W911KB-15-R-0025_AM_2.pdf

PDF 342 KB Posted

Attached to
DOUGLAS HARBOR MAINTENANCE DREDGING, DOUGLAS, ALASKA Federal contract opportunity
Solicitation number
W911KB-15-R-0025
Issued by
Department of the Army Corps of Engineers Engineering District Alaska

About this file

Amendment 2 with replacement pages for Section 01 19 40 and 01 22 00

View the file

Other files for this federal contract opportunity

Other files attached to DOUGLAS HARBOR MAINTENANCE DREDGING, DOUGLAS, ALASKA, newest first.
File Type Posted
W911KB-15-R-0025_AM_4.pdf PDF
W911KB-15-R-0025-AM_3.pdf PDF
W911KB-15-R-0025_AM_1.pdf PDF
Dwgs_W911KB-15-R-0025.pdf PDF
RFP_W911KB-15-R-0025.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE/LOCATION: Douglas Harbor Maintenance Dredging, Douglas, Alaska

PROPOSAL DUE DATE is extended to 6 August 2015, 2:00 PM Alaska Time. Proposals shall be submitted in accordance w ith Section 00 21 00, Paragraph 1.10 Proposal Submittals.

This Amendment provides changes to the solicitation as indicated on page 2 of this document.

YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.

1. CONTRACT ID CODE PAGE OF PAGES

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-15-R-0025

X 9B. DATED (SEE ITEM 11)

19-Jun-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jul-2015

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KB-15-R-0025

SUMMARY OF CHANGES

AMENDMENT #0002

• The following drawings are substituted for the superseded drawings:

NONE

• The following revised documents are substituted for the superseded documents. The identifier “AM#02” appears before and after new and/or revised material and replacement pages are provided, except as noted:

PROPOSAL SCHEDULE – Item 0001 revised and Item 0013added

SECTION 01 22 00.00 10 – Paragraphs:

1.1.1.1 1.1.1.1.1 1.2.1.5 1.2.1.5.1 1.2.1.5.2

SECTION 01 19 40.00 29 – Paragraphs 1.11 and 1.13

The following changes do not contain an identifier:

FAR Clause 52.211-10

FAR Clause 52.217-7

• The following documents/drawings are deleted:

NONE

• The following documents are added:

NONE

• The following revisions are incorporated:

NONE

• Other:

o Proposal due date is extended to 6 August 2015, 2:00 pm Alaska time o Wage Determination has been updated from General Decision Number:

AK150001 07/10/2015 AK1 to General Decision Number: AK150001 07/24/2015

AK1

AM#2 W911KB-15-R-0025

PS-1

SECTION 00 11 01

PROPOSAL/CLIN SCHEDULE

DOUGLAS HARBOR DREDGING

DOUGLAS, ALASKA

Item Estimated Unit No. Description Quantity Unit Price Amount

BASE ITEMS

0001. Mobilization and Demobilization AM#2… (2016) …AM#2, complete. 1 JOB $__________ $__________

0002. Harbor Dredging and Dredged Material Disposal, complete.

0002AA. First 21,000 cubic yards 21,000 CY $__________ $__________

0002AB. All Over 21,000 cubic yards 6,100 CY $__________ $__________

0003. Harbor Sand Cap Placement, complete.

0003AA. First 3,100 cubic yards 3,100 CY $__________ $__________

0003AB. All Over 3,100 cubic yards 3,100 CY $__________ $__________

0004. Disposal Area Sand Cap Placement, complete.

0004AA. First 15,400 cubic yards 15,400 CY $__________ $__________

0004AB. Second 15,400 cubic yards 15,400 CY $__________ $__________

0005. Topographic/Hydrographic Surveys For Base Items, complete.

0005AA. Pre-Construction, Interim Condition, Post- Dredge/Pre-Cap, and Post Construction Surveys 4 EA $__________ $__________

