Technical Exhibit D - Asbestos Survey Report Solicitation 26-B-A001 Repair Barrack B. 29008-9,10,26.pdf
PDF 699 KB Posted
- Solicitation number
- W91151-26-B-A001
About this file
This document is an asbestos survey report containing environmental assessment findings for five buildings at Fort Hood, Texas (Buildings 29008, 29009, 29010, 29026, and related facilities).
The survey was conducted by Radian International LLC under U.S. Army Corps of Engineers Contract DACA56-94-D-0015 during late 1996 and early 1997. The project identified and documented asbestos-containing materials (ACM) and presumed asbestos-containing materials (PACM) across multiple building types, including enlisted barracks and a washer/dryer facility. Key findings include: Building 29008 identified 5 homogeneous areas with ACM (floor tile, wallboard, ceiling materials) and PACM (caulking, gaskets) with total estimated abatement costs of $349,045; Building 29009 identified one PACM area (caulking) with abatement cost of $430; Building 29010 identified 4 homogeneous areas with ACM and PACM with abatement costs of $381,124; and Building 29026 identified one PACM area (caulking) with abatement cost of $31. All materials were analyzed using polarized light microscopy and dispersal staining methods in accordance with EPA protocols. Risk assessments applied the Air Force Guidance for Rating Damage and Exposure (GRADE) system, assigning priority ratings from 1-4 based on friability, condition, and exposure potential. The survey included detailed documentation of sampling locations, photographs, analytical results, risk assessment data, and cost estimates for abatement, replacement, and repair activities for each identified homogeneous material area.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS SURVEY REPORT
BUILDING 29008
FORT HOOD, TEXAS
Submitted to:
U.S. Army Corps of Engineers, Fort Worth District
For:
Tulsa District
Prepared by:
Radian International LLC
8501 N. Mopac Blvd.
P.O. Box 201088
Austin, Texas 78720-1088
September 1997
Asbestos Survey, Fort Hood, Texas ii September 1997
Building 29008 f_29008.doc
Table of Contents
1.0 INTRODUCTION
1.1 Physical Inspections
1.2 Bulk Sampling and Analysis
1.3 Sample Numbering Scheme
2.0 FACILITY DESCRIPTION
3.0 DISCUSSION OF RESULTS
4.0 RISK ASSESSMENT
5.0 ABATEMENT COST ESTIMATES
APPENDIX A: HOMOGENEOUS AREAS AND DETAILED ANALYTICAL RESULTS
FOR BUILDING 29008 SURVEY
APPENDIX B: BUILDING 29008 FLOOR PLAN
APPENDIX C: REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN
BUILDING 29008
APPENDIX D: RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING
29008
List of Figures
B-1 Building 29008 Floor Plan--First Floor ..................................................................... B-1
B-2 Building 29008 Floor Plan--Second Floor ................................................................. B-2
B-3 Building 29008 Floor Plan--Third Floor .................................................................... B-3
B-4 Building 29008 Floor Plan--Roof .............................................................................. B-4
List of Tables
3-1 Summary of ACM and PACM in Building 29008
4-1 Priority Rating Table for Recommended Response Actions
4-2 Building 29008 Risk Assessment Results
5-1 Building 29008 Abatement and Replacement Cost Estimates
5-2 Building 29008 Repair Cost Estimates
A-1 Building 29008 Summary of Homogeneous Areas ................................................... A-1
A-2 Building 29008 Asbestos Survey Analytical Results ................................................. A-2
B-1 Inspector, Risk Assessor, and Laboratory Licenses for Building 29008 ................... B-5
D-1 Damage/Risk Values for Inspection Observations .................................................... D-2
D-2 Exposure Values for Inspection Observations ........................................................... D-2
D-3 Damage/Risk Observations for ACM and PACM in Bldg. 29008 ............................ D-3
Asbestos Survey, Fort Hood, Texas iii September 1997
D-4 Exposure Observations for ACM and PACM in Bldg. 29008 ................................... D-3
List of Photographs (Appendix C)
Photo 29008-1-A: 12x12 floor tile (beige with dark specks); various areas (see floor plan)
Photo 29008-1-B: Wallboard; various areas (see floor plan)
Photo 29008-1-C: Textured ceiling materials; all ceilings throughout building
Photo 29008-1-D: Building caulkings and putties
Photo 29008-1-E: Gaskets; light fixture
Asbestos Survey, Fort Hood, Texas iv September 1997
Acronyms and Abbreviations
ACM Asbestos-containing material
Act. Actinolite
Am. Amosite
Anth. Anthophyllite
Cell. Cellulose
Chry. Chrysotile
COR Contracting Officer’s Representative
Croc. Crocidolite
D Damage/risk factor
DS Dispersion staining
E Exposure factor
EPA United States Environmental Protection Agency
Fib. Fiberglass
GRADE Air Force Guidance for Rating Damage and Exposure
ID Identification
LLC Limited liability company m Meter m2 Square meter
M.W. Mineral wool
N/A Not analyzed
NA Not applicable
ND Not detected
O&M Operations and maintenance
PACM Presumed asbestos-containing material
PLM Polarized light microscopy
QA Quality assurance
QC Quality control
R Risk rating
RPD Relative percent difference
SACM Suspect asbestos-containing material
SWD Southwest Division (Laboratory)
Syn. Synthetics
T Total
TDH Texas Department of Health
Trem. Tremolite
TSI Thermal systems insulation
USACE United States Army Corps of Engineers
Asbestos Survey, Fort Hood, Texas September 1997
1.0 INTRODUCTION
Radian International LLC, under contract with the United States Army Corps of Engineers
(USACE), Contract DACA56-94-D-0015, performed a facility-wide asbestos survey at Fort
Hood, Texas, to meet the following project objectives:
Identify and locate, to the extent possible, all friable and non-friable suspect asbestos-containing materials (SACM);
Evaluate the condition of the SACM, collecting sufficient data to perform a risk assessment and to prioritize materials for appropriate response actions;
Collect and analyze bulk material samples in order to quantify, in metric units, SACM which contain greater than 1% asbestos;
Identify and quantify material which is presumed to contain asbestos;
Conduct risk assessments for all asbestos-containing materials (ACM) and presumed
ACM (PACM);
Conduct air monitoring where necessary according to risk assessment models; and
Prepare an Operations and Maintenance (O&M) program (under separate cover) for all
ACM and PACM.
The survey included base buildings and approximately 10% of the family housing buildings at
Fort Hood. Mr. Emmet Gray, Directorate of Public Works, is the post contact for this project.
This report presents the findings from the asbestos survey at Building 29008.
