EIE423-DWGS-RTA.pdf
PDF 26 MB Posted
- Solicitation number
- W911KB18R0025
About this file
DRAWING FOR EIE423 NOSE DOCK 1 RENOVATION
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
907.452.1414 | AECC605
1028 Aurora Drive, Fairbanks, Alaska 99709
US AIR FORCE
DESIGN COMPLETE
FOR CONSTRUCTION,
BY:
RENOVATE NOSE DOCK 1,
BUILDING. 1120
PROJECT NUMBER:FTQW 17-1009
PACIFIC AIR FORCES,
354 CIVIL ENGINEER SQUADRON,
EIELSON AFB, ALASKA
MARCH 27, 2018
PROJECT
LOCATION
R
TA
.4
.1
A
E C
C
A u ro ra D ri v e
F a ir b a n k s A la s k a
P R
O J E
C T
S
H E
E T
T
IT
L E
DESIGN
DRAWN
CHECKED
DATE
PROJECT No.
SHEET NUMBER
C O
N S
U L
T A
N T
REVISIONS
C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
E
IE
L S
O N
A F
B A
L A
S K
A
/2
/2
:1 :0
P
M
G-001
S H
E E
T I N
D E
X
FTQW 17-1009
R E
N O
V A
T E
N O
S E
D O
C K
B
U
IL
D
IN
G
BAA
MARCH 27, 2018
DESIGN COMPLETE, FOR CONSTRUCTION, MARCH 27, 2018
S-702 CANOPY ELEVATIONS AND DETAILS
S-701 CANOPY PLANS
S-510 DECK DETAILS
S-509 EXISTING BEAM UPGRADE DETAILS
S-508 STEEL TRUSS CONNECTIONS
S-507 STEEL BRACING DETAILS
S-506 STEEL BRACING DETAILS
S-505 STEEL DETAILS
S-504 STEEL DETAILS
S-503 STEEL DETAILS
S-502 FOUNDATION UPGRADES
S-501 CONCRETE DETAILS
S-403 MECHANICAL MEZZANINE PLAN AND DETAILS
S-402 LEVEL 3&4 - STAIRWAY FRAMING PLANS
S-401 LEVEL 1&2 - MEZZANINE PLANS
S-208 NEW BRACE FRAME AND TRUSS ELEVATION
S-207 NEW BRACE FRAME AND TRUSS ELEVATION
S-206 BUILDING SECTIONS
S-205 NEW BRACING ELEVATIONS
S-204 TRUSS MODIFICATION ELEVATION @ GRID 8 & 9
S-203 TRUSS MODIFICATION ELEVATION @ GRID 7 & 10
S-202 TRUSS MODIFICATION ELEVATION @ GRID 5 & 12
S-201 TRUSS MODIFICATION ELEVATION @ GRID 3 & 14
S-106 LEVEL 4 - AREA B - ROOF FRAMING
S-105 LEVEL 4 - AREA A - ROOF FRAMING
S-104 LEVEL 1 - AREA B - FOUNDATION PLAN
S-103 LEVEL 1 - AREA A - FOUNDATION PLAN
S-102 LEVEL 1 - OVERALL FOUNDATION PLAN
S-101 OVERALL DEMOLITION PLAN
S-002 GENERAL NOTES
S-001 GENERAL NOTES
STRUCTURAL
C-102 DETAILS
C-101 SITEPLAN & DETAILS
CIVIL
V-101 SURVEY CONTROL
SURVEY
G-201 LIFE SAFETY ELEVATION PLANS
G-103 OCCUPANT AND EGRESS LOADS
G-102 CLASSIFIED AREA PLAN
G-101 LIFE SAFETY PLANS
G-003 LIFE SAFETY
G-002 LIFE SAFETY
G-001 SHEET INDEX
G-000 COVER SHEET
GENERAL
T-500 COMMUNICATIONS DETAILS
T-404 ELEMENTARY COMMUNICATIONS ELEVATION
T-403 COMMUNICATIONS PLAN - LEVEL 2 & LEVEL 3
T-402 COMMUNICATIONS PLAN - LEVEL 1 - AREA B
T-401 COMMUNICATIONS PLAN - LEVEL 1 - AREA A
T-400 COMMUNICATIONS PLAN - LEVEL 1 - OVERALL
T-103 COMMUNICATIONS DEMOLITION PLAN - EAST & WEST MEZZANINE
T-102 COMMUNICATIONS DEMOLITION PLAN - LEVEL 1 - AREA B
T-101 COMMUNICATIONS DEMOLITION PLAN - LEVEL 1 - AREA A
T-100 COMMUNICATIONS DEMOLITION PLAN - LEVEL 1 - OVERALL
T-001 COMMUNICATIONS LEGEND AND NOTES
COMMUNICATIONS
E-502 ELECTRICAL PANEL SCHEDULES
E-501 ELECTRICAL PANEL SCHEDULES
E-400 ELECTRICAL ONE-LINE DIAGRAM
E-303 POWER PLAN - LEVEL 2 & LEVEL 3
E-302 POWER PLAN - LEVEL 1 - AREA B
E-301 POWER PLAN - LEVEL 1 - AREA A
E-300 POWER PLAN - LEVEL 1 - OVERALL
E-203 LIGHTING PLAN - LEVEL 2 & LEVEL 3
E-202 LIGHTING PLAN - LEVEL 1 - AREA B
E-201 LIGHTING PLAN - LEVEL 1 - AREA A
E-200 LIGHTING PLAN - LEVEL 1 - OVERALL
E-110 DEMOLITION ONE-LINE DIAGRAM
E-103 ELECTRICAL DEMOLITION PLAN - EAST & WEST MEZZANINE
E-102 ELECTRICAL DEMOLITION PLAN - LEVEL 1 - AREA B
E-101 ELECTRICAL DEMOLITION PLAN - LEVEL 1 - AREA A
E-100 ELECTRICAL DEMOLITION PLAN - LEVEL 1 - OVERALL
E-002 LUMINAIRE SCHEDULE
E-001 ELECTRICAL LEGEND AND NOTES
ELECTRICAL
M-713 MECHANICAL ROOM - ISOMETRIC VIEWS
M-712 MECHANICAL ROOM - ISOMETRIC VIEWS
M-711 PLUMBING ISOMETRICS
M-631 VENTILATION DIAGRAMS
M-622 STEAM STATION PIPING DIAGRAM
M-621 HEATING SYSTEM DIAGRAMS
M-611 PLUMBING DIAGRAMS
M-605 VENTILATION SCHEDULES
M-604 VENTILATION SCHEDULES
M-603 HYDRONIC SCHEDULES
M-602 HYDRONIC SCHEDULES
M-601 PLUMBING SCHEDULES
M-531 VENTILATION DETAILS
M-521 HEATING AND COOLING DETAILS
M-511 PLUMBING DETAILS
M-402 LARGE SCALE PLAN - MECHANICAL MEZZANINE
M-401 LEVEL 1 - LARGE SCALE PLAN - MECHANICAL ROOM
M-303 MECHANICAL ROOM SECTIONS
M-302 MECHANICAL BUILDING SECTIONS
M-301 MECHANICAL BUILDING SECTIONS
M-136 LEVEL 3 - AREA B - VENTILATION PLAN
M-135 LEVEL 3 - AREA A - VENTILATION PLAN
M-134 LEVEL 2 - AREA B - VENTILATION PLAN
M-133 LEVEL 2 - AREA A - VENTILATION PLAN
M-132 LEVEL 1 - AREA B - VENTILATION PLAN
M-131 LEVEL 1 - AREA A - VENTILATION PLAN
M-126 LEVEL 3 - AREA B - HYDRONIC PLAN
M-125 LEVEL 3 - AREA A - HYDRONIC PLAN
M-124 LEVEL 2 - AREA B - HYDRONIC PLAN
M-123 LEVEL 2 - AREA A - HYDRONIC PLAN
M-122 LEVEL 1 - AREA B - HYDRONIC PLAN
M-121 LEVEL 1 - AREA A - HYDRONIC PLAN
M-116 LEVEL 3 - AREA B - PLUMBING PLAN
M-115 LEVEL 3 - AREA A - PLUMBING PLAN
M-114 LEVEL 2 - AREA B - PLUMBING PLAN
M-113 LEVEL 2 - AREA A - PLUMBING PLAN
M-112 LEVEL 1 - AREA B - PLUMBING PLAN
M-111 LEVEL 1 - AREA A - PLUMBING PLAN
MD611 DEMOLITION MECHANICAL PIPING DIAGRAM
MD401 LEVEL 1 - LARGE SCALE DEMOLITION MECHANICAL ROOM
MD102 LEVEL 1 - AREA B - DEMOLITION MECHANICAL PLAN
MD101 LEVEL 1 - AREA A - DEMOLITION MECHANICAL PLAN
M-002 LEGENDS
M-001 MECHANICAL SYMBOL LEGEND AND ABBREVIATIONS
MECHANICAL
F-705 AS-BUILT REFERENCE DRAWING
F-704 AS-BUILT REFERENCE DRAWING
F-703 AS-BUILT REFERENCE DRAWING
F-702 AS-BUILT REFERENCE DRAWING
F-701 AS-BUILT REFERENCE DRAWING
F-501 FIRE ALARM GENERAL MATRIX
F-415 LEVEL 3 - LARGE SCALE FIRE PROTECTION PLAN
F-414 LEVEL 3 - LARGE SCALE FIRE PROTECTION PLAN
F-413 LEVEL 2 - LARGE SCALE FIRE PROTECTION PLAN
F-412 LEVEL 1 - LARGE SCALE FIRE PROTECTION PLAN
F-411 LEVEL 1 - LARGE SCALE FIRE PROTECTION PLAN
F-201 ELEVATION VIEWS
F-113 LEVEL 3 - FIRE PROTECTION PLAN
F-112 LEVEL 2 - FIRE PROTECTION PLAN
F-111 LEVEL 1 - FIRE PROTECTION PLAN
FIRE PROTECTION
No. Date Item
A-704 DETAILS
A-703 DETAILS
A-702 DETAILS
A-701 DETAILS
A-603 INTERIOR ELEVATIONS
A-602 STAIR SECTIONS
A-601 STAIR SECTIONS
A-503 WALL SECTIONS
A-502 WALL SECTIONS
A-501 WALL SECTIONS
A-402 BUILDING SECTIONS
A-401 BUILDING SECTIONS
A-301 EXTERIOR ELEVATIONS
A-207 REFLECTED CEILING PLAN
A-206 OVERALL REFLECTED CEILING PLAN
A-205 FLOOR PLANS
A-204 FLOOR PLANS
A-203 FLOOR PLANS
A-202 ROOF PLAN
A-201 OVERALL BUILDING PLAN
A-104 DEMOLITION WALL SECTIONS
A-103 DEMOLITION ELEVATIONS
A-102 DEMOLITION PLANS & RCPS
A-101 DEMOLITION PLAN
A-004 WINDOW TYPES
A-003 SCHEDULES
A-002 ASSEMBLIES
A-001 ABBREVIATIONS AND SYMBOLS
ARCHITECTURAL
1 INTRODUCTION
THE EIELSON NOSE DOCK 1 HANGAR - BUILDING 1120, WAS CONSTRUCTED IN 1954 AND IS CURRENTLY USED AS A WEATHER SHELTER, FOR SERVICING, AND FOR MAINTENANCE OF UP TO THREE HH-60G
PAVE HAWK HELICOPTERS.
