17-B-0026_SOLICITATION-REPUR_REPAIR_BLDG_36000_13_OCT_17_.pdf
PDF 180 KB Posted
- Attached to
- Repurpose Conference Room Area Building 36000
- Solicitation number
- W91151-17-B-0026
About this file
MOD RFI-2 responses. Solicitation date has been changed to 24 October 2017 at 1PM.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0010995828 AD006466
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1) Add the questions and answ ers from RFI Question-2.
2) Attach Technical Exhibit C- Revised Draw ings. The revised draw ings only include changes made to Sheets: G-101, AD-101B, A-102, A-102B, A-602, M-101A, M-101B, M-601,
3) Bid Opening date has changed from 17 October 2017 to 24 October 2017 at 1:00PM.
4) All other terms and conditions w ill remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Oct-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91151-17-B-0026
X 9B. DATED (SEE ITEM 11)
21-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Oct-2017
CODE
MISSION AND INSTALLATION CONTRACTING
MISSION CONTRACTING OFFICE (MCO)
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5095
W91151 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91151-17-B-0026
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RFI RESPONSES 2
RFI Responses – 2 W91151‐17‐B‐0026
REPURPOSE/REPAIR AREA ON SECOND FLOOR IN BLDG 36000
AD006466P
1. Drawing AD‐101 and A‐102: There is a gypsum board fur‐down in the ceiling at the column line running left to right across the room. This is not shown on the demo drawing or new ceiling layout.
The fur‐down houses the expansion joint and needs to remain in place. Please concur?
A: Concur
2. Drawing A101B shows Corridor 2802 and corridor C2802. The room finish schedule calls out carpet for corridor C2802. Corridor 2802 (no prefix) is not mentioned on the room finish schedule. What is the floor finish in corridor 2802 (the corridor outside the new men’s and women’s restrooms?
A:See Revised A‐602
3. Drawing A‐101B and Room Finish Schedule A‐602: Foyer 2801 calls for LVT floor finish. On either side of the Foyer, but all part of the same room are corridors C2801 and C2802 that are shown being carpeted. Can you show the transition points between carpet and LVT?
A: See Revised A‐602
4. Drawing AD‐101 General Demolition Note 10 and Drawing AD‐101B General Demolition Note 11 state, “Only demo/abate flooring as needed to accommodate wall and equipment demolition in coordination with new floor plan”. The response to original RFI question 12 states, “Some flooring will be affected due to demolition activities and should be approached correctly per HAZMAT report”.
The new floor finishes in most of the rooms is changing from the existing. Will we overlay the new carpet and new LVT over the existing VCT?
A: Yes.
5. Drawing A‐101B: Key note 3, “Install mount and all HDMI, DVI cable, and power connections from TV Monitor to desk location”. The conference table is shown to be in the middle of the room. Will the items mentioned above be installed in the ceiling above the center of the conference table?
A: Yes, exact location in ceiling will be provided after a projector is selected.
6. Will areas that are not disturbed during demo that are to receive new paint need abatement?
A: It is not the intent to abate these walls, however they will need to be prepared to receive new paint.
7. Sheet A‐102 shows new light fixtures on reflected ceiling plan, Sheet E‐102A Note #1 states “relocate existing fixtures” Sheet ED‐102A states “Demo & relocate” Notes #2 referrers to Sheet E‐102. Are we to remove and relocate? Or Demo and install new?
A: In first floor classroom (ED‐102A and E‐102A) relocate/reuse existing. In second floor, lights will be new per sheet E‐102. See revised A‐102.
8. Sheet A‐102 states “reuse existing diffuser & return duct” Sheet M‐101A states “supply new. Please clarify on drawings See Revised A‐102
9. Nurse call (#23) and cameras (#28) per last round of RFI’s is said to demo, to what extent are we to demo?
A: Demo all power back to nearest junction box. Other cable can be abandoned in wall. Install wall plates to cover openings as needed.
10. On M‐101A, there are several notes that state “Fire Damper”. Can you please confirm if these need to be new fire dampers or is this existing?
A: New
11. Is there any demo associated with M‐101A? If So, can as‐builds be provided or demo drawings for this work?
A: No demolition of mechanical equipment or duct is intended.
12. All grills on Mechanical drawings ware in bold lines. Can you please confirm if all grills are to be replaced for M‐101A and M‐101B?
A: All existing grills are to be replaced.
13. Note # 2 under general notes calls for new exhaust fan. However there is not exhaust fan schedule for the mechanical drawings. Please provide schedule page.
A: See Revised Drawings
14. The notes call out for new grills and diffusers. However there is no air device schedule on drawings. Please provide schedule page.
A: See Revised Drawings
15. Sheet A‐101B General Note #2 calls out Fissured Tegular tile. Sheet A‐102B Legend calls out 2’x2’ ceiling tile & grid but no mention of kind of ceiling tile. Sheet A‐602 under ceiling (MAT) calls out both ACT & Tegular. Are we to install both per call out on A‐602?
A: Where tegular is called out, install tegular ceiling tile. All other acoustical ceiling tile is to be standard lay‐in type.
16. Sheet A‐102B does not have all items on drawings called out on the legend.
A: Concur. See corrected drawings.
17. Sheet AD‐101B is showing a single dashed line on the west wall, running north to south, of the large open area. What is the dashed line for?
A: On the East wall, there is a longer hatched line depicting a furr‐down. The surrounding hatched line is a misprint. See revised drawing.
18. On M‐101A, there are several notes that state “Fire Damper”. Can you please confirm if these need to be new fire dampers or is this existing?
A: Confirmed, these need to be new fire dampers.
19. Is there any demo associated with M‐101A? If So, can as‐builds be provided or demo drawings for this work?
A: No demolition of mechanical duct is intended.
20. All grills on Mechanical drawings ware in bold lines. Can you please confirm if all grills are to be replaced for M‐101A and M‐101B?
A: See answer above.
4. Note # 2 under general notes calls for new exhaust fan. However there is not exhaust fan schedule for the mechanical drawings. Please provide schedule page.
A: See answer above.
21. The notes call out for new grills and diffusers. However there is no air device schedule on drawings. Please provide schedule page.
A: See answer above.
SECTION 00010 - SOLICITATION CONTRACT FORM
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A Technical Exhibit A-
Specifications
3313 11-JAN-2016
Exhibit B Technical Exhibit B - Drawings
20 01-MAY-2017
Exhibit C Technical Exhibit C - NEC Documents
10 26-APR-2017
Exhibit D Technical Exhibit D - Revised Drawings
28 28-AUG-2017
Attachment 1 Appendix A 120 04-AUG-2016 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A Technical Exhibit A-
Specifications
3313 11-JAN-2016
Exhibit B Technical Exhibit B - Drawings
20 01-MAY-2017
Exhibit C Technical Exhibit C - NEC Documents
10 26-APR-2017
Exhibit D Technical Exhibit D - Revised Drawings
28 28-AUG-2017
Attachment 1 Appendix A 120 04-AUG-2016 Attachment 2 Exhibit C 13-OCT-2017
(End of Summary of Changes)
File details come from the government source that posted it. Updated .