1.1 Physical Inspections
Survey teams visually inspected the accessible areas of the interior and exterior of each building, including interior and exterior rooms, mechanical spaces, storage areas, crawl spaces, attics, and roofs, to identify appropriate homogeneous areas (i.e., unique SACM or PACM). A reasonable effort was made by the survey team to gain access to inaccessible areas. If access could not be gained, the survey team made assumptions regarding the presence and quantity of SACM based on the visual inspection of the remainder of the building and interviews with the building occupants.
The following steps were taken to complete physical inspections.
1. Obtain a copy of the building floor plan.
2. Perform an initial building walk-through.
a) Note fire doors/walls on the floor plan.
b) Identify homogeneous areas.
c) Identify locations of friable and non-friable SACM and PACM. PACM is defined as SACM which could be visually identified but which were inaccessible for sampling, or were not sampled at the client’s request.
d) Note the type, estimated quantity, description, friability, and physical damage of each SACM and PACM. Mark location(s) of SACM and PACM on the floor plan and take one color photograph of each homogeneous area to show materials and conditions present at the time of the survey.
e) Define the bulk sample locations.
1.2 Bulk Sampling and Analysis
Homogeneous materials were categorized by the survey teams as surfacing materials, thermal systems insulation (TSI), or miscellaneous materials. Building age, use, and size were taken into consideration, along with building materials, when determining sample locations. Three bulk samples were obtained from each SACM within each building surveyed. Homogeneous areas categorized as PACM were not sampled. Where applicable, bulk samples were collected from all material layers (e.g., roofing and flooring materials). Samples were collected by cutting, scraping, and/or coring. The following procedures were used during bulk sample collection:
1. Mark sample locations on the floor plan using a unique identification number.
2. Record SACM sample information on a field data sheet, including:
a) Building number and room number/area description;
b) Typical occupancy and population;
c) SACM description (e.g., pipe insulation, 9x9 brown floor tile, etc.);
d) Estimated quantity of SACM (i.e., area or length);
e) Friability;
f) Physical damage;
g) Potential for damage or disturbance during maintenance;
h) Potential cause of damage or disturbance; and
i) Unique sample identification number.
3. Take one color photograph from each homogeneous area to show materials and conditions present at the time of the survey.
4. Repair any damage caused by sampling using sealants and methods approved by the
Contracting Officer’s Representative (COR).
Samples were analyzed by RJ Lee Group, Inc. laboratory in Houston, Texas, using polarized light microscopy (PLM) coupled with dispersion staining (DS) in accordance with the Environmental
Protection Agency (EPA)-approved method USEPA 600/R-93/116: “Method for Determination of Asbestos in Bulk Building Samples.” In accordance with the Scope of Work dated 20 August
1996, point-counting was not performed. In order to meet quality assurance/quality control
(QA/QC) requirements, triplicate samples were collected from 5% of the sample locations for the overall project. Two of the samples, the normal and duplicate samples, were analyzed by the RJ
Lee Group laboratory. The third sample is the QA sample that was sent to the USACE
Southwestern Division Laboratory (SWD) in Dallas, Texas.
1.3 Sample Numbering Scheme
Unique identification numbers were assigned to each sample using the following numbering scheme:
aaaaa-b-c-xd, where:
aaaaa identifies the five-digit building number;
b identifies the subdivision within that building;
c identifies the homogeneous area;
x identifies the sample type, where:
0 = normal sample
8 = field duplicate (QC sample)
9 = QA sample d identifies the sample number (1,2, or 3)
[Note: “b-c” represents the unique homogeneous area identification (ID) for a particular building. When necessary, “e” is used by the laboratory to identify additional layers of material not separated in the field (e.g., tile and mastic associated with flooring materials)].
2.0 FACILITY DESCRIPTION
Building 29008, encompassing an area of 42,264 sq ft, is a three story Enlisted Barracks without
Dining Area built in 1975. A building floor plan is presented in Appendix B.
3.0 DISCUSSION OF RESULTS
Building 29008 was inspected during December 1996. During this inspection, 6 homogeneous areas were identified and 12 normal samples were collected. Table 3-1 presents a summary of
ACM and PACM identified during the survey of Building 29008. Appendix A contains a detailed table of homogeneous area descriptions for all SACM and PACM, and PLM analytical results for samples collected in Building 29008. Sample and photograph locations are presented in the Building 29008 floor plan (see Appendix B). Table B-1 contains information regarding inspector, risk assessor, and laboratory licenses for this building survey. Appendix C contains representative photographs of each ACM and PACM identified in Building 29008.
Table 3-1
Summary of ACM and PACM in Building 290081
Homogeneous Area Area/Length Physical ACM
ID Description & Location Estimate Units Damage Friability Type
1-A 12x12 floor tile (beige with dark specks); various areas (see floor plan)
3,120 m2 Minimal None ACM
1-B Wallboard; various areas (see floor plan) 246 m2 None Low ACM
1-C Textured ceiling materials; all ceilings throughout building
3,928 m2 Minimal None ACM
1-D Building caulkings and putties 3.9 m2 None None PACM
1-E Gaskets; light fixture 2.2 m None None PACM2 1 A complete list of homogeneous areas and detailed analytical results are presented in Appendix A. Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs are shown in Appendix C.
2 This homogenous area was inaccessible to the inspection team.
m2 = Square meter
Homogeneous areas 1-A, 1-B, 1-C, 1-D, and 1-E were identified as containing ACM or PACM.
The risk assessment and abatement cost estimates for these materials are further discussed in
Sections 4 and 5. Homogenous area 1-E was inaccessible to the inspection team. Interior and incoming electrical wiring appeared to be non-ACM.
No duplicate (QC) samples were collected from materials in Building 29008.
4.0 RISK ASSESSMENT
A risk assessment was conducted for each homogeneous area containing ACM or PACM identified within the building using a modified version of the Air Force Guidance for Rating and
Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk factors (D) and exposure factors (E). These factors are summed and placed in the following equation:
R = 12.0324 - [(0.1683 x D) + (0.1693 x E)].
Table 4-1 was used to establish a priority rating for each homogeneous area, based on the risk rating or “R” value.
Table 4-1
Priority Rating Table for Recommended Response Actions
Risk Rating (R) Priority Recommended Response Action
R < 6 1 Immediate removal/repair
6 R < 8 2 Planned removal/repair; place in O&M program in interim 1
8 R < 10 3 Place in O&M program
R 10 4 No action required; place in O&M program as a precaution 1 If material is repaired, it will remain in the O&M program until it is removed.