FUEL SYSTEMS ARE NOT SERVICED WITHIN THIS FACILITY. AIRCRAFT PAINTING OPERATIONS ARE NOT DONE IN THIS FACILITY. NO SLEEPING ROOMS/AREAS ARE ALLOWED WITHIN THE HANGAR FACILITY.
UNDER DIRECTION OF THE AFCEC FIRE PROTECTION ENGINEER, FIRE PROTECTION SYSTEMS
UPGRADES SHALL NOT BE INCLUDED IN THE CURRENT PROJECT SCOPE “(INCLUDING CHANGING THE
PREACTION SYSTEM IN THE HANGAR TO AN AFFF SYSTEM)”.
FIRE PROTECTION SYSTEMS UPGRADES TO BE INCLUDED IN THIS PROJECT INVOLVE EXTENDING THE EXISTING SPRINKLERS INTO NEW OR REVISED SPACES AND EXTENDING THE EXISTING FIRE ALARM SYSTEM INTO NEW OR REVISED SPACES. THIS ANALYSIS IS IN SUPPORT A LIMITED FIRE AND LIFE
SAFETY SYSTEMS EXTENSION, WHERE SPACES ARE ADDED OR RECONFIGURED.
THE FACILITY LIFE SAFETY SYSTEMS ARE PLANNED TO BE BROUGHT UP TO CODE AT A FUTURE DATE.
2 CODES
THIS ANALYSIS IS BASED ON COMPLIANCE WITH EXISTING CONSTRUCTION REQUIREMENTS. CURRENT
EDITIONS OF EACH REFERENCED CODE FOR EXISTING CONSTRUCTION ARE APPLICABLE.
· EIELSON AFB FIRE SYSTEMS STANDARDS (2016), 354TH CIVIL ENGINEER SQUADRON, ALARM
MAINTENANCE SHOP (APPENDIX 9 OF THE FTQW 17-1009 STATEMENT OF WORK)
· ETL 98-8 (CHANGE 1): FIRE PROTECTION ENGINEERING CRITERIA – EXISTING AIRCRAFT FACILITIES
25 JUNE 1998
· ENGINEERING AND CONSTRUCTION BULLETIN 2015-17, (ISSUED SEPTEMBER 1, 2015, EXPIRES
SEPTEMBER 1, 2017)
· EM 385-1-1, SAFETY AND HEALTH REQUIREMENTS MANUAL (2014)
· IBC, INTERNATIONAL BUILDING CODE (2015) AS MODIFIED BY UFC 1-200-01
· NFPA 13, INSTALLATION OF AUTOMATIC SPRINKLER SYSTEMS (2016)
· NFPA 16, INSTALLATION OF FOAM-WATER SPRINKLER AND FOAM-WATER SPRAY SYSTEMS (2015)
· NFPA 20, STATIONARY FIRE PUMPS (2016)
· NFPA 70, NATIONAL ELECTRICAL CODE (2017)
· NFPA 72, FIRE ALARM AND SIGNALING CODE (2016)
· NFPA 101, LIFE SAFETY CODE (2015) AS MODIFIED BY UFC 1-200-01
· NFPA 409, AIRCRAFT HANGARS (2016) FOR GROUP I HANGARS
· UFC 1-200-01, DOD BUILDING CODE (GENERAL BUILDING REQUIREMENTS), 20 JUNE 2016
· UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES, 8 AUGUST 2016
· UFC 3-600-01 SECTION 4-3 REFERENCES UFC 4-211-01. UFC 4-211-01 HAS NOT BEEN PUBLISHED AS OF NOVEMBER, 2016 NOR PROVIDED FOR THE PROJECT IN DRAFT FORM. UFC 4-211-01N APPLIES TO NAVY
AND MARINE FACILITIES AND IS, THEREFORE, NOT APPLICABLE IN TO THIS PROJECT.
· UFC 4-010-01, DOD ANTITERRORISM STANDARDS FOR BUILDINGS (9 FEBRUARY 2012 CHANGE 1, 1 OCTOBER 2013)
· UFC 4-021-01, DESIGN AND O&M: MASS NOTIFICATION SYSTEMS (9 APRIL 2008, CHANGE 1, JANUARY 2010)
· ETL 02-15 FIRE PROTECTION ENGINEERING CRITERIA – NEW AIRCRAFT FACILITIES DECEMBER 3, 2002 DOES NOT APPLY AS ETL 02-15 SECTION 3.6 SPECIFICALLY EXCLUDES EXISTING MAINTENANCE
HANGARS WITH SUPPRESSION SYSTEMS.
3 BUILDING CODE ANALYSIS
ACTUAL HEIGHT: 49 FT.
ACTUAL AREA: 24,660 SF FIRST STORY FOOT PRINT, 20,217 SF HANGAR BAY AREA
3.1 IBC CHAPTER 5
OCCUPANCY:
S-1 MODERATE HAZARD STORAGE, AIRCRAFT HANGAR (SERVICE AND REPAIR) WITH SUPPORT AREAS (OFFICES, LOCKER ROOM, CONFERENCE ROOM, BREAK ROOM, BATHROOMS, STORAGE, MECHANICAL AND ELECTRICAL ROOMS). THERE ARE NO MEZZANINES CURRENTLY IN THE FACILITY, AS DEFINED BY IBC EVEN THOUGH THERE ARE “MEZZANINES” DESCRIBED IN THE AS-BUILT DRAWINGS. THOSE AREAS
ARE ELEVATED, ENCLOSED OFFICE, CONFERENCE, AND BREAK ROOM AREAS, SUPPORTING THE
FUNCTION OF THE HANGAR.
CONSTRUCTION TYPE:
IIB (000), CONSTRUCTED IN 1954. INTERIOR HANGAR COLUMNS ARE UNPROTECTED STEEL. THE INTERIOR SEPARATIONS BETWEEN OFFICE AREAS AND THE HANGAR ARE NON-FIRE RATED WALLS, FLOORS, AND WINDOWS.
EXTERIOR WALL OPENINGS:
LESS THAN 30 FT., UNLIMITED UNPROTECTED OPENINGS
SUPPRESSION:
THE ENTIRE FACILITY IS FULLY PROTECTED BY CLOSED HEAD, WET AND DRY PIPE PREACTION AUTOMATIC WATER SPRINKLER SYSTEM. PREACTION ZONES ARE SUPERVISED BY COMPRESSED AIR VIA ON-SITE COMPRESSOR. THE HANGAR HAS TWO OVERHEAD PREACTION ZONES, PRESSURIZED BY A FIRE PUMP ON THE MAIN HANGAR FLOOR. THE FIRE PUMP IS NECESSARY AS THE EXISTING WATER PRESSURE TO THE SITE IS INADEQUATE FOR EXISTING SPRINKLER SYSTEM DEMAND. THE OFFICE
AREAS ON EACH END OF THE HANGAR ARE IN SEPARATE SPRINKLER ZONES.
AREA:
EVEN THOUGH THE ACCESSORY OCCUPANCIES OF THE HANGAR BAY ARE NOT REQUIRED TO BE
SEPARATED FROM THE HANGAR BAY PER IBC 508.2.4, NFPA 409 REQUIRES 1-HOUR SEPARATION OF ALL SPACES WITHIN THE HANGAR BAY. ALSO, DIRECT EXTERIOR EGRESS IS REQUIRED FROM THE ELEVATED, SEPARATED SPACES DUE TO EGRESS TRAVEL DISTANCE LIMIT OF 75 FEET AND EXIT TRAVEL THROUGH
THE HANGAR AREA FROM THE OFFICE AREA IS NOT ALLOWED BY IBC AND NFPA 101.
IBC SECTION 508.4 REQUIREMENTS APPLY FOR SEPARATED OCCUPANCIES TO DETERMINE TABULAR AREA
FOR CALCULATIONS. S-1 IS MOST RESTRICTIVE PER IBC 508.4 SEPARATED OCCUPANCIES.
ALLOWABLE AREA:
(AA) = [AT + (NS X IF)]
AT = 52,500 (GROUP S-1, TYPE IIB CONSTRUCTION)
NS = 17,500 (IBC TABLE 506.2)
FRONTAGE INCREASE (IBC 506.3)
IF = [F/P-0.25]W/30
F/P = 0.75 DUE TO LIMITED ACCESS ON AIRFIELD SIDE
WIDTH LIMITS (IBC 506.3)
W = 30 (W LIMITED TO 30 FEET)
IF = [1 - 0.25] 30/30
IF = 0.5
ALLOWABLE AREA PER STORY, FULLY SPRINKLERED, WITH FRONTAGE INCREASE:
AA = [52,500 + (17,500 X 0.5)]
AA = 61,250 SF
ACTUAL AREA:
24,660 SF FIRST STORY FOOT PRINT, 20,217 GROSS SF HANGAR BAY AREA
HEIGHT:
IBC SECTION 504.1 EXCEPTION FOR UNLIMITED HEIGHT OF A ONE-STORY SPRINKLERED HANGAR DOES NOT APPLY AS THIS HANGAR IS NOT A ONE-STORY HANGAR. THE SECOND STORY OFFICE AND BREAK ROOM
AREAS MAKE THIS A TWO-STORY FACILITY.
ALLOWABLE HEIGHT (ABOVE GRADE PLANE): 75 FT., FULLY SPRINKLERED, 3 STORIES
ACTUAL HEIGHT: 49 FT. (2 CURRENT LEVELS, GRADE AND OFFICE LEVEL)
SEPARATION OF FIRE AREAS WITHIN BUILDING:
NO FIRE RESISTIVE RATED SEPARATION REQUIRED BY IBC BETWEEN S-1 MODERATE HAZARD AND
BUSINESS USE AREAS. THE SINGLE BAY HANGAR AREA IS ONE FIRE AREA.
3.2 NFPA 409 AND ETL 98-8
OCCUPANCY CLASSIFICATION:
GROUP I AIRCRAFT HANGAR, AIRCRAFT ACCESS DOOR HEIGHT IN EXCESS OF 28 FT. (NFPA 409 SECTION 4.1.1(1))
ACTUAL HANGAR BAY AREA: 20,217 SF
NFPA 409 TABLE 4.1.2: CONSTRUCTION TYPE II (000)
SUPPRESSION:
THE EXISTING PREACTION SPRINKLER SYSTEMS AND WET PIPE SYSTEM SHALL REMAIN AND BE EXTENDED INTO NEW AND RECONFIGURED SPACES. DENSITY PER SPACE IS INDICATED ON "F" SHEETS IN THIS
PACKAGE.
DOOR HEIGHT: NOT LIMITED.
ACTUAL: HANGAR BAY AIRCRAFT DOOR OPENING IS APPROXIMATELY 30 FEET IN HEIGHT.
SEPARATION OF BUILDINGS:
CLEAR SPACE BETWEEN NOSE DOCK 1 (BUILDING 1120) AND NOSE DOCK 2 (BUILDING 1121) IS OVER 50 FEET (NFPA 409 TABLE 5.3.1, 50 FT. MINIMUM FOR CONSTRUCTION TYPE II (000) SINGLE HANGAR BUILDING
CLEAR SPACE SEPARATION).
NFPA 409 REQUIRES 1-HOUR FIRE RESISTIVE RATED SEPARATION BETWEEN HANGAR BAY AREA AND OFFICE, BREAK ROOM, AND CONFERENCE ROOM AREA. NOTE THE FOLLOWING G SHEETS AND A SHEETS FOR WALL RATINGS AS PROVIDED BY THIS LIMITED SCOPE PROJECT. NEW 1-HOUR RATED HALLWAYS
HAVE BEEN ADDED TO PROVIDE PROTECTION OF EXIT PATH, TO THE EXTERIOR.
