EIE386 W911KB-17-R-0044 Amendment 0008 is issued for the Phase 2 offerors.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE / LOCATION: F-35 CONSOLIDATED MUNITIONS ADMIN FACILITY, EIELSON AIR FORCE BASE (AFB), ALASKA (EIE386)

a. This amendment provides changes to the solicitation as indicated on the continuation pages of this document.

b. PHASE 2 PROPOSAL DUE DATE IS UNCHANGED AND REMAINS 16 FEBRUARY 2018 AT 1400 ALASKA TIME. Proposals shall be submitted in accordance w ith Section 00 21 00, paragraph 1.9, Proposal Format.

c. YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Feb-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911KB-17-R-0044

X 9B. DATED (SEE ITEM 11)

29-Sep-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Feb-2018

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KB-17-R-0044

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

a. The following drawings are substituted for the superseded documents/sections:

- A-602

b. The following revised documents/sections are substituted for the superseded documents/sections. The identifier “AM#8” appears before and after new and/or revised materials, except as noted below.

SECTION 01 10 00 – STATEMENT OF WORK

- Revised paragraphs 2.5; 3.8.1.8; 3.8.2.5.9.f; 3.8.8.1; 3.8.8.4; 3.8.8.5; 3.8.8.6; 3.8.8.11 and 3.8.8.14

(Reissuing pages 5 and 78-84)

NOTE: Revisions within the following documents do not contain the above referenced identifiers.

SECTION 00 73 46 – WAGE DETERMINATIONS

- Replaced with AK1, dated 09 February 2018

c. The following sections are deleted:

NONE

d. The following documents are added:

e. The following revisions are incorporated:

f. Other:

- PROJNET BIDDER INQUIRY REPORT dated 09 February 2018 is incorporated.

(End of Summary of Changes)

ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.

General Decision Number: AK180001 02/09/2018 AK1

Superseded General Decision Number: AK20170001

State: Alaska

Construction Types: Building and Heavy

Counties: Alaska Statewide.

BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/09/2018

ASBE0097-001 01/01/2017

Rates Fringes

Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 38.68 20.07

HAZARDOUS MATERIAL HANDLER

(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 37.38 19.55

BOIL0502-002 08/01/2016

Rates Fringes

BOILERMAKER......................$ 44.26 28.41

BRAK0001-002 07/01/2017

Rates Fringes

Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 40.81 19.19 Tile & Terrazzo Finisher.........$ 34.79 19.19

CARP1501-001 09/01/2016

Rates Fringes

MILLWRIGHT.......................$ 36.74 22.99

CARP2520-003 09/01/2016

Rates Fringes

Diver Stand-by....................$ 42.65 25.04 Tender......................$ 41.65 25.04 Working.....................$ 82.45 25.04 Piledriver Carpenter...................$ 38.34 25.04 Piledriver; Skiff Operator and Rigger..................$ 38.34 25.04 Sheet Stabber...............$ 38.34 25.04 Welder......................$ 43.90 25.04

DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:

50-100 feet $1.00 per foot 101 feet and deeper $2.00 per foot

ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:

5-50 FEET $1.00 PER FOOT/DAY

51-100 FEET $2.00 PER FOOT/DAY

101 FEET AND ABOVE $3.00 PER FOOT/DAY

SATURATION DIVING:

The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP4059-001 09/01/2016

Rates Fringes

CARPENTER

Carpenter...................$ 38.34 25.04 Lather/Drywall Applicator...$ 36.59 22.59

ELEC1547-004 04/01/2017

Rates Fringes

CABLE SPLICER....................$ 39.82 3%+25.44

ELECTRICIAN......................$ 39.49 3%+25.69

ELEC1547-005 04/01/2017

Line Construction

Rates Fringes

CABLE SPLICER....................$ 52.57 3%+30.81

Linemen (Including Equipment Operators, Technician)...........$ 50.52 3%+30.81 Powderman........................$ 48.52 3%+30.81

