Dwgs_W911KB-15-R-0025.pdf

PDF 8 MB Posted

Attached to
DOUGLAS HARBOR MAINTENANCE DREDGING, DOUGLAS, ALASKA Federal contract opportunity
Solicitation number
W911KB-15-R-0025
Issued by
Department of the Army Corps of Engineers Engineering District Alaska

About this file

Drawings

View the file

Other files for this federal contract opportunity

Other files attached to DOUGLAS HARBOR MAINTENANCE DREDGING, DOUGLAS, ALASKA, newest first.
File Type Posted
W911KB-15-R-0025_AM_4.pdf PDF
W911KB-15-R-0025-AM_3.pdf PDF
W911KB-15-R-0025_AM_2.pdf PDF
W911KB-15-R-0025_AM_1.pdf PDF
RFP_W911KB-15-R-0025.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS (NOT ALL USED IN THESE DRAWINGS)

GENERAL NOTES

1. SCOPE OF WORK:

THIS PROJECT INCLUDES DREDGING THE SPECIFIED AREA OF DOUGLAS HARBOR, DISPOSING

OF THE DREDGED MATERIAL IN GASTINEAU CHANNEL, AND APPLYING A SAND CAP TO BOTH

THE DREDGED AREA AND THE DISPOSAL AREA.

2. STAGING AREA:

NO STAGING AREA IS DESIGNATED. COORDINATE WITH THE CITY AND BOROUGH OF JUNEAU

PORT DIRECTOR CARL UCHYTIL AT (907) 586-0292 OR

http://www.juneau.org/harbors/webcontact/index.php.

3. THE DOUGLAS HARBOR ENTRANCE CHANNEL IS SUBJECT TO HIGH WINDS, WAVES, AND

CURRENTS. WAVE HEIGHTS OF UP TO 4' HAVE BEEN OBSERVED AT THE ENTRANCE

CHANNEL. WIND AND WAVE CONDITIONS FOR THE DISPOSAL SITE HAVE NOT BEEN

EVALUATED BUT ARE KNOW TO BE HIGHER THAN THOSE AT THE ENTRANCE CHANNEL.

SUCH CONDITIONS CAN AND DO OCCUR ANY TIME OF THE YEAR. THE CONTRACTOR SHALL

PLAN AND PERFORM HIS CONSTRUCTION ACTIVITIES AND SEQUENCE TO TAKE INTO

ACCOUNT SUCH CONDITIONS.

4. THE CONTRACTOR SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO AVOID ANY

DISTURBANCE TO THE EXISTING HARBOR FACILITIES. PRIOR TO BEGINNING CONSTRUCTION

THE CONTRACTOR SHALL PERFORM A PRE-CONDITION WALK THROUGH WITH THE HARBOR

MASTER AND GOVERNMENT REPRESENTATIVE. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR RESTORING THE PROJECT AREA TO ITS ORIGINAL CONDITION AT HIS OWN EXPENSE

UPON COMPLETION OF THE PROJECT.

5. THE CONTRACTOR SHALL COORDINATE WITH THE CITY AND BOROUGH OF JUNEAU PORT

DIRECTOR TO MINIMIZE DISRUPTION OF NORMAL HARBOR OPERATIONS. THE CONTRACTOR

SHALL BE REQUIRED TO PROVIDE ACCESS THROUGH THE PROJECT SITE FOR BOATS

ENTERING OR LEAVING THE HARBOR AT ALL TIMES.

6. THE CONTRACTOR SHALL COMPLY WITH THE CITY AND BOROUGH OF JUNEAU NOISE

ORDINANCE CBJ 42.20.095(b). CURRENTLY CONSTRUCTION EQUIPMENT SHALL ONLY

OPERATE BETWEEN 07:00 & 22:00 MONDAY THRU FRIDAY AND BETWEEN 09:00 & 22:00 ON

SATURDAY AND SUNDAY.

7. GCI SUBMERSIBLE FIBER OPTIC CABLES WITH 30' EASEMENTS ARE PRESENT IN GASTINEAU

CHANNEL AS SHOWN ON SHEET V-102. THE CONTRACTOR SHALL TAKE ALL MEASURES

NECESSARY TO PROTECT THESE LINES.

8. TIDAL DATA, JUNEAU, GASTINEAU CHANNEL, ALASKA

BASED ON:

ANALYSIS PERIOD : 01/01/2007 - 12/31/2011

TIDAL EPOCH: 1983-2001

CONTROL STATION: 9452210, JUNEAU, AK

NOAA CHART: 17315

USGS QUAD (1:63,000): JUNEAU B-2

ELEVATIONS OF DATUMS REFERRED TO MEAN LOWER LOW WATER (MLLW), IN FEET:

HIGHEST OBSERVED WATER LEVEL (2 NOV, 1948) = 24.82

MEAN HIGHER HIGH WATER (MHHW) = 16.31

MEAN HIGH WATER (MHW) = 15.34

MEAN SEA LEVEL (MSL) = 8.56

MEAN TIDE LEVEL (MTL) = 8.47

MEAN LOW WATER (MLW) = 1.60

MEAN LOWER LOW WATER (MLLW) = 0.00

LOWEST OBSERVED WATER LEVEL 14 DEC, 2008) = -5.89

@ AT

# NUMBER

& AND

2L DOUBLE ANGLE

℄ CENTERLINE

Ø DIAMETER, ROUND

AB ANCHOR BOLT

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

AKDOT ALASKA DEPARTMENT OF

TRANSPORTATION

ALUM ALUMINUM

APPROX APPROXIMATELY

ASTM AMERICAN SOCIETY FOR TESTING

AND MATERIALS

AWS AMERICAN WELDING SOCIETY

BJ BAR JOIST

BLDG BUILDING

BLKG BLOCKING

BOTT BOTTOM

BP BASE PLATE

C AMERICAN STANDARD CHANNELS

CB CATCH BASIN

CHKR CHECKER

CIP CAST IN PLACE

CJP COMPLETE JOINT PENETRATION

CL CENTERLINE

CLR CLEAR

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNIT

CONC CONCRETE

CONN(S) CONNECTION(S)

CONT CONTINUOUS

COORD'S COORDINATES

CSK COUNTERSINK

DET(S) DETAIL(S)

DICA DRILL-IN-CONCRETE-ANCHOR

DIM(S) DIMENSION(S)

DIST DISTANCE

DO DITTO

DTI DIRECT TENSION INDICATOR

DWG(S) DRAWING(S)

DS DROP STRUCTURE

(E) EXISTING

EA EACH

EF EACH FACE

EL ELEVATION, EARTHQUAKE LOAD

ES EACH SIDE

EW EACH WAY

EXP EXPANSION

EXT EXTERIOR

f`c COMPRESSIVE STRENGTH

FAB FABRICATION

FBW FLOATING BREAKWATER

FF FINISH FLOOR

FH FLAT HEAD

FIO FOR INFORMATION ONLY

FLR FLOOR

FRT FIRE RETARDANT TREATED

FS FAR SIDE

FT FOOT OR FEET

FT³ CUBIC FEET

R RADIUS

RBW RUBBLEMOUND BREAKWATER

REBAR REINFORCING STEEL BAR(S)

REINF REINFORCING, REINFORCEMENT,

REINFORCED

REQD REQUIRED

RO ROUGH OPENING

RP RADIUS POINT

S AMERICAN STANDARD STEEL

SHAPE, SOUTH, SPACING

SCHED SCHEDULE

SDMH STORM DRAIN MANHOLE

SECT SECTION

SHT SHEET

SIM SIMILAR

SLH SHORT LEG HORIZONTAL

SLV SHORT LEG VERTICAL

SOG SLAB ON GRADE

SPEC SPECIFICATION

SPI SEDIMENT PROFILE IMAGING

SQ SQUARE

SS STAINLESS STEEL

SSL(S) SHORT-SLOTTED HOLE(S)

SSMH SANITARY SEWER MANHOLE

ST STRUCTURAL TEE FROM THE S

SERIES SECTION

STD STANDARD, STANDARD-WEIGHT

PIPE

STL STEEL

SYM SYMMETRICAL

T TOP

TBLT TIMBER BOLT

T&B TOP & BOTTOM

THK THICK(NESS)

THRU THROUGH

TOC TOP OF CONCRETE

TR TELEPHONE RISER

TRANS TRANSVERSE

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

UHMW-PE ULTRA HIGH MOLECULAR WEIGHT

POLYETHYLENE

USACE U.S. ARMY CORPS OF ENGINEERS

VERT VERTICAL

W W SERIES SECTION, WEST, WIDE

W/ WITH

W/O WITHOUT

WL WORK LINE

WP WORK POINT

WT WEIGHT, STRUCTURAL TEE FROM

W SERIES SECTION

WV WATER VALVE

WWF WELDED WIRE FABRIC

XS EXTRA-STRONG WEIGHT PIPE

XXS DOUBLE-EXTRA-STRONG WEIGHT

PIPE

YD YARD

YD³ CUBIC YARD

GALV GALVANIZE(D), GALVANIZING

H HIGH

HAS HEADED ANCHOR STUD

HDG HOT-DIPPED GALVANIZED

HGT HEIGHT

HOR HORIZONTAL

HS HIGH-STRENGTH

HSB HIGH-STRENGTH BOLT

HSS HOLLOW STRUCTURAL SECTION

HYD FIRE HYDRANT

IE INVERT ELEVATION

INT INTERIOR

IP IRON PIPE

JB JUNCTION BOX

JT JOINT

JST JOIST

K-FT KIP-FEET

KIP 1,000 POUNDS

kN KILONEWTON(S)

L ANGLE, LONG

LBS POUNDS

LIW LOAD INDICATING WASHER(S)

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LONG LONGITUDINAL

LSL(S) LONG-SLOTTED HOLE(S)

M STEEL SHAPE FROM THE

MISCELLANEOUS SECTION

MAX MAXIMUM

MBR(S) MEMBERS(S)

MI MALLEABLE IRON

MILS THOUSANDTHS OF AN INCH

MIN MINIMUM

MISC MISCELLANEOUS

MIW MALLEABLE IRON WASHER

MPa MEGAPASCAL(S)

MPH MILES PER HOUR

MT STRUCTURAL TEE FROM THE M

SERIES SECTION

N NORTH

NIC NOT IN CONTRACT

No. NUMBER

NOM NOMINAL

NPS NOMINAL PIPE SIZE

NS NEAR SIDE

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OPP OPPOSITE

OVS OVERSIZED HOLES

PC POINT OF CURVATURE

PJP PARTIAL JOINT PENETRATION

PL PLATE(S)

PLF POUNDS PER LINEAR FOOT

PSI POUNDS PER SQUARE INCH

PT POINT OF TANGENCY

PVI PLAN VIEW IMAGING

G E

N E

R A

L

G-002

G E

N E

R A

L

N

O T

E S

A

N D

B B

R E

V I A

T I O

N S

O T

E D

C E

P O

A E

N G

E N

G

H

H

G E

N E

R A

L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

C T

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

F

R A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

G d w g l a s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r t

P o n

P

M

G

H

P

N

O

W K

B R

J U

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S K

IF THIS LINE DOES NOT

MEASURE 2", ADJUST SCALE ACCORDINGLY.

PROJECT LOCATION

SOURCE: USGS TOPOGRAPHIC MAP JUNEAU (B-2), ALASKA

VICINITY MAP

Gulf of Alaska

PROJECT

LOCATION

Arctic Ocean

Bering Sea

Pacific Ocean

ALASKA CANADA

FAIRBANKS

ANCHORAGE

HOMER

JUNEAU

DOUGLAS

KETCHIKAN

SCALE IN FEET

300 0 600

G a s t i n e u h a n n e l

P L

A N

S

V-101

L O

C A

T I O

N

A

V

I C

I N

I T

Y

M

A P

T

E D

C E

P O

A E

N G

E N

G

H

H

S U

R V

Y

P

P I N

G

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

V d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

JUNEAU

ISLAND

N 2,356,000

E

E

E

N 2,356,000

E

N 2,355,000 N 2,355,000

N 2,354,000 N 2,354,000

N 2,353,000

E

E

E

N 2,353,000

E

DSL-5

DSL-6

DSL-7

DSL-8

HSL-1

HSL-2

HSL-3

HSL-4

GCI SUBMERSIBLE

FIBER OPTIC CABLES

AND 30' EASEMENTS

BACKGROUND PHOTO IS A DIGITAL

GLOBE GEO-REFERENCED IMAGE

TAKEN ON 4 APRIL, 2015.

DISP BL-5

DISP BL-6

C

U x

C

U x

C

U x

C

U x

C

U x

C

U x

C

U x

C

U x

C

U x

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C U x

C U x

C U x

C E

C E

C E

C E

C E

C E

C E

C E

C E

C E

E

E

CB-1

CB-2

CB-3

CB-4

CB-5

SOUTH

LAUNCH

RAMP

DISPOSAL PLACEMENT

ZONES, SEE C-102

THANE

ROAD

SOUTHEAST

RUBBLEMOUND

BREAKWATER

NORTHWEST

RUBBLEMOUND

BREAKWATER

FEDERAL

DREDGE

BASIN LIMITS

NORTH

GANGWAY

HARBOR

FLOATS, TYP

DISPOSAL SITE

CONTROL BOUNDARY

NORTH

LAUNCH

RAMP

GRAPHIC SCALE IN FEET

0 600400200 200100

SURVEY CONTROL

DATA

STATION

DH-3

DH-C

DH-D

DHAR

DL-1

RAMP

NORTHING

2,354,095.52

2,353,359.31

2,353,103.36

2,353,388.57

2,353,650.68

2,353,048.30

EASTING

2,546,951.26

2,546,726.69

2,547,126.72

2,547,704.09

2,547,782.85

2,547,438.98

MLLW

26.02

25.69

25.40

23.74

64.37

23.02

DESCRIPTION

3 1/4 INCH BC

IN GRANITE

BOULDER

3 1/4 INCH

DBC IN

ASPHALT

3 1/4 INCH

DBC IN

ASPHALT

SIDEWALK

3 1/4 INCH BC

IN GRANITE

BOULDER

USACE SBC

FLAGPOLE IN

CONCRETE

USACE SBC

W. SIDE RAMP

END PVMT.