3.3 NFPA 101 SECTION 43
PER NFPA 101 SECTION 43.1.2.4, HISTORIC BUILDINGS UNDERGOING REHABILITATION SHALL COMPLY WITH THE REQUIREMENTS OF NFPA 101 SECTION 43.10. HOWEVER, THE SCOPE OF THIS PROJECT IS TO MAINTAIN THE EXTERIOR HISTORIC APPEARANCE OF THE FACILITY. THIS PROJECT IS NOT REQUIRED TO MAINTAIN THE HISTORIC NATURE OF THE INTERIOR SYSTEMS, FUNCTION OR CONFIGURATION OF THE FACILITY.
THEREFORE NFPA 101 SECTION 43.10 DOES NOT APPLY.
4 CLASSIFICATION OF OCCUPANCY (BOTH IBC AND NFPA)
4.1 IBC SECTION 311
MODERATE HAZARD STORAGE, S-1, AIRCRAFT HANGAR (STORAGE AND REPAIR) IN ACCORDANCE WITH UFC 1-200-01 SECTION 2-4, IBC CHAPTER 4 DOES NOT APPLY AND UFC 3-600-01 TAKES PRECEDENCE. (DO NOT APPLY IBC 2015 SECTION 412.4, AIRCRAFT HANGAR, TYPE IIB CONSTRUCTION (000) AND IBC TABLE 412.4.6.)
4.2 NFPA 409 SECTION 4.1.2 AND ETL 98-8
GROUP I AIRCRAFT HANGAR
NO PAINTING OR FUEL SYSTEMS SERVICE IS DONE WITHIN THE HANGAR BAY. NO SLEEPING ROOMS OR
AREAS ARE ALLOWED WITHIN THE FACILITY.
4.3 NFPA 101 SECTION 40 FOR GENERAL INDUSTRIAL AND 40.6 FOR AIRCRAFT SERVICING HANGARS
GENERAL INDUSTRIAL OCCUPANCY - AIRCRAFT SERVICING HANGARS USED FOR MAINTENANCE AND
SERVICE.
4.4 UFC 3-600-01 SECTION 4-3.1
AIRCRAFT HANGARS: FOR FIXED WING AND ROTARY WING AIRCRAFT FUEL CELL MAINTENANCE FACILITIES, ALERT, STORAGE, DEPOT-LEVEL AND GENERAL-PURPOSE MAINTENANCE HANGARS COMPLY WITH UFC 4-211-01. (UFC 4-211-01 DOES NOT EXIST AS OF 22 NOVEMBER 2016.) THEREFORE, THE REMAINING
REFERENCED CODES HEREIN APPLY.
5 COMPARTMENTATION AND SPECIAL HAZARD PROTECTION
REQUIREMENTS FOR FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE BARRIERS AND SMOKE
PARTITIONS, COMPARTMENTATION AND SPECIAL HAZARD PROTECTION (BOTH HORIZONTAL AND
VERTICAL). INCLUDE THE ASSOCIATED FIRE RESISTANCE RATING.
5.1 IBC SECTION 6
TYPE IIB CONSTRUCTION – FIRE RESISTANCE RATING OF 0,0,0 (IBC TABLE 601 & 602)
PRIMARY STRUCTURAL: 0 HOURS
EXTERIOR BEARING WALLS: 0 HOURS
NONBEARING EXTERIOR WALLS PER IBC TABLE 602
NORTH: 0 HOURS (CLEAR SEPARATION >30')
WEST: 0 HOURS (CLEAR SEPARATION >30')
SOUTH: 0 HOURS (CLEAR SEPARATION >30')
EAST: 0 HOURS (CLEAR SEPARATION >30')
NONBEARING INTERIOR WALLS: 0 HOURS
FLOOR CONSTRUCTION: 0 HOURS
ROOF CONSTRUCTION: 0 HOURS
5.2 NFPA 409 SECTION 5 (AND ETL 98-8)
INTERNAL SEPARATIONS (NFPA 409 SECTION 5.2.3 AND ETL 98-8 A1.1.2.2): 1-HOUR MINIMUM FIRE
RESISTIVE RATED SEPARATION BETWEEN HANGAR AND ALL OTHER AREAS (SHOPS, PARTS
STORAGE, OFFICE, BREAK ROOM, LOCKER ROOM, BATHROOM, CONFERENCE ROOMS, ETC.)
CURRENT CONSTRUCTION DOES NOT APPEAR TO COMPLY WITH THE 1-HOUR SEPARATION
REQUIREMENT ABOVE GRADE LEVEL. INTERIOR 1-HOUR RATED HALLWAYS ARE BEING ADDED AT
GRADE LEVEL TO PROTECT THE PATH TO EXTERIOR DOORS.
HANGAR BAY COLUMN PROTECTION (NFPA 409 SECTION 5.6): AS THE STRUCTURE IS BEING
UPGRADED, HANGAR STRUCTURAL COLUMNS SUPPORTING THE ROOF SHALL HAVE A MINIMUM 2-
HOUR FIRE RESISTIVE RATING OR THE COLUMNS SHALL HAVE AUTOMATIC FIXED WATER OR FOAM- WATER PROTECTION IN ADDITION TO THE CEILING MOUNTED SPRINKLERS. THERE IS NO APPARENT
RATING OR COLUMN PROTECTION CURRENTLY. COLUMN WRAP OR COATING IS RECOMMENDED
OVER FIXED SPRAY PROTECTION.
5.3 UFC 3-600-01 SECTION 9 AND NFPA 20 SECTION 4.13
UFC 3-600-01 SECTION 9 AND NFPA 20 SECTION 4.13 REQUIRE A 1-HOUR FIRE RESISTIVE RATED
ENCLOSURE FOR THE FIRE PUMP ROOM. THAT IS INCLUDED IN THIS PROJECT.
THE FIRE PUMP ROOM SHALL BE ACCESSIBLE BY A DOOR DIRECTLY TO THE OUTSIDE. IF NOT
WAIVED BY THE AUTHORITY HAVING JURISDICTION, AN EXTERIOR FIRE PUMP ROOM DOOR SHALL BE
INCLUDED IN THE FUTURE FIRE AND LIFE SAFETY SYSTEMS UPGRADE.
6 HORIZONTAL AND VERTICAL PENETRATIONS AND OPENINGS – FIRE RESISTANCE RATING
6.1 NFPA 409 SECTION 5.2.3
A 1-HOUR MINIMUM FIRE RESISTIVE RATED SEPARATION IS REQUIRED BETWEEN THE HANGAR BAY
AND ALL OTHER AREAS (SHOPS, PARTS STORAGE, OFFICE, BREAK ROOM, LOCKER ROOM,
BATHROOM, CONFERENCE ROOMS, ETC.) WITH OPENINGS PROTECTED BY LISTED FIRE DOORS OR SHUTTERS HAVING A MINIMUM FIRE RESISTANCE RATED OF 45 MINUTES. THE NEW GRADE LEVEL
ROOMS AND CORRIDORS SHALL PROVIDE COMPLIANCE WITH THESE REQUIREMENTS.
7 SEPARATION FROM HAZARDS
ALL ELECTRICAL EQUIPMENT IN THE AIRCRAFT HANGAR SHALL COMPLY WITH NFPA 70, NATIONAL
ELECTRICAL CODE, BASED ON THE CURRENT INSTALLATION CRITERIA.
ETL 98-8: FIRE PROTECTION ENGINEERING CRITERIA FOR EXISTING AIRCRAFT FACILITIES INDICATES
“ENSURE ALL ELECTRICAL EQUIPMENT IN THE AIRCRAFT HANGAR COMPLIES WITH NFPA 70,
NATIONAL ELECTRICAL CODE, BASED ON THE ORIGINAL INSTALLATION CRITERIA.”
THE UPGRADED SEPARATIONS AND REQUIREMENTS NOTED ON SHEET G-102 OF THIS PACKAGE
PROVIDE COMPLIANCE WITH THIS CRITERIA.
AIRCRAFT FUEL SYSTEMS ARE NOT SERVICED WITHIN THIS FACILITY. PAINTING OPERATIONS ARE
NOT PERFORMED WITHIN THIS FACILITY.
THIS FACILITY DOES NOT HAVE LANDING GEAR PITS, DUCTS, OR TUNNELS LOCATED BELOW FLOOR
LEVEL. (NFPA 409 SECTION 5.9)
8 INTERIOR FINISH RATINGS PER NFPA 101
ANY NEW INTERIOR WALL AND CEILING FINISH MATERIALS SHALL BE CLASS A, CLASS B, OR CLASS C IN OPERATING AREAS. ANY NEW INTERIOR FLOOR FINISHES IN EXIT ENCLOSURES AND IN EXIT
ACCESS CORRIDORS SHALL BE CLASS I OR CLASS II.
9 MEANS OF EGRESS PROVISIONS AND COMPONENTS
THE FACILITY WILL REMAIN IN COMPLIANCE AT THE COMPLETION OF THE UPGRADES DESCRIBED
HEREIN.
9.1 EGRESS CAPACITY:
DOORS:
0.2 INCHES/PERSON
34-INCH CLEAR WIDTH DOOR (TYPICAL FOR SITE)
170 PERSON EXIT CAPACITY PER 34-INCH CLEAR WIDTH DOOR (TYPICAL FOR SITE)
STAIRWAYS:
0.3 INCHES/PERSON
MINIMUM 36-INCH CLEAR WIDTH STAIRWAY (TYPICAL FOR SITE)
120 PERSON EXIT CAPACITY PER MINIMUM 36-INCH WIDE STAIR
ARRANGEMENT OF MEANS OF EGRESS (NFPA 101 TABLE 40.2.5.1, GENERAL INDUSTRIAL
OCCUPANCY, SPRINKLERED):
DEAD END CORRIDOR: MAXIMUM 50 FT - NOT EXCEEDED.
COMMON PATH OF TRAVEL: MAXIMUM 100 FT - NOT EXCEEDED.
.4
.1
A
E C
C
A u ro ra D ri v e
F a ir b a n k s A la s k a
P R
O J E
C T
S
H E
E T
T
IT
L E
DESIGN
DRAWN
CHECKED
DATE
PROJECT No.
SHEET NUMBER
C O
N S
U L
T A
N T
REVISIONS
C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
E
IE
L S
O N
A F
B A
L A
S K
A
/2
/2
:1 :0
P
M
G-002
L
IF
E S
A F
E T
Y
FTQW 17-1009
R E
N O
V A
T E
N O
S E
D O
C K
B
U
IL
D
IN
G
CAS
CB
MJL
MARCH 27, 2018
DESIGN COMPLETE, FOR CONSTRUCTION, MARCH 27, 2018
No. Date Item
9.2 EXISTING OCCUPANT LOAD PER NFPA 101:
(IBC CHAPTER 10 IS SUPERSEDED BY UFC 3-600-01 WHICH REFERENCES NFPA 101)
9.2.1 BUSINESS USE: OFFICES, LOCKER ROOM, BATHROOMS, BREAK ROOM AND CONFERENCE ROOM
AREAS UNDER 750 SF
OCCUPANT LOAD FACTOR: 100 GROSS SF/PERSON (NFPA 101 TABLE 7.3.1.2 OCCUPANT LOAD
FACTOR)
• PLAN NORTHEAST CORNER, 3RD FLOOR - 745 GROSS SF. OCCUPANT LOAD: 8 PERSONS. PRIMARY
EXIT WITHIN 75 FT. LIMIT FROM 2ND FLOOR DIRECT TO EXTERIOR STAIRS. EGRESS CAPACITY OF
STAIRS: 120 PERSONS / STAIR WITH 36-INCH CLEAR WIDTH. ADEQUATE CAPACITY.