TREE TRIMMER.....................$ 35.84 3%+23.56

ELEV0019-002 01/01/2018

Rates Fringes

ELEVATOR MECHANIC................$ 55.45 32.645+a+b

FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:

New Year's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving, and Christmas Day

ENGI0302-002 01/01/2017

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 40.28 22.65

GROUP 1A....................$ 42.04 22.65

GROUP 2.....................$ 39.51 22.65

GROUP 3.....................$ 38.79 22.65

GROUP 4.....................$ 32.58 22.65

TUNNEL WORK

GROUP 1....................$ 44.31 22.65

GROUP 1A...................$ 46.24 22.65

GROUP 2....................$ 43.46 22.65

GROUP 3....................$ 42.67 22.65

GROUP 4....................$ 35.84 22.65

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Roller: Breakdown, Intermediate, and Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;

Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;

Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:

Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through 40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler

GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),

(b) Tower cranes; Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.; Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.

and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;

Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;

GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;

Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, (i.e., Elevating Grader and Material Transfer Vehicle); Locomotives: rod and geared engines;

Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.

GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;

Bombardier (tack or tow rig); Boring Machine; Brooms-power;

Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor

GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.

FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.

IRON0751-003 07/01/2017

Rates Fringes

Ironworkers:

BRIDGE, STRUCTURAL,

ORNAMENTAL, REINFORCING

MACHINERY MOVER, RIGGER,

SHEETER, STAGE RIGGER,

BENDER OPERATOR.............$ 37.25 30.43

FENCE, BARRIER INSTALLER....$ 33.75 30.08

GUARDRAIL INSTALLERS........$ 34.75 30.08

GUARDRAIL LAYOUT MAN........$ 34.49 30.08

HELICOPTER, TOWER...........$ 38.25 30.43

LABO0341-005 04/01/2017

Rates Fringes

Laborers: South of the 63rd

Parallel & West of Longitude 138 Degrees

GROUP 1.....................$ 30.55 26.72

GROUP 2.....................$ 31.55 26.72

GROUP 3.....................$ 32.45 26.72

GROUP 3A....................$ 35.73 26.72

GROUP 3B....................$ 39.27 24.01

GROUP 4.....................$ 20.12 26.72

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 33.61 26.72

GROUP 2....................$ 34.71 26.72

GROUP 3....................$ 35.70 26.72

GROUP 3A...................$ 39.30 26.72

GROUP 3B...................$ 43.20 24.01

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

* LABO0942-001 04/01/2017

Rates Fringes

Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees

GROUP 1.....................$ 30.55 26.72

GROUP 2.....................$ 31.55 26.72

GROUP 3.....................$ 32.45 26.72

GROUP 3A....................$ 35.73 26.72

GROUP 3B....................$ 39.27 24.01

GROUP 4.....................$ 20.12 26.72

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 33.61 26.72

GROUP 2....................$ 34.71 26.72

GROUP 3....................$ 35.70 26.72

GROUP 3A...................$ 39.30 26.72

GROUP 3B...................$ 43.20 24.01

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

PAIN1959-001 07/01/2017

NORTH OF THE 63RD PARALLEL

Rates Fringes

PAINTER

BRUSH/ROLLER PAINT OR WALL

COVERER.....................$ 31.99 20.29

TAPING, TEXTURING,

STRUCTURAL PAINTING,

SANDBLASTING, POT TENDER,

FINISH METAL, SPRAY,

BUFFER OPERATOR, RADON

MITIGATION, LEAD BASED

PAINT ABATEMENT, HAZARDOUS

MATERIAL HANDLER............$ 32.51 20.29

PAIN1959-002 07/01/2017

SOUTH OF THE 63RD PARALLEL

Rates Fringes

PAINTER

Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and Commercial Spray............$ 30.23 20.04 Machine Taper/Drywall.......$ 31.48 20.04 Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 31.58 20.04

