign-in sheet. On: Jul 27 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9341490 Civil 35 31 19-2.2.1-a
Comment Classification: Controlled Unclassified Information (CUI)
The question asked #9338802 noted the specific gravity of 2.63. That is the apparent specific gravity, the SSD specific gravity is 2.61. Will this be acceptable?
On: Jul 26 2021.
Government Response. . The rock provided for this project must meet the requirements of Section 35 31
19. On: Jul 29 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9341572 Civil 35 31 19-2.2.1.1
Comment Classification: Controlled Unclassified Information (CUI) we are having difficulty finding rock within a reasonable distance to the project. Either the SSD specific gravity is too low (2.61), or the abrasion is too high (26). the only requirement for Alaska DOT Class IV rip rap is the abrasion shall be less than 50. Can the specifications for this project be modified accordingly to accommodate local materials?
On: Jul 26 2021.
Government Response. . The rock provided for this project must meet the requirements of Section 35 31
19. The specification will not be modified. On: Jul 29 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9341840 Civil 353119-2.4.1
Comment Classification: Controlled Unclassified Information (CUI)
I asked this question 7-19-21 Assuming my riprap test results meet the specifications for this project, will the following gradation be acceptable?
50% weighing 2000 pounds or more 15% weighing up to 400 pounds 35% weighing 400 up to 2000 pounds
All angular well-graded stone.
And you responded that my gradation as written was ambiguous. Well I get that, but so is your riprap gradation Section 35 31 19 Part 2, 2.4.1. Furthermore in Part 3 3.2 Placement For Groin Repairs states
"Rock will be placed to the full thickness shown on the drawings. Rocswill be placed in such a manner as to produce a well-keyed mass of rock with individual pieces tightly in contact with each surrounding stone, and with the least practicable amount of void spaces. The finished surface must be free from pockets of single size rock.
Placement of small rock to chink the spaces between large rock, or for leveling the surface, will not be permitted".
Page 4 of 8ProjNet: Logged In User
I think it would be impossible to place all 2000 lbs stone or larger into a WELL-KEYED mass of rock without using a variety of well graded stone sizes up to 400 lbs. And a variety of well grades stone sizes over 400 lbs up to 2000 lbs.
Please help us understand what you are thinking would be an acceptable gradation for riverine erosion protection?
On: Jul 26 2021.
Government Response. . The rock provided for this project must meet the gradation and quality requirements of Section 35 31 19. On: Jul 29 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9342382 General 01 57 20.01 29 Environmental Protection; Part 3 Execution; Paragraph
3.7 Biological Resources
Comment Classification: Controlled Unclassified Information (CUI)
Are there any environmental issues that can cause a work stoppage. i.e. fish run
On: Jul 26 2021.
Government Response. . There are no known environmental issues that would cause a work stoppage.
On: Jul 27 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9342395 General Section 35 31 19; Part 3 Execution; Paragraph 3.2
Comment Classification: Controlled Unclassified Information (CUI)
Can fill material be stacked on groin for placement?
On: Jul 26 2021.
Government Response. . Yes, fill material may be placed on the groin to create a work surface. On: Jul 27 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9342398 General Section 35 31 19; Part 3 Execution; Paragraph 3.2
Comment Classification: Controlled Unclassified Information (CUI)
Is benching allowed on existing slope?
On: Jul 26 2021.
Government Response. . A bench is not allowed. The design concept is to place material from the crest of the groin and have the riprap fill from the bottom of the river to the crest in one constant slope. On: Jul 27 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9342402 General Section 35 31 19; Part 3 Execution; Paragraph 3.2
Comment Classification: Controlled Unclassified Information (CUI)
Where is overburden to be placed?
On: Jul 26 2021.
Government Response. . Debris removed from the groin is to be disposed off site however interim stockpiling will be permitted near the riprap stockpile location. On: Jul 27 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9342409 General Section 35 31 19; Part 3 Execution; Paragraph 3.4
Comment Classification: Controlled Unclassified Information (CUI)
Can material start being stockpiled on site at the NPT of Oct 31, 2021 in preparation of a spring start?
Page 5 of 8ProjNet: Logged In User
On: Jul 26 2021.
