W911KB-15-R-0021 Seawall Reconstruction (LIS006) Amendment 1.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.24_Solicitation_Amendment_0005_LIS006.pdf | ||
| LIS006_Amd_4.pdf | ||
| LIS006_AM_3_Final.pdf | ||
| LIS006_Amd_2_Final.pdf | ||
| A.02.23_SPECS-LIS006-RFP-Final-1Jun15.pdf | ||
| A.02.23_DWGS-LIS006-RFP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE/LOCATION: Seaw all Reconstruction, U.S. Air Force Long Range Radar Site, Cape Lisburne, Alaska (LIS006).
The purpose of this amendment is to make revisions as outlined in the attached Summary of Changes page. Attachments w ill include only those pages/clauses affected. Proposal due date remains 15 July 2015, 2:00pm Alaska time.
POC for this amendment is Ron Jackson, 907 753-5596.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jun-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-15-R-0021
X 9B. DATED (SEE ITEM 11)
01-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jun-2015
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
a. The following drawings are substituted for the superseded drawings.
NONE.
b. The following revised documents are substituted for the superseded documents. The identifier “AM#1” appears before and after new and/or revised material, except as noted below.
NONE
c. The following section is deleted.
d. The following documents are added.
e. The following revisions are incorporated.
1.) The proposal schedule has been revised.
2.) Evaluation of Offers, paragraph 4 has been revised.
3.) Section 00 21 00 paragraph 1.16 (i) has been revised.
4.) Section 00 72 00 clause 52.211-10 has been revised.
5.) Section 00 72 00 clause 52.217-7 has been revised.
f. Other:
NONE.
(End of Summary of Changes)
Cape Lisburne Seawal Reconstruction
Draft proposal schedule
04/30/2015
ITEM UNIT
NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT
BASE ITEMS
1. Mobilization and Demobilization, THREE seasons, complete. 1 Job -$ -$
2. Perform Excavation for Seawall, Increments 1-2, complete 49,000 CY -$ -$
3. Construct Seawall Filter layer, Increments 1-2, complete 17,500 CY -$ -$
4. Construct Seawall Core Rock Layer, Increments 1-2, complete. 13,200 CY -$ -$
5. Construct Seawall B Rock Layer, Increments 1-2, complete. 25,400 CY -$ -$
6. Construct Seawall Armor Rock
Layer, Increments 1-2, complete. 25,400 CY -$ -$
Total of items 1 through 6 -$
OPTIONAL ITEMS
7. Perform Excavation for Seawall, Increments 3, complete 31,000 CY -$ -$
8. Construct Seawall Filter layer, Increments 3, complete 8,700 CY -$ -$
9. Construct Seawall Core Rock Layer, Increments 3, complete. 6,600 CY -$ -$
10. Construct Seawall B Rock Layer, Increments 3, complete. 12,700 CY -$ -$
11. Construct Seawall Armor Rock
Layer, Increments 3, complete. 12,600 CY -$ -$
AM#1... Total of items 7 through 11, increment 3. -$
...AM#1
12. Perform Excavation for Seawall, Increments 4, complete 45,000 CY -$ -$
Project:
Description:
Prepared:
13. Construct Seawall Filter layer, Increments 4, complete 8,300 CY -$ -$
14. Construct Seawall Core Rock Layer, Increments 4, complete. 6,200 CY -$ -$
15. Construct Seawall B Rock Layer, Increments 4, complete. 12,000 CY -$ -$
16. Construct Seawall Armor Rock
Layer, Increments 4, complete. 11,600 CY -$ -$
AM#1... Total of items 12 through 16, increment 4. -$
...AM#1
17. Perform Excavation for Seawall, Increments 5, complete 27,300 CY -$ -$
18. Construct Seawall Filter layer, Increments 5, complete 8,750 CY -$ -$
19. Construct Seawall Core Rock Layer, Increments 5, complete. 6,600 CY -$ -$
20. Construct Seawall B Rock Layer, Increments 5, complete. 12,800 CY -$ -$
21. Construct Seawall Armor Rock
Layer, Increments 5, complete. 12,900 CY -$ -$
AM#1... Total of items 17 through 21, increment 5. -$
...AM#1
22. Perform Excavation for Seawall, Increments 6, complete 25,400 CY -$ -$
23. Construct Seawall Filter layer, Increments 6, complete 8,800 CY -$ -$
24. Construct Seawall Core Rock Layer, Increments 6, complete. 6,650 CY -$ -$
25. Construct Seawall B Rock Layer, Increments 6, complete. 12,800 CY -$ -$
26. Construct Seawall Armor Rock
Layer, Increments 6, complete. 12,900 CY -$ -$
AM#1... Total of items 22 through 26, increment 6. -$
...AM#1
27. Perform Excavation for Seawall, Increments 7, complete 31,000 CY -$ -$
28. Construct Seawall Filter layer, Increments 7, complete 8,800 CY -$ -$
29. Construct Seawall Core Rock Layer, Increments 7, complete. 6,650 CY -$ -$
30. Construct Seawall B Rock Layer, Increments 7, complete. 12,800 CY -$ -$
31. Construct Seawall Armor Rock
Layer, Increments 7, complete. 12,900 CY -$ -$
AM#1... Total of items 27 through 31, increment 7. -$
...AM#1
32. Perform Excavation for Seawall, Increments 8, complete 11,200 CY -$ -$
33. Construct Seawall Filter layer, Increments 8, complete 2,900 CY -$ -$
34. Construct Seawall Core Rock Layer, Increments 8, complete. 2,100 CY -$ -$
35. Construct Seawall B Rock Layer, Increments 8, complete. 4,100 CY -$ -$
36. Construct Seawall Armor Rock
Layer, Increments 8, complete. 4,050 CY -$ -$
AM#1... Total of items 32 through 36, increment 8. -$
...AM#1
Total of items 7 through 36 -$
Total of items 1 through 36 -$
EVALUATION OF OFFERS
1. AWARD: Award will be made in accordance with Section 00 22 11 – PROPOSAL SUBMISSION
REQUIREMENTS EVALUATION CRITERIA AND BASIS OF AWARD.
2. INCOMPLETE OFFERS: Failure to submit an offer on all items in the schedule will result in an incomplete offer and the proposal will be rejected. Job or unit prices must be shown for each item within the schedule.
3. OPTIONS: The Government will evaluate offers for award purposes by including the price for all options plus the price for the basic requirement; i.e. options will be included in the evaluation for award purposes.
AM#1…
4. For CLINs 0007 through 0036, the Contracting Officer may exercise the option by written notice to the
Contractor NLT 730 calendar days after the date of contract award. Exercised items shall be completed within an additional 730 calendar days after exercise of all options combined. The additional 730 calendar days will be added to the 1,095 calendar days given for completion of the base CLIN items, for a total of 1,825 calendar days for completion of the base plus all option items combined. Options will be exercised in complete increments. Increments 3, 4, 5, 6, 7, and 8 will be exercised in their entirety, no partial increments will be exercised.
…AM#1
--END OF PROPOSAL SCHEDULE--
Section 00 21 00 W911KB-15-R-0021
LIS006
Section 00 21 00 Page 7
52.219-9, Small Business Sub Contracting Plan (applies only to Large Business)
52.219-16, Liquidated Damages – Small Business Subcontracting Plan (applies only to Large Business)
252.226-7001, Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns
(a) Goals. The U.S. Army Corps of Engineers considers the following subcontracting goals reasonable and achievable for the performance of the resultant contract:
(b) AM#1… 50.0% 20.0% …AM#1 of subcontracted amount to small business concerns.
(c) 17.0% of total planned small business subcontracting dollars with those small business concerns owned and controlled by socially and economically disadvantaged individuals.
(d) 18.0% of total planned small business subcontracting dollars with those small business concerns owned and controlled by women.
(e) 4.0% of total planned small business subcontracting dollars with those small business concerns owned and controlled by Service-Disabled Veterans.
(f) 10.0% of total planned small business subcontracting dollars with HUBZone-certified small business concerns.
(g) 8.5 % of total planned small business subcontracting dollars with those small business concerns owned and controlled by Veterans.
1.0 BUY AMERICAN ACT FOR CONSTRUCTION MATERIALS
Your attention is invited to Clause 52.225-12 Notice of Buy American Act Requirement-Construction Materials under Trade Agreements. You are advised to inform your potential subcontractors and suppliers of the Buy American Act requirements contained in this solicitation. Subparagraph (b) of the clause provides instructions for pre-award determinations as follows: “Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.” In accordance with FAR Part 25 Foreign Acquisition, subpart 25.205, entitled Post Award determinations, subparagraph (a), if a contractor requests a determination regarding the inapplicability of the Buy American Act after contract award, the contractor must explain why it could not request the determination before contract award or why the need for such determination otherwise was not reasonably foreseeable.
2.0 SOLICITIATION PROVISIONS
52.211-14 Notice Of Priority Rating For National Defense, Emergency Preparedness, and Energy Program
Use
FROM SECTION 00 72 00 PAGE 22:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 1,095 calendar days after the date the Contractor receives the notice to proceed.
AM#1… * IF EXERCISED, OPTION ITEMS 0007 – 0036 SHALL BE EXERCISED NLT 730 CALENDAR
DAYS AFTER THE DATE OF CONTRACT AWARD. EXERCISED OPTION ITEMS SHALL BE
COMPLETED WITHIN AN ADDITIONAL 730 CALENDAR DAYS AFTER EXERCISE OF ALL
OPTIONS COMBINED. THE ADDITIONAL 730 CALENDAR DAYS WILL BE ADDED TO THE 1,095
CALENDAR DAYS GIVEN FOR COMPLETION OF THE BASE CLIN ITEMS, FOR A TOTAL OF 1,825
CALENDAR DAYS FOR COMPLETION OF THE BASE PLUS ALL OPTIONS COMBINED. …AM#1
** The time stated for completion shall include final cleanup of the premises.
(End of clause)
FROM SECTION 00 72 00 PAGE 28:
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as option items, in the quantity and at the price stated in the Schedule. If not exercised at the time of contract award, the Contracting Officer may exercise the option by written notice to the Contractor as follows:
AM#1…
CLINs 0007 - 0036: NLT 730 CALENDAR DAYS AFTER THE DATE OF CONTRACT AWARD.
…AM#1
Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)