PAIN1959-003 07/01/2017

NORTH OF THE 63RD PARALLEL

GLAZIER..........................$ 38.63 22.39

PAIN1959-004 07/01/2017

Rates Fringes

FLOOR LAYER: Carpet.............$ 29.23 13.96

PAIN1959-006 07/01/2017

SOUTH OF THE 63RD PARALLEL

Rates Fringes

GLAZIER..........................$ 38.63 21.67

PLAS0867-001 02/01/2016

Rates Fringes

PLASTERER

North of the 63rd parallel..$ 37.25 20.41 South of the 63rd parallel..$ 37.00 20.41

PLAS0867-004 02/01/2016

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

North of the 63rd parallel..$ 37.25 20.41 South of the 63rd parallel..$ 37.00 20.41

PLUM0262-002 01/01/2017

East of the 141st Meridian

Rates Fringes

Plumber; Steamfitter.............$ 38.02 26.72

PLUM0367-002 07/01/2017

South of the 63rd Parallel

Rates Fringes

Plumber; Steamfitter.............$ 39.00 23.80

PLUM0375-002 07/01/2017

North of the 63rd Parallel

Plumber; Steamfitter.............$ 40.91 25.40

PLUM0669-002 04/01/2017

Rates Fringes

SPRINKLER FITTER.................$ 46.00 23.29

ROOF0189-006 04/01/2016

Rates Fringes

ROOFER...........................$ 42.62 15.50

SHEE0023-003 07/01/2017

South of the 63rd Parallel

Rates Fringes

SHEET METAL WORKER...............$ 42.00 24.82

SHEE0023-004 07/01/2017

North of the 63rd Parallel

Rates Fringes

SHEET METAL WORKER...............$ 47.74 23.48

TEAM0959-003 09/01/2017

Rates Fringes

TRUCK DRIVER

GROUP 1.....................$ 39.59 21.97

GROUP 1A....................$ 40.86 21.97

GROUP 2.....................$ 38.33 21.97

GROUP 3.....................$ 37.51 21.97

GROUP 4.....................$ 36.93 21.97

GROUP 5.....................$ 36.17 21.97

GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler

GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)

GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;

Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;

Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards; Partsman;

Stringing Truck

GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Oil Distributor Drivers; Trucks/Jeeps (push or pull); Traffic Control Technician

GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;

Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate); Lumber Carrier; Water Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons; Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle; Hydro-seeders, dual axle;

Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver; Combination Truck-fuel and grease;

Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield); Ready Mix, up to and including 7 yards;

GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;

Gear/Supply Truck; Bus Operator, Up to 30 Passengers;

Rigger/Swamper

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries Submitted Between 24-Oct-17 and 09-Feb-18

Project: EIE386 F35 New Consolidated Munitions Admin Fac Review: New Consolidated Munition - W911KB-17-R-

0044 (EIE386)

(sorted by CommentID ) Displaying 128 inquiries.

Id Discipline Sheet Detail Spec

7265562 Commissioning 01 91 00.15 Appendix A

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Amendment 0004, Appendix A is noted to be the Owner's Project Requirements (OPR). However, the attached OPR is only an example of an OPR and not the OPR for the project. There is no requirement in 01 91 00.15 or the original phase 1 solicitation for the design/build contractor to create the OPR. Please clarify the Government will either issue an OPR for the project or add language to the solicitation requiring the contractor to create and maintain the OPR.

On: Jan 04 2018.

Government Response. . 01 10 10 paragraph 3.7.26.7 reads "The Contractor shall prepare the Owners Project Requirement (OPR) as referenced in paragraph 5.2.2 of ASHRAE Guideline 1.1 based on the facility requirements included in this RFP and submit it for review at interim and final stages of review."

01 10 10 paragraphs 3.7.26.7, 3.7.26.8, 3.7.26.9, 3.7.26.10 contain other requirements for the OPR. On:

Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7265599 Commissioning 01 91 00.15

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Building Envelope Technical Commissioning Specialist requirements reference Section 07 05 23 Pressure Testing an Air Barrier System for Air Tightness. Please confirm the specialist does not need to be a sub to the commissioning firm and it is acceptable for the Building Envelope Technical Commissioning Specialist to be sub-contracted directly by the Contractor and assigned to the commissioning team to fulfill the Building Envelope Technical Commissioning Specialist requirements while working under the direction of the Lead Commissioning Specialist.

On: Jan 04 2018.

Government Response. . Section 01 91 00.15, Paragraph 1.6.2 states: "Technical Commissioning Specialists, EMPLOYED BY THE COMMISSIONING FIRM [emphasis added] and that have...". This reads that Technical Specialists be either employees of or directly sub-contracted to the Commissioning Firm. On:

Jan 10 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7267768 General Appendix E Drawings

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can we please get the RFP Drawings and survey data in Autocad format?

On: Jan 05 2018.

Government Response. . AutoCAD Drawings will be provided as part of an upcoming amendment. On:

Jan 10 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7268197 Architectural 01 10 00 Statement of Work

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 3.1.1 second paragraph discusses a Room Data Matrix and room specific criteria sheets. These sheets have not been included in the RFP. Please provide these documents.

Page 1 of 30ProjNet: Logged In User

2/9/2018https://www.projnet.org/projnet/binKornHome/index.cfm

On: Jan 05 2018.

Government Response. . Room Matrices are included in Appendix E, Drawings A-601 and A-602. There are no Room Criteria Sheets. 3.1.1 only states to reference Room Data Matrix for ADDITIONAL room specific criteria; it does not mention room criteria sheets. On: Jan 10 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7268221 Plumbing A-601, A-602 01 10 00-3.6.7

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Compressed Air: 01 10 00-3.6.7.1 Requires eight overhead hose reels in Equipment Maintenance, three wall-mounted air stations in Heated Vehicle Storage, and two wall-mounted air stations in Munitions Training Bay. The Room Matrix Data on sheets A-601 and A-602 indicate for these rooms: compressed air - every two stalls to have one shared retracting reel. Please clarify the requirements.

On: Jan 05 2018.

Government Response. . Follow requirements for compressed air in paragraph 01 10 00- 3.6.7.1. On:

Jan 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7268257 Plumbing A-602 01 10 00-3.6.7

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Compressed Air: The Room Data Matrix on sheet A-602 indicates a requirement for compressed air in the Electrical, Mechanical, and Generator rooms [Mechanical Key Note M7 = Compressed Air - Every two stalls to have one shared retracting reel.] There are no stalls in these rooms; what are the actual requirements for compressed air?

On: Jan 05 2018.

Government Response. . There are no requirements for compressed air in these rooms. Mechanical Key Note M7 is to be deleted in a future amendment. On: Feb 05 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7268270 Architectural 01 10 00 Para 3.1.1

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

This paragraph requires CMU exterior walls. Are other noncombustible wall construction types that meet the performance criteria of the RFP allowed?

On: Jan 05 2018.

Government Response. . No. CMU was chosen by EAFB as the exterior wall construction based on other programmatic concerns. On: Jan 10 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7268272 Architectural 01 10 00 Para 3.2.1 / 2-4

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Are drive through bays for Munitions Training, Equipment Maintenance and/or Heated Vehicle Storage required or desirable? Refer to bullets that state 'Overhead sectional doors at ingress/egress end of each trailer/truck stall'. The Proof on Concept plan does not provide this feature.

On: Jan 05 2018.

Government Response. . No. Only one OVHD door is required, as only one end of truck stall will serve as ingress/egress function. On: Jan 10 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7269843 Architectural 01 10 00 Space Allocation

Table

Page 2 of 30ProjNet: Logged In User

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

For a number of components the space breakdown requirements of 3.2.1 exceed the total area allocation in Space Allocation Table. For example, 5 type F workstations are listed for Plans and Scheduling with a total SF allocation of 240 sf in the Space Allocation Table. AFMAN lists Type F workstations at 64 SF each and 5x64=320 SF, 80 SF more than the Table area. Other components with similar issues are Line Delivery, Munitions Storage, Munitions Support and Shared Administration. Please confirm that it is acceptable to exceed the component areas listed in the Space Allocation Table as long as the overall gross facility area does not exceed the 1391 limitation of 21,000 GSF or provide updates to the Space Allocation Table.

