This document summarizes a federal contract solicitation for sustainment, restoration, and modernization services. The U.S. Army Corps of Engineers, Alaska District is seeking proposals for an Indefinite Delivery Indefinite Quantity Multiple Award Task Order Contract to provide design-build and design-bid-build construction services, including facility repairs, renovations, infrastructure improvements, environmental work, and maintenance services at various locations in Alaska and Wake Island. The solicitation will be issued on February 7, 2019. The government intends to award at least four small business contracts under NAICS code 236220 with a $36.5 million size standard and an $98 million total shared ceiling value. The base ordering period is five years with firm fixed price task orders having a minimum $5,000 guarantee. Proposals are due on March 8, 2019 with work including construction, repair, maintenance and environmental services at military and other federal facilities.

AMENDMDENT #2

View the file

Other files for this federal contract opportunity

Other files attached to SRM MATOC IDIQ, newest first.
File Type Posted
B.03.08_19R0005_SRM_MATOC_AMEND__1.pdf PDF
A.07.23_19R0005-SRM_2.0_RFP-DIV_00.pdf PDF
A.07.23_19R0005-SRM_2.0_RFP-DIV_01.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Apr-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB19R0005

X 9B. DATED (SEE ITEM 11)

08-Feb-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PROJECT TITLE/LOCATION: SRM 2.0 IDIQ MATOC, VARIOUS LOCATIONS ALASKA AND WAKE ISLAND

a. This amendment provides changes to the solicitation as indicated on the continuation page(s) of this document.

b. PROPOSAL DUE DATE IS CHANGED TO 11 APRIL 2019 AT 1400 HOURS ALASKA TIME..RESPONSES CAN BE ELECTRONICALLY SUBMITTED EITHER TO Robert Norris at Robert.l.norris@usace.army.mil or Theresa Afrank at theresa.m.afrank@usace.army.mil.

c. YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.

POC is Robert Norris at Robert.l.norris@usace.army.mil and Theresa Afrank at Theresa.m.afrank@usace.army.mil

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Apr-2019

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

a. The following drawings are substituted for the superseded documents/sections:

NONE

b. The following drawings are added:

c. The following revised documents/sections are substituted for the superseded documents/sections:

The identifier “AM#02” appears before and after new and/or revised materials, except as noted below.

SECTION 00 22 10 PROPOSAL SUBMISSION REQUIREMENTS EVALUATION CRITERIA

-- para 7.2.2- has been revised please see page replacement

NOTE: Revisions within the following documents do not contain the above referenced identifiers:

d. The following sections are deleted:

e. The following documents are added:

f. The following revisions are incorporated:

g. Other:

(End of Summary of Changes)

SECTION 00 22 10 W911KB19R0005

SRM MATOC

job location of key personnel, and lines of communication. Identify the design firm(s) and the disciplines applicable as chosen for the project, if not to be self-performed. Describe the proposed management structure for the team, describing how the design and construction process will be managed and the authorities and the delegations of authority in single task order award. Also describe the proposed management structure for the team, describing how the design and construction process will be managed and the authorities and the delegations of authority within the team assuming two different geographic locations in Alaska, in the event a

Contractor is awarded two simultaneous Task Orders.

7.1.3 Key Personnel Capabilities and Experience:

Provide resumes using the Key Personnel Resume form (Attachment 6) at the end of this section for key personnel to include; Project Manager, Superintendent, and Quality Control System Manager. Provide resumes for two (2) personnel for each key position.

7.1.4 Self-Performed Work: Generally describe the items the offeror will self- perform to comply with the requirements in Section 00 72 00 for self-performed work (Reference clause 52.219-14, Limitations on

Subcontracting).

7.2 EVALUATION CRITERIA:

7.2.1 Government will evaluate the proposed management structure for the team, the responsibilities, lines of communication, authority between the construction firm and design firm(s), and any teaming arrangement proposed. The Government will evaluate how the design and construction process will be managed and the delegations of authority within the team. The Offeror is required to select and commit to design firms to achieve an “acceptable” rating. Joint venture participant’s contribution to the organization should be commensurate with their skills and background.

7.2.2 Key Personnel Experience: The Government will evaluate the Contractor’s resumes of key personnel to determine how well the offeror identifies and demonstrates that its key personnel meet or exceed minimum qualifications. This includes previous satisfactory experience on similar types of projects as described in this solicitation. Government will evaluate how well the Offeror demonstrates it has the experienced, qualified personnel within its organization to effectively execute the construction operations, manage the quality control, and manage the subcontracts. The minimum experience requirements for the project manager(s) is 5 years construction management experience on similar projects as described in this solicitation. The minimum experience requirement for the superintendent(s) is 5 years’ experience as superintendent, managing multiple trades and subcontractors for similar types of projects as described in this solicitation. AM#02 The minimum experience requirements for the Quality Control System Manager(s) is 10 five (5) years’ experience as Quality

Control System Manager construction experience on construction similar to this contract and shall comply with

Division 01 Specification 45 04.00 29 and have experience on similar projects as described in this solicitation.

AM#02

7.2.3 Self-Performed Work: The Government will evaluate the Contractor’s resources to determine if it has the capability to self-perform the required amount of the project, in accordance with public policy to assure adequate interest in and supervision of all work.

8.0 PHASE 1 EVALUATION PROCEDURES