SOLICITATION EIE423 NOSE DOCK 1 RENOVATION, EIELSON AFB, AK

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RTA

REQUEST FOR PROPOSAL

US Army Corps of Engineers Alaska District

EIE423

(FTQW171009)

SPECIFICATIONS

RENOVATE NOSE DOCK 1

BLDG 1120

EIELSON AFB, ALASKA

W911KB18R0025

JUNE 2018

(INTENTIONALLY LEFT BLANK)

SPECIFICATIONS

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SF 1442

PROPOSAL SCHEDULE

00 21 00 INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

00 22 11 PROPOSAL SUBMISSION REQUIREMENTS EVALUATION CRITERIA

AND BASIS OF AWARD, ONE STEP, BEST VALUE

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 72 00 TABLE OF CONTENTS FOR CONTRACT CLAUSES

00 73 00.00 29 SPECIAL CONTRACT REQUIREMENTS

00 73 46 WAGE DETERMINATIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 01 00 DESCRIPTION OF WORK AND COORDINATION

01 04 50 CUTTING AND PATCHING

01 07 30 EXPLANATION OF DRAWINGS AND SPECS

01 08 00 EXISTING UTILITIES

01 12 00 ALTERATION PROJECT PROCEDURES

01 19 30.02 29 SPECIAL ITEMS FOR EIESON AFB PROJECTS

01 22 00.00 10 PRICE AND PAYMENT PROCEDURES

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 36 00.00.29 RADIOACTIVE MATERIALS PROCEDURES

01 42 00 SOURCFES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMSCM)

01 45 04.00 29 CONTRACTOR QUALITY CONTROL

01 50 00 CONSTRUCTION FACILITIES AND CONTROLS

01 50 00.04 29 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS FOR

EIELSON AFB PROJECTS

01 57 20.01 29 ENVIRONMENTAL PROTECTION

01 58 00 PROJECT IDENTIFICATION

01 60 00 PRODUCTS AND SUBSTITUTIONS

RTA RENOVATE NOSE DOCK 1

EIELSON AFB, ALASKA

EIE423

01 70 00 RECORD DOCS, INSPECTIONS AND CLOSEOUT

01 74 19.01 29 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

02 82 14.00 10 HAZARDOUS MATERIALS ABATEMENT

02 83 13.00 20 LEAD IN CONSTRUCTION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING

PCBS AND MERCURY

02 85 00.00 20 MOLD REMEDIATION

DIVISION 03 – CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 05 – METALS

05 12 00 STRUCTURAL STEEL FRAMING

05 12 00A STRUCTURAL STEEL APPENDIX A

05 31 00 STEEL DECKING

05 40 00 COLD-FORMED METAL FRAMING

05 50 00 METAL FABRICATIONS

05 51 00 METAL STAIRS

05 52 13 PIPE AND TUBE RAILINGS

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 00 ARCHITECTURAL WOOD CASEWORK

06 61 00 SOLID SURFACE FABRICATIONS

RTA RENOVATE NOSE DOCK 1

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 20 10 BUILDING INSULATION

07 41 00 INTERIOR METAL WALL PANELS

07 41 13 METAL ROOF PANELS

07 41 30 INSULATED-CORE METAL WALL PANELS

07 42 13 METAL WALL PANELS

07 62 00 SHEET METAL FLASHING AND TRIM

07 72 00 ROOF ACCESSORIES

07 81 20 INTUMESCENT FIRE RESISTIVE MATERIALS

07 84 13 PENETRATION FIRESTOPPING

07 90 00 JOINT SEALANTS

DIVISION 08 – OPENINGS

08 11 13 HOLLOW METAL DOORS AND FRAMES

08 31 00 ACCESS DOORS AND PANELS

08 36 00 SECTIONAL OVERHEAD DOORS

08 37 50 REFURBISHMENT OF HANGAR DOORS

08 45 23 INSULATED TRANSLUCENT FIBERGLASS PANELS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 80 00 GLAZING

08 91 00 LOUVERS

DIVISION 09 – FINISHES

09 21 16 GYPSUM BOARD ASSEMBLIES

09 51 00 SUSPENDED ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 00 FLOORING OVERLAY RESURFACER