Government Response. . Material may be stockpiled at any time after NTP. All stockpiling operations are to be coordinated with the Chena Project Office. On: Jul 27 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9343598 General SECTION 01 45 04.00 29; CONTRACTOR QUALITY CONTROL
Comment Classification: Controlled Unclassified Information (CUI)
It was mentioned during the site visit that the Government would have a quality control representative at the material load out site during operations. Is the General Contractor required to have a quality control representative at the material load out site at any time?
On: Jul 27 2021.
Government Response. . The contractor is responsible for quality control of all operations both onsite and offsite and should address how quality control will be implemented at the quarry and load out site in the Quality Control Plan. On: Jul 27 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9343610 General
SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS;
Paragraph 1.6.1.1 Site Safety and Health Officer
Comment Classification: Controlled Unclassified Information (CUI)
Can the Superintendent also be the SSHO?
On: Jul 27 2021.
Government Response. . Per Section 01 35 26-1.6.1.1.1, the SSHO may have no other duties. On: Jul 27 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9343664 General Section 35 31 19; Part 3 Execution; Paragraph 3.4
Comment Classification: Controlled Unclassified Information (CUI)
Due to road restrictions, material hauling and stockpiling will need to be started as soon after NTP as possible, prior to the restrictions. Please clarify that winter hauling and stockpiling will be allowed.
On: Jul 27 2021.
Government Response. . Winter hauling and stockpiling will be permitted however unpaved roads on the Chena Project are not maintained or plowed in the winter. All stockpiling operations are to be coordinated with the Chena Project Office. On: Jul 27 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9343671 General Section 35 31 19; Part 3 Execution; Paragraph 3.2
Comment Classification: Controlled Unclassified Information (CUI)
Will any compaction be required? If so please provide a spec.
On: Jul 27 2021.
Government Response. . There is no compaction required in the contract. On: Jul 27 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9345832 General
SECTION 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS; 3.4.1 Administrative Field Offices
Comment Classification: Controlled Unclassified Information (CUI)
Please indicate where the Contractors office/laydown area will be located.
On: Jul 28 2021.
Page 6 of 8ProjNet: Logged In User
Government Response. . There is no designated Contractor office/laydown area however Moose Creek Landing Road will be closed to the public during construction and an office trailer/laydown area between the first gate and the groin may be coordinated with the Chena Project Office. On: Jul 29 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9345833 General
SECTION 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS; 3.4.1 Administrative Field Offices
Comment Classification: Controlled Unclassified Information (CUI)
Is electric available at the Contractors office/laydown area?
On: Jul 28 2021.
Government Response. . There are no utilities available. On: Jul 29 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9345835 General
SECTION 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS; 3.4.1 Administrative Field Offices
Comment Classification: Controlled Unclassified Information (CUI)
Will the Contractor be charged for electric usage? If so what are the rates?
On: Jul 28 2021.
Government Response. . There are no utilities available. On: Jul 29 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9345836 General
SECTION 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS; 3.4.1 Administrative Field Offices
Comment Classification: Controlled Unclassified Information (CUI)
Is temp fencing required at the Contractor field office/laydown area? If so please provide a temp fence spec.
On: Jul 28 2021.
Government Response. . A temporary fence is not required for a field office/laydown area in the Moose Creek Landing Road area that will be closed to the public. On: Jul 29 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9346852 General Reference Question 9336230
Comment Classification: Controlled Unclassified Information (CUI)
Please reconsider extending the bid date by two weeks, to allow for further research on material sources.
On: Jul 29 2021.
Government Response. . The bid date will remain August 5, 2021. On: Jul 29 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9347411 General Ref Question 9342409
Comment Classification: Controlled Unclassified Information (CUI)
If Contractor chooses to stockpile immediately after receiving NTP, in anticipation of spring construction. What is the required on site staffing during stockpile operations? Full time Super, SSHO and QC?
On: Jul 29 2021.
Government Response. . The site staffing required by the contract applies to all contract activities. On:
Jul 29 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
Page 7 of 8ProjNet: Logged In User
Report Complete
Controlled Unclassified Information (CUI) Only Patent 11/892,984 ProjNet property of ERDC since 2004.
Page 8 of 8ProjNet: Logged In User