TECH_EXHIBIT_B_-_DRAWINGS_19-B-0005.pdf
PDF 3 MB Posted
- Attached to
- Replace #2 Chiller at CEP, Bldg 37015 Federal contract opportunity
- Solicitation number
- W9115119B0005
About this file
Technical Exhibit B- Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| TECHNICAL_EXHIBIT_C_DRAWINGS-REVISED.pdf | ||
| Tech_Exhibit_D-_AS-BUILTS._07_2005.PDF | ||
| Amendment_0001__3-14-2019.pdf | ||
| Solicitation_W91151-19-B-0005_Rpl__2Chiller_at_CEP_B_37015.pdf | ||
| Attachment_1-Appendix_A_19-B-0005.pdf | ||
| TECH_EXHIBIT_A_-_SPECIFICATION_19-B-0005.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C: 2 :i:
c
OJ
Q)
,,,,C: "' e-u::
1'i
Cl:'. ... w
(9 z u Cl:'.
w Cl:'.
0..
N
:;: 3
0..
U1 U1 .,.
'i
A I B I C I D
WATER-COOLED MAGNETIC BEARING CHILLER SCHEDULE
EVAPORATOR CONDENSER ELECTRICAL ACCESSORIES
MARK LOCATION COMP MIN. NO. STEPS MIN. CAP NPLV CAP FLUID GPM EWT LWT NO. OF MAX FLUID GPM NO. OF EWT LWT MAX
CH-2
TYPE OF UNLOADING UNLOADED
CIRCUITS %
MECH RM CENTRIFUGAL 2 VARIABLE 25 0.329
REMARKS:
1. REFRIGERANT R-134A
2. BASIS OF DESIGN: TRANE MAGNATIC
3. VFD SHALL BE SET TO PROVIDE CHILLER MFR MIN. FLOW (GPM)
4. PIPE ALL RELIEF VALVES TO ATMOSPHERE PER MFR RECOMMENDATIONS
5. INSTALL EXTERNAL TOWER AND CHILLED WATER PUMP FLOW INTERLOCKS
6. START-UP MUST BE PERFORMED BY MFR OR AN AGENT OF MFR AUTHORIZED TO
PERFORM START UP AND WARRANTY OF MFR PRODUCTS.
7. PROVIDE 5 YEARS EXTENTED FACTORY WARRANTY FOR LABOR AND MATERIALS.
8. VFD TO BE PROVIDED W/ GROUND FAULT PROTECTION,
TONS
1,300 WTR
VOL TS/PH/HZ
F F PASSES P.D. PASSES F F P.D.
FT FT
2500 56 44 2 15 WTR 3,750 2 85 95 20 480/3/60 ALL
ACCESSORIES:
1. UNIT INTERNAL FLOW SWITCH AND PROVIDE BLDG FLOW SWITCH INTERLOCKS
2. SINGLE POINT SUPPLY TERMINAL BLOCK, UNIT MOUNTED STARTER AND DISCONNECT, AND CIRCUIT BREAKER
3. CONTROL TRANSFORMER.
4. FACTORY INSTALLED EVAPORATOR AND ACCESSORY COOLER INSULATION IN LIEU OF STANDARD 3/4"
5. ;◊�:i:�m..;�iut'Jiffst�iv�it1��i�2JlPN
E� ����!��� (BALL TYPE) ISOLATION VALVES, EACH SYSTEM, AND
6. FACTORY FURNISHED ELASTOMERIC MOUNTING PADS
7. ANALOG CONDENSER FLOW REGULATING OUTPUT SIGNAL
8. FACTORY AUTHORIZED STARTUP
SURGE PROTECTOR/LIGHTING ARRESTOR AND ANALOG AMMETERS AND VOLTMETERS. 9. FACTORY INSTALLED BLDG AUTOMATION SYSTEM INTERFACE BOARD
10. LONWORK / LON MARK PROTOCOL
11. VFD DRIVE
12. MEETS ASHRAE 90.1-2010
f1\ CHILLER SCHEDULE AND CONTROLS
� NOT TO SCALE
I
REMARKS
ALL
E I F
CQNJRQI S FQR NEW CENJRIEI !GAi GHIi I ER CH-2·
1.
2.
3.
CONTRACTOR TO FURNISH AND INSTALL NEW CONTROL DEVICES TO INCLUDE NEW VALVES,
ACTUACTORS, SENSORS, RELAYS AND OTHER CONTROL DEVICES THAT ARE NECESSARY TO
ACCOMPLISH THE SEQUENCE OF OPERATION AS EXISTING.
CONTRACTOR TO INTEGRATE NEW CHILLER INTO EXISTING USMS DDC CONTROLS SYSTEM.
CHILLER TO OPERATE VIA PACKAGED CONTROLS. CHILLER TO COMMUNICATE WITH UCMS
VIA DDC INTERFACE CARD PROVIDED BY CHILLER MANUFACTURER. CHILLER TO START/STOP
AUTOMATICALLY PER USMS SYSTEM. CHILLER SEQUENCING PER UCMS SYSTEM. CHILLER
ALARMS WILL OPERATE PER CHILLER MANUFACTURER.
1-,---------------------.----------------------.---------------------.--------------------.--------------------... ---------------------1 a_ w
N :it 0::
w ...J ...J
I
...J a_ 0::
37015
Bldg. No.
AD005757P
Project No.
SHEET
REFERENCE
NUMBER
M-601