PS-2

0005AB. Additional Interim Condition or Post- Dredge/Pre-Cap Surveys 2 EA $__________ $__________

0006. Monitoring Program, complete. 1 JOB $__________ $__________

Total of Base Items 0001 thru 0006 (Excluding Item 0004AC) $ __________

OPTIONAL ITEMS

0004AC Disposal Area Sand Cap

Placement, All over 30,800 cubic yards (reference CLIN 0004 above) 10,500 CY $__________ $__________

0007. 1 Year Topographic/Hydrographic Performance Survey, complete. 1 JOB $__________ $__________

0008. Post Construction Monitoring, complete. 1 JOB $__________ $__________

0009. Harbor Sand Cap Repair, complete. 3,000 CY $__________ $__________

0010. Disposal Area Sand Cap Repairs, complete.

0010AA. First 10,000 cubic yards 10,000 CY $__________ $__________

0010AB. Second 10,000 cubic yards 10,000 CY $__________ $__________

0010AC. All Over 20,000 cubic yards 10,000 CY $__________ $__________

PS-3

0011. Harbor Sand Cap Repair Topographic/Hydrographic Confirmation Survey, complete. 1 JOB $__________ $__________

0012. Disposal Area Sand Cap Repair Hydrographic Confirmation Survey, complete. 1 JOB $__________ $__________

AM#2…

0013. Mobilization and Demobilization for Sand Cap Repairs (2017), complete. 1 JOB $__________ $__________

Total of Optional Items 0004AC, and 0007 thru 0013 $ __________

Total of Items 0001 thru 0013 $ __________

…AM#2

PS-4

EVALUTION OF PROPOSAL NOTES.

1. INCOMPLETE OFFERS: Failure to submit an offer on all items in the schedule will result in an incomplete offer and the offer will be rejected. Unit or lump sum prices must be shown for each item within the schedule.

2. AWARD: Award will be in accordance with paragraph SECTION 00 22 11.

3. EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

PROPOSAL SCHEDULE NOTES.

1. SPLIT BID ITEM (DREDGING): The estimated minimum quantity available to the “required dredge depth” is shown on the bid schedule as the “AA” item. The estimated quantity available from the “required dredge depth” to the “maximum pay line” is shown on the bid schedule as the “AB” item. All volume estimates are based on the 2013 survey shown in the drawings. The quantities are based on “in place” volume of material prior to dredging.

2. SPLIT BID ITEM (DISPOSAL AREA SAND CAP): The volume of sand cap material placed in the disposal area is dependent upon the deposition trajectory of the disposed dredged and sand cap materials. The “AA” item quantity of sand cap material in the disposal area stated in the proposal schedule is based on the results of a sediment deposition model study using the same disposal zones and timing as required by the contract. Sand cap requirements will be determined by the SPI/PVI testing and augmented by the post-dredge/pre-cap survey and coordinated with the Contracting Officer prior to sand cap construction.

-- End of Proposal Schedule --

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contracting Officer shall specify either a number of days after the date the contractor received the notice to proceed, or a calendar date The Contractor shall be required to (a) commence work under this contract within ten

(10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than specified below. The time stated for completion shall include final cleanup of the premises.

CLIN Number Commence Work Complete Work (Not Later Than)

0001 -0006 12 October 2015 1 March 2016 0004AC (Add’l Disposal Area Sand Cap)

Upon award of CLIN

0004AC

1 March 2016

0007-0008 (1 Year Performance Survey and Post Construction Monitoring)

1 Year after Completion of Sand Cap Construction 1 June 2017

0009-0010 (Sand Cap Repairs) 0013 (Mobilization and Demobilization Sand Cap Repair 2017)

15 October 2017 15 Nov 2017

0011-0012 (Sand Cap Confirmation Surveys)

After Completion of Sand Cap Repairs

15 Dec 2017

(End of clause)

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor by the time indicated in the table below:

CLIN Number Exercise by

0004AC 1 February 2016 0007-0008 1 March 2016 0009-0013 1 June 2017

Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause)

SECTION 00 73 46 - WAGE DETERMINATIONS SCHEDULES

The following have been modified:

WAGE DETERMINATION

General Decision Number: AK150001 07/24/2015 AK1

Superseded General Decision Number: AK20140001

State: Alaska

Construction Types: Building and Heavy

Counties: Alaska Statewide.

BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/02/2015 1 01/09/2015 2 01/23/2015 3 02/06/2015 4 02/20/2015 5 03/27/2015 6 04/03/2015 7 04/10/2015 8 05/29/2015 9 06/12/2015 10 07/10/2015 11 07/24/2015

ASBE0097-001 09/02/2013

Rates Fringes

Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 34.88 18.67

ASBE0097-002 09/02/2013

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 34.88 18.67

BOIL0502-002 01/01/2013

Rates Fringes

BOILERMAKER......................$ 42.97 26.60

BRAK0001-002 07/01/2014

Rates Fringes

Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 39.03 18.95 Tile & Terrazzo Finisher.........$ 33.27 18.95

CARP1501-001 09/01/2014

Rates Fringes

MILLWRIGHT.......................$ 35.74 21.29

CARP2520-003 09/01/2014

Rates Fringes

Diver Stand-by....................$ 41.65 23.34 Tender......................$ 40.65 23.34 Working.....................$ 81.45 23.34 Piledriver Carpenter...................$ 37.34 23.34 Piledriver; Skiff Operator and Rigger..................$ 37.34 23.34 Sheet Stabber...............$ 36.59 22.59 Welder......................$ 42.90 23.34

DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:

50-100 feet $1.00 per foot 101 feet and deeper $2.00 per foot

ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:

5-50 FEET $1.00 PER FOOT/DAY

51-100 FEET $2.00 PER FOOT/DAY

101 FEET AND ABOVE $3.00 PER FOOT/DAY

SATURATION DIVING:

The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP4059-001 09/01/2014

Rates Fringes

CARPENTER

Carpenter...................$ 37.34 23.34 Lather/Drywall Applicator...$ 36.59 22.59

ELEC1547-004 04/01/2015

Rates Fringes

CABLE SPLICER....................$ 39.82 3%+24.36

ELECTRICIAN......................$ 39.49 3%+24.36

ELEC1547-005 04/01/2015

Line Construction

Rates Fringes

CABLE SPLICER....................$ 52.27 3%+28.48

Linemen (Including Equipment Operators, Technician)...........$ 50.52 3%+28.48 Powderman........................$ 48.52 3%+28.48

TREE TRIMMER.....................$ 35.34 3%+21.66

ELEV0019-002 01/01/2015

Rates Fringes

ELEVATOR MECHANIC................$ 51.34 28.38+a+b

FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:

New Year's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day

ENGI0302-002 01/01/2015

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 40.03 21.10

GROUP 1A....................$ 41.79 21.10

GROUP 2.....................$ 39.26 21.10

GROUP 3.....................$ 38.54 21.10

GROUP 4.....................$ 32.33 21.10

TUNNEL WORK

GROUP 1....................$ 44.03 21.10

GROUP 1A...................$ 45.97 21.10

GROUP 2....................$ 43.19 21.10

GROUP 3....................$ 42.39 21.10

GROUP 4....................$ 35.56 21.10

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Roller: Breakdown, Intermediate, and Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;

Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;

Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:

Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through 40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler

GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),

(b) Tower cranes; Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.; Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.

and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;

Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;

GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;

Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, (i.e., Elevating Grader and Material Transfer Vehicle); Locomotives: rod and geared engines;

Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.

GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;

Bombardier (tack or tow rig); Boring Machine; Brooms-power;

Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor

GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.

FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.

