Attachment 2 is a Historical Workload Data table detailing the volume and duration of various technology installation and management tasks. The document lists 11 different categories of work, including Conference Room AV Installation (25 iterations, 60-90 days), Infrastructure/Cabling IT Installation & Repair (8 iterations, 30-90 days), and AV/CR/KM Sharepoint Management (8 iterations, normally 365 days). Other notable categories include Tactical Command Center AV/VTC Installation, SIPR Protected Distribution System Expansion/Repair, and Wireless NIPR Installation. The table provides a comprehensive overview of past task orders, with volumes ranging from 1 to 25 iterations and durations spanning 30 to 180 days, indicating a diverse range of technical installation and support services.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
HISTORICAL WORKLOAD DATA
Category Type of Work Volume Duration Conference Room AV Installation 25 Iterations
(TO’s) 60-90 Days
Infrastructure/Cabling IT Installation & Repair 8 Iterations(TO’s) 30-90 days AV/CR/KM Sharepoint Management
Full FTE’s 8 Iterations Normally 365 days
Other Room AV Installation 6 Iterations(TO’s) 60-90 Days Training/Classroom AV Installation 5 Iterations(TO’s) 90-120 days Tactical Command Center
AV/VTC
Installation 5 Iterations(TO’s) 90-180 days
SIPR Protected Distribution system (PDS)
Expansion/Repair 4 Iterations(TO’s) 60-120 days
Public Address (PA) / Audio Systems
Installation 3 Iterations(TO’s) 60-90 days
Wireless NIPR Installation 3 Iterations 90-120 Days Video Wall Installation 1 Iteration (TO’s) 90-120 Days Cable TV Dial Isolators Installation 1 Iteration 60-90 Days
*TO means Task Order