On: Jan 08 2018.

Government Response. . Office/space square footage numbers are based on AFMAN 32-1084/Chapter 6 Tables and represent the minimum S.F. requirements for individual components (personnel/workstations). It is acceptable to "up-size" rooms/spaces as needed to accommodate functions, provided overall gross S.F.

does not exceed 1391. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7269849 Architectural 01 10 00 Space Allocation

Table

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The Space Allocation Table shows the Equipment Maintenance Bay with a net area of 5,199 and a 1391 gross area limit of the same 5,199 GSF. It is not possible for the net to equal the gross due to wall thicknesses. Please provide guidance on which requirement prevails; can the net area be reduced to meet the gross area limit or can the gross area exceed 5,199 GSF for this component?

On: Jan 08 2018.

Government Response. . Net S.F. will need to be reduced so that space does not exceed 1391 GSF.

Note that the Space Allocation Table in RFP Section 01 10 00 was revised in AM#6 on 30 Jan 18. On: Jan 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7269853 Architectural 3.2.1-3 Equipment Maintenance Bay

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Paragraph 3.2.1 – 3/Equipment Maintenance Bay requires a personnel access/egress door at each vehicle bay whereas the Proof of Concept Plan only shows one egress door of all 8-bays. Please confirm that a door at each bay is required or if access/egress merely needs to be code compliant.

On: Jan 08 2018.

Government Response. . Ingress/Egress is not required at each vehicle stall OVHD door. Number of Ingress/Egress doors is for entire bay IAW code. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7270718 Architectural RFP Drawing A601 Section 01 10 00 3.4.3.7.5

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 3.4.3.7.5 calls for FRP in the munitions training bay to 12' AFF, Drawing sheet A601 calls for fire rated plywood with intumescent paint to 8'. Please clarify the wall finish in the munitions training bay. There is an FRP-3 code listed on sheet A601 but is not used in any room. please clarify.

On: Jan 08 2018.

Government Response. . Follow Room Data Matrix shown on Sheet A-601. Please note that AM#6 replaced A-601 on 30 Jan 18. On: Jan 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7270810 Civil 01 10 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Page 3 of 30ProjNet: Logged In User

What is/are the design vehicle/vehicles for this project, and how many passes of the vehicle/vehicles should be considered for pavement design?

On: Jan 08 2018.

Government Response. . See 01010 paragraph 2.4, 3.2.1.2, 3.2.1.3, 3.2.1.4 for interior vehicle spaces and vehicles. See 3.3.8.5 for POV's. See 3.3.8.6 for GOV's. See 3.3.9 for pavement design requirements.

On: Jan 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7270872 Architectural Sheet A601 3.4.2.12.3 OH Doors

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 3.4.2.12.3 calls for the exterior OH doors to be 14'Hx12'W where as Sheet A601 DR-11 calls for the OH doors to be 10'H Min and 18'W Min. Please clarify size of OH Doors

On: Jan 08 2018.

Government Response. . For bidding purposes, assume OVHD doors will be single door per vehicle stall with size 14'-0" H x 12'-0" W IAW 01 10 00/3.4.2.12.3. However, Sheet A-601/Door DR-11 notes revised in AM#6 for preference for double-width (14'-0" H x 24'-0" W) 2-vehicle stall wide doors. On: Jan 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7272253 Architectural Para. 3.1.1 01 10 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

This Paragraph requires exterior walls with "continuous exterior insulation." Most of the recent projects for the F35 at Eielson have required at minimum a masonry wainscot with some of them having full height masonry. Please confirm masonry wainscot's are not required.

On: Jan 09 2018.

Government Response. . Masonry wainscot required per Eielson AFB Architectural Compatibility Plan.

