A.07.24_W911KB-17-R-0044_AM_1.pdf

PDF 109 KB Posted

Attached to
EIE386 Design-Build F-35 Consolidated Munitions Admin Facility
Solicitation number
W911KB-17-R-0044
Issued by

About this file

EIE386 Amendment #1, W911KB-17-R-0044, F-35 Consolidated Munitions Admin Facility, Eielson AFB, Alaska

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE / LOCATION: F-35 CONSOLIDATED MUNITIONS ADMIN FACILITY, EIELSON AIR FORCE BASE, ALASKA (EIE386)

a. This amendment provides changes to the solicitation as indicated on the continuation pages of this document.

b. PROPOSAL DUE DATE OF 02 NOVEMBER 2017 AT 1400 ALASKA TIME is unchanged. Proposals shall be submitted in accordance w ith Section 00 21 00, paragraph 1.9, Proposal Format.

c. YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Oct-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-17-R-0044

X 9B. DATED (SEE ITEM 11)

29-Sep-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Oct-2017

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KB-17-R-0044

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

a. The following drawings are substituted for the superseded documents/sections:

NONE

b. The following revised documents/sections are substituted for the superseded documents/sections. The identifier “AM#1” appears before and after new and/or revised materials, except as noted below.

SECTION 00 22 10 – PHASE 1 OF 2 PHASE DESIGN-BUILD SELECTION PROCEDURES

- Revised paragraphs 7.1.1 and 7.1.2 (Reissuing page 8).

NOTE: Revisions within the following documents do not contain the above referenced identifiers:

SECTION 00 11 00 – STANDARD FORM (SF) 1442

- Block 13: The number of offeror copies required has increased by 1 from 1 to 2.

c. The following sections are deleted:

d. The following documents are added:

e. The following revisions are incorporated:

f. Other:

- PROJNET BIDDER INQUIRY REPORT dated 23 October 2017 is incorporated.

(End of Summary of Changes)

ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.

Section 00 22 10 W911KB-17-R-0044

EIE386

Section 00 22 10 Page 8 on the project is not considered relevant. If the Government does not obtain past performance information for the projects identified by the offeror and cannot establish a past performance record for the offeror through other sources, past performance will be rated neither favorably nor unfavorably. The performance confidence assessment will be considered “Unknown Confidence (Neutral)”.

7.0 TAB D – FACTOR 3 - ORGANIZATION

7.1. SUBMISSION REQUIREMENTS:

7.1.1. Provide a project-specific narrative that describes the offeror’s organization and the items below. Limit the information to two (2) pages or less and individually address each paragraph below. The page limit does not include resumes submitted for key personnel AM#1…nor the organizational chart required in Tab D. …AM#1

7.1.2. Organization: Describe the prime contractor and design firms proposed to participate in this project, their resources and how their resources will be utilized, their roles and responsibilities and any contractual arrangements that have been established. Clearly describe any teaming or joint venture arrangements, including a clear description of each firm’s roles and responsibilities on the project. Include an organizational chart AM#1…(not included in the two (2) page count limit above)…AM#1 with position title and job location for the following key personnel: project manager responsible for design and construction, onsite manager (if applicable), general superintendent, design manager responsible for managing designers of record, Registered Communications Distribution Designer (RCDD) and the designers of record for architecture, structural, civil, geotechnical, fire protection, electrical and mechanical. Describe the proposed management structure for the design-build team, describing how the design and construction process will be managed and the authorities and the delegations of authority within the team.

7.1.3. Key Personnel Capabilities and Experience:

Provide a brief resume (not included in the two page count limit above) using the Key Personnel Resume form (Attachment 5) at the end of this section for project manager responsible for design and construction, general superintendent, design manager and the designers of record for civil, architectural, structural, geotechnical, fire protection, electrical, telecommunications (RCDD) and mechanical. All designers of record must be registered in accordance with contract clause 52.236-25, Requirements for Registration of Designers and Section 01 33 16.00 29, Design After Award.

7.2. EVALUATION CRITERIA:

7.2.1. Organization: The Government will evaluate the strengths, weaknesses and any deficiencies in the offeror’s organization to evaluate the firm’s capability to execute the project. The Government will evaluate clarity and strength of the overall organization, the structure and staffing to execute the entire scope of work. Joint venture participant’s contribution to the organization should be commensurate with their skills and background.

7.2.2. Key Personnel Capabilities and Experience: The Government will evaluate the required information to determine how well the offeror identifies and demonstrates that its key personnel meet or exceed minimum qualifications necessary, which includes previous satisfactory experience in similar type work, to manage, control

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: EIE386 F35 New Consolidated Munitions Admin Fac Review: New Consolidated Munition - W911KB-17-R-

0044 (EIE386)

(sorted by CommentID ) Displaying 3 inquiries.

Id Discipline Sheet Detail Spec 7188792 General Section 00 21 10, page 8 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

7.1.1 states the Organization section is limited to 2 pages. It also states that the resumes do not count in the 2 pages. Can the organizational chart also be outside of the two pages? It would be helpful to have the full 2 pages to describe the organization.

On: Oct 16 2017.

Government Response. . The required organization chart, reference 00 22 10 paragraph 7.1.2, will not be included in the two (2) page limit for Phase 1, Factor 3 (Tab D). The change will be reflected in an upcoming amendment. On: Oct 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

7189082 General Section 00 21 00, Page 5 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can you please confirm the number of binders the government would like of our Phase I response? Page 5 seems to differ from the SF1442.

On: Oct 16 2017.

Government Response. . Offerors shall follow the instructions in Section 00 21 00, paragraph 1.9, Proposal Format, for proposal submissions. Block 13 of the SF1442 will be updated in an upcoming amendment to match the number of copies required in paragraph 1.9 for printed matter. On: Oct 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

7191019 General Section 00 22 10, Page 8 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The referenced section includes a list of several key personnel required for this project, but we do not see an interior designer listed for this project. Does the Government not wish for us to include the interior design team member/resume for this project?

On: Oct 18 2017.

Government Response. . Reference the submission requirements for Phase 1, Factor 3, Organization, Section 00 22 10, paragraph 7.1.3, no resume is required for an interior designer. On: Oct 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

Report Complete

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Patent 11/892,984 ProjNet property of ERDC since 2004.

Page 1 of 1ProjNet: Logged In User

10/23/2017https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReport...

SF30
00 22 10 Page 8
Phase 1 ProjNet Bidder Inquiry Report 23 Oct 17

File details come from the government source that posted it. Updated .