IRON0751-003 08/01/2013

Rates Fringes

Ironworkers:

BRIDGE, STRUCTURAL,

ORNAMENTAL, REINFORCING

MACHINERY MOVER, RIGGER,

SHEETER, STAGE RIGGER,

BENDER OPERATOR.............$ 33.55 25.53

FENCE, BARRIER AND

GUARDRAIL INSTALLERS........$ 30.05 25.53

GUARDRAIL LAYOUT MAN........$ 30.79 25.53

HELICOPTER, TOWER...........$ 34.55 25.53

LABO0341-005 09/01/2014

Rates Fringes

Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees

GROUP 1.....................$ 29.24 23.43

GROUP 2.....................$ 30.24 23.43

GROUP 3.....................$ 31.14 23.43

GROUP 3A....................$ 34.42 23.43

GROUP 3B....................$ 35.25 23.43

GROUP 4.....................$ 18.81 23.43

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 32.16 23.43

GROUP 2....................$ 33.26 23.43

GROUP 3....................$ 34.25 23.43

GROUP 3A...................$ 37.86 23.43

GROUP 3B...................$ 38.78 23.43

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

LABO0942-001 04/01/2015

Rates Fringes

Laborers: North of the 63rd Parallel & East of Longitude

138 Degrees

GROUP 1.....................$ 29.79 24.83

GROUP 2.....................$ 30.79 24.83

GROUP 3.....................$ 31.69 24.83

GROUP 3A....................$ 34.97 24.83

GROUP 3B....................$ 35.80 24.83

GROUP 4.....................$ 19.36 24.83

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 32.77 24.83

GROUP 2....................$ 33.87 24.83

GROUP 3....................$ 34.86 24.83

GROUP 3A...................$ 38.47 24.83

GROUP 3B...................$ 39.38 24.83

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

* PAIN1959-001 07/01/2015

NORTH OF THE 63RD PARALLEL

Rates Fringes

PAINTER

BRUSH/ROLLER PAINT OR WALL

COVERER.....................$ 31.47 19.86

TAPING, TEXTURING,

STRUCTURAL PAINTING,

SANDBLASTING, POT TENDER,

FINISH METAL, SPRAY,

BUFFER OPERATOR, RADON

MITIGATION, LEAD BASED

PAINT ABATEMENT, HAZARDOUS

MATERIAL HANDLER............$ 31.99 19.86

* PAIN1959-002 07/01/2015

SOUTH OF THE 63RD PARALLEL

Rates Fringes

PAINTER

Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and Commercial Spray............$ 29.71 19.61 Machine Taper/Drywall.......$ 30.96 19.61 Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 31.06 19.61

* PAIN1959-003 07/01/2015

NORTH OF THE 63RD PARALLEL

Rates Fringes

GLAZIER..........................$ 37.88 20.04

PAIN1959-004 07/01/2012

Rates Fringes

FLOOR LAYER: Carpet.............$ 30.09 13.02

* PAIN1959-006 07/01/2015

SOUTH OF THE 63RD PARALLEL

Rates Fringes

GLAZIER..........................$ 37.88 20.04

PLAS0867-001 02/01/2015

Rates Fringes

PLASTERER

North of the 63rd parallel..$ 36.94 20.22 South of the 63rd parallel..$ 36.69 20.22

PLAS0867-004 02/01/2015

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

North of the 63rd parallel..$ 36.69 20.22 South of the 63rd parallel..$ 36.44 20.22