Wall construction to be load-bearing masonry with continuous exterior insulation, masonry wainscot to minimum 30" AFF and EIFS above. Reference change in 01 10 00/3.4.2.11.5 incorporated in AM#6. On:

Feb 05 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7273543 Chemistry 02 61 13

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The Chemical data report states the following regarding barium:

"Barium results in samples from two boreholes, G17-386-01 (AP-5915) and G17-386-04 (AP-5918), were above the potential migration to groundwater cleanup level (2100 mg/kg), with concentrations above the cleanup limit ranging from 2180 to 4420 mg/kg. These concentrations are above the Eielson AFB soil background range of 27.5 to 1,350 mg/kg (US Air Force 1993). A possible source of barium is coal ash, which may be present due to this site's proximity to the power plant"

Our concern is that the levels of barium would result in the soils being classified as RCRA waste (40 CFR 261.24).

In order to be a listed RCRA waste barium TCLP concentrations would be 100 mg/L. The data contained in the chemical data report are total metals by EPA SW6020A.

TCLP metals results can be approximated by dividing the Total metals results by 20. In this case, the resulting barium levels are above 100 mg/L and the soils from these areas would be considered RCRA waste. In that case, there is no in-state disposal option.

Please confirm that it is the governments intention to have the Barium contaminated soils disposed of out of state.

On: Jan 10 2018.

Government Response. . It is the government's intention that Barium contaminated soils be disposed of out of state in a RCRA (Subtitle C or D) landfill as applicable. Please refer to paragraph 1.5.1 of specification 02 61 13. On: Jan 19 2018

Page 4 of 30ProjNet: Logged In User

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7273878 Environmental 02 61 13 - 1.5.1

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Clin 0005 is for the disposal of 100 Cubic yards of Barium, per 02 61 13- 1.5.1 Barium contaminates are not allowed to be disposed in the State of Alaska and must be transported and disposed in the lower 48 states in a RCRA landfill.

Is our CLIN 0005 price supposed to include all the permits, transportation costs and disposal costs for this barium contaminated soils to the lower 48?

On: Jan 10 2018.

Government Response. . Yes, CLIN 0005 covers all cost of Barium disposal. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7274492 General Section 01 50 00.04 29

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 01 50 00.04 29 Temporary Construction Facilities paragraph 3.4 requires the contractor to provide the government a 200 SF, fully furnished, office trailer, with utilities and permanent connection to water and sewer.

Please confirm that this will be required. If so, where are we to set it up and tie into the utilities as they will not be onsite till after EIE405 brings them to the MH 527.

On: Jan 10 2018.

Government Response. . Government Field Office is not required. Confirmed with USACE Resident Office/EAFB, a consolidated Field Office for F-35 Projects will be located and funded under separate contract. Refer to revised 01 50 00.04 29 in AM#6 on 30 Jan 18. On: Jan 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7275533 Antiterrorism-Force

Protection C-101

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that there are no security requirements for the access road around the north and east side of the site.

Is there an access control gate on that road preventing POV's from accessing the perimeter of the site? The RFP drawing C-101 does not show any fencing or force protection measures around the perimeter and it appears a POV could get within the ATFP setback without some additional security measures. If ATFP measures are required is there a base preferred system for this area?

On: Jan 11 2018.

Government Response. . Site to meet vehicle barrier requirements to protect facility and personnel.

Installation prefers more natural type passive barriers to enclose the site, e.g. deep swales, earthen berms, large boulders. Approved vehicle barrier swing style gates are required at the standoff distance to control vehicles at any access drives. POV parking shall be designed at the proper standoff per ATFP requirements. On: Jan 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7276030 Architectural A-601 01 10 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

3.4.3.7.4 calls for stainless steel diamond plate to a minimum of 4'-0" AFF in the Vehicle Storage, Munitions Training Bay and Equipment Maintenance Bays.

3.4.3.7.5 calls for Munitions Training to have FRP to 144".

A-601 calls for the following:

Equipment Maintenance Bays: CMU with epoxy paint and AC Plywood with intumescent paint to 8'0".

Munitions Training: CMU with epoxy paint and AC Plywood with intumescent paint to 8'0".