09 68 13 TILE CARPETING

09 91 13 EXTERIOR PAINTING

09 91 23 INTERIOR PAINTING

RTA RENOVATE NOSE DOCK 1

DIVISION 10 – SPECIALTIES

10 11 00 VISUAL DISPLAY UNITS

10 44 00 FIRE PROTECTION SPECALTIES

DIVISION 20 – RESERVED

20 55 00 SELECTIVE DEMOLITION HAZMAT

DIVISION 21 – FIRE SUPPRESSION

21 13 13 WET-PIPE SPRINKLER SYSTEMS

DIVISION 22 – PLUMBING

22 00 00 GENERAL REQUIREMENTS FOR PLUMBING

22 05 13 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

22 05 17 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

22 05 23 GENERAL DUTY VALVES FOR PLUMBING

22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND

EQUIPMENT

22 05 33 HEAT TRACING FOR PLUMBING PIPING

22 05 48 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND

EQUIPMENT

22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

22 07 19 PLUMBING PIPING INSULATION

22 11 16 DOMESTIC WATER PIPING

22 11 19 DOMESTIC WATER PIPING SPECIALTIES

22 11 23 DOMESTIC WATER PUMPS

22 13 16 SANITARY WASTE AND VENT PIPING

22 13 19 SANITARY WASTE PIPING SPECIALTIES

22 33 00 ELECTRIC, DOMESTIC-WATER HEATERS

22 42 16 COMMERCIAL SINKS

22 45 00 EMERGENCY PLUMBING FIXTURES

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 GENRAL REQUIREMENTS FOR HVAC

RTA RENOVATE NOSE DOCK 1

23 05 13 MOTOR REQUIREMENTS FOR HVAC

23 05 17 SLEEVES AND SLEEVE SEALS FOR HVAC

23 05 23 GENERAL DUTY VALVES FOR HVAC

23 05 29 HANGERS AND SUPPORTS FOR HVAC

23 05 48 VIBRATION CONTROLS FOR HVAC

23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 19 HVAC INSULATION

23 09 23 BUILDING AUTOMATION SYSTEM

23 09 93 SEQUENCE OF OPERATION FOR HVAC

23 21 13 HYDRONIC PIPING

23 21 16 HYDRONIC PIPING SPECIALTIES

23 21 23 HYDRONIC PUMPS

23 22 13 STEAM AND CONDENSATE HEATING PIPING

23 22 16 STEAM AND CONDENSATE PIPING SPECIALTIES

23 22 23 STEAM CONDENSATE PUMPS

23 31 13 METAL DUCTS

23 33 00 AIR DUCT ACCESSORIES

23 34 23 HVAC POWER VENTILATORS

23 36 00 AIR TERMINAL UNITS

23 37 13 DIFFUSERS, REGISTERS, AND GRILLES

23 38 13 KITCHEN HOODS

23 41 00 PARTICULATE AIR FILTRATION

23 73 13 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS

23 82 36 FINNED-TUBE RADIATION HEATERS

23 82 39 UNIT HEATERS

DIVISION 26 – ELECTRICAL

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 05 48.16 SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 05 72 OVERCURRENT PROTECTIVE DEVICE SHORT-CIRCUIT STUDY

26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

RTA RENOVATE NOSE DOCK 1

26 05 74 OVERCURRENT PROTECTIVE DEVICE ARC-FLASH STUDY

26 09 23 LIGHTING CONTROL DEVICES

26 09 43 DIGITAL LIGHTING CONTROL

26 24 16 PANELBOARDS

26 27 13 ELECTRICAL METERING

26 27 26 WIRING DEVICES

26 28 13 FUSES

26 28 14 CIRCUIT BREAKERS

26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

26 29 13 ENCLOSED CONTROLLERS

26 51 19 LED LIGHTING

26 52 19 EMERGENCY AND EXIT LIGHTING

DIVISION 27 – COMMUNICATIONS

27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS

27 05 28 PATHWAYS FOR COMMUNICATIONS SYSTEMS

27 05 29 HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS

27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 05 44 SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS

PATHWAYS AND CABLING

27 05 53 IDENTIFICATION FOR COMMUNICATIONS SYSTEMS

27 11 00 COMMUNICATIONS EQUIPMENT ROOM FITTINGS

27 13 13 COMMUNICATIONS COPPER BACKBONE CABLING

27 13 23 COMMUNICATIONS OPTICAL FIBER BACKBONE CABLING

27 13 33 COMMUNICATIONS COAXIAL BACKBONE CABLING

27 15 13 COMMUNICATIONS COPPER HORIZONTAL CABLING

27 15 23 COMMUNICATIONS OPTICAL FIBER HORIZONTAL CABLING

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 31 11 DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

DIVISION 31 – EARTHWORK

31 09 20.00 29 FIELD SCREEN TESTING OF SOILS FOR CHEMICAL

CONTAMINATION

31 10 00 SITE CLEARING

RTA RENOVATE NOSE DOCK 1

31 20 00 EARTH MOVING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 12 16 ASPHALT PAVING

32 13 13 CONCRETE PAVING

32 31 13 CHAIN LINK FENCE

32 92 00 TURF AND GRASSES

RTA RENOVATE NOSE DOCK 1

PROJECT TITLE/LOCATION: EIE423 NOSE DOCK 1 Renovation, Eielson AFB, Alaska.

NAICS: 236220 SIZE STANDARD: $36.5

1 STEP BEST VALUE SOURCE SELECTION

Competitive 8(a) Acquisition - SBA Requirement No: 1084/18/801270

Description of Work: Renovate Nose Dock 1 Hangar utilizing conventional design and construction methods to upgrade the facility to modern standards.

POC for this project is: Robert Norris, 907-753-5592.

AWARD WILL BE SUBJECT TO AVAILABILITY OF FUNDS

ROBERT L NORRIS (907)753-5592

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

06-Jun-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________385 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________06 Jul 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W911KB18R0025 224

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W911KB-18-R-0025

Section 00 11 01 - CLIN SCHEDULE

PROPOSAL SCHEDULE

RENOVATE NOSE DOCK 1

EIELSON AFB, ALASKA

BASE ITEMS

Item No.

Description Quantity Unit Unit Price Amount

0001 Renovate, Nose Dock 1 within the bldg. 5 foot lines , Complete 1 Job $_________ $_________

0002 Construct Site work outside the bldg. 5 foot lines complete, Complete

1 Job $_________ $_________

0003 Sample, Test and Remove Asbestos Containing Material (ACM), including packaging, storing and transporting, per spec sections 01 57 20.01 29 and 02 82 14.00 10, Estimated Quantity, Complete *

100 LF $_________ $_________

0004 Sample, Test and Remove lead base paint material, including packaging, storing and transporting, per spec section 02 83 13.00 20, Estimated Quantity, Complete *

100 SF $_________ $_________

0005 Sample, Test and Remove moldy material, including packaging, storing and transporting, per spec section 02 85 00.00 20, Estimated Quantity, Complete *

100 SF $_________ $_________

Total of Base Items 0001 thru 0005 $_________

OPTION ITEMS

Item No.

Description Quantity Unit Unit Price Amount

1 W911KB-18-R-0025

0006 Stockpile and Sample 50 Cubic Yards of Potentially Contaminated Soil, From Field Screening, Including Construction of Holding Cells, Estimated Quantity, Complete**

50 CY $_________ $_________

0007 Dispose of 50 Cubic Yards of POL Contaminated Soil, Estimated Quantity, Complete

50 CY $_________ $_________

Total of Option Items 0006 thru 0007 $_________

Total of Base and Optional Items 0001 thru 0007 $_________

Proposed Contract Duration: ____________________

* For CLINs 0003 through 0005, the Contractor shall keep a record of the amount of material being removed and disposed of.

** Work on CLIN 0006 shall be the cost for work identified in Specs 02 61 13 “Excavation and Handling of Contaminated Material” and Section 01 57 20.01 29 “Environmental Protection” that is additional to the requirements of the normal project excavation and the field screening identified in Section 31 09 20.00 29 “Field Screen Testing of Soils for POL Contamination”. For CLIN 0006, the Contractor shall keep a record of the amount of contaminated soil being excavated and disposed of. CLIN 0006 can be awarded at any time during the Construction Contract period and will not affect the duration of the contract.

*** For CLIN 0007 the Contractor shall keep a record of the amount of contaminated soil being disposed of.

This is the soil determined to be contaminated through the testing of soil required by CLIN 0006 to be stockpiled and sampled. Upon completion, if the amount of contaminated soil disposed of is less than the estimated quantities shown, the Government will receive a credit based upon the unit price noted in CLIN 0007. CLIN 0007 can be awarded at any time during the Construction Contract period and will not affect the duration of the contract.

CLINs 0003 through 0007 are estimated quantities. Equitable adjustments will be made in accordance with FAR CLAUSE 52.211-18, VARIATION IN ESTIMATED QUANTITY

EVALUATION OF OFFERS.

1. AWARD: Award will be made in accordance with Section 00 22 11 - EVALUATION FACTORS FOR

AWARD.

2. INCOMPLETE OFFERS: Failure to submit an offer on all items in the schedule constitutes an incomplete offer. Incomplete offers may be rejected. Lump sum or unit prices must be shown for each item within the schedule.

3. EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

-- END OF PROPOSAL SCHEDULE --

Section 00 21 00 Page 1

Section 00 21 00 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

SECTION 00 21 00

INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

1.0 GENERAL INFORMATION

1.1 GENERAL DESCRIPTION OF WORK

1.2 COST MAGNITUDE FOR CONSTRUCTION COSTS

1.3 BOND AMOUNT REQUIRED

1.4 PRE-AWARD SURVEYS

1.5 PERFORMANCE OF WORK BY THE CONTRACTOR

1.6 GOVERNMENT SECURITY REQUIREMENTS

1.7 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

1.8 OFFEROR'S QUESTIONS AND COMMENTS

1.9 SMALL BUSINESS SIZE STANDARD/NAICS CODE

1.10 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

1.11 SITE VISIT/PRE-PROPOSAL CONFERENCE

1.12 ACCURACY IN PROPOSALS

1.13 PROPOSAL SUBMITTALS

1.14 PROPOSAL FORMAT

1.15 JOINT VENTURE AND LLC PROPOSAL REQUIREMENTS

1.16 BUY AMERICAN ACT FOR CONSTRUCTION MATERIALS

1.17 SOLICITATION PROVISIONS

Section 00 21 00 W911KB-18-R-0025

Section 00 21 00 Page 2

1.0 GENERAL INFORMATION

It has been determined that competition is limited, or restricted geographically to the servicing area of the

SBA Alaska District Office. All 8(a) certified firms serviced by the Alaska District office and all 8(a) certified firms with a bona fide place of business located in the servicing area of the Alaska District Office are deemed eligible to submit offers. In addition, it has been determined that competition will not be restricted by stage (transitional, or developmental) of a firm’s 8(a) program participation.

1.1. GENERAL DESCRIPTION OF WORK

Remove all existing exterior bolt-on metal siding and insulation in the building envelope and replace with new energy efficient insulation and siding. Add insulation to existing hangar doors. Upgrade building structural system to include installing structural columns and trusses. Replace all old windows with newer, more energy efficient windows.

Replace all old roll-up and man-doors with newer, more energy efficient doors. Install new offices beneath one of the existing mezzanines, adding a third floor. Renovate existing office/living space and associated fixtures in existing mezzanines to bring up to a more "live-able" standard. This will include the addition of a breakroom in the mezzanine living space. Repair one corroded exterior stairwell and stairwell enclosure. Repair hangar door operating systems.

Hazardous material removal of asbestos, lead paint, and contaminated soil as needed. Replace unit heaters and install new thermal equalizers in hanger to reduce heat loss through roof. Replace electrical system components, with the exception of: panelboards, lights and outlets in the locker room and bathrooms, fire pump power system, and 400 Hz aircraft power system. Replace all old lights with newer, more energy efficient lights. Replace glycol apron heating system. Upgrade by replacement one corroded exterior stairwell and stairwell enclosure to include heating of enclosure. Install 2 14ft by 50ft concrete pads for tugs to operate on while towing in helicopters. Install 3 canopies

(10ft by 12ft) to go over tug pull-through pads to protect tugs and personnel from snow and falling ice, and one other canopy (5ft by 5ft) over door entrance. Add sidewalk (585sq ft) on North side of building. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01.

1.2. COST MAGNITUDE FOR CONSTRUCTION COSTS

The construction costs will be subject to the funds available for this project. The contract cost magnitude for contract award is approximately $5 Million to $10 Million. Offerors are notified that they are under no obligation to approach this ceiling however the Government may not be able make an award if the cost magnitude set for this project is exceeded.

1.3. BOND AMOUNT REQUIRED

Offeror Guarantee: The requirements for an Offer Guarantee as required in FAR Clause 52.228-1 Bid Guarantee

(Sep 1996) are hereby waived. However, the offeror must submit a letter from their bonding company indicating the offeror’s ability to obtain performance and payment bonds in the amount of the proposal price.

1.4. PRE-AWARD SURVEYS

The Government reserves the right to conduct a pre-award survey of any firm under consideration to confirm any part of the information furnished by the Offeror, or to require other evidence of managerial, financial, technical, and other capabilities, the positive establishment of which is determined by the Government to be necessary for the successful performance of the contract.

1.5. PERFORMANCE OF WORK BY THE CONTRACTOR

Your attention is invited to Section 00 72 00, FAR 52.219-14 entitled “Limitations on Subcontracting.” Submit with the proposal, a description of the work that the contractor intends to perform with his own organization (e.g.

earthwork, paving, brickwork, roofing, etc.), the percentage of the total work and the estimated cost thereof.

Section 00 21 00 Page 3

1.6. GOVERNMENT SECURITY REQUIREMENTS

The Offeror(s) must ensure that ALL mail sent to the Alaska District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc.

ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of

Engineers mail room facility located at PO Box 6898, Joint Base Elmendorf-Richardson (JBER), Alaska 99506-

6898 if it does not contain a return mailing address. There will be no exceptions.

1.7. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Federal Business Opportunities website at: http://www.fbo.gov/ via Quick Search

(Solicitation No. W911KB-18-R-0025).

It shall be the contractor’s responsibility to check the website for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.

A list of interested vendors (potential offerors and subcontractors) is available on the federal business opportunities web site (registration required) is available at: http://www.fbo.gov/ via Quick Search (Solicitation No. W911KB-

18-R-0025).

1.8. OFFEROR'S QUESTIONS AND COMMENTS

Questions and/or comments relative to these documents should be submitted via the Bidder Inquiry system as indicated below.

All questions and/or comments should be submitted no later than ten (10) calendar days prior to the proposal due date.

Bidder Inquiry

Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in

ProjNet at http://www.projnet.org/projnet.

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.

To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user.

Verify that information on the next screen is correct and click on continue.

From this page you may view all bidder inquiries or add inquiry. A complete listing of all inquiries and responses will be issued by amendment after the inquiry period closes.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

The Solicitation Number is: W911KB-18-R-0025

The Bidder Inquiry Key is: QIP5G6-S5TE8S

The Bidder Inquiry System will be unavailable for new inquires 10 calendar days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

http://www.fbo.gov/ http://www.fbo.gov/ http://www.projnet.org/projnet

Section 00 21 00 Page 4

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

1.9. SMALL BUSINESS SIZE STANDARD/NAICS CODE

See Standard Form 1442, block 10 for the small business size standard/NAICS code.

1.10. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

1.11. SITE VISIT/PRE-PROPOSAL CONFERENCE

A pre-proposal conference/site visit has been determined. Offerors interested should see FAR Clause 52.236-27 ALT I in this section for all pertinent information. Only one site visit will be held. For any additional information please contact;

U.S. Army Corps of Engineers, Alaska District

ATTN: CEPOA-CT (Robert Norris)

P.O. Box 6898

Joint Base Elmendorf-Richardson, Alaska 99506-0898

Fax: 907-753-5592

Email: robert.l.norris@usace.army.mil

1.12. ACCURACY IN PROPOSALS

Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments).

The penalty for making false statements is prescribed in 18 U.S.C. 1001.

1.13. PROPOSAL SUBMITTALS

Offerors must mail or deliver proposals to be received no later than the date and time stated on the standard form

(SF) 1442 or subsequent solicitation amendment. Questions concerning proposal receipt can be directed to the

Contract Specialist/Contracting Officer listed in the solicitation.

Offerors are advised to plan accordingly. No arrangements will be made by the government to assist in proposal delivery. Day-pass procedures will not be used for proposal delivery purposes nor are there proposal pick-up services. No escort services will be provided. It is incumbent on the offeror to plan for unanticipated delays in delivery of proposals. Due to heightened security at Government installations, visitors to Joint Base Elmendorf-

Richardson (JBER) must use the Boniface Gate or Fort Richardson Gate (Visitor Centers). All vehicle occupants are required to wear seatbelts and hand-held cell phone usage by vehicle operators while driving on base/post is prohibited. Violators will lose their Base/Post driving privileges for these offenses.

For offerors who will have their proposals hand-delivered, or use personal delivery services such as DHL, UPS or

FedEx, the delivery must be by person, courier or personal delivery service with active base access.

Proposals will be received no later than the date and time stated on the SF1442 or subsequent solicitation amendment at:

Mailing Address:

U.S. Army Corps of Engineers, Alaska District

ATTN: CEPOA-CT (Norris, Rm 30)

PO Box 6898

Joint Base Elmendorf-Richardson AFB, Alaska 99506-0898

Physical Address:

mailto:robert.l.norris@usace.army.mil

Section 00 21 00 Page 5

U.S. Army Corps of Engineers, Alaska District

ATTN: CEPOA-CT (Norris)

2204 3rd Street, Room 30

Joint Base Elmendorf-Richardson, Alaska 99506

Proposals will be accepted in Room 30 during Alaska District Corps of Engineer business hours (7:30 AM to

4:30PM) Monday through Friday excluding holidays but not later than the date and time stated on the SF1442 or subsequent solicitation amendment. Proposers are advised that the Alaska District Corps of Engineers building has limited access. Only the main door (in front under the Corps of Engineers red flag facing Talley Ave) and the atrium doors (the tan addition to the main building located on Third Street) are open to individuals without a building pass. Room 30 is located in the basement (turn right if using the main stairs or elevator). There is a date/time stamp located at the front desk in Room 30 and is the official clock used for proposal receipt.

The Packaging that contains the Proposals shall be marked:

”Proposals for Solicitation Number: W911KB-18-R-0025, DO NOT OPEN”

1.14. PROPOSAL FORMAT

(a) Written materials: 8 ½” x 11” format, using 10 point or larger font size, in bound volumes, using 3-ring binders. Each bound volume will contain a Title Sheet on the cover for ready identification of the proposal and a full table of contents, separated by Tabs, as prescribed herein. Within each Tab, it is recommended that the proposal information be presented in the same relative format as the submission requirements are listed. Per FAR 52.204-4

Printed or Copied Double-sided on Postconsumer Fiber Content Paper – Offerors must submit proposals in double-sided format.

(i) The prime, consortium, or joint venture’s name, address, a signature of the official that can bind the firm and a telephone number and email address shall appear in the lower left corner of the title page of any document/volume to be evaluated. One (1) page is defined as the front of one (1) sheet; the front and back of one (1) sheet will be counted as two (2) pages. The Government will not evaluate any material exceeding the page limitations stated in the RFP.

(ii) Volume number, section, page number and date submitted shall appear in the bottom right corner of each page

(along with the revision number for the amended page, if necessary).

(b) Drawing sheets: Use 11” x 17” for half size drawings.

(c) Electronic Format: Provide CD in searchable, read-only format, preferably using .pdf files. All price breakdown information to aide in the price evaluation shall be submitted in Excel format.

(d) Number of copies: For Volume 1, submit one original and three (3) copies of drawings and printed matter

(Bound Volumes), as well as one (1) CD. For Price, Volume 2, submit the original and one copy and one separate

CD. Any Pro Forma information for Joint Ventures, or LLC as outlined in Section 00 21 00, paragraph 1.15 shall be included in Volume 2 along with evidence of bondability.

(e) The successful contractor shall provide one (1) searchable, read only electronic (*.pdf) copy for each of the entire Volumes 1 and 2.

1.15. JOINT VENTURE AND LLC PROPOSAL REQUIREMENTS

Joint Ventures are allowable on competitive 8(a) set-asides. SBA must receive the joint venture agreement and all supporting documentation no less than twenty (20) working days prior to the scheduled date for contract award. If you are contemplating a joint venture on this project, you must advise your assigned Business Opportunity Specialist

(BOS) in writing as soon as possible. The joint venture must be approved by SBA prior to contract award.

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration.

Section 00 21 00 Page 6

If this is an 8(a) or HUBZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.

When proposing as a Limited Liability Company (LLC), a member authorized to bind the LLC shall sign the SF

1442. A copy of the LLC Certificate of Organization, Articles of Organization and the Operating Agreement shall be submitted with the proposal.

1.16. BUY AMERICAN ACT FOR CONSTRUCTION MATERIALS

Your attention is invited to Clause 52.225-12, Notice of Buy American Act Requirement-Construction Materials under Trade Agreements. You are advised to inform your potential subcontractors and suppliers of the Buy

American Act requirements contained in this solicitation. Subparagraph (b) of the clause provides instructions for pre-award determinations as follows: “Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting

Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.” In accordance with FAR Part 25 Foreign Acquisition, subpart 25.205, entitled Post

Award determinations, subparagraph (a), if a contractor requests a determination regarding the inapplicability of the

Buy American Act after contract award, the contractor must explain why it could not request the determination before contract award or why the need for such determination otherwise was not reasonably foreseeable.

1.17. SOLICITIATION PROVISIONS

52.204-7

52.204-16

52.211-14

System for Award Management

Commercial and Government Entity CAGE Reporting

Notice Of Priority Rating For National Defense, Emergency Preparedness, and Energy Program

Use

52.215-1 Instructions to Offerors--Competitive Acquisition

52.216-1 Type Of Contract

52.217-5 Evaluation Of Options

52.222-5 Davis-Bacon Act--Secondary Site of the Work

52.222-23

52.223-1

Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for

Construction

Biobased Product Certification

52.225-12 Notice of Buy American Act – Construction Materials under Trade Agreements

52.233-2 Service Of Protest

52.236-27 Alt I Site Visit (Construction) (Feb 1995) - Alternate I

52.236-28

252.204-7004

252.225-7031

Preparation of Proposals – Construction

System for Award Management – Alt A

Secondary Boycott of Israel

252.236-7008 Contract Prices-Bidding Schedules

Section 00 21 00 Page 7

Section 00 21 00 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)

(a) Definitions. As used in this provision--

Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.

Registered in the System for Award Management (SAM) database means that--

(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into the SAM database;

(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record ``Active''.

Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

(b)(1) By submission of an offer, the Offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in the SAM database.

(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:

(1) Company legal business name.

(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(3) Company physical street address, city, state, and Zip Code.

(4) Company mailing address, city, state and Zip Code (if separate from physical).

(5) Company telephone number.

(6) Date the company was started.

http://www.sam.gov/ http://www.sam.gov/

Section 00 21 00 Page 8

(7) Number of employees at your location.

(8) Chief executive officer/key manager.

(9) Line of business (industry).

(10) Company headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) Offerors may obtain information on registration at https://www.acquisition.gov.

(End of clause)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)

(a) Definitions. As used in this clause--

Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management (SAM) records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.

Registered in the System for Award Management (SAM) database means that--

(1) The Contractor has entered all mandatory information, including the unique entity identifier and the EFT indicator (if applicable), the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14), into the SAM database;

(2) The Contractor has completed the Core, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record ``Active''.

System for Award Management (SAM) means the primary Government repository for prospective Federal awardee and Federal awardee information and the centralized Government system for certain contracting, grants, and other assistance-related processes. It includes—

(1) Data collected from prospective Federal awardees required for the conduct of business with the Government;

(2) Prospective contractor-submitted annual representations and certifications in accordance with FAR subpart 4.12;

and

(3) Identification of those parties excluded from receiving Federal contracts, certain subcontracts, and certain types of Federal financial and non-financial assistance and benefits.

Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

https://www.acquisition.gov/ http://www.sam.gov/ https://cage.dla.mil/ https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx http://www.nato.int/structur/AC/135/main/links/contacts.htm

Section 00 21 00 Page 9

(b) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis, from the date of initial registration or subsequent updates, its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(c)(1)(i) If a Contractor has legally changed its business name, doing business as name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to—

(A) Change the name in the SAM database;

(B) Comply with the requirements of subpart 42.12 of the FAR; and

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor shall provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (c)(1)(i) of this clause, or fails to perform the agreement at paragraph (c)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the ``Suspension of Payment'' paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the ``Suspension of Payment'' paragraph of the EFT clause of this contract.

(3) The Contractor shall ensure that the unique entity identifier is maintained with the entity designated at www.sam.gov for establishment of the unique entity identifier throughout the life of the contract. The Contractor shall communicate any change to the unique entity identifier to the Contracting Officer within 30 days after the change, so an appropriate modification can be issued to update the data on the contract. A change in the unique entity identifier does not necessarily require a novation be accomplished.

(d) Contractors may obtain additional information on registration and annual confirmation requirements at https://www.acquisition.gov.

(End of clause)

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016)

(a) Definition. As used in this provision--

Commercial and Government Entity (CAGE) code means— https://cage.dla.mil/

Section 00 21 00 Page 10

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;

or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

(b) The Offeror shall enter its CAGE code in its offer with its name and address or otherwise include it prominently in its proposal. The CAGE code entered must be for that name and address. Enter ``CAGE'' before the number. The CAGE code is required prior to award.

(c) CAGE codes may be obtained via--

(1) Registration in the System for Award Management (SAM) at www.sam.gov. If the Offeror is located in the United States or its outlying areas and does not already have a CAGE code assigned, the DLA Commercial and Government Entity (CAGE) Branch will assign a CAGE code as a part of the SAM registration process. SAM registrants located outside the United States and its outlying areas shall obtain a NCAGE code prior to registration in SAM (see paragraph (c)(3) of this provision).

(2) The DLA Commercial and Government Entity (CAGE) Branch. If registration in SAM is not required for the subject procurement, and the offeror does not otherwise register in SAM, an offeror located in the United States or its outlying areas may request that a CAGE code be assigned by submitting a request at https://cage.dla.mil.

(3) The appropriate country codification bureau. Entities located outside the United States and its outlying areas may obtain an NCAGE code by contacting the Codification Bureau in the foreign entity's country if that country is a member of NATO or a sponsored nation. NCAGE codes may be obtained from the NSPA at https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx if the foreign entity's country is not a member of NATO or a sponsored nation. Points of contact for codification bureaus, as well as additional information on obtaining NCAGE codes, are available at http://www.nato.int/structur/AC/135/main/links/contacts.htm.

(d) Additional guidance for establishing and maintaining CAGE codes is available at https://cage.dla.mil.

(e) When a CAGE Code is required for the immediate owner and/or the highest-level owner by 52.204-17 or 52.212-3(p), the Offeror shall obtain the respective CAGE Code from that entity to supply the CAGE Code to the Government.

(f) Do not delay submission of the offer pending receipt of a CAGE code.

(End of Provision)

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be N/A DX rated order; C2 DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.

(End of provision)

52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2017)

(a) Definitions. As used in this provision--

“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting

Section 00 21 00 Page 11

Officer's discretion, result in the offeror being allowed to revise its proposal.

“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.

Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show--

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

(3) Submission, modification, or revision, of proposals.

(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the Government office designated in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.