PLUM0262-002 07/01/2013

East of the 141st Meridian

Rates Fringes

Plumber; Steamfitter.............$ 36.02 25.62

PLUM0367-002 07/01/2013

South of the 63rd Parallel

Rates Fringes

Plumber; Steamfitter.............$ 38.46 20.74

PLUM0375-002 07/01/2014

North of the 63rd Parallel

Rates Fringes

Plumber; Steamfitter.............$ 40.96 21.25

PLUM0669-002 07/01/2013

Rates Fringes

SPRINKLER FITTER.................$ 42.05 21.67

SHEE0023-003 07/01/2015

South of the 63rd Parallel

Rates Fringes

SHEET METAL WORKER...............$ 40.79 22.38

SHEE0023-004 07/01/2015

North of the 63rd Parallel

Rates Fringes

SHEET METAL WORKER...............$ 45.93 21.44

TEAM0959-003 09/01/2014

Rates Fringes

TRUCK DRIVER

GROUP 1.....................$ 39.09 20.02

GROUP 1A....................$ 40.36 20.02

GROUP 2.....................$ 37.83 20.02

GROUP 3.....................$ 37.01 20.02

GROUP 4.....................$ 36.43 20.02

GROUP 5.....................$ 35.67 20.02

GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler

GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)

GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;

Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;

Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards; Partsman;

Stringing Truck

GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Oil Distributor Drivers; Trucks/Jeeps (push or pull); Traffic Control Technician

GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;

Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate); Lumber Carrier; Water Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons; Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle; Hydro-seeders, dual axle;

Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver; Combination Truck-fuel and grease;

Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield); Ready Mix, up to and including 7 yards;

GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;

Gear/Supply Truck; Bus Operator, Up to 30 Passengers;

Rigger/Swamper

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)

AM#2 DOUGLAS HARBOR DREDGING DGH010

DOUGLAS, ALASKA

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 19 40.00 29

SPECIAL ITEMS (CIVIL WORKS)

PART 1 GENERAL

1.1 SCOPE

1.2 REFERENCES

1.3 SUBMITTALS

1.4 ACCIDENT PREVENTION PLAN

1.4.1 Navigation Safety and Coordination Plan

1.5 FIRE SAFETY

1.6 DISPOSITION OF MATERIALS

1.7 TESTS

1.8 Warranty Related Failures

1.9 CAMP FACILITIES

1.10 CONTRACTOR-FURNISHED VEHICLE

1.11 ACCOMMODATIONS FOR GOVERNMENT REPRESENTATIVES

1.12 PARTNERING

1.13 SCHEDULING OF WORK

1.13.1 Schedule Updates

1.14 COORDINATION OF WORK

1.15 EQUIPMENT

1.16 HAUL ROADS, LOADING RAMPS, AND DOCKS

1.17 BLASTING

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

-- End of Section Table of Contents --

Section 01 19 40.00 29 Page 1

SECTION 01 19 40.00 29

SPECIAL ITEMS (CIVIL WORKS)

PART 1 GENERAL

1.1 SCOPE

Items included in this section cover special features and/or requirements which are not otherwise specified or indicated.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

Government acceptance is required for submittals with a "G" designation.

SD-01 Preconstruction Submittals

Accident Prevention Plan (APP); G

Equipment Schedule

1.4 ACCIDENT PREVENTION PLAN

The Accident Prevention Plan (APP) requirements listed in this section supplement those for the APP submittal discussed in Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and EM 385-1-1.

1.4.1 Navigation Safety and Coordination Plan

The Contractor shall submit a Navigation Safety and Coordination Plan as part of the APP. This plan shall include but not be limited to temporary lights at night and/or marker buoys during construction, "Notice to Mariners" and coordination with local officials, and reference to applicable U.S. Coast Guard regulations for construction vessels as well as SECTION 19, Floating Plant and Marine Activities, of EM 385-1-1.

Section 01 19 40.00 29 Page 2

1.5 FIRE SAFETY

The Contractor shall obtain a permit from the organization having jurisdiction over the job site for any welding or open flame work.

1.6 DISPOSITION OF MATERIALS

Combustible and noncombustible waste material shall be disposed of off-site.

No burning will be permitted.

1.7 TESTS

The Contractor shall provide testing, except where specifically noted to be performed by the Government, in accordance with SECTION 01 45 04.00 29

CONTRACTOR QUALITY CONTROL.

1.8 Warranty Related Failures

Upon receipt of notice from the Government of failure of any part of warranted items during the warranty period, the affected part or parts shall be promptly replaced. Such replacement shall include furnishing and installing the necessary new part or parts, making all necessary repairs, restoring the affected item to the operating condition specified in this contract and making all such tests as are necessary to ensure that there are no remaining defects. Such tests shall be performed in the presence of representatives of the Using Agency indicated below. Upon final acceptance of the work or transfer of responsibility to the Government for operation and maintenance of the items covered, whichever is earlier, the Contractor shall be responsible to the Using Agency for the warranty provisions of this contract. A letter stating the applicable warranty provisions shall be furnished to the Contracting Officer in duplicate, in the format and text shown in the sample letter attached to this section.

U.S. Army Engineer District, Alaska P.O. Box 6898

JBER, Alaska 99506-6898

1.9 CAMP FACILITIES

There are no Government owned camp facilities at the job site for the Contractor's use.

1.10 CONTRACTOR-FURNISHED VEHICLE

The Contractor shall provide and maintain a four-wheel-drive late model Blazer/Explorer-type vehicle at the job site, in good repair and approved by the Contracting Officer, for the use of the Government representatives regularly employed at the job site. The cost of providing the vehicle and fuel, oil, maintenance and repairs shall be borne by the Contractor and included in the contract price. The vehicle shall be in place by start of initial setup work at the job site and maintained through final cleanup.

During any down time, an equal substitute vehicle shall be provided immediately.

1.11 ACCOMMODATIONS FOR GOVERNMENT REPRESENTATIVES

The Contractor shall furnish suitable separate living facilities near the job site to be used as quarters for the Government representatives regularly employed at the job site, and located separately from the

Section 01 19 40.00 29 Page 3

Contractor's area. Quarters furnished shall be equivalent in quality to the quarters furnished to the Contractor's supervisory personnel. The facilities shall meet all prescribed safety, sanitation and health requirements. All costs shall be borne by the Contractor and included in the contract price. The facilities shall be subject to the approval of the Contracting Officer and shall meet or exceed the following requirements:

a. One hotel room, house or modular-type housing unit, with the following for each unit:

b. Single rooms for two people, each equipped with dresser, nightstand, full-size bed with clean linen, blankets and pillows; each room to have at least 160 square feet of area.

c. A kitchen equipped with a range (vented hood), garbage disposal, microwave oven, refrigerator with freezer, and cooking and eating utensils.

d. A utility room equipped with clothes washer and dryer.

e. A day room equipped with chairs, couch, and a color television with clear reception of basic, locally available channels.

f. A private bathroom for each bedroom, with toilet, wash basin, and shower.

g. Daily maid and janitorial service; weekly linen service.

h. A telephone and answering machine with a single party line.

The Contractor shall furnish and install utilities, providing connections to service locations. Accommodations shall be in place and connected by start of initial setup work at the job site and maintained through final cleanup. All costs shall be borne by the Contractor and included in the contract price, except that long distance charges incurred by the Government representative will be paid for by the Government upon arrangement with the Contracting Officer.

AM#2...deleted text...AM#2

1.12 PARTNERING

a. The Government intends to encourage the foundation of a cohesive partnership with the Contractor and its subcontractors. This partnership will be structured to draw on the strengths of each organization to identify and achieve reciprocal goals. The objectives are effective and efficient contract performance, intended to achieve completion within budget, on schedule, and in accordance with plans and specifications.

b. This partnership will be bilateral in makeup, and participation will be totally voluntary. Implementation of this initiative will be a topic of discussion at the Preconstruction Conference. Other recurring or special purpose meetings, as agreed between the Government and the Contractor, will be held as necessary to resolve contentious issues and maintain the partnering spirit.

Section 01 19 40.00 29 Page 4

1.13 SCHEDULING OF WORK

The contractor shall develop a construction schedule in accordance with FAR 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS. The construction schedule shall be submitted, reviewed and approved by the Contracting Officer or designated representative prior to the start of any construction activities. The schedule shall be in bar chart format and include activities that correspond with the pay activities listed in the QCS data base. A narrative addressing each of the activities shall be provided as part of the schedule.

AM#2... The Contractor shall comply with the City and Borough of Juneau noise ordinance CBJ 42.20.095(c). Currently construction equipment shall only operate between 07:00 & 22:00 Monday through Friday and between 09:00 & 22:00 on Saturday and Sunday. ...AM#2

Non pay activities, sufficient to clearly describe the efforts needed to execute the work, shall be identified and clearly shown on the schedule and in the narrative. As a minimum the following items shall be included in the schedule:

a. Notice to Proceed (NTP) date

b. Mobilization

c. Plan submittals/approvals

d. Pre-Construction survey

e. Dredging Start

f. Dredging End

g. Post-Dredge/Pre-Cap Survey

h. Capping Start

i. Capping End

j. Post Construction Survey

k. Demobilization

l. Construction Completion Date (CCD)

1.13.1 Schedule Updates

An updated schedule and narrative shall be provided as part of each pay request package. The bar chart shall be updated to graphically reflect the current progress of each item. The narrative shall include a description of each activity and its current status/progress, actual start date and actual end date. An estimated completion percentage shall be identified for each activity in the schedule.

1.14 COORDINATION OF WORK

The Contractor shall be responsible for all coordination with the U.S.

Coast Guard and all concerned State and local interests regarding its activities, and also with any other contractors as specified in the CONTRACT CLAUSES. The Contractor shall keep advised of vessel traffic near the job site and conduct operations so that interference with vessels will not occur. The Contractor shall conduct its work and dispose of its plant and equipment in a manner that will minimize interference with other construction or operations at the job site. The Government does not guarantee unrestricted availability of the site. Upon completion of the work, the Contractor shall promptly remove its plant, including ranges, buoys, piles, and other temporary structures placed by it under the contract, in navigable waters or on shore.

Section 01 19 40.00 29 Page 5

1.15 EQUIPMENT

The following Equipment Schedule shall be completed by the Contractor and submitted within 10 days of receipt of Notice-to-Proceed. The Contractor shall keep equipment on the job sufficient to meet the requirements of the work. The equipment shall be in satisfactory operating condition and capable of safely and efficiently performing the work as set forth in the specifications and shall be subject to inspection by the Contracting Officer at all times. The equipment used shall be of a design and have characteristics similar to equipment which has been used successfully for a minimum of 3 years under similar conditions. It shall be the responsibility of the Contractor to prove this equipment has sufficient capacity to accomplish the work in a timely manner without damaging existing facilities or obstructing navigation.

a. Number. For equipment give identifying number or name.

b. Type. Under this heading give general description. Sufficient detailed information shall be furnished to properly delineate the proposed equipment and operation.

c. Capacity. Under this heading, state the estimated capacity of the plant and equipment in cubic yards or tons per day when working materials similar to those anticipated in the work. No reduction in the stated capacity of the plant and equipment employed on the work shall be made except by written permission of the Contracting Officer.

The measure of the "capacity of the plant and equipment" shall be its actual performance on the work.

PLANT AND EQUIPMENT SCHEDULE

(To Be Submitted as Indicated)

Minimum Plant To Be Used Number Type Capacity Manufacturer Age & Condition Location Value

Note: In preparing the above tabulation, the Contractor shall insert the necessary information under the appropriate heading, using a separate line for each major item and additional pages if necessary.

1.16 HAUL ROADS, LOADING RAMPS, AND DOCKS

The use of existing roads for hauling shall be coordinated with Federal, State and Local agencies. It shall be the Contractor's responsibility to acquire all permits and easements for use of existing roads and docks or for construction of new haul roads, loading ramps, and docks.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .