EXHIBIT_A_-_Specs _25_Apr_16.pdf

PDF 9 MB Posted

Attached to
Renovate Admin Facility Federal contract opportunity
Solicitation number
W91151-16-B-0023
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

Specifications

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Headquarters III Corps, Fort Hood Directorate of Public Works (DPW)

Technical Exhibit “A”

Renovate Admin Facility Building 38022

SPECIFICATIONS

April 25, 2016

Contract No. W91151‐15‐C‐XXXX

Directorate of Public Works Engineering Division US Army, III Corps 4612 Engineer Dr.

Fort Hood, TX 76544

S U

B M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

T E

R

IA

L N

E E

D E

D B

Y

A C

T

IO

N C

O D

E

D A

T E

O F

A C

T

IO

N

D A

T E

F W

D T

O O

T H

E R

R E

V

IE

W E

R

D A

T E

R C

D F

R O

M O

T H

R E

V

IE

W E

R

A C

T

IO

N C

O D

E

D A

T E

O F

A C

T

IO

N

(a) (b) (c) (d) (e) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

01 32 01.00 10 SD-01 Preconstruction Submittals Project Schedule 3.4

01 35 23.00 40 SD-01 Preconstruction Submittals Contractor's Health and Safety 1.3.1 Plan SD-06 Test Reports Gas Protection 1.14 SD-07 Certificates Protection Plan 1.3.2 License Certificates 1.11

01 35 29 SD-01 Preconstruction Submittals Activity Hazard Analysis Crane Critical Lift Plan Crane Operators Confined Space Entry Permit SD-06 Test Reports Accident Reports Regulatory Citations and 1.11.1 Violations

01 45 01.00 20 SD-03 Product Data Contractor Quality Control Plan 3.2

(QCP)

01 57 20.00 10 SD-01 Preconstruction Submittals Air Program Submittals Contractor Hazardous Material 3.3.1 Inventory and Consumption Log Appointment of an Environmental Manager SD-11 Closeout Submittals Contractor Hazardous Material 3.3.1 Inventory and Consumption Log Air Program Submittals Emission Inventory Weight Tickets 3.9.2

01 77 00 SD-10 Operation and Maintenance Data Equipment/Product Warranty List SD-11 Closeout Submittals Certification of EPA Designated Items Form DD1354 (and Appendix D where applicable) Videos Final Operation and Maintenance Manuals Final Record Drawings Inventory of Contractor Furnished and Installed Equipment

02 41 00 SD-01 Preconstruction Submittals

Demolition Plan

Utility Cut and Cap Plan

SD-07 Certificates

Asbestos and Lead Based Paint

Notification Forms submitted to

Texas Department of State Health

Services

SD-11 Closeout Submittals

Receipts

02 82 00 SD-03 Product Data

Material Safety Data Sheets 1.3.8

(MSDS) for all materials

SD-06 Test Reports

Air sampling results 1.5.5

Asbestos disposal quantity report 3.3.3.2

Clearance sampling 3.2.7.3

Asbestos Survey Report 1.3.10.1

SD-07 Certificates

Asbestos hazard abatement plan 1.3.9

Testing laboratory 1.3.10

Private qualified person 1.5.1 documentation

Contractor's license 1.5.4

Competent person 1.5.2

Worker's license 1.5.3

Landfill approval 1.3.11

Employee training 1.3.3

Medical certification 1.3.12

Waste shipment records 1.3.11

Respiratory Protection Program 1.3.6

Delivery tickets 1.3.11

Notifications 1.3.4

Notifications to Texas

Department of State Health

Services

SD-11 Closeout Submittals

Notifications 1.3.4

Permits and licenses 1.3.4

D

IV

IS

IO

N

C L

A S

S

IF

IC

A

T

IO

N G

O V

T O

R A

/E R

E V

IE

W

E R

CONTRACTO CONTR APPROVING

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH

SUBMITTAL REGISTER CONTRACT NO.

Renovate Admin Facility Bldg 38022 CONTRACTOR

B E

T A

N B

T A

B L

E O

F C

O N

T E

N T

S

A C

T

IV

IT

Y

N O

T R

A N

S M

IT

T

A L

N O

S P E C

S E C T DESCRIPTION ITEM SUBMITTED

P A

R A

G R

A P

H

REMARKS

D A

T E

F W

D T

O A

P P

R A

U T

H

D A

T E

R C

D F

R O

M C

O N

T R

(f) (l)

FIO

FIO

G

FIO

FIO

G

FIO

FIO

FIO

D E

M O

L

IT

IO

N

A S

B E

S T

O S

R E

M E

D

IA

T

IO

N

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

02 82 18.00 20 SD-06 Test Reports

Air sampling results 1.5.4

Clearance sampling 3.2.8.2

SD-07 Certificates

Mold remediation plan 1.3.9

Private qualified person documentation (Mold assessors, remediators)