NOTES

1. HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 1,

NAD83(2011) IN U.S. SURVEY FEET BASED ON LOCAL

CONTROL MONUMENT "DHAR" AS N 2,354,095.52, E

2,546,726.69 AND "DH-D 2000" AS N 2,353,359.31, E

2,547,126.72.

2. VERTICAL CONTROL IS MEAN LOWER LOW WATER

(MLLW=0.0'), BASED ON NOAA/NOS TIDAL BENCH MARK LIST:

"945 2210, JUNEAU, GASTINEAU CHANNEL, STEPHENS PASS,

ALASKA", PUBLISHED 10/20/2011. THIS TIDAL DATUM IS

BASED ON THE 2002-2006 TIDAL EPOCH AND IS

REFERENCED BY HOLDING NOAA TIDAL BENCH MARK "JNU

TIDAL GPS 1999" (PID AI4908, VM# 16187) AS 29.16' AND NOAA

TIDAL BENCH MARK "2210 K 2011" (VM# 20160) AS 26.88'.

3. VERTICAL TIES TO THE NATIONAL SPATIAL REFERENCE

SYSTEM ARE BASED ON PUBLISHED NAVD88 ELEVATIONS

HOLDING THE OPUS DB PUBLISHED VALUES OF "JNU TIDAL

GPS 1999" (PID AI4908, VM#16187) AS 20.30'.

4. THE SURVEY WAS CONDUCTED ON MAY 6 & 8, 2013 BY

HUGHES & ASSOCIATES. HYDROGRAPHIC SOUNDING DATA

WAS COLLECTED USING AN ODOM ES3 MULTI-BEAM

ECHOSOUNDER (200KHZ, 120-DEGREE SWATH-WIDTH WITH

480, 0.75 DEGREE BEAMS). POSITIONING AND VESSEL

ATTITUDE WERE PROVIDED IN REAL TIME USING A TRIMBLE

461 RTK GPS RECEIVER OPERATING ON KINEMATIC

CORRECTORS BROADCAST FROM A TRIMBLE R8 RTK BASE

RECEIVER SET AT CONTROL STATION, "DH-C". SOUND

VELOCITY PROFILE WAS PROVIDED USING AN ODOM

DIGI-BAR PRO, AND WAS PROVIDED IN REAL TIME AT THE

SOUNDER HEAD USING AN ODOM DIGI-BAR V. DATA

COLLECTION AND NAVIGATION WERE PERFORMED USING

HYPACK HYSWEEP (2013) SOFTWARE. MULTI-BEAM SURVEY

DATA WAS POST-PROCESSED USING HYPACK HYSWEEP

(2013) SOFTWARE.

5. THIS DRAWING INDICATES GENERAL CONDITIONS AT THE

TIME OF THE SURVEY.

LEGEND

SURVEY CONTROL STATION

SURVEY LIMITS AND CONSTRUCTION BOUNDARY WHERE COMMON

HARBOR SURVEY LIMIT CORNER

DISPOSAL AREA SURVEY LIMIT CORNER

HSL-2

DSL-5

CONSTRUCTION BOUNDARY

EXISTING SUBMERGED FIBER OPTIC COMMUNICATION CABLE

COMMUNICATION CABLE EASEMENT

CU

x

C/E

P L

A N

S

V-102

S U

R V

N

T R

O L

T

E D

C E

P O

A E

N G

E N

G

H

H

S U

R V

P

P I N

G

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

V d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

DISPOSAL AREA SURVEY LIMITS

CORNER#

DSL-5

DSL-6

DSL-7

DSL-8

NORTHING

2,355,899.59

2,353,879.54

2,352,479.81

2,354,499.86

EASTING

2,549,014.69

2,551,178.24

2,549,871.35

2,547,707.79

HARBOR SURVEY LIMITS

CORNER#

HSL-1

HSL-2

HSL-3

HSL-4

NORTHING

2,353,873.99

2,353,531.23

2,353,039.90

2,353,382.66

EASTING

2,547,176.07

2,547,722.46

2,547,414.23

2,546,867.85

COORDINATE TABLE NOTES:

1. SURVEY LIMITS, DISPOSAL BASELINE, AND CONSTRUCTION

BOUNDARY SHOWN PERTAIN TO SURVEY WORK REQUIRED FOR

THIS CONTRACT RATHER THAN SURVEY CONTROL WORK

PERFORMED BY HUGHES & ASSOCIATES.

2. BOTH HYDROGRAPHIC AND TOPOGRAPHIC METHODS ARE

REQUIRED TO SURVEY THE HARBOR SURVEY LIMITS AND THE

CONSTRUCTION BOUNDARY.

DISPOSAL BASELINE

NAME

DISP BL-5

DISP BL-6

NORTHING

2,355,554.60

2,352,824.80

EASTING

2,547,981.16

2,550,904.88

CONSTRUCTION BOUNDARY COORDINATES

CORNER#

CB-1

CB-2

HSL-3

HSL-2

CB-3

CB-4

CB-5

DSL-7

DSL-6

DSL-5

CCW ORDER

NORTHING

2,354,145.98

2,353,647.48

2,353,039.90

2,353,531.23

2,353,801.65

2,354,013.25

2,354,117.61

2,352,479.81

2,353,879.54

2,355,899.59

EASTING

2,546,844.35

2,546,445.71

2,547,414.23

2,547,722.46

2,547,291.39

2,547,313.29

2,547,525.33

2,549,871.35

2,551,178.24

2,549,014.69

T

E D

C E

P O

A E

N G

E N

G

H

H

S U

R V

P

P I N

G

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

V

O

R D

I N

A T

E

T

A B

L E

S d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

S C

H E

D U

L E

S

A

A

G R

A M

S

V-601

C O

O R

D I N

A T

E

T

A B

L

L

O

A

T

I

E

A

K

W

A

T

E

R

N

O

R

H

U

N

M

P

F

E

D

E

R

E

D

S

I

N

P

A

R

K

I

N

G

U

S

U

R

E

M

I

N

E

S

JUNEAU

ISLAND

P

A

R

K

I

N

G

P

A

R

K

I

N

G

S

A

V

I

K

A

D

S

A

V

I

K

A

D

SAVIKKO PARK

23680

(DOUGLAS BOAT HARBOR LIGHT ID)

E

E

E

E

N 2,353,250

E

N 2,353,500

N 2,353,750

E

E

E

E

N 2,354,000

E

N 2,353,250

E

N 2,353,500

N 2,353,750

N 2,354,000

E

A

B

C

D

E

4+00

N-S BL1

N-S BL2

E x

E x

W x

J

B

T

R

T

R

J

B

W x

W x

W x

W x

W x

W x

W x

W x

W x

J

B

J

B

S

D

M

H

C

B

S

D

M

H

M

B

E

R

W

A

L

L

P

S

D

M

H

I

E

C

B

S

D

M

H

SDM

H

IE 14.58'

S

D

M

H

S D

M H

C

B

S

D

M

H

4+00

7+00

E-W BL3

E-W BL4

CB-3

CB-4

C

M

P

C

M

P

S

D

M

H

C

M

P

C

M

P

C

M

P

C

M

P

C

M

P

C

M

P

C

M

P

C

M

P

W

A

T

E

R

V

A

L

V

E

P

I

T

P

A

D

M

O

U

N

T

T

R

A

N

S

F

O

R

M

E

R

(E) UNDERGROUND

ELECTRICAL LINE

GRAPHIC SCALE IN FEET

0 15010050 5025

A

C

C

B

C

C

T

Y

P

(E) LAUNCH RAMP

AND BOARDING

FLOAT, SEE NOTE 2.

NOTES:

1. ALL MOORING FLOATS, ASSOCIATED GANGWAY AND PILING, AND MOORED VESSELS WILL BE

REMOVED FROM THE FEDERAL DREDGE BASIN, BY OTHERS, PRIOR TO THE START OF FIELD

WORK ON THIS CONTRACT.

2. THREE CONCRETE RAMP PLANKS HAVE BEEN PLACED JUST BELOW THE WEST CORNER OF THE

TOE OF THE RAMP. THE CONTRACTOR SHALL EXERCISE CAUTION IN DREDGING THE SIDE

SLOPES NEAR THE TOE OF THE EXISTING CONCRETE LAUNCH RAMP, AND NEAR THESE THREE

ADDITIONAL PLANKS, TO KEEP FROM UNDERMINING THE TOE OR THE ADDITIONAL PLANKS. IT IS

ACCEPTABLE TO STEEPEN THE SIDE SLOPE IN A SMALL, LOCAL AREA, THE MINIMUM AMOUNT

NECESSARY TO ACCOMPLISH THIS.

3. RIPRAP BOUNDARY SHOWN IS APPROXIMATE. THE CONTRACTOR SHALL EXERCISE CAUTION IN

THIS AREA. LOCATE THE ACTUAL EXTENT OF THE RIPRAP TOE AND PROTECT THE (E) RIPRAP

AND FILTER FABRIC. SEE C/C-301 FOR ADDITIONAL INFORMATION REGARDING THIS AREA.

4. CONTRACTOR SHALL DEMO AND DISPOSE OF ONE (E) ABANDONED 3" OR 4" HDPE WATER LINE

AND ONE ASSUMED CONCRETE ANCHOR BLOCK WITHIN EXTENT OF SPECIFIED DREDGING. NOTE

THAT BOTH ENDS OF THE WATER LINE WILL BE DISCONNECTED PRIOR TO THE START OF FIELD

WORK ON THIS CONTRACT.

5. BACKGROUND PHOTO IS A DIGITAL GLOBE GEO-REFERENCED IMAGE TAKEN ON 4 APRIL, 2015.

6. EXTENT OF DREDGING ALONG THE BASIN BOUNDARY BETWEEN DREDGE LIMIT CORNERS 1 AND 2

SHALL BE TO THE PRACTICABLE LIMITS OF THE CONTRACTORS EQUIPMENT GIVEN THE

RESTRAINTS OF THE (E) FLOATS AND ASSOCIATED STEEL PILES. THE HARBOR MASTER WILL

CLEAR ALL MOORED VESSELS FROM THE FINGER FLOATS ON THE EAST SIDE OF MAINWALK

FLOAT D PRIOR TO START OF DREDGING.

7. THE CONTRACTOR SHALL SEPARATE AND PROPERLY DISPOSE OF ALL VISIBLY EVIDENT

MAN-MADE MATERIALS AND DEBRIS ENCOUNTERED DURING DREDGING ACTIVITIES. SEE

SECTION 35 20 23 FOR A DESCRIPTION OF THE INCIDENTAL WORK REQUIRED.

C

C

C

(E) ABANDONED 3"

OR 4" HDPE WATER

LINE, SEE NOTE 4.

LEGEND

MAINWALK FLOAT DESIGNATION

SURVEY MONUMENT

DREDGE BASIN CORNER5

NAVIGATION MARKER

A

(E) 1' CONTOUR

(E) 5' CONTOUR

POST-DREDGE 1' CONTOUR

POST-DREDGE 5' CONTOUR

(E) STORM DRAIN PIPE

(E) OVERHEAD ELECTRIC LINE

(E) UNDERGROUND WATER LINE

(E) TELEPHONE RISER

(E) UTILITY POLE

(E) STORM DRAIN MANHOLE

(E) SDMH W/ INLET

(E) WATER VALVE

(E) FIRE HYDRANT

Y

(E) ELECTRICAL JUNCTION BOX

(E) CATCH BASIN

(E) LIGHT POLE OR

PILE MOUNTED LIGHT

DREDGE LIMITS

CORNER#

NORTHING

2,353,746.99

2,353,463.37

2,353,402.25

2,353,353.12

2,353,177.75

2,353,499.66

2,353,712.22

EASTING

2,547,214.45

2,547,036.52

2,547,133.94

2,547,103.12

2,547,382.66

2,547,584.60

2,547,245.76

DREDGING BASELINES

NAME

E-W BL3

E-W BL4

N-S BL1

N-S BL2

NORTHING

2,353,669.51

2,353,244.38

2,353,126.57

2,353,719.55

EASTING

2,546,956.31

2,547,634.00

2,547,087.90

2,547,459.89

E x

W x

P L

A N

S

C-101

H A

R B

T

E

P

L A

N

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

A

B

C

D

N 2,354,500

E

E

N 2,354,500

E

N 2,354,000 N 2,354,000

N 2,353,500

E

E

N 2,353,500

E

SCHEMATIC EXTENTS OF

DISPOSAL MOUND SHOWN FOR

ILLUSTRATION ONLY.

CONTRACTOR SHALL

DETERMINE ACTUAL MOUND

GEOMETRY, BY SPI/PVI AND

SURVEY METHODS SPECIFIED,

AFTER PLACEMENT.

L

W

R

R

E

N

T

P

L

A

C

E

M

E

Z

N

E

E

B

B

T

I

D

E

P

L

A

C

E

M

E

N

E

F

L

O

O

D

T

I

D

E

P

L

A

C

E

M

E

N

E

D

O

M

I

N

A

B

C

U

R

R

E

N

T

E

S

P

O

S

A

L

H

E

A

D

I

N

G

D

O

M

I

N

A

O

O

D

C

U

R

R

E

N

T

F

L

O

S

P

O

S

A

L

H

E

A

D

I

N

G

C

U x

C

U x

C

U x

C

U x

C

U x

C

U

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

DISPOSAL AREA SURVEY

LIMITS, SEE V-102 AND V-601

SCHEMATIC EXTENT

OF DISPOSAL

THICKER THAN 1cm

SCHEMATIC EXTENT

OF DISPOSAL

THICKER THAN 6 in.

GRAPHIC SCALE IN FEET

0 300200100 10050

A

C

C

GCI SUBMERSIBLE

FIBER OPTIC CABLE

AND 30' EASEMENT

GASTINEAU CHANNEL DREDGE DISPOSAL

SITE CONTROL SUMMARY TABLE

POINT

A

B

C

D

NORTHING

2,354,852

2,354,128

2,353,459

2,354,183

EASTING

2,549,404

2,550,179

2,549,555

2,548,780

LATITUDE

N058° 16' 44.90"

N058° 16' 37.85"

N058° 16' 31.20"

N058° 16' 38.25"

LONGITUDE

W134° 22' 33.32"

W134° 22' 18.69"

W134° 22' 30.24"

W134° 22' 44.87"

EBB-TIDE PLACEMENT ZONE CONTROL

SUMMARY

POINT

NORTHING

2,354,440

2,354,235

2,354,103

2,354,308

EASTING

2,549,307

2,549,526

2,549,404

2,549,184

LATITUDE

N058° 16' 40.83"

N058° 16' 38.84"

N058° 16' 37.53"

N058° 16' 39.53"

LONGITUDE

W134° 22' 35.06"

W134° 22' 30.92"

W134° 22' 33.19"

W134° 22' 37.33"

FLOOD-TIDE PLACEMENT ZONE CONTROL

SUMMARY

POINT

NORTHING

2,354,276

2,354,071

2,353,940

2,354,144

EASTING

2,549,483

2,549,702

2,549,579

2,549,360

LATITUDE

N058° 16' 39.24"

N058° 16' 37.24"

N058° 16' 35.94"

N058° 16' 37.93"

LONGITUDE

W134° 22' 31.75"

W134° 22' 27.61"

W134° 22' 29.88"

W134° 22' 34.02"

LOW CURRENT PLACEMENT ZONE

CONTROL SUMMARY

POINT

NORTHING

2,354,358

2,354,153

2,354,022

2,354,226

EASTING

2,549,395

2,549,614

2,549,491

2,549,272

LATITUDE

N058° 16' 40.04"

N058° 16' 38.04"

N058° 16' 36.73"

N058° 16' 38.73"

LONGITUDE

W134° 22' 33.41"

W134° 22' 29.27"

W134° 22' 31.54"

W134° 22' 35.68"

D I S

P O

S A

L

S

I T

E

B O

U N

D A

R Y

O U

T E

R

B

O U c m

I C

K

O

R

T H

I C

K E

R

D

R E

D G

T

E R

I A

L

D

E P

O S

I T

SAND

CAP

SAND

CAP

SCHEMATIC DISPOSAL MOUND

GEOMETRY, FINAL EXTENT AND

THICKNESS TO BE FIELD DETERMINED.

EBB - TIDE

PLACEMENT ZONE

FLOOD - TIDE

PLACEMENT ZONE

LOW CURRENT

PLACEMENT ZONE

EXISTING

GROUND

DISPOSAL SITE SAND CAP SECTION

NOT TO SCALE

A

C-102 C-102

A

D

B

C

D I S

P O

S A

L

S

I T

E

B O

U N

D A

R Y

MIN 12" THK SAND CAP OVER 6" THK OR THICKER

DEPOSIT OF DREDGED MATERIAL, TYP

MIN 6" THK SAND CAP OVER

DREDGED MATERIAL DEPOSIT

< 6" THK BUT >= 1cm THK

MIN 6" THK SAND

CAP OVER DREDGED

MATERIAL DEPOSIT < 6"

THK BUT >= 1cm THK

EXISTING

GROUND

O U

T E

R

B

O U

I C

K

O

R

T H

I C

K E

R

D

R E

D G

T

E R

I A

L

D

E P

O S

I T

O U

T E

R

B

O U

I C

K

O

R

T H

I C

K E

R

D

R E

D G

T

E R

I A

L

D

E P

O S

I T

O U

T E

R

B

O U c m

I C

K

O

R

T H

I C

K E

R

D

R E

D G

T

E R

I A

L

D

E P

O S

I T

THANE

ROAD

GRAPHIC SCALE IN FEET

0 1200800400 400200

DISPOSAL

SITE

CONTROL

BOUNDARY

BACKGROUND PHOTO IS A DIGITAL

GLOBE GEO-REFERENCED PHOTO

TAKEN ON 4 APRIL, 2015.

DISPOSAL AREA

SURVEY LIMITS

DISPOSAL SITE VICINITY

SCALE: 1" = 400'

DISPOSAL PLACEMENT NOTES:

1. THE CONTROLLED RELEASE OF DISPOSAL OR CAP MATERIAL SHALL ONLY OCCUR FROM 1

HOURS BEFORE TO 1

HOURS AFTER THE PREDICTED HIGH OR LOW TIDES (GENERALLY TWO HIGH AND TWO LOW TIDES PER DAY).

2. LOW CURRENT, FOR THE PURPOSES OF THIS CONTRACT, IS DEFINED TO BE THE PERIOD FROM

HOUR BEFORE TO

HOUR AFTER THE PREDICTED HIGH OR LOW TIDES.

3. THE CONTRACTOR SHALL MAINTAIN A CONTROLLED GROUND SPEED BETWEEN 0.1 AND 1.0 KNOTS IN AN UP-CURRENT DIRECTION DURING RELEASE.

P L

A N

S

C-102

D I S

P O

S A

L

A

R E

A

P

L A

N

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

O

A

T

I

E

A

K

W

A

T

E

R

N

O

R

U

N

M

P

F

E

D

E

R

E

D

S

I

N

P

A

R

K

I

N

G

U

S

U

R

E

M

I

N

E

S

JUNEAU

ISLAND

P

A

R

K

I

N

G

P

A

R

K

I

N

G

S

A

V

I

K

A

D

S

A

V

I

K

A

D

SAVIKKO PARK

23680

(DOUGLAS BOAT HARBOR LIGHT ID)

E

E

E

E

N 2,353,250

E

N 2,353,500

N 2,353,750

E

E

E

E

N 2,354,000

E

N 2,353,250

E

N 2,353,500

N 2,353,750

N 2,354,000

E

DH-07

DH-11

DH-15

DH-21

DH-01

DH-02

DH-03

DH-04

DH-05

DH-06

DH-08

DH-09

DH-10

DH-12

DH-13

DH-14

DH-16

DH-17

DH-18

DH-19

DH-20

DH-22

DH-23

WQH-01

A

B

C

D

E

E x

E x

W x

J

B

T

R

T

R

J

B

W x

W x

W x

W x

W x

W x

W x

W x

W x

J

B

J

B

S

D

M

H

C

B

S

D

M

H

M

B

E

R

W

A

L

L

P

S

D

M

H

I

E

C

B

S

D

M

H

SDM

H

IE 14.58'

S

D

M

H

S D

M H

C

B

S

D

M

H

CB-3

CB-4

C

M

P

C

M

P

S

D

M

H

C

M

P

C

M

P

C

M

P

C

M

P

C

M

P

C

M

P

C

M

P

C

M

P

W

A

T

E

R

V

A

L

V

E

P

I

T

P

A

D

M

O

U

N

T

T

R

A

N

S

F

O

R

M

E

R

(E) UNDERGROUND

ELECTRICAL LINE

NOTES:

1. ALL MOORING FLOATS, ASSOCIATED

PILING, AND MOORED VESSELS WILL BE

REMOVED, BY OTHERS, FROM THE

FEDERAL DREDGE BASIN PRIOR TO THE

START OF FIELD WORK ON THIS

CONTRACT.

2. BACKGROUND PHOTO IS A DIGITAL

GLOBE GEO-REFERENCED IMAGE TAKEN

ON 4 APRIL, 2015.

GRAPHIC SCALE IN FEET

0 15010050 5025

PRIMARY SPI/PVI SAMPLE LOCATION

SECONDARY SPI/PVI SAMPLE LOCATION

SEDIMENT AND SPI/PVI SAMPLE LOCATION

WATER QUALITY SAMPLE LOCATION

LEGEND

MAINWALK FLOAT DESIGNATION

NAVIGATION MARKER

A

(E) 1' CONTOUR

(E) 5' CONTOUR

(E) STORM DRAIN PIPE

(E) OVERHEAD ELECTRIC LINE

(E) UNDERGROUND WATER LINE

(E) TELEPHONE RISER

(E) UTILITY POLE

(E) STORM DRAIN MANHOLE

(E) SDMH W/ INLET

(E) WATER VALVE

(E) FIRE HYDRANT

Y

(E) ELECTRICAL JUNCTION BOX

(E) CATCH BASIN

(E) LIGHT POLE OR

PILE MOUNTED LIGHT

E x

W x

P L

A N

S

C-103

H A

R B

E

A

S

A M

P L

I N

G

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

N 2,353,000

E

GC-07

GC-09

GC-11

GC-13

GC-39

GC-40

GC-49

GC-50

GC-01

GC-02

GC-03

GC-04

GC-05

GC-06

GC-15

GC-16

GC-17

GC-18

GC-19

GC-20

GC-21

GC-22

GC-23

GC-24

GC-26

GC-29

GC-31

GC-32

GC-33

GC-34

GC-35

GC-36

GC-37

GC-38

GC-41

GC-42

GC-43

GC-44

GC-45

GC-46

GC-47

GC-48

GC-51

GC-52

GC-53

GC-54

GC-69

GC-70

GC-71

GC-72

WQUS-01

WQDS-01

WQDS-02

WQDS-03

GC-08

GC-10

GC-12

GC-14

GC-25

GC-27

GC-28

GC-30

GC-55

GC-56

GC-57

GC-58

GC-59

GC-60

GC-61

GC-62

GC-63

GC-64

GC-65

GC-66

GC-67

GC-68

SCHEMATIC EXTENT

OF DISPOSAL

THICKER THAN 1cm

SCHEMATIC EXTENT

OF DISPOSAL

THICKER THAN 6 in.

GCI SUBMERSIBLE

FIBER OPTIC CABLE

AND 30' EASEMENT

JUNEAU

ISLAND

C

U x

C

U x

C

U x

C

U x

C

U x

C

U x

C

U x

C

U x

C

U

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

C

E

E

E

N 2,354,000 N 2,354,000

N 2,355,000

E

E

E

E

N 2,355,000

E

DISPOSAL AREA SURVEY

LIMITS, SEE V-102 AND V-601

DISPOSAL SITE

CONTROL BOUNDARY

GRAPHIC SCALE IN FEET

0 450300150 15075

BACKGROUND PHOTO IS A DIGITAL

GLOBE GEO-REFERENCED IMAGE

TAKEN ON 4 APRIL, 2015.

R-01

R-02

R-03

PRIMARY SPI/PVI SAMPLE LOCATION

SECONDARY SPI/PVI SAMPLE LOCATION

SEDIMENT AND SPI/PVI SAMPLE LOCATION

WATER QUALITY SAMPLE LOCATION

LEGEND

P L

A N

S

C-104

D I S

P O

S A

L

A

R E

A

A

A

N N

M

P L

I N

G

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

LOCATION OF DOUGLAS HARBOR IN INSET.

INSET IS FROM NAVIGATION CHART 17315,

REMOTE CHANNEL SEDIMENT SAMPLE

LOCATIONS ARE SHOWN IN INSET.

TYPICAL DREDGE BASIN SECTION

SCALE: 1" = 20' (N-S BASELINE STA 4+00 SHOWN)

A

C-101 C-301

EXISTING GROUND

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 2. OFFSET = -222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

MHHW EL

= +16.31'

-15 FT MLLW MAX

PAY LINE, TYP

6" THK MIN, TO 12"

THK MAX, SAND CAP

REQ'D DREDGE DEPTH

ELEV = -14 FT MLLW

BOTTOM DETAIL

SCALE: 1" = 5'

-15' MLLW MAXIMUM PAY LINE

-13' MLLW MAX FINISHED ELEVATION

-14' MLLW REQUIRED DREDGE DEPTH

6" THK MIN, TO 12"

THK MAX, SAND CAP

EXISTING

GROUND

E L

E V

A T

I O

N

OFFSET

-30

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

TYPICAL DREDGE SLOPE SECTION

SCALE: 1" = 10' (N-S BASELINE STA 4+00 SHOWN)

B

C-101 C-301

EXISTING

GROUND

EDGE OF

DREDGE BASIN

-15 FT MLLW MAX

PAY LINE, TYP

6" THK MIN, TO

12" THK MAX,

SAND CAP

REQ'D DREDGE

DEPTH ELEV =

-14 FT MLLW

E L

E V

A T

I O

N

OFFSET

-30

-20

-10

200 220 240 260 280

E L

E V

A T

I O

N

OFFSET

-30

-20

-10

180 200 220 240 260

DREDGE SLOPE SECTION AT (E) WALL

SCALE: 1" = 10' (CUT AT E-W BASELINE STA 3+00)

C

C-306 C-101 C-301

EXISTING

GROUND

TYP 2H:1V SIDE

SLOPE SHOWN FOR

REFERENCE ONLY

FIELD LOCATE TOE OF (E) RIPRAP AND CUT

NEW SIDE SLOPE TO MATCH ACTUAL TOE

LOCATION AS SHOWN WITHIN EXTENT OF

(E) RIPRAP ALONG (E) TIMBER FACED WALL.

(E) TIMBER

FACED WALL

APPROX EXTENT OF (E) 2' THK

CLASS II RIPRAP AND UNDERLYING

GEOTEXTILE FABRIC

DREDGING NOTES:

1. THE CONTRACTOR SHALL BE REQUIRED TO DREDGE UNTIL

THERE ARE NO SURFACE ELEVATIONS WITHIN THE FEDERAL

DREDGE BASIN ABOVE THE REQUIRED DREDGE DEPTH OF -14

FEET MLLW.

2. THE CONTRACTOR WILL NOT BE PAID FOR ANY MATERIAL

REMOVED BELOW THE MAXIMUM PAY LINE OF -15 FEET MLLW.

3. NO SAND CAP MATERIAL WILL BE ALLOWED TO REMAIN

ABOVE THE MAXIMUM FINISHED ELEVATION OF -13 FEET

MLLW.

4. MINOR FUTURE SLOUGHING OF THE 2H:1V DREDGE SLOPES IS

EXPECTED.

S E

C T

I O

N S

C-301

T Y

P I C

E

D G

I N

G

S

E C

T I O

N S

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 2+00

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 2+25

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 2+50

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 2+75

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

EDGE OF DREDGE

BASIN AT CORNER 4.

OFFSET = -107.5'

EDGE OF DREDGE

BASIN AT CORNER 5.

OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 3

AND 4. OFFSET = -107.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 3

AND 4. OFFSET = -107.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 2. OFFSET = -222.5'

MAX PAY LINE FOR SAND CAP SIDE SLOPE

IS 10H:1V DOWNWARD SLOPE FROM 12"

MAX SAND CAP THICKNESS, TYPICAL

SAND CAP SIDE SLOPE

MAX PAY LINE BETWEEN

CORNERS 2 AND 3.

APPROX LINE OF STEEL

PILES AT END OF MAINWALK

FLOAT D FINGER FLOATS

S E

C T

I O

N S

C-302

H A

R B

S

E L

I N

E

X

S

E C

T I O

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 3+00

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 3+25

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 3+50

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 3+75

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 2. OFFSET = -222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 2. OFFSET = -222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 2. OFFSET = -222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 2. OFFSET = -222.5'

APPROX LINE OF STEEL

PILES AT END OF MAINWALK

FLOAT D FINGER FLOATS

APPROX LINE OF STEEL

PILES AT END OF MAINWALK

FLOAT D FINGER FLOATS

APPROX LINE OF STEEL

PILES AT END OF MAINWALK

FLOAT D FINGER FLOATS

APPROX LINE OF STEEL

PILES AT END OF MAINWALK

FLOAT D FINGER FLOATS

S E

C T

I O

N S

C-303

H A

R B

S

E L

I N

E

X

S

E C

T I O

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 4+25

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 4+50

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 4+75

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 4+00

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 2. OFFSET = -222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 2. OFFSET = -222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 2. OFFSET = -222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 2. OFFSET = -222.5'

APPROX LINE OF STEEL

PILES AT END OF MAINWALK

FLOAT D FINGER FLOATS

APPROX LINE OF STEEL

PILES AT END OF MAINWALK

FLOAT D FINGER FLOATS

APPROX LINE OF STEEL

PILES AT END OF MAINWALK

FLOAT D FINGER FLOATS

APPROX LINE OF STEEL

PILES AT END OF MAINWALK

FLOAT D TEE FLOAT

S E

C T

I O

N S

C-304

H A

R B

S

E L

I N

E

X

S

E C

T I O

I

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 5+00

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 5+25

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 5+50

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 5+75

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM N-S BASELINE

N-S BASELINE STA 5+80

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 260 2800-20-40-60-80-100-120-140-160-180-200-220-240

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 2. OFFSET = -222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 2. OFFSET = -222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 2. OFFSET = -222.5'

EDGE OF DREDGE

BASIN AT CORNER

6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 2. OFFSET = -222.5'

DREDGE BASIN CORNER

No. 7. OFFSET = -177.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 5

AND 6. OFFSET = +222.5'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 2. OFFSET = -222.5'

APPROX LINE OF STEEL

PILES AT END OF MAINWALK

FLOAT D TEE FLOAT

S E

C T

I O

N S

C-305

H A

R B

S

E L

I N

E

X

S

E C

T I O

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 2+00

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 2+25

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 2+50

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 2+75

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 1+77.50

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

EDGE OF DREDGE

BASIN AT CORNER 1.

OFFSET = ~ -202.8'

EDGE OF DREDGE

BASIN AT CORNER 2.

OFFSET = +132.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 1

AND 7. OFFSET = ~ -196.4'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 2

AND 3. OFFSET = +132.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 2

AND 3. OFFSET = +132.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 2

AND 3. OFFSET = +132.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 2

AND 3. OFFSET = +132.0'

DREDGING SIDE SLOPE

ADJACENT TO CORNER 4

FOR TYPICAL 2H:1V SIDE

SLOPE, SEE C/C-301.

STEEL PILE AT END OF

MAINWALK FLOAT D FINGER

FLOATS, TYPICAL

S E

C T

I O

N S

C-306

H A

R B

S

E L

I N

E

X

S

E C

T I O

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 3+25

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 3+50

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 3+75

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 4+00

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 3+00

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 240 2600-20-40-60-80-100-120-140-160-180-200-220-240

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 4

AND 5. OFFSET = +190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 4

AND 5. OFFSET = +190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 4

AND 5. OFFSET = +190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 4

AND 5. OFFSET = +190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 4

AND 5. OFFSET = +190.0'

S E

C T

I O

N S

C-307

H A

R B

S

E L

I N

E

X

S

E C

T I O

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 4+25

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 4+50

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 4+75

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 5+00

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 5+25

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 4

AND 5. OFFSET = +190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 4

AND 5. OFFSET = +190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 4

AND 5. OFFSET = +190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 4

AND 5. OFFSET = +190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 4

AND 5. OFFSET = +190.0'

S E

C T

I O

N S

C-308

H A

R B

S

E L

I N

E

X

S

E C

T I O

I

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 5+50

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 5+75

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 6+00

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

E L

E V

A T

I O

N

OFFSET FROM E-W BASELINE

E-W BASELINE STA 6+22.50

-25

-20

-10

0 20 40 60 80 100 120 140 160 180 200 220 2400-20-40-60-80-100-120-140-160-180-200-220-240

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 4

AND 5. OFFSET = +190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 4

AND 5. OFFSET = +190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 7

AND 6. OFFSET = -190.0'

EDGE OF DREDGE BASIN

BETWEEN CORNERS 4

AND 5. OFFSET = +190.0'

EDGE OF DREDGE

BASIN AT CORNER

6. OFFSET = -190.0'

EDGE OF DREDGE

BASIN AT CORNER

5. OFFSET = +190.0'

S E

C T

I O

N S

C-309

H A

R B

S

E L

I N

E

X

S

E C

T I O

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 5+20

-130

-120

-100

-80

-60

-40

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 6+00

-130

-120

-100

-80

-60

-40

-20

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 7+00

-150

-140

-120

-100

-80

-60

-40

-20

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 8+00

-130

-120

-100

-80

-60

-40

-20

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 9+00

-150

-140

-120

-100

-80

-60

-40

-20

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

EDGE OF DISPOSAL AREA

SURVEY LIMIT AT CORNER

DSL-5. OFFSET = -957.5'

EDGE OF DISPOSAL AREA

SURVEY LIMIT AT CORNER

DSL-8. OFFSET = 957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-5

AND DSL-6. OFFSET = -957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-8

AND DSL-7. OFFSET = 957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-5

AND DSL-6. OFFSET = -957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-8

AND DSL-7. OFFSET = 957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-5

AND DSL-6. OFFSET = -957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-8

AND DSL-7. OFFSET = 957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-5

AND DSL-6. OFFSET = -957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-8

AND DSL-7. OFFSET = 957.5'

S E

C T

I O

N S

C-310

D I S

P O

S A

L

B

A S

E L

I N

E

X

S

E C

T I O

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 10+00

-150

-140

-120

-100

-80

-60

-40

-20

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 11+00

-150

-140

-120

-100

-80

-60

-40

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 12+00

-150

-140

-120

-100

-80

-60

-40

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 13+00

-150

-140

-120

-100

-80

-60

-40

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 14+00

-150

-140

-120

-100

-80

-60

-40

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-5

AND DSL-6. OFFSET = -957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-8

AND DSL-7. OFFSET = 957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-5

AND DSL-6. OFFSET = -957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-8

AND DSL-7. OFFSET = 957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-5

AND DSL-6. OFFSET = -957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-8

AND DSL-7. OFFSET = 957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-5

AND DSL-6. OFFSET = -957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-8

AND DSL-7. OFFSET = 957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-5

AND DSL-6. OFFSET = -957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-8

AND DSL-7. OFFSET = 957.5'

S E

C T

I O

N S

C-311

D I S

P O

S A

L

B

A S

E L

I N

E

X

S

E C

T I O

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 15+00

-150

-140

-120

-100

-80

-60

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 16+00

-150

-140

-120

-100

-80

-60

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 17+00

-150

-140

-120

-100

-80

-60

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 18+00

-150

-140

-120

-100

-80

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 15+20

-150

-140

-120

-100

-80

-60

-40

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-5

AND DSL-6. OFFSET = -957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-8

AND DSL-7. OFFSET = 957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-5

AND DSL-6. OFFSET = -957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-8

AND DSL-7. OFFSET = 957.5'

EDGE OF DISPOSAL SITE

CONTROL BOUNDARY AT

POINT A. OFFSET = -457.5'

EDGE OF DISPOSAL SITE

CONTROL BOUNDARY AT

POINT D. OFFSET = 457.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-5

AND DSL-6. OFFSET = -957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-8

AND DSL-7. OFFSET = 957.5'

EDGE OF DISPOSAL SITE

CONTROL BOUNDARY BETWEEN

POINTS A AND B. OFFSET = -457.5'

EDGE OF DISPOSAL SITE

CONTROL BOUNDARY BETWEEN

POINTS D AND C. OFFSET = 457.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-5

AND DSL-6. OFFSET = -957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-8

AND DSL-7. OFFSET = 957.5'

EDGE OF DISPOSAL SITE

CONTROL BOUNDARY BETWEEN

POINTS A AND B. OFFSET = -457.5'

EDGE OF DISPOSAL SITE

CONTROL BOUNDARY BETWEEN

POINTS D AND C. OFFSET = 457.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-5

AND DSL-6. OFFSET = -957.5'

EDGE OF DISPOSAL AREA SURVEY

LIMIT BETWEEN CORNERS DSL-8

AND DSL-7. OFFSET = 957.5'

EDGE OF DISPOSAL SITE

CONTROL BOUNDARY BETWEEN

POINTS A AND B. OFFSET = -457.5'

EDGE OF DISPOSAL SITE

CONTROL BOUNDARY BETWEEN

POINTS D AND C. OFFSET = 457.5'

EDGE OF

PLACEMENT ZONE.

OFFSET = ±90'

S E

C T

I O

N S

C-312

D I S

P O

S A

L

B

A S

E L

I N

E

X

S

E C

T I O

I

T

E D

C E

P O

A E

N G

E N

G

H

H

C I V

I L

ALASKA DISTRICT

D R

A W

I N

G

F I L E

D W

G

S

C A

L E

P L O

T

S

C A

L E

D A

T E

A C

T I O

N S

Y M

D R

A W

N

R E

S I D

E N

T

E

N G

I N

E E

R

D A

T E

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R D

A T

E D

E S

C R

I P

T I O

N A

P P

D

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R E

C O

M M

E N

D E

D

A P

P R

O V

E D

S U

B M

I T

T E

D

D E

S I G

N E

D

R E

V I E

W E

D

C H

I E

A

N C

H

C H

I E

C

T I O

N

REFERENCE

NUMBER:

SHEET OF

HGFEDCBA

US ARMY CORPS

OF ENGINEERS

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s D

G H

D w g s C

A D

D

G H

C d s t s a v e d o n

P

M w a s p l o t t e d b y

T e d r i c k

R o b e r

P

H

P

N

O

W K

B R

D O

U G

L A

S

H

A R

B O

R

D

R E

D G

I N

G

D O

U G

L A

S

A

L A

S

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 19+00

-150

-140

-120

-100

-80

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 20+00

-150

-140

-120

-100

-80

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 21+00

-150

-140

-120

-100

-80

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 22+00

-150

-140

-120

-100

-80

0 100 200 300 400 500 600 700 800 9000-100-200-300-400-500-600-700-800-900

E L

E V

A T

I O

N

OFFSET FROM DISPOSAL BASELINE

DISPOSAL BASELINE STA 23+00

-150

-140

-120

-100

-80

0 100 200 300 400 500 600 700 800…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .