TECH_EXHIBIT_B_-_DRAWINGS_19-B-0005.pdf

PDF 3 MB Posted

Attached to
Replace #2 Chiller at CEP, Bldg 37015 Federal contract opportunity
Solicitation number
W9115119B0005
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

Technical Exhibit B- Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Replace #2 Chiller at CEP, Bldg 37015, newest first.
File Type Posted
TECHNICAL_EXHIBIT_C_DRAWINGS-REVISED.pdf PDF
Tech_Exhibit_D-_AS-BUILTS._07_2005.PDF PDF
Amendment_0001__3-14-2019.pdf PDF
Solicitation_W91151-19-B-0005_Rpl__2Chiller_at_CEP_B_37015.pdf PDF
Attachment_1-Appendix_A_19-B-0005.pdf PDF
TECH_EXHIBIT_A_-_SPECIFICATION_19-B-0005.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C: 2 :i:

c

OJ

Q)

,,,,C: "' e-u::

1'i

Cl:'. ... w

(9 z u Cl:'.

w Cl:'.

0..

N

:;: 3

0..

U1 U1 .,.

'i

A I B I C I D

WATER-COOLED MAGNETIC BEARING CHILLER SCHEDULE

EVAPORATOR CONDENSER ELECTRICAL ACCESSORIES

MARK LOCATION COMP MIN. NO. STEPS MIN. CAP NPLV CAP FLUID GPM EWT LWT NO. OF MAX FLUID GPM NO. OF EWT LWT MAX

CH-2

TYPE OF UNLOADING UNLOADED

CIRCUITS %

MECH RM CENTRIFUGAL 2 VARIABLE 25 0.329

REMARKS:

1. REFRIGERANT R-134A

2. BASIS OF DESIGN: TRANE MAGNATIC

3. VFD SHALL BE SET TO PROVIDE CHILLER MFR MIN. FLOW (GPM)

4. PIPE ALL RELIEF VALVES TO ATMOSPHERE PER MFR RECOMMENDATIONS

5. INSTALL EXTERNAL TOWER AND CHILLED WATER PUMP FLOW INTERLOCKS

6. START-UP MUST BE PERFORMED BY MFR OR AN AGENT OF MFR AUTHORIZED TO

PERFORM START UP AND WARRANTY OF MFR PRODUCTS.

7. PROVIDE 5 YEARS EXTENTED FACTORY WARRANTY FOR LABOR AND MATERIALS.

8. VFD TO BE PROVIDED W/ GROUND FAULT PROTECTION,

TONS

1,300 WTR

VOL TS/PH/HZ

F F PASSES P.D. PASSES F F P.D.

FT FT

2500 56 44 2 15 WTR 3,750 2 85 95 20 480/3/60 ALL

ACCESSORIES:

1. UNIT INTERNAL FLOW SWITCH AND PROVIDE BLDG FLOW SWITCH INTERLOCKS

2. SINGLE POINT SUPPLY TERMINAL BLOCK, UNIT MOUNTED STARTER AND DISCONNECT, AND CIRCUIT BREAKER

3. CONTROL TRANSFORMER.

4. FACTORY INSTALLED EVAPORATOR AND ACCESSORY COOLER INSULATION IN LIEU OF STANDARD 3/4"

5. ;◊�:i:�m..;�iut'Jiffst�iv�it1��i�2JlPN

E� ����!��� (BALL TYPE) ISOLATION VALVES, EACH SYSTEM, AND

6. FACTORY FURNISHED ELASTOMERIC MOUNTING PADS

7. ANALOG CONDENSER FLOW REGULATING OUTPUT SIGNAL

8. FACTORY AUTHORIZED STARTUP

SURGE PROTECTOR/LIGHTING ARRESTOR AND ANALOG AMMETERS AND VOLTMETERS. 9. FACTORY INSTALLED BLDG AUTOMATION SYSTEM INTERFACE BOARD

10. LONWORK / LON MARK PROTOCOL

11. VFD DRIVE

12. MEETS ASHRAE 90.1-2010

f1\ CHILLER SCHEDULE AND CONTROLS

� NOT TO SCALE

I

REMARKS

ALL

E I F

CQNJRQI S FQR NEW CENJRIEI !GAi GHIi I ER CH-2·

1.

2.

3.

CONTRACTOR TO FURNISH AND INSTALL NEW CONTROL DEVICES TO INCLUDE NEW VALVES,

ACTUACTORS, SENSORS, RELAYS AND OTHER CONTROL DEVICES THAT ARE NECESSARY TO

ACCOMPLISH THE SEQUENCE OF OPERATION AS EXISTING.

CONTRACTOR TO INTEGRATE NEW CHILLER INTO EXISTING USMS DDC CONTROLS SYSTEM.

CHILLER TO OPERATE VIA PACKAGED CONTROLS. CHILLER TO COMMUNICATE WITH UCMS

VIA DDC INTERFACE CARD PROVIDED BY CHILLER MANUFACTURER. CHILLER TO START/STOP

AUTOMATICALLY PER USMS SYSTEM. CHILLER SEQUENCING PER UCMS SYSTEM. CHILLER

ALARMS WILL OPERATE PER CHILLER MANUFACTURER.

1-,---------------------.----------------------.---------------------.--------------------.--------------------... ---------------------1 a_ w

N :it 0::

w ...J ...J

I

...J a_ 0::

37015

Bldg. No.

AD005757P

Project No.

SHEET

REFERENCE

NUMBER

M-601

G-101 Cover Sheet
C-101
M-101
M-501
M-601