FOR OFFICIAL USE ONLY

DEPARTMENT OF THE ARMY

NETWORK ENTERPRISE CENTER

PLANS, ARCHITECTURE & SERVICE OPERATIONS BRANCH

FORT HOOD, TEXAS 76544

NETWORK ENTERPRISE CENTER

STATEMENT OF REQUIREMENTS

Project BLDG 36000 1st Floor (Class Room)

Communications Infrastructure Upgrade

FORT HOOD, TEXAS

DEVELOPED BY

26 April 2017

Distribution authorized to US Government agencies and their specified contractors only, for administrative or operational use. Other requests for this document shall be referred to Network Enterprise Center Attn: NEC, Plans Branch, Building 422 27th St, Fort Hood, Texas 76544

GENERAL STATEMENT OF REQUIREMENT

Network Enterprise Center (NEC)

BLDG 36000 1st Floor (Class Room)

1. General Information: 04/26/2017

Primary POC: Mr. Angel 254(535-2237) angel.l.rodriguezayal.civ@mail.mil

Project ID:

Location: Building 36000 1st Floor (Class Room).

Onsite POC:

Summary: N/A

2. General Requirements:

Contractor shall provide all labor, material, and equipment required to install communications infrastructure to make the facility complete and usable.

Contractor shall follow all TIA/EIA and RUS standards covering all installation aspects of communications infrastructure. In addition to the industry standards, the contractor shall follow the guidance published by the Network Enterprise Center (NEC) IT Installation Design Guide (IDG).

Contractor shall make all required repairs, fixes and adjustments necessary to ensure the installation meets applicable NEC quality assurance standards. The project shall not be considered complete until a thorough quality control inspection is conducted by the NEC QA and the work accepted.

3. Outside Plant General Installation:

3.1 Duct/Manhole System:

No duct / manhole system requirement.

3.2 Outside Plant Fiber:

No Outside Plant Fiber Work is required.

3.3 Outside Plant Copper:

No Outside Plant Copper work is required.

4. Building Plant General Installation:

4.1 Entrance Facility:

No Entrance Facility work is required.

4.2 Communication Room(s)/Cabinet(s)/Case(s):

Contractor shall remove all existing Category 6/5/3, telephone cables from the 1st floor Class Room area. The Contractor shall provide to the NEC Plans section an as built line drawing identifying placement of voice and data drops.

After removing all existing Category 6/5/3, telephone cables from the 1st floor Class Room area the contractor shall utilize existing pipes and gang boxes to run and terminate the new Category 6 cables where possible.

Provide/Install 1” EMT from the user drop locations to 1’ above ceiling.

Ensure to have a plastic sleeve installed at the end above the ceiling to prevent cable chafing when installing the category 6 cables.

Provide/Install in telecommunications room 1411 fire retardant back boards painted for mounting required equipment within the telecommunications room. DO NOT PAINT OVER THE FIRE RETARDANT STAMP.

Contractor shall install 1 each floor mounted equipment 7’ racks in room 1411.

Contractor shall install (refer to floor plan) Category 6 unclassified network drops (2, 4, 6 and 8), blue in color in the 1st floor Class Room area.

Each category 6 UTP cable shall be terminated at the outlet with a Category 6, RJ-45 jack, 8P8C, and using T568B termination.

Provide/install in the telecommunications room 1411 Category 6 patch panel sized appropriately for the Category 6 cables coming from the various user outlet locations as depicted on the floor plans.

Contractor shall extend 75 copper pairs utilizing riser cable and terminate pairs on patch panels in floor mounted rack in TR 1411.

Provide/Install in telecommunications room 1411 1st floor Class Room area appropriate TMGB and ground all telecom equipment utilizing #6 AWG grounding wire in accordance with NFPA 70 and other regulatory and industry standards.

Contractor shall install 12 strands SM fiber from telecommunications room 1411 to telecommunications room 0708 terminate fiber strands with ST connector inside fiber panels inside both telecommunications rooms.

Contractor shall provide/install one each 12 port ST insert (SIECOR) in the fiber panel in telecommunications room 0708 to connect new install 12 strands fiber optic cable coming from telecommunications room.

Provide/Install two each single mode (SM) duplex jumpers with “ST” to “LC” terminated ends at each fiber panel location.

Provide/Install in the 1st floor Class Room area telecommunications room 1411 two dedicated and independent 20 amps quad electrical outlet at the rack location for energizing electronic devices mounted in the rack.

Contractor shall install appropriate cable management equipment (vertical, horizontal front and rear) to support all incoming and interior cables at the telecommunication board and rack locations. Velcro ties shall be used in lieu of plastic Zip ties or electrical tape to secure loose patch cabling.

Contractor shall perform a permanent link test on each category 6 cable as published in the NEC IDG and provide test reports to the DPW COR.

All fiber optic terminations shall have testing completed per TIA/EIA and NEC IDG requirements and a copy of the test reports provided to the DPW

COR.

5. Networking and Switching:

Network Enterprise Center will provide network Switches.

End of Statement:

DEPARTMENT OF THE ARMY

NETWORK ENTERPRISE CENTER

PLANS, ARCHITECTURE & SERVICE OPERATIONS BRANCH

FORT HOOD, TEXAS 76544

STATEMENT OF REQUIREMENTS

Project BLDG 36000 2nd Floor (Conference Room) Communications Infrastructure Upgrade

FORT HOOD, TEXAS

DEVELOPED BY

26 April 2017

Distribution authorized to US Government agencies and their specified contractors only, for administrative or operational use. Other requests for this document shall be referred to Network Enterprise Center Attn: NEC, Plans Branch, Building 422 27th St, Fort Hood, Texas 76544

GENERAL STATEMENT OF REQUIREMENT

Network Enterprise Center (NEC)

BLDG 36000 2nd Floor (Conference Room)

1. General Information: 04/26/2017

Primary POC: Mr. Angel 254(535-2237) angel.l.rodriguezayal.civ@mail.mil

Project ID:

Location: Building 36000 2nd Floor (Conference Room).

Onsite POC:

Summary: N/A

2. General Requirements:

Contractor shall provide all labor, material, and equipment required to install communications infrastructure to make the facility complete and usable.

Contractor shall follow all TIA/EIA and RUS standards covering all installation aspects of communications infrastructure. In addition to the industry standards, the contractor shall follow the guidance published by the Network Enterprise Center (NEC) IT Installation Design Guide (IDG).

Contractor shall make all required repairs, fixes and adjustments necessary to ensure the installation meets applicable NEC quality assurance standards. The project shall not be considered complete until a thorough quality control inspection is conducted by the NEC QA and the work accepted.

3. Outside Plant General Installation:

3.1 Duct/Manhole System:

No duct / manhole system requirement.

3.2 Outside Plant Fiber:

No Outside Plant Fiber Work is required.

3.3 Outside Plant Copper:

No Outside Plant Copper work is required.

4. Building Plant General Installation:

4.1 Entrance Facility:

No Entrance Facility work is required.

4.2 Communication Room(s)/Cabinet(s)/Case(s):

Contractor shall remove all existing Category 6/5/3, telephone cables from the 2nd floor Conference Room area. The Contractor shall provide to the NEC Plans section an as built line drawing identifying placement of voice and data drops.

After removing all existing Category 6/5/3, telephone cables from the 2nd floor Conference Room area the contractor shall utilize existing pipes and gang boxes to run and terminate the new Category 6 cables where possible.

Provide/Install 1” EMT from the user drop locations to 1’ above ceiling.

Ensure to have a plastic sleeve installed at the end above the ceiling to prevent cable chafing when installing the category 6 cables.

Provide/Install in telecommunications room 2820 fire retardant back boards painted for mounting required equipment within the telecommunications room. DO NOT PAINT OVER THE FIRE RETARDANT STAMP.

Contractor shall install 1 each floor mounted equipment 7’ racks in room 2820.

Contractor shall install (refer to floor plan) Category 6 unclassified network drops (dual), blue in color in the 2nd floor Conference Room area.

Each category 6 UTP cable shall be terminated at the outlet with a Category 6, RJ-45 jack, 8P8C, and using T568B termination.

Provide/install in the telecommunications room 2820 Category 6 patch panel sized appropriately for the Category 6 cables coming from the various user outlet locations as depicted on the floor plans.

Contractor shall extend 75 copper pairs utilizing riser cable and terminate pairs on patch panels in floor mounted rack in TR 2820.

Provide/Install in telecommunications room 2820 2nd floor Conference Room area appropriate TMGB and ground all telecom equipment utilizing #6 AWG grounding wire in accordance with NFPA 70 and other regulatory and industry standards.

Contractor shall install 12 strands SM fiber from telecommunications room 2820 to telecommunications room 0708 terminate fiber strands with ST connector inside fiber panels inside both telecommunications rooms.

Contractor shall provide/install one each 12 port ST insert (SIECOR) in the fiber panel in telecommunications room 0708 to connect new install 12 strands fiber optic cable coming from telecommunications room 2820.

Provide/Install two each single mode (SM) duplex jumpers with “ST” to “LC” terminated ends at each fiber panel location.

Provide/Install in the 2nd floor Conference Room area telecommunications room 2820 two dedicated and independent 20 amps quad electrical outlet at the rack location for energizing electronic devices mounted in the rack.

Contractor shall install appropriate cable management equipment (vertical, horizontal front and rear) to support all incoming and interior cables at the telecommunication board and rack locations. Velcro ties shall be used in lieu of plastic Zip ties or electrical tape to secure loose patch cabling.

Contractor shall perform a permanent link test on each category 6 cable as published in the NEC IDG and provide test reports to the DPW COR.

All fiber optic terminations shall have testing completed per TIA/EIA and NEC IDG requirements and a copy of the test reports provided to the DPW

COR.

5. Networking and Switching:

Network Enterprise Center will provide network Switches.

End of Statement:

MICHAEL.A.LOVE3

Typewritten Text

1ST FLOOR CLASSROOM

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

MICHAEL.A.LOVE3

Typewritten Text

2ND FLOOR CONFERENCE ROOM

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

ANGEL.L.RODRIGUEZAYA

Stamp

BLDG 36000 1st Floor (Classroom) SOW