• PLAN NORTHEAST CORNER, 3RD FLOOR (BREAK ROOM AREA) - 761 GROSS SF. OCCUPANT LOAD: 8 PERSONS. PRIMARY EXIT WITHIN 75 FT. LIMIT FROM 3RD FLOOR DIRECT TO EXTERIOR STAIRS.
EGRESS CAPACITY OF STAIRS: 120 PERSONS / STAIR WITH 36-INCH CLEAR WIDTH. ADEQUATE
CAPACITY.
• PLAN NORTHWEST CORNER, 2ND FLOOR (SIPR AREA) - 748 GROSS SF. OCCUPANT LOAD: 8
PERSONS. PRIMARY EXIT WITHIN 75 FT. LIMIT FROM 1ST FLOOR DIRECT TO EXTERIOR STAIRWELL AND EXTERIOR DOOR. EGRESS CAPACITY OF STAIRS: 120 PERSONS / STAIR WITH 36-INCH CLEAR WIDTH.
ADEQUATE CAPACITY.
• PLAN NORTHWEST CORNER, 1ST FLOOR - 706 GROSS SF. OCCUPANT LOAD: 7 PERSONS. PRIMARY EXIT WITHIN 75 FT. LIMIT FROM 1ST FLOOR DIRECT TO EXTERIOR STAIRWELL AND EXTERIOR DOOR.
EGRESS CAPACITY PER DOOR: 170 PERSONS / 34-INCH CLEAR WIDTH DOOR. ADEQUATE CAPACITY.
• 1ST FLOOR BATHROOMS, LOCKER ROOM, STORAGE, MECHANICAL ROOM, TWO ELECTRICAL ROOMS
- 1091 GROSS SF. OCCUPANT LOAD: 11 PERSONS. EXITS: ALL ROOMS HAVE EXTERIOR PRIMARY EXIT DOORS EXCEPT THE BATHROOM WHICH EXITS VIA HANGAR BAY PATH TO ONE OF THE 34-INCH
EXTERIOR DOORS EGRESS CAPACITY PER DOOR: 170 PERSONS / 34-INCH CLEAR WIDTH DOOR.
ADEQUATE CAPACITY.
EXITS FROM THE HANGAR SUPPORT AND BUSINESS USE AREAS MEET THE CAPACITY AND TRAVEL DISTANCE LIMITS REQUIRED. NFPA 101 SECTION 40.6 SPECIAL PROVISIONS FOR AIRCRAFT SERVICING
HANGARS HAVE BEEN MET.
9.2.2 GENERAL INDUSTRIAL USE: HANGAR BAY
OCCUPANT LOAD FACTOR: 500 GROSS SF/PERSON (UFC 3-600-01 TABLE 10-1)
HANGAR BAY - 20,217 GROSS SF (DOES NOT INCLUDE BUILT-IN STORAGE CAGE AREAS OR OFFICE
AREAS). OCCUPANT LOAD: 41 PERSONS
EXITS: FIVE EXTERIOR 34-INCH CLEAR WIDTH EXIT DOORS EVENLY SPACED AROUND THE BUILDING
PERIMETER OF THE HANGAR BAY NORTH, EAST, AND SOUTH WALLS.
EGRESS CAPACITY VIA HANGAR BAY EXTERIOR 34-INCH DOORS: 5 DOORS X 170 PERSONS PER
DOOR = 850 PERSONS. ADEQUATE CAPACITY.
THE CURRENT HANGAR BAY EXITS MEET THE CAPACITY AND TRAVEL DISTANCE LIMITS REQUIRED.
NFPA 101 SECTION 40.6 SPECIAL PROVISIONS FOR AIRCRAFT SERVICING HANGARS HAVE BEEN MET.
THE TOTAL OCCUPANT LOAD OF THE FACILITY AFTER RENOVATIONS UNDER THIS PROJECT IS (8+8+8
+7+11+41) = 83 PERSONS.
10 WATER SUPPLIES, WATER DISTRIBUTION, THE LOCATION OF FIRE HYDRANTS, FIRE FLOW
CALCULATIONS
CURRENT HYDRANT SPACING AND RELATED HOSE LAY PATHS AVAILABLE ARE IN COMPLIANCE WITH
UFC 3-600-01.
HYDRANT 222-10 IS AT NORTH CORNER OF BUILDING 1120 (2287 FLIGHTLINE DR.), BUT THE REPORT
SHOWS IT AS OUT OF SERVICE.
THE FOLLOWING FLOW DATA WAS ACQUIRED AT SITE ON 11 OCTOBER 2016 BY BASE STAFF.
• HYDRANT 222-20 IS AT EAST SIDE OF BUILDING 1120 AND 1121 (2287/2311 FLIGHTLINE DR.). FLOWED
HYDRANT 222-20, 56 PSI PITOT, 1,257 GPM. 63 PSI STATIC, 42 PSI RESIDUAL AT HYDRANT 232-10.
• HYDRANT 232-10 IS AT NORTHEAST SIDE OF BUILDING 1123 (FLIGHTLINE DR.). FLOWED HYDRANT
232-10, 52 PSI PITOT, 1,211 GPM. 63 PSI STATIC, 42 PSI RESIDUAL AT HYDRANT 222-20.
• HYDRANT 222-30 IS AT WEST SIDE BETWEEN BUILDING 1120/1121 ON RAMP (2287/2311 FLIGHTLINE
DR.). FLOWED HYDRANT 222-30, 48 PSI PITOT, 1,164 GPM. 63 PSI STATIC, 42 PSI RESIDUAL AT
HYDRANT 222-20.
11 LOCATION OF FIRE DEPARTMENT CONNECTIONS (FDC)
THE FDC IS LOCATED ON THE EAST FACE (PARKING LOT SIDE) OF THE BUILDING, NEAR THE
SOUTHEAST CORNER, NEXT TO THE FIRE PUMP TEST HEADER.
12 LOCATION OF POST INDICATOR VALVES (PIVS) AND OTHER CONTROL OR ISOLATION VALVES
THERE IS NO EXTERIOR ISOLATION VALVE FOR THE BUILDING SUCH AS A POST INDICATOR VALVE
(PIV). PIVS ARE NOT REQUIRED BY UFC 3-600-01.
A MONITORED OS&Y VALVE IN THE HEATED MECHANICAL ROOM AT THE 8-INCH MAIN WATER
SERVICE ENTRY FROM THE UTILIDOR SERVES AS THE BUILDING WATER DISCONNECT. THIS VALVE IS ACCESSIBLE ONLY BY THE EXTERIOR BOILER ROOM DOOR. THIS DISCONNECT METHOD COMPLIES
WITH UFC 3-600-01 SECTION 9-3.4.
18 SMOKE MANAGEMENT OR CONTROL METHODS
VENTILATION SHALL BE MAINTAINED AT MINIMUM AIR CHANGE LEVELS FOR HANGAR BAYS AND SPACES ADJACENT TO HANGAR BAYS IN ACCORDANCE WITH NFPA 409 FOR GROUP I HANGARS AND NFPA 101 BUSINESS OCCUPANCIES. NO ADDITIONAL SMOKE MANAGEMENT OR CONTROL METHODS ARE REQUIRED BY NFPA 101, NFPA 409, IBC, OR UFC.
THE EXISTING HVAC SYSTEM IS UNDERSTOOD TO PROVIDE REQUIRED AIR CHANGE AND AIR QUALITY MONITORING FOR THIS HANGAR, PROVIDED IT IS NOT USED FOR SERVICES FUEL SYSTEMS, REFUELING, OR PAINTING.
19 CONNECTION TO AND DESCRIPTION OF BASE FIRE ALARM REPORTING SYSTEM
THE EXISTING MONACO M-1 TRANSCEIVER CONNECTS THE BUILDING FIRE ALARM PANEL TO THE BASE REPORTING SYSTEM MONACO D-21 FIRE ALARM RECEIVING STATION. THIS IS A POINT TO POINT REPORTING SYSTEM. THE CONNECTION
APPEARED TO BE FUNCTIONING PROPERLY.
20 COORDINATION WITH SECURITY AND ANTITERRORISM REQUIREMENTS, INCLUDING CONNECTION TO INSTALLATION-WIDE
MASS NOTIFICATION SYSTEM
IN-BUILDING MASS NOTIFICATION IS NOT PART OF THIS PROJECT SCOPE, BUT IS INCLUDED IN FUTURE UPGRADE. SEE
SECTION 1 OF THIS ANALYSIS.
THE HANGAR IS WITHIN THE BASE PERIMETER AND SET BACK FROM BASE ACCESS ROADS. PARKING IS ALSO SET BACK FROM THE BUILDING PERIMETER ON THE PARKING LOT SIDE. THE AIRFIELD SIDE IS SECURED.
MASS NOTIFICATION IS SUPPORTED BY GIANT VOICE AT THIS FACILITY. OUTSIDE NOTIFICATION MORE THAN 16 FT FROM
THE BUILDING IS PROVIDED BY THE WIDE AREA MNS.
UFC 4-021-01 REQUIRES EXISTING FACILITIES TO BE UPDATED WITH IN-BUILDING MASS NOTIFICATION SYSTEMS (MNS). UFC 4-021-01 SECTION 5-3.1 “WHEN REPLACING A FACP IN A BUILDING WITHOUT AN EXISTING MNS, PROVIDE A COMBINATION MASS NOTIFICATION AND FIRE ALARM SYSTEM MEETING THE REQUIREMENTS FOR NEW CONSTRUCTION PROJECTS (SEE CHAPTER 4). WHEN INSTALLING A MNS IN A BUILDING WITH AN EXISTING SEPARATE FACP, REMOVAL OF BOTH SYSTEMS AND INSTALLATION OF A COMBINATION SYSTEM MEETING NEW CONSTRUCTION CRITERIA IS RECOMMENDED BUT NOT REQUIRED. CONSIDER THE AGE AND CONDITION OF THE FACP AND THE LIFE-CYCLE COSTS OF KEEPING THE EXISTING FACP WHEN DETERMINING WHETHER TO INSTALL A NEW COMBINED SYSTEM OR REMAIN WITH SEPARATE SYSTEMS.”
ARMY AND AIR FORCE INSTALLATIONS SHALL USE EXISTING CLEAR/WHITE STROBES FOR FIRE AND INSTALL AMBER
STROBES FOR MNS. NEW AMBER STROBES WILL BE MARKED WITH WORD “ALERT.”
UFC 4-010-01 SECTION 1-8.2.1 “IMPLEMENTATION OF THESE STANDARDS TO BRING ENTIRE INHABITED BUILDINGS INTO COMPLIANCE IS MANDATORY FOR ALL DOD BUILDING RENOVATIONS, MODIFICATIONS, REPAIRS, REVITALIZATIONS, AND RESTORATIONS WHERE PROJECT COSTS EXCEED 50% OF THE PLANT REPLACEMENT VALUE OF THE EXISTING BUILDING IN ACCORDANCE WITH UFC 3-701-01 BASED ON A BUILDING OF THE SAME SIZE EXCEPT AS OTHERWISE STATED IN THESE STANDARDS. THE 50% COST IS EXCLUSIVE OF THE COSTS IDENTIFIED TO MEET THESE STANDARDS. …”
UFC 4-010-01 EXEMPTION SECTION 1-9.1 FOR LOW OCCUPANCY BUILDINGS, DOES NOT APPLY AS THE OFFICE AND
CONFERENCE ROOM AREAS QUALIFY THE FACILITY AS AN INHABITED BUILDING.
21 FIRE DEPARTMENT ACCESS
PROVIDE ENCLOSURE / SNOW COVER TO PREVENT SNOW AND ICE ACCUMULATION AROUND FDC PER REQUEST FROM
BASE FIRE DEPARTMENT.
PROVIDE PROTECTION OF ENTRANCE PATH AND FDC ACCESS FROM ICE AND SNOW FALLING FROM ROOF EDGE ABOVE.
PROTECTION AND ENCLOSURE CAN BE PART OF THE EXTERIOR STAIR ENCLOSURE UPGRADE.
22 AHJ APPROVED EQUIVALENCIES OR EXEMPTIONS
NONE.
23 INITIAL, OR DRAFT, INTEGRATED PERFORMANCE VERIFICATION AND TESTING PLAN(S) WHERE MULTIPLE SYSTEMS ACROSS MULTIPLE TRADES RELY ON AN INTEGRATED OPERATION TO PERFORM THE DESIRED RESULT
INTEGRATE FIRE ALARM TESTING WITH SECURITY SYSTEM TESTING TO MINIMIZE OCCUPANT DISTRACTION AND HVAC
INTERRUPTION..
INTEGRATE SPRINKLER SYSTEM UPGRADES WITH DOMESTIC WATER SHUT OFF WHEN POSSIBLE.
SPRINKLER SYSTEM TESTING. THE SYSTEM, INCLUDING THE UNDERGROUND WATER MAINS, AND THE ABOVEGROUND PIPING AND SYSTEM COMPONENTS, SHALL BE TESTED IN ACCORDANCE WITH NFPA 13 AND NFPA 24 TO ASSURE THAT EQUIPMENT AND COMPONENTS FUNCTION AS INTENDED. UPON COMPLETION OF SPECIFIED TESTS, THE CONTRACTOR SHALL COMPLETE AND SUBMIT THE CONTRACTOR'S MATERIAL AND TEST CERTIFICATES. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER’S REPRESENTATIVE TO INVITE FIRE ALARM SHOP PERSONNEL AND FIRE DEPARTMENT PERSONNEL TO WITNESS FINAL TESTING. FINAL TESTING SCHEDULE SHALL BE FLEXIBLE TO ACCOMMODATE FIRE ALARM
SHOP SCHEDULE.
FIRE ALARM TESTING. THE FIRE ALARM SYSTEMS SHALL BE FULLY TESTED WITH A FUNCTIONAL AND OPERATIONAL PERFORMANCE TESTS INCLUDING EACH INSTALLED INITIATING AND NOTIFICATION DEVICE, MEGGERING OF CONDUCTORS FOR GROUNDED, SHORTED OR OPEN CIRCUITS. AN ACCEPTANCE TEST SHALL BE PERFORMED IN ACCORDANCE WITH NFPA
72. EACH DEVICE SHALL BE TESTED. AFTER TESTING IS COMPLETED, THE CONTRACTOR SHALL FURNISH TO THE CONTRACTING OFFICERS REPRESENTATIVE COMPLETED ORIGINALS OF THE NFPA 72 RECORD OF COMPLETION AND THE NFPA 72 TESTING AND INSPECTION FORM. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER’S REPRESENTATIVE TO INVITE FIRE ALARM SHOP PERSONNEL AND FIRE DEPARTMENT PERSONNEL TO WITNESS FINAL TESTING. FINAL TESTING SCHEDULE SHALL BE FLEXIBLE TO ACCOMMODATE FIRE ALARM SHOP SCHEDULE.
13 ANALYSIS OF AUTOMATIC SPRINKLER AND SUPPRESSION SYSTEMS AND OF PROTECTED AREAS
EXISTING SUPPRESSION CONSISTS OF WET PIPE SPRINKLERS WITH CLOSED PENDANTS AND UPRIGHTS IN THE HEATED OFFICE AREAS, BATHROOM, AND LOCKER ROOM. TWO DRY PIPE PREACTION ZONES PROTECT THE HANGAR BAY, ELECTRIC ROOMS, FIRE PUMP AREA, AND SPACES BELOW THE ELEVATED OFFICE AREAS.
THE SPRINKLER SYSTEM IS PRESSURIZED BY A PATTERSON CENTRIFUGAL SPLIT CASE FIRE PUMP WITH ELECTRIC DRIVER (6X5X17 SSC, SINGLE STAGE, SERIAL NO: FP-CO43843, 50 RATED BHP, 57.2 MAX BHP, MAX SUCTION 168 PSI, 1000 GPM, 1775RPM, 65 PSIG, 82 MAX PSIG, 45 PSIG 1.5 CAPACITY, 13.250 INCHES IMPELLER
DIAMETER).
ISOLATION OS&Y VALVES AROUND THE REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER SHOWED
SIGNS OF LEAKING AND CORROSION.
THE HANGAR BAY HAS AN EXPOSED STRUCTURE CEILING PEAKED AT A HEIGHT OF 47 FEET -11 INCHES ABOVE THE HANGAR FLOOR. THE MAJORITY OF THE HANGAR BAY HAS A CEILING SLOPE OF 2.75 IN 12. THE SLOPE ON THE AIRFIELD SIDE IS 12 IN 12 AND COVERS APPROXIMATELY 13 FEET OF HORIZONTAL DEPTH INTO THE BAY
ALONG THE LENGTH OF THE ENTIRE AIRFIELD WALL.
HANGAR BAY SPRINKLER SPACING SHALL NOT EXCEED 100 SF (NFPA 13 EXTRA HAZARD SPACING). THE CURRENT SPACING IS 130 SF OR LESS. BRANCH LINES SHALL NOT EXCEED 12 FT. SEPARATION.
THE EXISTING WATER SYSTEM TEST HEADER SHALL BE REMAIN.
THE EXISTING REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER SHALL REMAIN.
EXISTING SPRINKLER SYSTEM PIPING APPEARS TO COMPLY WITH ETL 98-8 AS IT ALL APPEARS TO BE
SCHEDULE 40 BLACK IRON.
14 STANDPIPE SYSTEMS
EXISTING STANDPIPES SERVE HOSE RACKS. HOSES HAVE BEEN REMOVED. EXISTING FIRE HOSE RACKS AND
MANUAL STATIONS SHALL BE REMOVED PER ETL 98-8 SECTION A3.1.2.
15 PORTABLE FIRE EXTINGUISHERS
ABC FIRE EXTINGUISHERS ARE PROVIDED THROUGHOUT AND APPEAR TO BE ADEQUATE, BUT PROPER
MOUNTING BRACKETS NEED REPLACEMENT OR CABINETS SHALL BE INSTALLED.
TWO EXISTING HALON 1211 150 LB WHEELED TANKS ARE PROVIDED IN HANGAR BAY. THESE TANKS SHALL
REMAIN, BUT ARE NOT REQUIRED.
16 FIRE DETECTION
EXISTING SPOT TYPE HEAT DETECTION IS LOCATED THROUGHOUT AND APPEARS TO BE SPACED PROPERLY.
(ETL 98-8 A3.3.2)
EXISTING SPOT TYPE SMOKE DETECTION IS LOCATED THROUGHOUT AND SPACED PROPERLY.
DUCT SMOKE DETECTORS ARE PROVIDED IN THE TWO DUCTS DOWNSTREAM OF HEAT RECOVERY VENTILATOR
TO HANGAR AND ADJACENT SPACES. SEE SHEET F-111.
DETECTION DEVICES APPEAR TO BE IN COMPLIANCE, BUT SHOULD BE CONSIDERED FOR REPLACEMENT IN
THE NEXT FIRE PROTECTION SYSTEMS UPGRADE FOR THE BUILDING.
ONE UV/IR FLAME DETECTOR IS INSTALLED IN THE HANGAR BAY. NO CHANGE IS REQUIRED UNDER THIS
PROJECT SCOPE.
17 FIRE ALARM SYSTEM
ETL 98-8 A3.7 REQUIRES REPLACEMENT OF ALL FIRE SUPPRESSION SYSTEM CONTROL PANELS OVER 20 YEARS OLD. THE EXISTING PANEL WAS INSTALLED APPROXIMATELY 16 YEARS AGO AND IS COMING UP FOR
REPLACEMENT. NO REPLACEMENT IS REQUIRED WITHIN THIS PROJECT SCOPE.
THE EXISTING FIRE ALARM CONTROL PANEL IS A SIMPLEX 4010 FIRE ALARM CONTROL PANEL WITH A MONACO ENTERPRISES M-1 TRANSCEIVER FOR REMOTE SUPERVISION. THESE PANELS ARE LOCATED IN THE BACK OF THE CENTER HANGAR AREA. TWO SEPARATE SUPPRESSION DISCONNECTS WERE MOUNTED ABOVE TO THE
SIMPLEX 4010 PANEL.
THE SIMPLEX 4010 SHOWED A TROUBLE AT THE TIME OF THE SITE OCTOBER 2016 SITE VISIT.
DOUBLE ACTION PULL STATIONS ARE LOCATED AT ALL BUILDING AND FLOOR EXITS AS REQUIRED.
HORNS AND CLEAR STROBES ARE LOCATED THROUGHOUT THE FACILITY, BUT WILL REQUIRE LOCATION
MODIFICATION AND ADDITIONAL DEVICES PER WALL ADDITIONS AND SHIFTS.
.4
.1
A
E C
C
A u ro ra D ri v e
F a ir b a n k s A la s k a
P R
O J E
C T
S
H E
E T
T
IT
L E
DESIGN
DRAWN
CHECKED
DATE
PROJECT No.
SHEET NUMBER
C O
N S
U L
T A
N T
REVISIONS
C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
E
IE
L S
O N
A F
B A
L A
S K
A
/2
/2
:1 :0
P
M
G-003
L
IF
E S
A F
E T
Y
FTQW 17-1009
R E
N O
V A
T E
N O
S E
D O
C K
B
U
IL
D
IN
G
CAS
CB
MJL
MARCH 27, 2018
UP
DN
2 3 4 5 6 7 8 9 10 11 12 13 14 15
G
F
E
D
C
B
A
G-201
G-201
G-201
G-201
TD = 35'8"
TD = 81'1" TOTAL
(25'+56'1")
TD, DE = 22'6"
TD = 33'6"
TD = 51'6"
TD = 174'4"
FEC
FEC
FEC
FEC
EXISTING MAIN
HANGAR
20217 SF
PJ GEAR
426 SF
OPEN OFFICE
602 SF
OFFICE
104 SF
NEW EXTERIOR
STAIR
292 SF
EXT. STORAGE
76 SF
EXT. ELECT
76 SF
FIRE PUMP
ROOM
215 SF
HALL
432 SF
MECH
218 SF
MENS
RESTROOM
229 SF
LOCKER ROOM
281 SF
TOOL CRIB
735 SF
WOMENS
RESTROOM
54 SFWATER HEATER
8 SF
SHOWER
32 SF
3 4 5
E
D
G-201
TD=52'10"
FEC
CONFERENCE
ROOM
546 SF
SIPR ROOM
144 SF
8 9
F
E
G-201
CP = 56'1"
(TO BOTTOM
OF STAIRS)
FEC
12 13 14
E
D
G-201
G-201
FEC
TD = 108'
3 4 5
E
D
G-201
FEC
TD = 108'
LIFE SAFETY LEGEND
DENOTES FIRE EXTINGUISHER CABINET
LOCATION
COMMON PATH OF TRAVEL
EGRESS TRAVEL DISTANCE
DEAD END
1-HOUR FIRE RESISTANCE RATED PARTITION
FEC
CP=XX FT
TD=XX FT
DE=XX FT
SCALE:
.4
.1
A
E C
C
A u ro ra D ri v e
F a ir b a n k s A la s k a
P R
O J E
C T
S
H E
E T
T
IT
L E
DESIGN
DRAWN
CHECKED
DATE
PROJECT No.
SHEET NUMBER
C O
N S
U L
T A
N T
PLAN NORTH
16' 32'
1/16" = 1' - 0"
16' 32'
A B
REVISIONS
2 3 8 9 14 15
E
C
A
G
C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
E
IE
L S
O N
A F
B A
L A
S K
A
/2
/2
:1 :0
P
M
G-101
L
IF
E S
A F
E T
Y P
L A
N S
FTQW 17-1009
R E
N O
V A
T E
N O
S E
D O
C K
B
U
IL
D
IN
G
CAS
CB
MJL
MARCH 27, 2018
DESIGN COMPLETE, FOR CONSTRUCTION, MARCH 27, 2018
1/16" = 1'-0"5
LIFE SAFETY PLAN
1/8" = 1'-0"1
LEVEL 2 - NEW
MEZZANINE CONFERENCE ROOM
1/8" = 1'-0"2
LEVEL 2 - NEW
MECHANICAL PLATFORM
1/8" = 1'-0"4
LEVEL 3 - BREAK ROOM
1/8" = 1'-0"3
LEVEL 3 - OFFICES
10' -2" TO 20'-8" FLOOR ELEVATION
10' -2" ELEVATION
20'-8" ELEVATION
20'-8" ELEVATION
LEVEL 1 0'-0" ELEVATION
SHEET NOTES
COLUMNS THAT SUPPORT HANGAR ROOF SHALL BE
CLAD WITH A TWO-HOUR FIRE RESISTIVE RATED
ASSEMBLY.
1.
2 3 4 5 6 7 8 9 10 11 12 13 14 15
G
F
E
D
C
B
A
G-201
G-201
20' - 0"
/2
75' - 4" 75' - 9 1/2"
AIRCRAFT CURRENTLY IN HANGAR:
UP TO THREE HH-60G PAVE HAWK
HELICOPTERS
CLASS 1, DIVISION 2 FROM THE FLOOR
UP TO 18 INCHES ABOVE THE FLOOR.
CLASS 1, DIVISION 2 FROM THE FLOOR
UP TO 14 FEET - 2 INCHES ABOVE THE FLOOR
(BASED ON 5 FEET PLUS THE 9 FOOT - 2 INCH
HEIGHT OF THE PAVE HAWK HELICOPTER
POWER PLANT OBSERVED IN THE HANGAR).
LEGEND
SCALE:
.4
.1
A
E C
C
A u ro ra D ri v e
F a ir b a n k s A la s k a
P R
O J E
C T
S
H E
E T
T
IT
L E
DESIGN
DRAWN
CHECKED
DATE
PROJECT No.
SHEET NUMBER
C O
N S
U L
T A
N T
PLAN NORTH
16' 32'
1/16" = 1' - 0"
16' 32'
A B
REVISIONS
2 3 8 9 14 15
E
C
A
G
C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
E
IE
L S
O N
A F
B A
L A
S K
A
/2
/2
:1 :0
P
M
G-102
C L
A S
S
IF
IE
D
A R
E A
P L
A N
FTQW 17-1009
R E
N O
V A
T E
N O
S E
D O
C K
B
U
IL
D
IN
G
CAS
CB
MJL
MARCH 27, 2018
DESIGN COMPLETE, FOR CONSTRUCTION, MARCH 27, 2018
1/16" = 1'-0"1
ELECTRICAL CLASSIFIED AREA PLAN
NOTES
CLASSIFIED AREAS BASED ON THE FOLLOWING NFPA 70 ARTICLE 513.3 REQUIREMENTS:
(B) AREAS NOT CUT OFF OR VENTILATED. THE ENTIRE AREA OF THE
HANGAR, INCLUDING ANY ADJACENT AND COMMUNICATING AREAS
NOT SUITABLY CUT OFF FROM THE HANGAR, SHALL BE CLASSIFIED
AS CLASS 1, DIVISION 2 OR ZONE 2 LOCATION UP TO A LEVEL
450MM (18 IN.) ABOVE THE FLOOR.
(C) VICINITY OF AIRCRAFT.
(1) AIRCRAFT MAINTENANCE AND STORAGE HANGARS. THE AREA
WITHIN 1.5M (5 FT.) HORIZONTALLY FROM AIRCRAFT POWER
PLANTS OR AIRCRAFT FUEL TANKS SHALL BE CLASSIFIED AS
CLASS 1, DIVISION 2 OR ZONE 2 LOCATION THAT SHALL EXTEND
UPWARD FROM THE FLOOR TO A LEVEL 1.5M (5 FT.) ABOVE
THE UPPER SURFACE OF THE WINGS AND OF ENGINE ENCLOSURES.
DN
2 3 4 5 6 7 8 9 10 11 12 13 14 15
G
F
E
D
C
B
A
EXISTING MAIN
HANGAR
20217 SF
PJ GEAR
426 SF
OPEN OFFICE
602 SF
OFFICE
104 SF
NEW EXTERIOR
STAIR
292 SF
EXT. STORAGE
76 SF
EXT. ELECT
76 SF
FIRE PUMP
ROOM
215 SFHALL
432 SF
MECH
218 SF
MENS
RESTROOM
229 SF
LOCKER ROOM
281 SF
TOOL CRIB
735 SF
WOMENS
RESTROOM
54 SF
WATER HEATER
8 SF
SHOWER
32 SF
D O
O R
D O
O R
8 3
DOOR
D O
O R
D O
O R
D O
O R
DOOR
D O
O R
8 3
AIR CREW GEAR
460 SF
HALL
237 SF
DOOR
D O
O R
4 DOOR
3 4 5
E
D
FECDOOR
8 9
G
F
E
FEC
3 4 5
E
D
FEC
DOOR
12 13 14
E
D
FEC
DOOR
DOOR
X:XXX
OCCUPANT NUMBER
REQUIRED EXIT WIDTH
PROVIDED EXIT WIDTH (CLEAR)
OCCUPANT NUMBER
OCCUPANT LOAD FACTOR
LIFE SAFETY LEGEND
XX FT (XXFT)
TRAVEL DISTANCE (COMMON PATH)
.4
.1
A
E C
C
A u ro ra D ri v e
F a ir b a n k s A la s k a
P R
O J E
C T
S
H E
E T
T
IT
L E
DESIGN
DRAWN
CHECKED
DATE
PROJECT No.
SHEET NUMBER
C O
N S
U L
T A
N T
REVISIONS
C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
E
IE
L S
O N
A F
B A
L A
S K
A
/2
/2
:1 :1
P
M
G-103
O C
C U
P A
N T
A N
D E
G R
E S
S L
O A
D S
FTQW 17-1009
R E
N O
V A
T E
N O
S E
D O
C K
B
U
IL
D
IN
G
CAS
CB
MJL
MARCH 27, 2018
DESIGN COMPLETE, FOR CONSTRUCTION, MARCH 27, 2018
1/16" = 1'-0"5
OCCUPANT AND EGRESS LOADS
1/8" = 1'-0"1
LEVEL 2 - NEW OCCUPANT AND EGRESS
LOADS - CONFERENCE ROOM
1/8" = 1'-0"2
LEVEL 2 - NEW
MECHANICAL MEZZANINE
1/8" = 1'-0"3
LEVEL 3 - OFFICES
1/8" = 1'-0"4
LEVEL 3 - BREAK ROOM
Level 1 0' - 0"
Level 3 20' - 8"
Level 2 - New Mezzanine
10' - 2"
E D
TD=77'9"
TD=51'
Level 1 0' - 0"
Level 3 20' - 8"
Level 2 - New Mezzanine
10' - 2"
G F E
TD=38'9"
Level 1 0' - 0"
Level 3 20' - 8"
E
TD=108'2"
Level 1 0' - 0"
Level 3 20' - 8"
ED
TD=108'2"
LIFE SAFETY LEGEND
DENOTES FIRE EXTINGUISHER CABINET
LOCATION
COMMON PATH OF TRAVEL
EGRESS TRAVEL DISTANCE
DEAD END
1-HOUR FIRE RESISTANCE RATED PARTITION
FEC
CP=XX FT
TD=XX FT
DE=XX FT
SCALE:
.4
.1
A
E C
C
A u ro ra D ri v e
F a ir b a n k s A la s k a
P R
O J E
C T
S
H E
E T
T
IT
L E
DESIGN
DRAWN
CHECKED
DATE
PROJECT No.
SHEET NUMBER
C O
N S
U L
T A
N T
PLAN NORTH
8' 16'
1/8" = 1' - 0"
8' 16'
A B
REVISIONS
2 3 8 9 14 15
E
C
A
G
C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
E
IE
L S
O N
A F
B A
L A
S K
A
/2
/2
:1 :1
P
M
G-201
L
IF
E S
A F
E T
Y E
L E
V A
T
IO
N P
L A
N S
FTQW 17-1009
R E
N O
V A
T E
N O
S E
D O
C K
B
U
IL
D
IN
G
CAS
CB
MJL
MARCH 27, 2018
DESIGN COMPLETE, FOR CONSTRUCTION, MARCH 27, 2018
1/8" = 1'-0"1
LIFE SAFETY PLAN - NEW MEZZANINE
CONFERENCE ROOM AND OFFICES
1/8" = 1'-0"2
LIFE SAFETY PLAN - NEW MECHANICAL
MEZZANINE
1/8" = 1'-0"3
LIFE SAFETY PLAN - PUMP ROOM AND
BREAK ROOM
1/8" = 1'-0"4
LIFE SAFETY PLAN - BREAK ROOM
NOTES:
1. THE PURPOSE OF THIS SHEET IS TO PROVIDE SITE CONTROL FOR THE NOSE DOCK 1 RENOVATION PROJECT
AT EIELSON AIR FORCE BASE.
2. THE FIELD WORK FOR THIS SURVEY WAS CONDUCTED IN JANUARY AND FEBRUARY 2017. DUE TO HEAVY
SNOW COVER, SOME FEATURES MAY HAVE BEEN OBSCURED UNDER SNOW AT THE TIME OF THE SURVEY.
3. THE BASIS OF HORIZONTAL CONTROL IS PDC CONTROL POINT 1, A 2" ALUMINUM CAP WHOSE COORDINATES
WERE DERIVED FROM A 6 HOUR STATIC GPS OBSERVATION PROCESSED THROUGH THE NGS OPUS UTILITY.
THIS SURVEY IS IN THE NAD83 UTM NORTH ZONE 6 GRID COORDINATE SYSTEM. UNITS ARE U.S SURVEY
FEET.
4. THE BASIS OF VERTICAL CONTROL IS PDC CONTROL POINT 1, A 2" ALUMINUM CAP WHOSE ELEVATION WAS
DERIVED FROM A 6 HOUR STATIC GPS OBSERVATION PROCESSED THROUGH THE NGS OPUS UTILITY
INCORPORATING GEOID 12B. THE VERTICAL DATUM IS NAVD 88 IN U.S. SURVEY FEET.
5. TEMPORARY BENCHMARK AND SURVEY CONTROL ELEVATIONS WERE ESTABLISHED BY CLOSED
DIFFERENTIAL LEVEL LOOPS RUN FROM CONTROL POINT 1. ALL ERRORS OF CLOSURE WERE LESS THAN
0.05' TIMES THE SQUARE ROOT OF THE DISTANCE, IN MILES.
SET TEMPORARY BENCHMARK
SET SPIKE
SET REBAR WITH 2" CAP
FIRE HYDRANT
VERTICAL CONTROL TABLE
BENCHMARK NORTHING EASTING ELEVATION DESCRIPTION
23533087 1624312 539.03 CHISELED 'X' ON CONCRETE TRANSFORMER PADTBM 013117'A'
HORIZONTAL CONTROL TABLE
POINT
NORTHING
23533502.20
23533101.86
23533461.27
EASTING
1624085.09
1624316.54
1624099.31
DESCRIPTION
SET REBAR WITH 2" CAP (11798-S, 2017)
SET 8" SPIKE
SET REBAR WITH 2" CAP (11798-S, 2017)
B
U
I
L
D
I
N
G
B
U
I
L
D
I
FENCE LINE
HEAD BOLT
TELEPHONE POLE
OH
OVERHEAD POWER LINE
GUY LINE WITH ANCHOR
BOLLARD
FLOOR DRAIN SUMP
OIL SEPARATOR
MANHOLE 101
MANHOLE 102
MANHOLE 102-A
FINISHED FLOOR ELEVATIONFF
ASPHALT PAVEMENT
CONCRETE
G
R
A
S
L
A
W
N
G
R
A
W
N
G
R
A
W
N
G
R
A
W
N
TBM 020117'C'
TBM 020117'A'
23533170 1624154 540.43
23533087 1624312 540.06
TBM 020117'B' 23533194 1624213 540.13
MARKED 'X' ON CONCRETE MANHOLE RIM - MH 101
MARKED 'X' ON CONCRETE MANHOLE RIM - MH 102-A
MARKED 'X' ON CONCRETE MANHOLE RIM - MH 102
TBM 013117'A'
FIRE HYDRANT
FIRE HYDRANT
LEGEND:
TBM 020117'B'
TBM 020117'A'
TBM 020117'C'
DESIGN COMPLETE, FOR CONSTRUCTION, MARCH 27, 2018
S H
E E
T
T
I T
E
No.
PROJECT No.
DATE
CHECKED
DRAWN
DESIGN
ItemDate
REVISIONS
P R
O J
E C
T
C O
N S
U L
T A
T
P
F B
E
I E
N o s e
D o c k L
V
X R
E F
T
O P
O
F B
V
V Y
C
R
M a r
P
M
R E
N O
V A
O S
E
D
O C
K
B
U I L
D I N
G
FTQW 17-1009
I E
L S
F B
A
L A
S K
A
MARCH 27, 2018
C
I V
I
G
I N
E E
R
S
Q U
A D
R O
N
V-101
BC/CK
X X
X
X X
X X
X
X
X X
X X
X X
B U
I L
D I N
G
P A
R K
I N
G
DESIGN COMPLETE, FOR CONSTRUCTION, MARCH 27, 2018
S H
E E
T
T
I T
SHEET NUMBER
PROJECT No.
DATE
CHECKED
DRAWN
DESIGN
ItemDate
REVISIONS
P R
O J
E C
T
C O
N S
U L
T A
F B
E
I E
N o s e
D o c k C
C c n s t
F B
C l a n
D e t a i s r
P
M
R E
N O
V A
S
E
D
O C
K
B
U I L
D I N
G
I E
L S
B
A
L A
S K
A
MARCH 27, 2018
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
C-101C-101
RAD
RJP
KAB
5' WIDE
CONCRETE
SIDEWALK
EXISTING
STAIRWELL
TOP-BACK
OF CURB
N
SCALE:
40'20'020'
1" = 20'
UTILIDOR
ACCESS
UTILIDOR
ACCESSFIRE HYDRANT 222-30
FIRE HYDRANT
222-20
18" CMP
STORM DRAIN LINE
SITE PLAN
NEW STAIRWELL,
SEE STRUCTURAL
PLANS
GENERAL NOTES:
1. RECONNECT BRANCH CIRCUITS NOT BEING REMOVED
WHICH PASS THROUGH OR CONNECT TO HEAD BOLT
HEATERS INDICATED TO BE REMOVED.
APRON CURB CUT
C
APRON CURB CUT
REMOVE HEADBOLT HEATER
REMOVE HEADBOLT HEATER
UNDERGROUND
UTILIDORS
EXISTING
SIDEWALK
POWER
POLES
EXISTING STRIPING
C
EXISTING
CURB & GUTTER
CURB & GUTTER,
TYPE E
EXISTING CURB AT NORTH
END OF PARKING LOT
SCALE : N.T.S.
WALKWAY CURB RAMP
B
TIE TAPER TO EXISTING CURB AT
NORTH END OF PARKING LOT
5%
SCALE : N.T.S.
CURB & GUTTER - TYPE E
C
E
5'
SIDEWALK
(EXCEPT AS
NOTED IN PLAN)
4" CONCRETE WITH #4 REBAR
SPACED 12" ON CENTER EACH
WAY
12" STRUCTURAL FILL
ORIGINAL GROUND 4" TOPSOIL & SEED
AS NEEDED
7'
SCALE : N.T.S.
TYPICAL SECTION: SIDEWALK
D
12"
SCALE : N.T.S.
TYPICAL SECTION:
ASPHALT SAWCUT AND PATCH
F
EXISTING ASPHALT PAVEMENT
SAWCUT AND TACK COAT
2" HOT MIX ASPHALT
CONCRETE PAVEMENT
6" D-1
STRUCTURAL FILL
14'
APRON
8" CONCRETE WITH #5 REBAR
SPACED 18" ON CENTER EACH
WAY
12" STRUCTURAL FILL
4" TOPSOIL & SEED
AS NEEDED
16'
SCALE : N.T.S.
TYPICAL SECTION: APRON
E
B
WALKWAY CURB RAMP
ORIGINAL GROUND
MIN
1%
MIN
1%
ASPHALT SAWCUT
AND PATCH
F
APRON BOLLARD
PLACEMENT
D
APRON BOLLARD
PLACEMENT
D
CANOPY SUPPORT
FOUNDATION, TYP
B
18.25'
#4
REBAR
APRON,
TYP OF 2
C
CANOPY SUPPORT
FOUNDATION, TYP
B
CANOPY SUPPORT
FOUNDATION, TYP
B
CANOPY SUPPORT
FOUNDATION, TYP
B
1"
3"
3'
4'
BUILDING 1120
DESIGN COMPLETE, FOR CONSTRUCTION, MARCH 27, 2018
S H
E E
T
T
I T
SHEET NUMBER
PROJECT No.
DATE
CHECKED
DRAWN
DESIGN
ItemDate
REVISIONS
P R
O J
E C
T
C O
N S
U L
T A
F B
E
I E
N o s e
D o c k C
C c n s t
F B
C e t a i s r
P
M
R E
N O
V A
S
E
D
O C
K
B
U I L
D I N
G
I E
L S
B
A
L A
S K
A
MARCH 27, 2018
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
C-102C-102
RAD
RJP
KAB
N
SCALE : N.T.S.
DETAIL: BOLLARD
A
A
FINISH GRADE
8"Ø SCHEDULE 40 STEEL
PIPE FILLED W/ CONCRETE
YELLOW BOLLARD COVER
APRON
CONCRETE
APRON EDGE
8" BOLLARD, TYP, SEE
CANOPY
SUPPORT, TYP
2" TYP
T Y
P
1/2" EXPANSION JOINT FILLER
W/ 1/4" ELASTOMERIC JOINT
SEALANT, TYP
SCALE : N.T.S.
PLAN DETAIL:
APRON BOLLARD PLACEMENT
D
S
YM
E
TR
IC
A
L A
B O
U T
A P
R O
N
1:1
1:1
SAFE SLOPES, TYP
STRUCTURAL FILL
SYMMETRICAL
ABOUT ℄
SCALE : N.T.S.
DETAIL:
CANOPY SUPPORT FOUNDATION
B
16" DIAMETER
CONCRETE BASE
APRON CANOPY
SUPPORT FOUNDATION
B
10'
14'
SCALE : N.T.S.
DETAIL: APRON CURB CUT
C
FLOW LINE
FACE OF CURB
TOE OF GUTTER
2' R (TYP)
TAPER CURB
HEIGHT TO ZERO
CURB & GUTTER,
TYPE E C
ASPHALT SAWCUT
AND PATCH F
MATCH EXISTING,
TYP EACH SIDE OF APRON
NOTE: SEE STRUCTURAL PLANS FOR CANOPY SUPPORT
DIMENSIONS
PROVIDE ADDITIONAL #5
BAR AT SLAB OPENINGS
.4
.1
A
E C
C
A u ro ra D ri v e
F a ir b a n k s A la s k a
P R
O J E
C T
S
H E
E T
T
IT
L E
DESIGN
DRAWN
CHECKED
DATE
PROJECT No.
SHEET NUMBER
C O
N S
U L
T A
N T
REVISIONS
C
U s e rs
\b ri a n a rm a g o s t\
D o c u m e n ts \P
D C
-S T
R -1
F
B R
V b ri a n a rm a g o s t.
rv t
/2
/2
:0 :5
P
M
S-001
G E
N E
R A
L N
O T
E S
FTQW 17-1009
R E
N O
V A
T E
N O
S E
D O
C K
B
U
IL
D
IN
G
C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
E
IE
L S
O N
A F
B A
L A
S K
A
AKM
BAA
WTH
MARCH 27, 2018
SPECIAL INSPECTIONS PLAN
REQUIRED VERIFICATION AND INSPECTION
INSPECTION RATE
REFERENCED
STANDARD
2015 IBC
STANDARD
CONTINUOUS PERIODIC
STEEL:
1. STEEL SPECIAL INSPECTIONS SHALL BE PERFORMED IN
ACCORDANCE WITH CHAPTER "N" OF THE SPECIFICATION
FOR STRUCTURAL STEEL BUILDINGS. AND SPEC 051200
AISC 360 -10. 1705.2
2. STEEL SPECIAL INSPECTIONS OF SEISMIC LATERAL
RESISTING SYSTEM (SLRS) ELEMENTS SHALL BE IN
ACCORDANCE WITH CHAPTER J OF THE SEISMIC
PROVISIONS FOR STRUCTURAL STEEL BUILDINGS, AND
APPENDIX A OF SPEC 051200
AISC 341-10 1705.2
CONCRETE:
1. INSPECTION OF REINFORCING STEEL, INCLUDING
PRESTRESSING TENDONS, AND VERIFY PLACEMENT. - X
ACI 318: CH. 20, 25.2,
25.3, 26.5.1-26.5.3
1908.4
2. INSPECT ANCHORS CAST IN CONCRETE - X ACI 318: 17.8.2 -
3. INSPECTION OF ANCHORS INSTALLED IN HARDENED
CONCRETE
- X
ACI 318: 17.8.2.4
ACI 318: 17.8.2
A. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR
UPWARDLY INCLINED ORIENTATIONS TO RESIST
SUSTAINED TENSION LOADS.
X
B. MECHANICAL ANCHORS AND ADHESIVE ANCHORS
NOT DEFINED IN 4.a
X
4. VERIFYING USE OF REQUIRED DESIGN MIX.
- X
ACI 318:CH. 19, 26.4.5,
26.12
1904.1, 1904.2, 1908.2, 1908.3
5. PRIOR TO CONCRETE PLACEMENT FABRICATE SPECIMENS
FOR STRENGTH TESTS, PERFORM SLUMP AND AIR
CONTENT TESTS, AND DETERMINE THE TEMPERATURE OF
THE CONCRETE.
X -
ASTM C 172 ASTM C
31 ACI 318: 26.4.5, 26.12
6. INSPECTION OF CONCRETE PLACEMENT FOR PROPER
APPLICATION TECHNIQUES.
X - ACI 318: 26.4.5
1908.6, 1908.7, 1908.8
7. VERIFY MAINTENANCE OF SPECIFIED CURING
TEMPERATURE AND TECHNIQUES.
- X ACI 318: 26.4.7-26.4.9 1908.9
SPECIAL INSPECTION PROGRAM:
1. THE CONTRACTOR SHALL RETAIN THIRD-PARTY QUALITY ASSURANCE AGENCIES TO CONDUCT SPECIAL INSPECTIONS.
2. THE INSPECTING AGENCY SHALL PROVIDE REPORTS OF THE SPECIAL INSPECTIONS DIRECTLY TO THE CONTRACTING OFFICER.
3. SPECIAL INSPECTION REQUIREMENTS.
4. ALL BRACES, ASSOCIATED BEAMS, COLUMNS, AND CONNECTION ELEMENTS ARE PART OF THE SLRS. ALL MEMBERS AND
CONNECTIONS INDICATED AS DRAG CONNECTIONS ARE PART OF THE SLRS.
STRUCTURAL ABBREVIATIONS
@ . . . . . . . . . AT
AB . . . . . . . . ANCHOR BOLT
AFF . . . . . . . ABOVE FINISH FLOOR
AISC . . . . . . . AMERICAN INSTITUTE
OF STEEL CONST.
ALT . . . . . . . . ALTERNATE
APPROX . . . APPROXIMATELY
ARCH . . . . . ARCHITECTURAL
ATR . . . . . . . ALL THREAD ROD
AWW . . . . . . ALL WEATHER WOOD
BET/BTWN . . BETWEEN
BM . . . . . . . . BEAM
BOF . . . . . . . BOTTOM OF FOOTING
BOS . . . . . . . BOTTOM OF STEEL
BOT . . . . . . . BOTTOM
BP . . . . . . . . BUTTON PUNCH
BPL . . . . . . . BOTTOM PLATE
BRKT . . . . . . BRACKET
BS . . . . . . . BOTH SIDES
CJ . . . . . . . . CONTROL JOINT
COL . . . . . . . COLUMN
CONC . . . . . CONCRETE
CONT . . . . . . CONTINUOUS
CONTR'S . . CONTRACTORS
CP . . . . . . . . COMPLETE
PENETRATION
(D) . . . . . . . . DEMO
DIA/DIAM/Ø . DIAMETER
DICA . . . . . . DRILLED IN CONCRETE
ANCHOR
DIM . . . . . . . DIMENSION
DL . . . . . . . DEAD LOAD
DP . . . . . . . . DEEP
DWG . . . . . . . DRAWING
(E) . . . . . . . . EXISTING
EA . . . . . . . EACH
EJ . . . . . . . . EXPANSION JOINT
ELEV . . . . . . ELEVATION
EMBED . . . . EMBEDDED
EOR . . . . . . . ENGINEER OF RECORD
EQ . . . . . . . EQUAL
ES . . . . . . . . EQUALLY SPACED
EW . . . . . . . . EACH WAY
FB . . . . . . . FLAT BAR
FDN . . . . . . . FOUNDATION
FF . . . . . . . . FINISH FLOOR
FRMG . . . . . FRAMING
FS . . . . . . . FAR SIDE
FT . . . . . . . FOOT/FEET
FTG . . . . . . FOOTING
FV . . . . . . . . . FIELD VERIFY
GA . . . . . . . GAGE
GLB . . . . . . . GLULAM BEAM
HDG . . . . . . . HOT DIPPED
GALVANIZED
H/HORIZ . . . HORIZONTAL
HSS . . . . . . . HOLLOW STRUCTURAL
SECTION
IBC . . . . . . . . INTERNATIONAL
BUILDING CODE
IN . . . . . . . . . INCH(ES)
INSUL . . . . . INSULATION
INT . . . . . . . . INTERIOR
JT . . . . . . . . . JOINT
K . . . . . . . . . . KIP (1000 LB)
KB . . . . . . . . . KWIK BOLT
KSI . . . . . . . . KIPS PER SQUARE INCH
LL . . . . . . . . . LIVE LOAD
LLV . . . . . . . LONG LEG VERTICAL
LOC . . . . . . . LOCATION
LONG . . . . . . LONGITUDINAL
MANUF . . . . MANUFACTURER
MATL . . . . . . MATERIAL
MAX . . . . . . . MAXIMUM
MECH . . . . . MECHANICAL
MIN . . . . . . . MINIMUM
MOA . . . . . . . MUNICIPALITY OF
ANCHORAGE
MPH . . . . . . . MILES PER HOUR
MTL . . . . . . . METAL
(N) . . . . . . . NEW
NIC . . . . . . . NOT IN CONTRACT
NS . . . . . . . NEAR SIDE
NTS . . . . . . . NOT TO SCALE
OC . . . . . . . ON CENTER
OF . . . . . . . . OUTSIDE FACE
OPP . . . . . . . OPPOSITE HAND
OWSJ . . . . . . OPEN WEB STEEL JOIST
PDF . . . . . . . POWDER DRIVEN
FASTENER
PC . . . . . . . . PRECAST
PEN . . . . . . . PENETRATION
PL . . . . . . . . . PLATE
PLB . . . . . . . PARALLAM BEAM
PLF . . . . . . . POUNDS PER LINEAL
FOOT
PSF . . . . . . . POUNDS PER SQUARE
FOOT
PSI . . . . . . . . POUNDS PER SQUARE
INCH
REF . . . . . . . REFERENCE
REINF . . . . . . REINFORCEMENT
REQ'D . . . . . REQUIRED
RO . . . . . . . . ROUGH OPENING
SCHED . . . . SCHEDULE
SCR . . . . . . . SCREWS
SIM . . . . . . . SIMILAR
SMS . . . . . . . SHEET METAL SCREWS
SOG . . . . . . SLAB ON GRADE
SQ . . . . . . . . SQUARE
STD . . . . . . . STANDARD
STL . . . . . . . STEEL
T&B . . . . . . . TOP & BOTTOM
THRD . . . . . . THREADED
TO . . . . . . . . TOP OF
TOC . . . . . . . TOP OF CONCRETE
TOS . . . . . . . TOP OF STEEL
TS . . . . . . . . TUBE STEEL
TYP . . . . . . . TYPICAL
UNO . . . . . . . UNLESS NOTED
OTHERWISE
V/VERT . . . . VERTICAL
W/ . . . . . . . . . WITH
WD . . . . . . . . WIDE
WF . . . . . . . . WIDE FLANGE
WP . . . . . . . . WORKING POINT
WWF . . . . . . WELDED WIRE FABRIC
.4
.1
A
E C
C
A u ro ra D ri v e
F a ir b a n k s A la s k a
P R
O J E
C T
S
H E
E T
T
IT
L E
DESIGN
DRAWN
CHECKED
DATE
PROJECT No.
SHEET NUMBER
C O
N S
U L
T A
N T
REVISIONS
C
U s e rs
\b ri a n a rm a g o s t\
D o c u m e n ts \P
D C
-S T
R -1
F
B R
V b ri a n a rm a g o s t.
rv t
/1
/2
:3 :5
P
M
S-002
G E
N E
R A
L N
O T
E S
FTQW 17-1009
R E
N O
V A
T E
N O
S E
D O
C K
B
U
IL
D
IN
G
C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
E
IE
L S
O N
A F
B A
L A
S K
A
AKM
BAA
WTH
MARCH 27, 2018
F
E
3 4
D
5 156 7 8 9 10 11 12 13 14
C
B
A
/8
294' - 0"
25' - 4 1/2" 17' - 4 1/2" 17' - 4 1/2" 19' - 5 1/2" 15' - 3 1/2" 34' - 9" 34' - 9" 34' - 9" 15' - 3 1/2" 19' - 5 1/2" 17' - 4 1/2" 17' - 4 1/2" 25' - 4 1/2"
/8
/8
/8
2 2 2 2
2 2 2
2 2
(E) STAIR SLABS
TO REMAIN
SHEET NOTES
1. FOR EXTENT OF NEW COLUMN FOUNDATION
SEE S-104S-103 &
SHEET KEYNOTES
DEMO EXISTING BRACING.
DEMO EXISTING SLAB FOR NEW FOOTING
CONSTRUCTION. CONTRACTOR SHALL FIELD
DETERMINE LIMITS OF SLAB DEMOLITION, TYP.
DEMO (E) COLUMN.
CONTRACTOR TO EXCAVATE AS REQUIRED FOR
FOOTING UPGRADES.
DEMO (E) C-GIRTS, WT HORIZ & DIAGONAL BRACES
BETWEEN GRIDS 3 & 5.
SHEET LEGEND
(E) BRACING TO BE DEMOLISHED.
BRACED FRAME ABOVE
THE LEVEL DISPLAYED
BRACED FRAME BELOW
THE LEVEL DISPLAYED
COLUMN, PER PLAN,
ORIENTATION VARIES, TYP
TYPICAL BRACED FRAME CALLOUT:
BRACED FRAME
ABOVE THE LEVEL
DISPLAYED
BRACED FRAME BELOW
THE LEVEL DISPLAYED
COLUMN, PER PLAN,
ORIENTATION VARIES, TYP
TYPICAL BRACED FRAME CALLOUT:
PLAN NORTH
PLAN NORTH
BRACE FRAME NOTES
SCALE:
.4
.1
A
E C
C
A u ro ra D ri v e
F a ir b a n k s A la s k a
P R
O J E
C T
S
H E
E T
T
IT
L E
DESIGN
DRAWN
CHECKED
DATE
PROJECT No.
SHEET NUMBER
C O
N S
U L
T A
N T
PLAN NORTH
16' 32'
1/16" = 1' - 0"
16' 32'
A B
REVISIONS
2 3 8 9 14 15
E
C
A
G
C
U s e rs
\b ri a n a rm a g o s t\
D o c u m e n ts \P
D C
-S T
R -1
F
B R
V b ri a n a rm a g o s t.
rv t
/2
/2
:0 :5
P
M
S-101
O V
E R
A L
L D
E M
O L
IT
IO
N P
L A
N
FTQW 17-1009
R E
N O
V A
T E
N O
S E
D O
C K
B
U
IL
D
IN
G
C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
E
IE
L S
O N
A F
B A
L A
S K
A
AKM
BAA
WTH
MARCH 27, 2018
DESIGN COMPLETE, FOR CONSTRUCTION, MARCH 27, 2018
1/16" = 1'-0"1
OVERALL -DEMOLITION PLAN
DEMO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.