O&M = Operations and maintenance
R = Risk Rating
Risk assessments for the homogeneous areas identified as ACM or PACM in Building 29008 are provided in Table 4-2. Appendix D contains a summary of field observations used to determine damage/risk factors (D) and exposure factors (E). The methodology used to determine these factors is also provided in Appendix D. No air sampling was required in this building based on risk assessment models.
Table 4-2
Building 29008 Risk Assessment Results
Homogeneous Area ACM Risk
ID Description & Location Type Rating (R) Priority
1-A 12x12 floor tile (beige with dark specks); various areas (see floor plan)
ACM 8.65 4a
1-B Wallboard; various areas (see floor plan) ACM 8.82 3
1-C Textured ceiling materials; all ceilings throughout building ACM 7.98 4a
1-D Building caulkings and putties PACM 8.99 4a
1-E Gaskets; light fixture PACM 8.99 4a a Priority rating is 4 because material is not friable.
5.0 ABATEMENT COST ESTIMATES
Abatement cost estimates are based on professional experience and costs from 1996 Fort Hood asbestos abatement contracts. Cost estimates were developed using the unit costs for abatement of the general category of material and the estimated area of identified ACM and/or PACM determined during the survey. Unit rates for abatement include labor, materials, equipment, overhead, insurance, and profit. Abatement unit rates do not include costs for design, air sampling, materials replacement, or off-site disposal. Total costs do not include contract administration costs.
Cost estimates were developed using the assumption that all materials within a building would be abated concurrently. In addition, costs are based on the assumption that all ACM and/or PACM which is friable or which has the potential to become friable during demolition will require removal. Detailed cost estimates for abatement, replacement, and repair of ACM and/or PACM in Building 29008 are presented in Tables 5-1 and 5-2.
Table 5-1
Building 29008 Abatement and Replacement Cost Estimates
Homogeneous Area Area/Length Unit Cost for Total Cost
ID Description & Location Estimate Units Abatement ($)
1-A 12x12 floor tile (beige with dark specks); various areas (see floor plan)
3,120 m2 $18.83/m2 $58,750
1-B Wallboard; various areas (see floor plan) 246 m2 $10.76/m2 $2,647
1-C Textured ceiling materials; all ceilings throughout building
3,928 m2 $37.66/m2 $147,928
1-D Building caulkings and putties 3.9 m2 $107.60/m2 $420
1-E Gaskets; light fixture 2.2 m $3.28/m $7
Subtotal $209,752
Design Fee (6%) $12,585
Air Monitoring Cost (10%) $20,975
Materials Replacement $82,793
Off-site Disposal Cost $22,940
TOTAL ESTIMATED ABATEMENT COST $349,045
Table 5-2
Building 29008 Repair Cost Estimates
Homogeneous Area
Approximate
Damaged
Area/Length
Unit Cost for
Total Cost
ID Description & Location Estimate Units Repair ($)
1-A 12x12 floor tile (beige with dark specks); various areas (see floor plan)
3 m2 $18.83/m2 $56
1-B Wallboard; various areas (see floor plan) 3 m2 $10.76/m2 $32
1-C Textured ceiling materials; all ceilings throughout building
3 m2 $37.66/m2 $113
1-D Building caulkings and putties 3 m2 $107.60/m2 $323
1-E Gaskets; light fixture 2.2 m $3.28/m $7
Subtotal $531
Design Fee (6%) $32
Air Monitoring Cost (10%) $53
Materials Replacement $163
Off-site Disposal Cost $33
TOTAL ESTIMATED REPAIR COST $812
APPENDIX A
HOMOGENEOUS AREAS AND DETAILED ANALYTICAL RESULTS FOR
BUILDING 29008 SURVEY
A-1
Table A-1
Building 29008 Homogeneous Areas 1
Homogeneous Area ACM
ID Description & Location Type 2
1-A 12x12 floor tile (beige with dark specks); various areas (see floor plan) ACM
1-B Wallboard; various areas (see floor plan) ACM
1-C Textured ceiling materials; all ceilings throughout building ACM
1-D Building caulkings and putties PACM
1-E Gaskets; light fixture PACM
R-A Roof shingles and underlayment None 1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of PACM and
ACM are shown in Appendix C.
2 ACM types include:
ACM = Materials containing >1% asbestos;
None = Materials containing 1% asbestos; and
PACM = Materials presumed to contain >1% asbestos.
ACM = Asbestos-containing material
ID = Identification
PACM = Presumed asbestos-containing material
Table A-2
Building 29008 Asbestos Survey Analytical Results1
Homogeneous Area Asbestos Results (%) Other Fibrous Materials Results (%)
Area
ID
Sample ID
Layer
Layer Description
(from Laboratory)
Total
Act
Am
Anth
Chry
Croc
Trem
Cell
Fib
M.W.
Synth
ACM
Type
1-A 29008-1-A-01 NA Tan Floor Tile ND ND ND ND ND ND ND 8 ND ND ND None
29008-1-A-02 NA Tan Floor Tile ND ND ND ND ND ND ND 6 ND ND ND None
29008-1-A-03 a Tan Floor Tile ND ND ND ND ND ND ND 8 ND ND ND None
29008-1-A-03 b Blk Mastic 4.00 ND ND ND 4 ND ND ND ND ND ND ACM
29008-1-A-03 NA Total 0.04 None
1-B 29008-1-B-01 NA Wht Plaster 4.00 ND ND ND 4 ND ND ND ND ND ND ACM
29008-1-B-02 NA Wht Drywall/Plaster 0.90 ND ND ND 0.9 ND ND 30 ND ND ND None
29008-1-B-03 NA Wht Plaster 4.00 ND ND ND 4 ND ND ND ND ND ND ACM
1-C 29008-1-C-01 NA Tan Ceiling Texture 6.00 ND ND ND 6 ND ND ND ND ND ND ACM
29008-1-C-02 NA Tan Ceiling Texture 6.00 ND ND ND 6 ND ND ND ND ND ND ACM
29008-1-C-03 NA Tan Ceiling Texture 6.00 ND ND ND 6 ND ND ND ND ND ND ACM
R-A 29008-R-A-01 NA Blk Roof Mat'l ND ND ND ND ND ND ND 60 10 ND ND None
29008-R-A-02 NA Blk Roof Mat'l ND ND ND ND ND ND ND 75 ND ND ND None
29008-R-A-03 NA Blk Roof Mat'l ND ND ND ND ND ND ND 70 ND ND ND None 1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of ACM and PACM are shown in Appendix C. If a sample contained multiple layers, all layers were analyzed separately. If any layer of a sample from a homogeneous area contained >1% asbestos, than that homogeneous area was classified as ACM. Totals (weighted composite average percent asbestos) are provided for samples with all layers containing >1% asbestos.
Act. = Actinolite
Am. = Amosite
Anth. = Anthophyllite
Cell. = Cellulose
Chry. = Chrysotile
Croc. = Crocidolite
Fib. = Fiberglass
ID = Identification
M.W. = Mineral wool
NA = Not applicable (sample contained single layer)
ND = Not detected (<1% asbestos)
Synth. = Synthetics
T = Total
Trem. = Tremolite
APPENDIX B
BUILDING 29008 FLOOR PLAN
Asbestos Survey, Fort Hood, Texas B-5 September 1997
Table B-1
Inspector, Risk Assessor, and Laboratory Licenses for Building 29008
Building and Analytical Laboratory Building Inspector/Risk Assessor Date
Homogeneous
Area ID1
Name
TDH
License #
License
Exp. Date
License #
License
Exp. Date
Inspected/
Sampled
29008-1-A RJ Lee Group 30-0051 02/26/97 Dave Stoetzel 60-1100 10/15/97 12/16/96
29008-1-B RJ Lee Group 30-0051 02/26/97 Dave Stoetzel 60-1100 10/15/97 12/16/96
29008-1-C RJ Lee Group 30-0051 02/26/97 Dave Stoetzel 60-1100 10/15/97 12/16/96
29008-1-D NA NA NA Dave Stoetzel 60-1100 10/15/97 12/16/96
29008-1-E NA NA NA Dave Stoetzel 60-1100 10/15/97 12/16/96
29008-R-A RJ Lee Group 30-0051 02/26/97 Dave Stoetzel 60-1100 10/15/97 1/16/97 1 The sampling information (including laboratory, inspector, risk assessor, and sample date) is the same for all samples associated with a particular homogeneous area. Unique sample identification numbers were assigned to each sample using the following sample numbering scheme:
aaaaa-b-c-xd, where:
aaaaa identifies the five-digit building number;
b identifies the subdivision within that building;
c identifies the homogeneous area;
x identifies the sample type, where:
0 = normal bulk material sample
6 = normal personnel air monitoring sample
7 = normal environmental air monitoring sample
8 = field duplicate bulk material (QC sample)
9 = QA bulk material sample d identifies the sample number (1, 2, or 3);
[Note: “b-c” represents the unique homogeneous area ID for a particular building.]
NA = Not applicable. (PACM was not sampled.)
PACM = Presumed asbestos-containing material
QA = Quality assurance
QC = Quality control
TDH = Texas Department of Health
APPENDIX C
REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN BUILDING
29008
APPENDIX D
RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING 29008
Asbestos Survey, Fort Hood, Texas D-1 September 1997
Appendix D
Risk Assessment Data and Methodology identified within the building using a modified version of the Air Force Guideline for
Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk factors (D), and exposure factors (E). These factors are summed and used in the following equation:
R = 12.0324 - [(0.1683 x D) + (0.1693 x E)];
Where D = the sum of the values for the following damage/risk observations:
Material type
Potential for contact
Physical damage
Water damage
Potential for damage by repair/maintenance activities
Asbestos content;
And E = the sum of the values for the following exposure observations:
Area of damaged material
Material friability
Population
Activity/vibration
Ventilation
Air movement
Floors
Walls
Barriers
A further breakdown of the values for the subunits under each category is provided in
Tables D-1 and D-2. Summaries of the inspection observations for damage/risk and exposure for the ACM and PACM in Building 29008 are presented in Tables D-3 and D-
4.
Table D-1
Damage/Risk Values for Inspection Observations 1
Material Type
Potential for Contact
Physical
Damage
Water Damage
Potential for Damage by
Repair/Maintenance Activities
Asbestos Content
Surfacing (4) <10 ft, Low (2) None (0) No (0) None (0) >1-30% (1)
TSI, Ventilation (3) <10 ft, Medium (5) Minimal (2) Yes (3) Low (1) >30-50% (3)
TSI, Other (1) <10 ft, High (8) Low (3) Moderate (2) >50% (5)
Misc., Damaged (1) >10 ft, Low (0) Moderate (4) High (3)
Misc., Undamaged (0) >10 ft, Medium (3) High (5)
>10 ft, High (5) 1 The value assigned to each category is shown in italics.
TSI = Thermal systems insulation
Table D-2
Exposure Values for Inspection Observations 1
Area of
Material
(m or m2)
Friability
Population
Activity/
Vibration
Interior
Ventilation
Air
Movement
Floors
<3 (0) None (0) None (0) Low (0) None (0) None (0) Smooth (1) Smooth (1) Permanent (1)
3-30 (1) Low (0) 1-9 (1) Occasional (2) Return Only (2) Perceptible (2) Rough, Seamed (2) Moderate (2) Semipermanent (2)
31-300 (2) Moderate (2) 10-200 (2) Constant (5) Supply Only (5) Turbulent (5) Carpet (4) Pitted (3) Minimal (3)
>300 (3) High (5) 201-500 (3) Supply & Return (7) Rough (4) None (4)
501-1,000 (4)
>1,000 (5)
Table D-3
Summary of Damage/Risk Observations for ACM and PACM in Building 29008
Potential for
Contact
Physical Damage
Water
Damage
Potential for Damage by
Repair/Maintenance Activities
Asbestos
Content
29008-1-A Misc., Undamaged (0) <10 ft, Low (2) Minimal (2) No (0) None (0) 1-30% (1)
29008-1-B Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) Low (1) 1-30% (1)
29008-1-C Surfacing (4) <10 ft, Low (2) Minimal (2) No (0) None (0) 1-30% (1)
29008-1-D Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) PACM (1)
29008-1-E Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) PACM (1)
Table D-4
Summary of Exposure Observations for ACM and PACM in Building 29008
Area of
Damaged
Activity
29008-1-A < 3 (0) None (0) 10-200 (2) Low (0) Supply and
Return (7)
None (0) Smooth (1) Rough (4) Permanent
(1)
29008-1-B < 3 (0) Low (0) 10-200 (2) Low (0) Supply and
Return (7)
None (0) Smooth (1) Rough (4) Permanent
(1)
29008-1-C < 3 (0) None (0) 10-200 (2) Low (0) Supply and
Return (7)
None (0) Smooth (1) Rough (4) Permanent
(1)
29008-1-D < 3 (0) None (0) 10-200 (2) Low (0) Supply and
Return (7)
None (0) Smooth (1) Rough (4) Permanent
(1)
29008-1-E < 3 (0) None (0) 10-200 (2) Low (0) Supply and
Return (7)
None (0) Smooth (1) Rough (4) Permanent
(1)
BUILDING 29009
Building 29009 f_29009.doc
1.0 INTRODUCTION
1.1 Physical Inspections
1.2 Bulk Sampling and Analysis
1.3 Sample Numbering Scheme
2.0 FACILITY DESCRIPTION
3.0 DISCUSSION OF RESULTS
4.0 RISK ASSESSMENT
5.0 ABATEMENT COST ESTIMATES
FOR BUILDING 29009 SURVEY
APPENDIX B: BUILDING 29009 FLOOR PLAN
APPENDIX C: REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN
BUILDING 29009
29009
B-1 Building 29009 Floor Plan--First Floor ..................................................................... B-1
B-2 Building 29009 Floor Plan--Second Floor ................................................................. B-2
B-3 Building 29009 Floor Plan--Third Floor .................................................................... B-3
B-4 Building 29009 Roof Plan ......................................................................................... B-4
3-1 Summary of ACM and PACM in Building 29009
4-1 Priority Rating Table for Recommended Response Actions
4-2 Building 29009 Risk Assessment Results
5-1 Building 29009 Abatement and Replacement Cost Estimates
5-2 Building 29009 Repair Cost Estimates
A-1 Building 29009 Summary of Homogeneous Areas ................................................... A-1
A-2 Building 29009 Asbestos Survey Analytical Results ................................................. A-2
B-1 Inspector, Risk Assessor, and Laboratory Licenses for Building 29009 ................... B-5
D-1 Damage/Risk Values for Inspection Observations .................................................... D-2
D-2 Exposure Values for Inspection Observations ........................................................... D-2
D-3 Damage/Risk Observations for ACM and PACM in Bldg. 29009 ............................ D-3
D-4 Exposure Observations for ACM and PACM in Bldg. 29009 ................................... D-3
Photo 29009-1-A: Building caulkings and putties
Am. Amosite
Anth. Anthophyllite
Cell. Cellulose
Chry. Chrysotile
COR Contracting Officer’s Representative
Croc. Crocidolite
D Damage/risk factor
DS Dispersion staining
E Exposure factor
EPA United States Environmental Protection Agency
Fib. Fiberglass
GRADE Air Force Guidance for Rating Damage and Exposure
ID Identification
LLC Limited liability company m Meter m2 Square meter
M.W. Mineral wool
N/A Not analyzed
NA Not applicable
ND Not detected
O&M Operations and maintenance
PACM Presumed asbestos-containing material
PLM Polarized light microscopy
QA Quality assurance
QC Quality control
R Risk rating
RPD Relative percent difference
SACM Suspect asbestos-containing material
SWD Southwest Division (Laboratory)
Syn. Synthetics
T Total
TDH Texas Department of Health
Trem. Tremolite
Evaluate the condition of the SACM, collecting sufficient data to perform a risk assessment and to prioritize materials for appropriate response actions;
Collect and analyze bulk material samples in order to quantify, in metric units, SACM which contain greater than 1% asbestos;
Identify and quantify material which is presumed to contain asbestos;
Conduct risk assessments for all asbestos-containing materials (ACM) and presumed
ACM (PACM);
Conduct air monitoring where necessary according to risk assessment models; and
This report presents the findings from the asbestos survey at Building 29009.
roofs, to identify appropriate homogeneous areas (i.e., unique SACM or PACM). A reasonable effort was made by the survey team to gain access to inaccessible areas. If access could not be gained, the survey team made assumptions regarding the presence and quantity of SACM based
2. Perform an initial building walk-through.
a) Note fire doors/walls on the floor plan.
b) Identify homogeneous areas.
c) Identify locations of friable and non-friable SACM and PACM. PACM is defined as SACM which could be visually identified but which were inaccessible for sampling, or were not sampled at the client’s request.
d) Note the type, estimated quantity, description, friability, and physical damage of each SACM and PACM. Mark location(s) of SACM and PACM on the floor plan and take one color photograph of each homogeneous area to show materials and consideration, along with building materials, when determining sample locations. Three bulk samples were obtained from each SACM within each building surveyed. Homogeneous areas categorized as PACM were not sampled. Where applicable, bulk samples were collected from
a) Building number and room number/area description;
b) Typical occupancy and population;
c) SACM description (e.g., pipe insulation, 9x9 brown floor tile, etc.);
d) Estimated quantity of SACM (i.e., area or length);
e) Friability;
f) Physical damage;
g) Potential for damage or disturbance during maintenance;
h) Potential cause of damage or disturbance; and
i) Unique sample identification number.
3. Take one color photograph from each homogeneous area to show materials and conditions present at the time of the survey.
Protection Agency (EPA)-approved method USEPA 600/R-93/116: “Method for Determination of Asbestos in Bulk Building Samples.” In accordance with the Scope of Work dated 20 August
1996, point-counting was not performed. In order to meet quality assurance/quality control
(QA/QC) requirements, triplicate samples were collected from 5% of the sample locations for the overall project. Two of the samples, the normal and duplicate samples, were analyzed by the RJ x identifies the sample type, where:
0 = normal sample
8 = field duplicate (QC sample)
9 = QA sample d identifies the sample number (1,2, or 3)
[Note: “b-c” represents the unique homogeneous area identification (ID) for a particular
Building 29009, encompassing an area of 31,698 sq ft, is a three story Enlisted Barracks without
Building 29009 was inspected during December 1996 and January 1997. During this inspection, 3 homogeneous areas were identified and 6 normal samples were collected. Table 3-1 presents a summary of ACM and PACM identified during the survey of Building 29009. Appendix A contains a detailed table of homogeneous area descriptions for all SACM and PACM, and PLM analytical results for samples collected in Building 29009. Sample and photograph locations are presented in the Building 29009 floor plan (see Appendix B). Table B-1 contains information regarding inspector, risk assessor, and laboratory licenses for this building survey. Appendix C contains representative photographs of each ACM and PACM identified in Building 29009.
Summary of ACM and PACM in Building 290091
1-A Building caulkings and putties 2.9 m2 None None PACM 1 A complete list of homogeneous areas and detailed analytical results are presented in Appendix A. Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs are shown in Appendix C.
Homogeneous area 1-A was identified as PACM. No ACM was identified in this building. The risk assessment and abatement cost estimates for these materials are further discussed in Sections
4 and 5. All areas of this building were accessible to the inspection team. Building 29009 was under renovation during the time of the inspection, therefore materials that had been removed were not identified as homogenous areas. Incoming electrical wiring appeared to be non-ACM.
Interior electrical wiring appeared to be ACM.
No duplicate (QC) samples were collected from materials in Building 29009.
Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk
6 R < 8 2 Planned removal/repair; place in O&M program in interim 1
8 R < 10 3 Place in O&M program
Risk assessments for the homogeneous areas identified as ACM or PACM in Building 29009 are damage/risk factors (D) and exposure factors (E). The methodology used to determine these
Building 29009 Risk Assessment Results
1-A Building caulkings and putties PACM 10.51 4a of the general category of material and the estimated area of identified ACM and/or PACM determined during the survey. Unit rates for abatement include labor, materials, equipment, overhead, insurance, and profit. Abatement unit rates do not include costs for design, air which is friable or which has the potential to become friable during demolition will require in Building 29009 are presented in Tables 5-1 and 5-2.
Building 29009 Abatement and Replacement Cost Estimates
1-A Building caulkings and putties 2.9 m2 $107.60/m2 $312
Subtotal $312
Design Fee (6%) $19
Air Monitoring Cost (10%) $31
Materials Replacement $65
Off-site Disposal Cost $3
TOTAL ESTIMATED ABATEMENT COST $430
Building 29009 Repair Cost Estimates
1-A Building caulkings and putties 2.9 m2 $107.60/m2 $312
Subtotal $312
Design Fee (6%) $19
Air Monitoring Cost (10%) $31
Materials Replacement $65
Off-site Disposal Cost $3
TOTAL ESTIMATED REPAIR COST $430
BUILDING 29009 SURVEY
A-1
Building 29009 Homogeneous Areas 1
1-A Building caulkings and putties PACM
1-B Surfacing material None
R-A Roof shingles and underlayment None 1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of PACM and
Building 29009 Asbestos Survey Analytical Results1
Type
1-B 29009-1-B-01 a Tan Paint ND ND ND ND ND ND ND ND ND ND ND None
29009-1-B-01 b Wht Jt Cmpnd ND ND ND ND ND ND ND 5 ND ND ND None
29009-1-B-01 NA Total ND None
29009-1-B-02 a Tan Paint ND ND ND ND ND ND ND ND ND ND ND None
29009-1-B-02 b Wht Jt Cmpnd ND ND ND ND ND ND ND 5 ND ND ND None
29009-1-B-02 NA Total ND None
29009-1-B-03 a Tan Paint ND ND ND ND ND ND ND ND ND ND ND None
29009-1-B-03 b Wht Compound ND ND ND ND ND ND ND 5 ND ND ND None
29009-1-B-03 NA Total ND None
R-A 29009-R-A-01 a Brn Insltn ND ND ND ND ND ND ND 85 ND ND ND None
29009-R-A-01 b Wht Frit/Blk Shingle ND ND ND ND ND ND ND ND 5 ND 10 None
29009-R-A-01 NA Total ND None
29009-R-A-02 a Brn Insltn ND ND ND ND ND ND ND 85 ND ND ND None
29009-R-A-02 b Wht Frit/Blk Shingle ND ND ND ND ND ND ND ND 5 ND 10 None
29009-R-A-02 NA Total ND None
29009-R-A-03 a Brn Insltn ND ND ND ND ND ND ND 85 ND ND ND None
29009-R-A-03 b Wht Frit/Blk Shingle ND ND ND ND ND ND ND ND 5 ND 10 None
29009-R-A-03 NA Total ND None 1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of ACM and PACM are shown in Appendix C. If a sample contained multiple layers, all layers were analyzed separately. If any layer of a sample from a homogeneous area contained >1% asbestos, than that homogeneous area was classified as ACM. Totals (weighted composite average percent asbestos) are provided for samples with all layers containing >1% asbestos.
ACM = Asbestos-containing material ND = Not detected (<1% asbestos)
Act. = Actinolite Synth. = Synthetics
Am. = Amosite T = Total
Anth. = Anthophyllite Trem. = Tremolite
Cell. = Cellulose
Chry. = Chrysotile
Croc. = Crocidolite
Fib. = Fiberglass
ID = Identification
M.W. = Mineral wool
NA = Not applicable (sample contained single layer)
BUILDING 29009 FLOOR PLAN
Inspector, Risk Assessor, and Laboratory Licenses for Building 29009
License #
License #
License
Exp. Date
Inspected/
Sampled
29009-1-A NA NA NA Robert Saenz 60-1037 4/8/97 12/16/96
29009-1-B RJ Lee Group 30-0051 02/26/97 Robert Saenz 60-1037 4/8/97 12/16/96
29009-R-A RJ Lee Group 30-0051 02/26/97 Robert Saenz 60-1037 4/8/97 1/17/97 1 The sampling information (including laboratory, inspector, risk assessor, and sample date) is the same for all samples associated with a particular homogeneous area. Unique sample identification numbers were assigned to each sample using the following sample numbering scheme:
aaaaa-b-c-xd, where:
aaaaa identifies the five-digit building number;
b identifies the subdivision within that building;
c identifies the homogeneous area;
x identifies the sample type, where:
0 = normal bulk material sample
6 = normal personnel air monitoring sample
7 = normal environmental air monitoring sample
8 = field duplicate bulk material (QC sample)
9 = QA bulk material sample
NA = Not applicable. (PACM was not sampled.)
PACM = Presumed asbestos-containing material
QA = Quality assurance
29009
RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING 29009
Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two
Potential for contact
Physical damage
Water damage
Material friability
Population
Activity/vibration
Ventilation
Air movement
Floors exposure for the ACM and PACM in Building 29009 are presented in Tables D-3 and D-
TSI, Ventilation (3) <10 ft, Medium (5) Minimal (2) Yes (3) Low (1) >30-50% (3)
TSI, Other (1) <10 ft, High (8) Low (3) Moderate (2) >50% (5)
Misc., Damaged (1) >10 ft, Low (0) Moderate (4) High (3)
Misc., Undamaged (0) >10 ft, Medium (3) High (5)
>10 ft, High (5)
3-30 (1) Low (0) 1-9 (1) Occasional (2) Return Only (2) Perceptible (2) Rough, Seamed (2) Moderate (2) Semipermanent (2)
31-300 (2) Moderate (2) 10-200 (2) Constant (5) Supply Only (5) Turbulent (5) Carpet (4) Pitted (3) Minimal (3)
>300 (3) High (5) 201-500 (3) Supply & Return (7) Rough (4) None (4)
501-1,000 (4)
Summary of Damage/Risk Observations for ACM and PACM in Building 29009
Damage
Potential for Damage by
Repair/Maintenance Activities
Asbestos
Content
29009-1-A Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) PACM (1)
Summary of Exposure Observations for ACM and PACM in Building 29009
Area of
Damaged
29009-1-A < 3 (0) None (0) None (0) Low (0) None (0) None (0) Smooth (1) Rough (4) Permanent
BUILDING 29010
Building 29010 f_29010.doc
1.0 INTRODUCTION
1.1 Physical Inspections
1.2 Bulk Sampling and Analysis
1.3 Sample Numbering Scheme
2.0 FACILITY DESCRIPTION
3.0 DISCUSSION OF RESULTS
4.0 RISK ASSESSMENT
5.0 ABATEMENT COST ESTIMATES
FOR BUILDING 29010 SURVEY
APPENDIX B: BUILDING 29010 FLOOR PLAN
APPENDIX C: REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN
BUILDING 29010
29010
B-1 Building 29010 Floor Plan--First Floor ..................................................................... B-1
B-2 Building 29010 Floor Plan--Second Floor ................................................................. B-2
B-3 Building 29010 Floor Plan--Third Floor .................................................................... B-3
B-4 Building 29010 Roof Plan ......................................................................................... B-4
3-1 Summary of ACM and PACM in Building 29010
4-1 Priority Rating Table for Recommended Response Actions
4-2 Building 29010 Risk Assessment Results
5-1 Building 29010 Abatement and Replacement Cost Estimates
5-2 Building 29010 Repair Cost Estimates
A-1 Building 29010 Summary of Homogeneous Areas ................................................... A-1
A-2 Building 29010 Asbestos Survey Analytical Results ................................................. A-2
B-1 Inspector, Risk Assessor, and Laboratory Licenses for Building 29010 ................... B-5
D-1 Damage/Risk Values for Inspection Observations .................................................... D-2
D-2 Exposure Values for Inspection Observations ........................................................... D-2
D-3 Damage/Risk Observations for ACM and PACM in Bldg. 29010 ............................ D-3
D-4 Exposure Observations for ACM and PACM in Bldg. 29010 ................................... D-3
Photo 29010-1-A: 12x12 floor tile (beige with dark specks); throughout building (see floor plan)
Photo 29010-1-B: Wallboard; various areas (see floor plan)
Photo 29010-1-C: Surfacing material; throughout building (see floor plan)
Photo 29010-1-D: Building caulkings and putties
Am. Amosite
Anth. Anthophyllite
Cell. Cellulose
Chry. Chrysotile
COR Contracting Officer’s Representative
Croc. Crocidolite
D Damage/risk factor
DS Dispersion staining
E Exposure factor
EPA United States Environmental Protection Agency
Fib. Fiberglass
GRADE Air Force Guidance for Rating Damage and Exposure
ID Identification
LLC Limited liability company m Meter m2 Square meter
M.W. Mineral wool
N/A Not analyzed
NA Not applicable
ND Not detected
O&M Operations and maintenance
PACM Presumed asbestos-containing material
PLM Polarized light microscopy
QA Quality assurance
QC Quality control
R Risk rating
RPD Relative percent difference
SACM Suspect asbestos-containing material
SWD Southwest Division (Laboratory)
Syn. Synthetics
T Total
TDH Texas Department of Health
Trem. Tremolite
Evaluate the condition of the SACM, collecting sufficient data to perform a risk assessment and to prioritize materials for appropriate response actions;
Collect and analyze bulk material samples in order to quantify, in metric units, SACM which contain greater than 1% asbestos;
Identify and quantify material which is presumed to contain asbestos;
Conduct risk assessments for all asbestos-containing materials (ACM) and presumed
ACM (PACM);
Conduct air monitoring where necessary according to risk assessment models; and
This report presents the findings from the asbestos survey at Building 29010.
roofs, to identify appropriate homogeneous areas (i.e., unique SACM or PACM). A reasonable effort was made by the survey team to gain access to inaccessible areas. If access could not be gained, the survey team made assumptions regarding the presence and quantity of SACM based
2. Perform an initial building walk-through.
a) Note fire doors/walls on the floor plan.
b) Identify homogeneous areas.
c) Identify locations of friable and non-friable SACM and PACM. PACM is defined as SACM which could be visually identified but which were inaccessible for sampling, or were not sampled at the client’s request.
d) Note the type, estimated quantity, description, friability, and physical damage of each SACM and PACM. Mark location(s) of SACM and PACM on the floor plan and take one color photograph of each homogeneous area to show materials and consideration, along with building materials, when determining sample locations. Three bulk samples were obtained from each SACM within each building surveyed. Homogeneous areas categorized as PACM were not sampled. Where applicable, bulk samples were collected from
a) Building number and room number/area description;
b) Typical occupancy and population;
c) SACM description (e.g., pipe insulation, 9x9 brown floor tile, etc.);
d) Estimated quantity of SACM (i.e., area or length);
e) Friability;
f) Physical damage;
g) Potential for damage or disturbance during maintenance;
h) Potential cause of damage or disturbance; and
i) Unique sample identification number.
3. Take one color photograph from each homogeneous area to show materials and conditions present at the time of the survey.
Protection Agency (EPA)-approved method USEPA 600/R-93/116: “Method for Determination of Asbestos in Bulk Building Samples.” In accordance with the Scope of Work dated 20 August
1996, point-counting was not performed. In order to meet quality assurance/quality control
(QA/QC) requirements, triplicate samples were collected from 5% of the sample locations for the overall project. Two of the samples, the normal and duplicate samples, were analyzed by the RJ x identifies the sample type, where:
0 = normal sample
8 = field duplicate (QC sample)
9 = QA sample d identifies the sample number (1,2, or 3)
[Note: “b-c” represents the unique homogeneous area identification (ID) for a particular
Building 29010, encompassing an area of 42,264 sq ft, is a three story Enlisted Barracks without
Building 29010 was inspected during December 1996 and January 1997. During this inspection, 5 homogeneous areas were identified and 12 normal samples were collected. Table 3-1 presents a summary of ACM and PACM identified during the survey of Building 29010. Appendix A contains a detailed table of homogeneous area descriptions for all SACM and PACM, and PLM analytical results for samples collected in Building 29010. Sample and photograph locations are presented in the Building 29010 floor plan (see Appendix B). Table B-1 contains information regarding inspector, risk assessor, and laboratory licenses for this building survey. Appendix C contains representative photographs of each ACM and PACM identified in Building 29010.
Summary of ACM and PACM in Building 290101
1-A 12x12 floor tile (beige with dark specks);
throughout building (see floor plan)
3,927 m2 None None ACM
1-B Wallboard; various areas (see floor plan) 246 m2 Minimal Low ACM
1-C Surfacing material; throughout building (see floor plan)
3,928 m2 None None ACM
1-D Building caulkings and putties 3.9 m2 None None PACM 1 A complete list of homogeneous areas and detailed analytical results are presented in Appendix A. Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs are shown in Appendix C.
Homogeneous areas 1-A, 1-B, 1-C, and 1-D were identified as containing ACM or PACM. The risk assessment and abatement cost estimates for these materials are further discussed in Sections
4 and 5. All areas of this building were accessible to the inspection team. Interior and incoming electrical wiring appeared to be non-ACM.
A field duplicate (QC) sample was collected at location 29010-1-C-01. The results of analysis for the QC sample indicated asbestos levels of 3% . These results are consistent with the normal sample, which also indicated asbestos levels of 3 percent.
Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk
6 R < 8 2 Planned removal/repair; place in O&M program in interim 1
8 R < 10 3 Place in O&M program
Risk assessments for the homogeneous areas identified as ACM or PACM in Building 29010 are damage/risk factors (D) and exposure factors (E). The methodology used to determine these
Building 29010 Risk Assessment Results
1-A 12x12 floor tile (beige with dark specks); throughout building (see floor plan)
ACM 8.99 4a
1-B Wallboard; various areas (see floor plan) ACM 8.48 3
1-C Surfacing material; throughout building (see floor plan) ACM 8.31 4a
1-D Building caulkings and putties PACM 8.99 4a of the general category of material and the estimated area of identified ACM and/or PACM determined during the survey. Unit rates for abatement include labor, materials, equipment, overhead, insurance, and profit. Abatement unit rates do not include costs for design, air which is friable or which has the potential to become friable during demolition will require in Building 29010 are presented in Tables 5-1 and 5-2.
Building 29010 Abatement and Replacement Cost Estimates
1-A 12x12 floor tile (beige with dark specks); throughout building (see floor plan)
3,927 m2 $18.83/m2 $73,945
1-B Wallboard; various areas (see floor plan) 246 m2 $10.76/m2 $2,647
1-C Surfacing material; throughout building (see floor plan)
3,928 m2 $37.66/m2 $147,928
1-D Building caulkings and putties 3.9 m2 $107.60/m2 $420
Subtotal $224,940
Design Fee (6%) $13,496
Air Monitoring Cost (10%) $22,494
Materials Replacement $95,640
Off-site Disposal Cost $24,554
TOTAL ESTIMATED ABATEMENT COST $381,124
Building 29010 Repair Cost Estimates
1-A 12x12 floor tile (beige with dark specks); throughout building (see floor plan)
3 m2 $18.83/m2 $56
1-B Wallboard; various areas (see floor plan) 3 m2 $10.76/m2 $32
1-C Surfacing material; throughout building (see floor plan)
3 m2 $37.66/m2 $113
1-D Building caulkings and putties 3 m2 $107.60/m2 $323
Subtotal $524
Design Fee (6%) $31
Air Monitoring Cost (10%) $52
Materials Replacement $156
Off-site Disposal Cost $33
TOTAL ESTIMATED REPAIR COST $796
BUILDING 29010 SURVEY
A-1
Building 29010 Homogeneous Areas 1
1-A 12x12 floor tile (beige with dark specks); throughout building (see floor plan) ACM
1-B Wallboard; various areas (see floor plan) ACM
1-C Surfacing material; throughout building (see floor plan) ACM
1-D Building caulkings and putties PACM
R-A Roof shingles and underlayment None 1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of PACM and
Building 29010 Asbestos Survey Analytical Results1
Type
1-A 29010-1-A-01 a Tan Floor Tile ND ND ND ND ND ND ND 2 ND ND ND None
29010-1-A-01 b Yellow Mastic ND ND ND ND ND ND ND 5 ND ND ND None
29010-1-A-01 NA Total ND None
29010-1-A-02 a Yellow Mastic ND ND ND ND ND ND ND 5 ND ND ND None
29010-1-A-02 b Tan Floor Tile ND ND ND ND ND ND ND 2 ND ND ND None
29010-1-A-02 NA Total ND None
29010-1-A-03 a Blk Mastic 5.00 ND ND ND 5 ND ND ND ND ND ND ACM
29010-1-A-03 b Wht Floor Tile 2.00 ND ND ND 2 ND ND ND ND ND ND ACM
29010-1-A-03 NA Total 2.3 ACM
1-B 29010-1-B-01 a Tan Paint ND ND ND ND ND ND ND ND ND ND ND None
29010-1-B-01 b Wht Compound 3.00 ND ND ND 3 ND ND ND ND ND ND ACM
29010-1-B-01 NA Total 2.7 ACM
29010-1-B-02 a Wht Compound 3.00 ND ND ND 3 ND ND ND ND ND ND ACM
29010-1-B-02 b Tan Paint ND ND ND ND ND ND ND ND ND ND ND None
29010-1-B-02 NA Total 2.7 ACM
29010-1-B-03 a Wht Compound 3.00 ND ND ND 3 ND ND ND ND ND ND ACM
29010-1-B-03 b Tan Paint ND ND ND ND ND ND ND ND ND ND ND None
29010-1-B-03 NA Total 2.7 ACM
1-C 29010-1-C-01 NA Tn Paint/Wht Ceil Texture 3.00 ND ND ND 3 ND ND ND ND ND ND ACM
29010-1-C-02 NA Tn Paint/Wht Ceil Texture 3.00 ND ND ND 3 ND ND ND ND ND ND ACM
29010-1-C-03 NA Tn Painted Wht Cmpnd 3.00 ND ND ND 3 ND ND ND ND ND ND ACM
29010-1-C-81 NA Tn Painted Wht Cmpnd 3.00 ND ND ND 3 ND ND ND ND ND ND ACM
R-A 29010-R-A-01 a Blk Shingle/Wht Frit ND ND ND ND ND ND ND 10 10 ND ND None
29010-R-A-01 b Brn Insulation ND ND ND ND ND ND ND 95 ND ND ND None
29010-R-A-01 NA Total ND None
29010-R-A-02 a Blk Shingle/Wht Frit ND ND ND ND ND ND ND 10 10 ND ND None
29010-R-A-02 b Brn Shingle ND ND ND ND ND ND ND 95 ND ND ND None
29010-R-A-02 NA Total ND None
29010-R-A-03 a Blk Shingle/Wht Frit ND ND ND ND ND ND ND 10 10 ND ND None
29010-R-A-03 b Brn Insulation ND ND ND ND ND ND ND 95 ND ND ND None
29010-R-A-03 NA Total ND None
1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of ACM and PACM are shown in Appendix C. If a sample contained multiple layers, all layers were analyzed separately.
This is the start of the file's text. The full file is on GovTribe.