Contractor's license 1.5.3

Responsible person

Notifications 1.3.4

Notifications 1.3.4

SD-11 Closeout Submittals

Notifications 1.3.4

Notifications 1.3.4

02 82 33.13 20 SD-03 Product Data

Vacuum Filters 1.6.4

Respirators 1.6.1

SD-06 Test Reports sampling results 1.5.2.3

Occupational and Environmental 1.5.2.3

Assessment Data Report

SD-07 Certificates

Qualifications of CP 1.5.1.1

Testing Laboratory 1.5.1.3

Occupant Notification 3.1.1.1

Training Certification 1.5.1.2

Notification of the

Commencement of LBP Hazard

Abatement activities

Third Party Consultant 1.5.1.4

Qualifications

Lead-based paint/paint with lead 1.5.3 removal/control plan

Respiratory Protection Program 1.5.2.6

Hazard Communication Program 1.5.2.7 approved hazardous waste treatment, storage, or disposal facility

Lead Waste Management Plan 1.5.2.8

Clearance Certification 3.5.1.1

SD-11 Closeout Submittals hazardous waste manifest 3.5.2.1

03 30 00 SD-02 Shop Drawings

Reinforcing steel 1.4.2.1

SD-05 Design Data mix design 2.3.1

SD-06 Test Reports

Compressive strength tests 3.12.2.2

Slump Tests 3.12.2.1

SD-07 Certificates

Reinforcing Bars 2.5.1

04 01 41 SD-03 Product Data

Cleaning and Restoration

Methods

04 20 00 SD-03 Product Data

Shop Drawings

Reinforcing Steel

Local/Regional Materials 1.5.1

Masonry Blends being used; to include each type of rock included in blend

Environmental Data

Brick

Concrete Masonry Units (CMU) 2.2

Water-Repellant Admixture 2.5

SD-04 Samples

Concrete Masonry Units (CMU) 2.2

Clay or Shale Brick 2.1

SD-08 Manufacturer’s Instructions

Masonry Cement 2.4.2

05 12 00 SD-02 Shop Drawings

Fabrication drawings 1.6.1

SD-06 Test Reports

Bolts, nuts, and washers 2.2

SD-07 Certificates

Steel 2.1

Galvanizing 2.5

AISC Quality Certification 1.4

AISC Fabrication Plant Quality

Certification

05 40 00 SD-02 Shop Drawings

Framing Components 1.5.1

SD-03 Product Data studs,joists 2.1

SD-05 Design Data

Metal framing calculations 1.5.2

Welds 3.1.1

05 50 00 SD-02 Shop Drawings steel stairs 2.20 structural steel door frames 2.22

Floor gratings and roof walkways 2.9

Handrails 2.12

Ladders 2.13

Roof hatch 3.14

SD-03 Product Data

Floor gratings and roof walkways 2.9

Handrails 2.12

Ladders 2.13

Steel stairs 2.20

Structural steel door frames 2.22

Roof hatch 3.14

C A

S T

-IN

-P

L A

C E

C O

N C

R E

T E

R E

M O

V A

L /C

O N

T R

O L

A N

D D

IS

P

O S

A L

O F

P A

IN

T

W

IT

H L

E A

D

FIO

FIO

FIO

E N

G

IN

E E

R

IN

G C

O N

T R

O L

A N

D D

IS

P

O S

A L

O

F M

O L

D C

O N

T A

M

IN

A T

E D

M A

T E

R

IA

L S

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G

G

FIO

FIO

FIO

FIO

FIO

G

FIO

FIO

FIO

FIO

FIO

G G

G

FIO

FIO

G

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

R E

S T

O R

A T

IO

N

D

M

S

O N

R Y

S T

R U

C T

U R

A L

S T

E E

L C

O L

D

- F

O R

M E

T A

L F

R A

M

IN

G M

E T

A L

: M

IS

C E

L L

A N

E O

U S

A N

D F

A B

R

IC

A T

IO

06 20 00 SD-03 Product Data

Cabinetry hardware

SD-04 Samples

Cabinetry and counter top

Moldings

Fascias and Trim 2.3

07 21 17 SD-03 Product Data

Insulation 3.3.1

Vapor retarder

SD-08 Manufacturer’s Instructions

Insulation 3.3.1

07 24 00 SD-03 Product Data

Sheathing board 2.2

Vapor Barrier

Thermal insulation 2.6

Adhesive

Mechanical Fasteners 2.5

Accessories 2.12

Base coat 2.7

Portland cement 2.8

Reinforcing fabric 2.9

Finish coat 2.10

Joint Sealant 2.13

Sealant Primer

Bond breaker 2.14

Backer Rod 2.15

Insulation Board

Warranty

SD-04 Samples

Sample Boards

SD-07 Certificates

Qualifications of EIFS 1.4.1

Manufacturer

Qualification of EIFS Installer 1.4.2

Qualification of Sealant

Applicator

SD-08 Manufacturer’s Instructions

Installation 3.3

SD-10 Operation and Maintenance

Data

EIFS

07 41 13 SD-02 Shop Drawings

Flashing and Accessories

Gutter/Downspout Assembly

SD-03 Product Data

Roof panels

FACTORY-APPLIED COLOR

FINISH

Accessories 2.4

Fasteners

SD-04 Samples

Roof Panels

SD-06 Test Reports

Fire Rating Test Report 2.6.2

Factory Finish and Color 2.2

Performance Requirements

SD-08 Manufacturer’s Instructions

INSTALLATION MANUAL

07 55 00 SD-03 Product Data

Insulation Board 2.2

Membrane Roofing

Fasteners

Sheet Metal Design Materials

Caulking

Contractors Qualifications

2-Roof Vents

Scuppers and Curbs Designs

Parapet Wall Flashing Designs

Fascia Designs and Colors

SD-04 Samples

Membrane Roofing

Insulation Board 2.2

Fasteners

Fascia

2-Way Roof Vent

SD-08 Manufacturer’s Instructions

Installation

SD-11 Closeout Submittals

Manufacturers Final Inspection

Quality Verification Report

07 57 14 SD-03 Product Data

Polyurethane foam

SD-07 Certificates

Qualification of Manufacturer

Qualification of Applicator

07 60 00 SD-02 Shop Drawings

Flashing at roof penetrations 3.1.27

07 84 00 SD-03 Product Data

Firestopping Materials 2.1

07 92 00 SD-03 Product Data

Sealants 2.1

Backstops 2.4

08 11 13 SD-03 Product Data

Doors 2.1

Frames 2.4

Accessories 2.2

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G

FIO

FIO

FIO

FIO

G G

M E

T A

L R

O O

F P

A N

E L

S M

E M

B R

A N

E R

O O

F

IN

G F

IN

IS

H

C

P E

N T

R Y

F

IB

E R

G L

A S

S

IN

S U

L A

T

IO

X

T E

R

IO

R

IN

S U

L A

T

IO

N A

N D

F

IN

IS

H

S Y

S T

E M

S S

P R

A Y

P

L

Y U

R E

T H

A N

E

F L

A S

H

IN

G A

N D

S H

E

T

IR

E S

T O

P P

I

JO

IN

A

L A

N T

S

S T

E

O R

D F

R A

Weatherstripping

08 11 16 SD-02 Shop Drawings

Doors and frames 2.1

SD-08 Manufacturer’s Instructions

Doors and frames 2.1

08 14 00 SD-03 Product Data

Doors 2.1

Fire resistance rating 2.1.7

08 33 23 SD-02 Shop Drawings

Overhead Coiling Doors 2.1

Counterbalancing Mechanism 1.6

Counterbalancing Mechanism 2.3

Manual Door Operators 1.6

Manual Door Operators 2.4

Electric Door Operators 1.6

Electric Door Operators 2.5

Bottom Bar 2.1.4

Guides 1.5

Mounting Brackets 2.3.1

Overhead Drum 2.1.10

Hood 1.6

Painting 1.6

Installation Drawings 1.5

SD-03 Product Data

Overhead Coiling Doors 2.1

Hardware 2.2

Counterbalancing Mechanism 1.6

Counterbalancing Mechanism 2.3

Manual Door Operators 1.6

Manual Door Operators 2.4

Electric Door Operators 1.6

Electric Door Operators 2.5

Fire-Rated Door Assembly 2.6

SD-05 Design Data

Overhead Coiling Doors 2.1

Hardware 2.2

Counterbalancing Mechanism 1.6

Counterbalancing Mechanism 2.3

Manual Door Operators 1.6

Manual Door Operators 2.4

Electric Door Operators 1.6

Electric Door Operators 2.5

Fire-Rated Door 1.2

SD-10 Operation and Maintenance

Data

Operation and Maintenance 1.5

Manuals

Overhead Coiling Door 1.6

Assemblies

Materials 1.6

Devices 1.6

Procedures 1.6

Manufacture's Brochures 1.6

Parts Lists 1.6

Cleaning 3.3.2

08 34 19.10 20 SD-02 Shop Drawings

Rolling service doors 2.1

Rolling fire doors

SD-03 Product Data

Rolling service doors 2.1

Motors 2.4.2

Controls 2.4.3

SD-08 Manufacturer’s Instructions

Rolling service doors 2.1

SD-10 Operation and Maintenance

Data

Rolling service doors 2.1

08 36 13 SD-02 Shop Drawings

Doors 2.2

SD-03 Product Data

Doors 2.2

Electric operators 2.6

SD-08 Manufacturer’s Instructions

Doors 2.2

SD-10 Operation and Maintenance

Data

Doors 2.2

08 36 19 SD-02 Shop Drawings

Doors 2.2

SD-03 Product Data

Doors 2.2

Motors 2.4.1

Controls 2.4.2

SD-08 Manufacturer’s Instructions

Doors 2.2

SD-10 Operation and Maintenance

Data

Doors 2.2

08 51 13.00 20 SD-02 Shop Drawings

Windows 2.1

Fabrication Drawings

SD-03 Product Data

Windows 2.1

Hardware 2.2.5.1

Weatherstripping 2.2.2

Accessories 2.2.5

SD-05 Design Data

Structural calculations for deflection

08 60 45 SD-02 Shop Drawings

A L

U M

IN

U

M W

IN

D

O W

S

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G

G G

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G

FIO

FIO

G G G

FIO

G

G

FIO

FIO

FIO

FIO

FIO

W O

O D

D O

O R

S O

V E

R H

E A

D C

O

IL

IN

G

D O

O R

S R

O L

L

IN

G S

E R

V

IC

E D

O O

R S

S E

C T

IO

N

V E

R H

E A

D D

O O

R S

V E

R T

IC

A

L L

IF

T

D O

O R

S E

S

A L

U M

IN

U

M D

O O

R S

A

Shop Drawings 3.2

SD-03 Product Data

SKYLIGHTS AND 2.1

TRANSLUCENT PANELS

Warranty 1.6

SD-06 Test Reports

Test Reports 2.1

SD-07 Certificates

Systems 2.5

Qualifications 1.4

08 71 00 SD-02 Shop Drawings

Keying system 2.3.6

SD-03 Product Data

Hardware items 2.3

SD-11 Closeout Submittals

Key Bitting 1.3

08 81 00 SD-02 Shop Drawings

Installation

SD-03 Product Data

Insulating Glass

Glazing Accessories 1.3

SD-07 Certificates

Insulating Glass

Laminated Glass

08 91 00 SD-02 Shop Drawings

Wall louvers 1.4

Wall louvers 1.5

SD-03 Product Data

Metal Wall Louvers 2.2

09 29 00 SD-03 Product Data

Cementitious backer units

Gypsum Board 2.1.1

Accessories 2.1.7

SD-08 Manufacturer’s Instructions

Material Safety Data Sheets

09 30 00 SD-03 Product Data

Tile 2.1

Adhesive

SD-04 Samples

Tile 2.1

Grout 2.3

09 51 00 SD-03 Product Data

Acoustical Ceiling Systems

SD-07 Certificates

Acoustic Ceiling Tiles and

Suspension System

09 65 00 SD-03 Product Data

Resilient Flooring and

Accessories

Adhesives 2.4

SD-08 Manufacturer’s Instructions

Surface Preparation 3.2

Installation

09 68 00 SD-03 Product Data

Carpet 2.1

Installation 3.4

SD-04 Samples

Carpet 2.1

SD-07 Certificates

Carpet 2.1

09 90 00 SD-03 Product Data

Coating 3.4.4

SD-08 Manufacturer’s Instructions

Manufacturer's Material Safety 1.6.2

Data Sheets

10 14 02 SD-02 Shop Drawings

Shop Drawings

10 21 13 SD-02 Shop Drawings

Installation Drawings

Fabrication Drawings

SD-03 Product Data

Colors And Finishes 2.6

Partition Panels and Doors 2.2

Anchoring Devices and 2.1.3

Fasteners

Hardware and Fittings 2.1.5

10 22 13 SD-03 Product Data

Wire mesh partitions 1.4

10 26 13 SD-03 Product Data

Corner Guards 2.2

10 28 13 SD-03 Product Data

Finishes

Accessory Items

10 44 16 SD-03 Product Data

Fire Extinguishers 2.1

Accessories

Cabinets 2.3

Wall Brackets 2.4

Replacement Parts

SD-07 Certificates

Fire Extinguishers 2.1

Manufacturer's Warranty with 2.1

Inspection Tag

11 68 13 SD-02 Shop Drawings

Configuration

Shop Drawings 1.5.5

S K

Y L

IG

H

T S

A

A N

S L

U C

E N

T P

A N

E L

S D

O

R D

W A

R E

G L

A Z

IN

G

M E

T A

L W

A

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G Y

P S

U M

B O

A R

D

C E

R A

M

IC

T

IT

L E

Q

U A

R R

Y T

IT

L

E

A N

D P

A V

O U

S T

IC

A

L C

E

IL

IN

G

S R

E S

IL

IE

O

O R

IN

G

C A

R P

E T

P A

IN

T

S A

A

T

IN

G S

IN

T

E

IOR

IL

M P

A R

T M

E N

T S

W

S

W A

L L

A N

D C

O R

N E

R G

U A

R D

S

T O

IL

E

T A

C C

E S

S O

R

IE

S F

IR

E

E X

T

IN

G U

IS

H

E

Fall Height

Equipment 2.2

Equipment Identification 1.3.4

Delivery, Storage and Handling 1.6

Manufacturer Qualification 1.5.1

Materials 2.1

SD-04 Samples

Color 2.1.5

SD-06 Test Reports

Recycled Plastic 2.1.3

Wood Finishes

SD-07 Certificates

Materials 2.1

Manufacturer Qualification 1.5.1

Installer Qualification 1.5.2

Manufacturer's Representative 1.5.3

Substitution

SD-10 Operation and Maintenance

Data

Maintenance Instructions 1.8

12 24 13 SD-03 Product Data

Window Shades 2.1

Hardware 1.3

SD-08 Manufacturer’s Instructions

Window Shades 2.1

13 34 19 SD-01 Preconstruction Submittals

Manufacturer's Qualifications 1.6.2

SD-02 Shop Drawings

Shop and Detail Drawings

SD-05 Design Data descriptive and technical literature building design analysis

21 12 00 SD-02 Shop Drawings

Standpipe system 1.4.4

SD-03 Product Data

Pipe and fittings 2.1.1

Mechanical couplings 2.1.1

Pipe hangers and supports 2.1.2

Valves 2.1.3

Fire department connections 2.1.9

Alarm valves 2.1.10

Water motor alarms 2.1.11

Pressure switch 2.1.12

Waterflow detector 2.1.13

Fire hose cabinets 2.1.14

Valve tamper switch 2.1.15

Backflow preventer 2.1.17

Buried Pipe and fittings 2.2.1

SD-06 Test Reports

Preliminary tests 3.8.1

Acceptance tests 3.8.2

SD-07 Certificates

Qualifications of installer 1.6.1

SD-10 Operation and Maintenance

Data

Alarm valves 2.1.10

Backflow preventer 2.1.17

SD-11 Closeout Submittals

System as-built drawings 1.6.2

21 13 00.00 20 SD-02 Shop Drawings

Sprinkler heads and piping 1.4 system layout

Electrical wiring diagrams 1.4.8

SD-03 Product Data

Piping 2.2

Alarm valves 2.2.4

Valves 2.2.8

Water motor alarms 2.2.5

Sprinkler heads 2.2.2

Pipe hangers and supports 2.2.7

Flow switch 2.2.6

Fire department connections 2.2.13

Excess pressure pump 2.2.14

Mechanical couplings 2.2.1

Backflow Preventer 2.2.9

SD-05 Design Data

Sprinkler system design 1.4

SD-06 Test Reports

Preliminary tests 3.2.1

SD-07 Certificates

Qualifications of installer 1.6.1

SD-10 Operation and Maintenance

Data

Alarm valves 2.2.4

Excess pressure pump 2.2.14

Backflow preventer 2.2.9

SD-11 Closeout Submittals

As-built drawings 1.4.9

21 13 00.00 40 SD-01 Preconstruction Submittals

Record of Existing Conditions 1.2

SD-02 Shop Drawings

Supporting Elements 2.2.3

Fire-Department Connections 2.2.4

Fire Alarm System 2.2.9.1

Sprinkler Heads 2.2.8

Valves 2.2.9

SD-03 Product Data

Underground Piping Materials 2.2.1

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G

G G G

FIO

FIO

FIO

FIO

FIO

G

G

G

G G G G

G

G G G G G G

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G

G

FIO

FIO

G

G

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G G G G

G

F

IR

E

- S

P L

A Y

G R

O U

N D

E Q

U

IP

M E

N T

R O

L L

W

D

A

D E

S

M E

T A

L B

U

IL

D

G

Y

S T

E M

S S

T A

N D

P

IP

E S

Y S

T E

M S

W E

T

- P

IP

E

F

IR

E S

U P

R E

S S

IO

N

S P

R

IN

K L

E

Aboveground Piping Materials 2.2.2

Valves 2.2.9

Fire-Department Connections 2.2.4

Riser Alarm Equipment 2.2.5

Air Compressor 2.2.6.1

Standpipe Equipment and Fire 2.2.7

Hose Cabinet Stations

Sprinkler Heads 2.2.8

Materials 2.3

Supporting Elements 2.2.3

Equipment and Performance 2.1

Data

SD-05 Design Data

Design Analysis and Calculations Part 2

SD-06 Test Reports

Pressure Tests 3.3.6

System Operating Tests 3.3.3

Air Tests 3.3.3

Valve-Operating Tests 3.3.3

Drainage Tests 3.3.3

21 13 16.00 20 SD-02 Shop Drawings

Sprinkler heads and piping 1.3.8 system layout

Electrical wiring diagrams 1.3.8

SD-03 Product Data

Piping 2.1

Valves 2.1.10

Water motor alarms 2.1.5

Sprinkler heads 2.1.2

Pipe hangers and supports 2.1.9

Fire department connections 2.1.14

Low air pressure supervisory 2.1.7 switch

Dry pipe valves 2.1.4

Air compressor 2.1.8

Mechanical couplings 2.1.1

Backflow Preventers 2.1.10.1

Pressure Switch 2.1.6

SD-05 Design Data

Sprinkler system design 1.3

SD-06 Test Reports

Preliminary tests 3.2.1

SD-07 Certificates

Qualifications of installer 1.5.1

SD-10 Operation and Maintenance

Data

Dry pipe valves 2.1.4

Air compressor 2.1.8

SD-11 Closeout Submittals

As-built drawings of each system 1.3.9

21 13 18.00 10 SD-02 Shop Drawings

Shop Drawings 1.4.3

As-Built Drawings 3.8

SD-03 Product Data

Fire Protection Specialist 1.4.1

Installer Qualifications 1.4.2

List of Submittals 1.4.1

Materials and Equipment 2.1

Spare Parts 1.6

OnSite Training 3.9

SD-05 Design Data

Sway Bracing 3.3.1

Hydraulic Calculations 1.2.1.2

Storage Batteries 2.13.4.1

SD-06 Test Reports

Preliminary Tests 3.7

Final Acceptance Tests 3.8

SD-07 Certificates

Inspection by Fire Protection 3.2

Specialist

SD-10 Operation and Maintenance

Data

Operating and Maintenance 3.9

Instructions

21 13 20.00 20 SD-02 Shop Drawings

Fire extinguishing system 1.3.1.1

SD-03 Product Data

Pipe, fittings, and mechanical 2.19.1 couplings

[Deluge] [Pre-action] valves 2.1.3

Valves 2.19.5

Water motor alarms 2.11.1

Sprinkler heads 2.1.1

Monitor nozzles 2.16

Hose and nozzles 2.17

Pipe hangers and supports 2.19.4

Pressure switch 2.11.3.1

Fire department inlet connections 2.19.11

Tank mounted air compressor 2.12

Air pressure regulating device 2.12

Air compressor 2.3.1 trouble alarm 2.11.4

Detection devices 2.2

Storage batteries 2.2.2.1

Alarm bells 2.11.2

Alarm horns 2.11.2

Annunciator panel 2.2.1.3

Foam hydrants 2.18

AFFF concentrate storage tanks 2.15.3

Proportioning equipment 2.14

AFFF concentrate 2.13

FIO

G G G G

G G G G G G

FIO

FIO

FIO

FIO

FIO

G G

FIO

FIO

G

G G G

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G G

G

G

FIO

FIO

G

FIO

G

FIO

G

FIO

G G G G G

G

G

G

FIO

G

G G G G G

G G G G G G

G G G G G G

S U

P R

E S

S

IO

N S

P R

IN

K

L E

R S

Y S

T E

M S

D R

Y

- P

IP

E

F

IR

E S

P R

IN

K

L E

R S

Y S

T E

M S

P R

E A

C T

IO

N

A N

D D

E L

U G

E S

P R

IN

K

L

S T

E M

S , F

IR

E

P R

O T

E C

T

IO

N F

O A

M F

IR

E

Strainers 2.19.3

Manual release stations 2.5

Backflow preventers 2.19.12

Control panel 2.2.1

Battery charger 2.2.2.2

SD-05 Design Data

Hydraulic calculations 1.3.1.2

Pressure discharge graphs or 1.3.1.2 tables

Battery standby power 1.3.1.2 requirements calculations

System surge analysis 1.3.1.2

SD-06 Test Reports

2-wire smoke detectors 2.7

Preliminary tests 3.8.1

Acceptance tests 3.8.2 diaphragm pressure 2.14.1 proportioning tanks

SD-07 Certificates

Qualifications of installer 1.5.1

AFFF containment and disposal 1.3.1.3 plan

Backflow preventers 2.19.12

SD-10 Operation and Maintenance

Data

[Deluge] [Pre-action] valves 2.1.3

Tank mounted air compressor 2.12

Proportioning equipment 2.14

Control panel 2.2.1

AFFF concentrate storage tanks 2.15.3

Monitor nozzles 2.16 fire extinguishing system 1.3.1.1

SD-11 Closeout Submittals

As-built drawings for the fire 1.3.1.4 extinguishing system

21 13 24.00 10 SD-02 Shop Drawings

Detail Drawings 1.4.3

As-built Drawings 1.4.1

SD-03 Product Data

Materials and Equipment 2.1

Spare Parts 1.5

AFFF System 1.2

Installer's Qualifications 1.4.2

Post-discharge Test 3.6.4

Requirements

SD-06 Test Reports

Test Reports 3.6.4

SD-07 Certificates

Materials and Equipment 2.1

SD-10 Operation and Maintenance

Data

Operation and Maintenance 3.8

Manuals

21 13 26.00 40 SD-01 Preconstruction Submittals

Material, Equipment, and Fixture

Lists Part 2

Record of Existing Conditions 1.4

SD-02 Shop Drawings

Connection Diagrams Part 2

Control Diagrams Part 2

Installation Drawings 1.4

SD-03 Product Data

Equipment and Performance

Data Part 2

Equipment Foundation Data Part 2

Piping Materials Part 2

Aboveground Piping Systems 2.3.7

Valves Part 2

Detection Systems 2.3.5

Alarms Part 2

Sprinkler Heads Part 2

Supporting Elements Part 2

SD-04 Samples

Manufacturer's Standard Color 3.1.3

Charts

SD-05 Design Data

Design Analysis and Calculations Part 2

SD-06 Test Reports

Pressure Tests 3.2

System Tests 3.2

Operating Tests 3.2

SD-07 Certificates

Listing of Product Installations 1.3

Piping Materials Part 2

Aboveground Piping Systems 2.3.7

Valves Part 2

Detection Systems 2.3.5

Alarms Part 2

Air Compressor Part 2

Sprinkler Heads Part 2

Supporting Elements Part 2

SD-10 Operation and Maintenance

Data

Operation and Maintenance 3.4.1

Manuals

21 21 01.00 10 SD-02 Shop Drawings

Piping layout 1.3

Electrical wiring diagrams 1.3.1

SD-03 Product Data

Storage cylinders

G

G G G G

G

G

G

G G G G

G

G

G

G

G G G G G G

G G

G

G

G

G

FIO

G

G

FIO

G G

G G G G G

G

G

G G

G

G G G

G G G G G G

G G

G G G

G

G

G

FIO

FIO

G

FIO

A Q

U E

O U

S F

IL

M

-F O

R M

IN

G

F O

A M

(A F

F F

F

IR

E

P R

O T

E C

T

IO

N S

Y S

T E

M X

T

IN

G U

IS

H

IN

G

F O

R A

IR

C

R A

F T

H A

N G

A R

S D

E L

U G

E F

IR

E

- S U

P R

E S

S

IO

N S

P R

IN

K

L E

R S

Y S

T E

Discharge head

Manifolds

Discharge alarm 2.9

Pipe and fittings 2.3

Pipe hangers and supports 2.4.3

Actuating stations 2.6

Pressure switch 2.6.3

Control panel 2.6.5

Smoke detectors 2.7.1

Heat activated detectors 2.7.2

Alarm horns 2.9.2

Visual alarms 2.9.3

Dampers 2.11

Main and reserve switch

Warning signs 2.9

Storage batteries 2.6.6.1

Battery charger 2.6.6.2

SD-05 Design Data

System calculations 1.3.2

Calculations substantiating 2.6.6.1 battery capacity

Open-area smoke detectors 1.3.2 calculations

SD-06 Test Reports

Preliminary tests 3.5.1

SD-07 Certificates

Qualifications of installer 1.5.1

SD-10 Operation and Maintenance

Data

Discharge head

Control panel 2.6.5

21 21 03.00 10 SD-02 Shop Drawings

Installation Drawings 1.4.3

SD-03 Product Data

Similar Services 1.4

Standard Products 2.1

Preliminary Tests 3.2

Final Acceptance Tests 3.3

Field Training 3.4

SD-06 Test Reports

Preliminary Tests 3.2

Final Acceptance Tests 3.3

SD-07 Certificates

Installation Technician 1.4.2

Installation Drawings 1.4.3

SD-10 Operation and Maintenance

Data

Operation and Maintenance 3.4

Instructions

21 30 00 SD-01 Preconstruction Submittals

Fire Pump Installation Related 1.3

Submittals

Fire Protection Specialist 1.7.1

SD-02 Shop Drawings

Installation Drawings 3.3.1

As-Built Drawings 3.11.2

Piping Layout 3.3.2

Pump Room 3.3.2

SD-03 Product Data

Catalog Data 2.1

Spare Parts 1.6

Preliminary Tests 3.8.2

Field Tests 3.8

Manufacturer's Representative 1.7.6

Field Training 3.11.1

Army Final Acceptance Test 3.8.3

Navy Formal Inspection and

Tests

SD-06 Test Reports

Preliminary Tests 3.8.2

Army Final Acceptance Test 3.8.3

SD-07 Certificates

Fire Protection Specialist 1.7.1

Qualifications of Welders 1.7.2

Qualifications of Installer 1.7.3

Preliminary Test Certification 1.7.4

Final Test Certification 1.7.5

SD-10 Operation and Maintenance

Data

Operating and Maintenance 3.11.1

Instructions

Flow Meter 2.17

22 00 00 SD-03 Product Data

Fixtures 2.4

Flush valve water closets 2.4.1

Flush valve urinals 2.4.2

Flush tank water closets

Wall hung lavatories 2.4.4

Countertop lavatories 2.4.5

Kitchen sinks 2.4.6

Service sinks

Drinking-water coolers 2.4.8

Plastic shower stalls

Plastic bathtub liners

Plastic bathtub wall surrounds

Water heaters 2.10

Pumps 2.12

Backflow prevention assemblies

Shower Faucets 2.6.2

Swimming Pool [and Spa]

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G G

FIO

G G G

FIO

FIO

FIO

G

G

G

G

G

G G G

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G G

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

C L

E A

N A

G E

N T

F

IR

E E

X T

IN

G

U

IS

H

T C

H E

M

IC

A L

F

IR

E E

X T

IN

G

U

IS

H

IN

G S

Y S

T E

M F

IR

E

P U

M P

S P

L U

M B

IN

G

, G E

N E

R

Suction Fittings

Pool Water Pump safety vacuum release system

Vibration-Absorbing Features 3.4

SD-06 Test Reports

Tests, Flushing and Disinfection 3.8

Test of Backflow Prevention 3.8.1.1

Assemblies

SD-07 Certificates

Materials and Equipment

SD-10 Operation and Maintenance

Data

Plumbing System 3.8.1

22 05 48.00 20 SD-02 Shop Drawings

Inertia bases 2.7

Machinery bases 2.6

Platforms 2.6

Rails 2.6

Saddles 2.6

SD-03 Product Data

Isolators 2.3

Flexible connectors 2.8

Flexible duct connectors 2.9

Pipe guides 2.11

Seismic snubbers 2.10

Vertical stops 3.1.3

Thrust restraints 2.12

Inertia bases 2.7

Machinery bases 2.6

Machinery foundations and 3.1.13 subbases

Platforms 2.6

Rails 2.6

Saddles 2.6

Machinery manufacturer's sound 1.4.2 data

SD-05 Design Data

Inertia bases 2.7

Machinery bases 2.6

Platforms 2.6

Rails 2.6

Saddles 2.6 machinery 1.4.3 machinery over 136 kilograms 1.4.4 machinery over 300 pounds 1.4.4

SD-06 Test Reports

Seismic snubbers 2.10

Equipment vibration tests 3.2.3.1

Equipment sound level tests 3.2.3.2

Protected spring isolators 2.4

SD-08 Manufacturer’s Instructions

Vibration and noise isolation 3.1.1 components

Seismic protection components 2.13

22 07 19.00 40 SD-03 Product Data

Adhesives 2.3

Coatings 2.3

Insulating Cement

Insulation Materials 2.3

Jacketing 2.3

Tape 2.3

SD-08 Manufacturer’s Instructions

Installation Manual 1.2

22 14 29.00 40 SD-03 Product Data

Manufacturer's Catalog Data 2.1

Pump Performance Curve 2.2.1

Pump and Motor Specifications 2.2.1

Spare Parts 1.5

Special Tools 1.5

Wet-Pit Sump Pumps 2.2

Submersible Pumps 2.3

Accessories 2.3

SD-06 Test Reports

Hydrostatic Leak 3.2.2

Static Heads 3.2.2

Pump Flow Capacity 3.2.2

SD-07 Certificates

Manufacturer's Certification of

Bearing Life

SD-08 Manufacturer’s Instructions

Manufacturer's Installation 2.1

Instructions

Vibration Specifications 2.1

22 15 14.00 40 SD-03 Product Data

Equipment and Performance 1.4

Data

Underground Piping Materials

Aboveground Piping Materials 2.1

Piping Specialties 2.2

Supporting Elements 2.5

Air Compressors

Valves 2.3

Accessories 3.1.1

Miscellaneous Materials 2.4

Vibration Isolation 3.1.5

SD-06 Test Reports

Hydrostatic Testing 3.2.1

Compressed Air Systems Testing 3.2

Valve-Operating Tests 3.2.1

Drainage Tests 3.2.1

Pneumatic Testing 3.2.1

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

P U

R P

O S

E P

L U

M B

IN

G

P

IP

U

L A

T

IO

N S

U M

P P

U M

P S

G E

N E

R A

L S

E R

V

IC

E C

O M

P R

E S

S E

D -A

IR

S

Y S

T L

O W

P R

E S

S U

R E

FIO

M E

C H

A N

IC

A

L S

O U

N D

, V

IB

R A

T

IO

N , S

E

IS

M

IC

C O

N T

R O

L

FIO

FIO

FIO

FIO

FIO

SD-10 Operation and Maintenance

Data

Operation and Maintenance 1.5

Manuals

22 31 00 SD-02 Shop Drawings

Installation 3.2

SD-03 Product Data

Softening Equipment 2.2

Spare Parts 1.4

Field Instructions 3.3.2

SD-06 Test Reports

Softening Equipment 2.2

Piping 3.4.2

SD-10 Operation and Maintenance

Data

Operating and Maintenance 3.3.2

Instructions

23 00 00 SD-03 Product Data

Metallic Flexible Duct 2.8.1.1

Insulated Nonmetallic Flexible

Duct Runouts

Duct Connectors 2.8.1.2

Duct Access Doors 2.8.2

Fire Dampers 2.8.3

Manual Balancing Dampers 2.8.4

Automatic Smoke-Fire Dampers

Automatic Smoke Dampers

Sound Attenuation Equipment 2.8.8

Acoustical Duct Liner 2.8.8.2

Diffusers 2.8.9.1

Registers and Grilles

Louvers 2.8.10

Air Vents, Penthouses, and 2.8.11

Goosenecks

Centrifugal Fans 2.9.1.1

In-Line Centrifugal Fans 2.9.1.2

Axial Flow Fans 2.9.1.3

Panel Type Power Wall 2.9.1.4

Ventilators

Centrifugal Type Power Wall 2.9.1.5

Ventilators

Centrifugal Type Power Roof 2.9.1.6

Ventilators

Propeller Type Power Roof 2.9.1.7

Ventilators

Air-Curtain Fans 2.9.1.8

Ceiling Exhaust Fans 2.9.1.9

Air Handling Units 2.10

Room Fan-Coil Units 2.11.1

Coil Induction Units

Constant Volume, Single Duct 2.11.2.1

Terminal Units

Variable Volume, Single Duct 2.11.2.2

Terminal Units

Variable Volume, Single Duct, 2.11.2.3

Fan-Powered Terminal Units

Dual Duct Terminal Units

Ceiling Induction Terminal Units

Reheat Units 2.11.2.5

Unit Ventilators 2.11.3

Energy Recovery Devices 2.12

Test Procedures 1.4.5

Diagrams

SD-06 Test Reports

Performance Tests 3.11

Damper Acceptance Test 3.9

SD-08 Manufacturer’s Instructions

Manufacturer's Installation 3.2

Instructions

Operation and Maintenance 3.13.2

Training

SD-10 Operation and Maintenance

Data

Operation and Maintenance 3.13.1

Manuals

Fire Dampers 2.8.3

Manual Balancing Dampers 2.8.4

Automatic Smoke-Fire Dampers

Automatic Smoke Dampers

Centrifugal Fans 2.9.1.1

In-Line Centrifugal Fans 2.9.1.2

Axial Flow Fans 2.9.1.3

Panel Type Power Wall 2.9.1.4

Ventilators

Centrifugal Type Power Wall 2.9.1.5

Ventilators

Centrifugal Type Power Roof 2.9.1.6

Ventilators

Propeller Type Power Roof 2.9.1.7

Ventilators

Air-Curtain Fans 2.9.1.8

Ceiling Exhaust Fans 2.9.1.9

Air Handling Units 2.10

Room Fan-Coil Units 2.11.1

Coil Induction Units

Constant Volume, Single Duct 2.11.2.1

Terminal Units

Variable Volume, Single Duct 2.11.2.2

Terminal Units

Variable Volume, Single Duct, 2.11.2.3

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

T E

M S

W

A T

E R

S O

F T

E N

E R

S

C A

T

IO

N -E

X C

H A

N

(S

D

IU

M C

Y C

L E

A

IR

S

U P

P L

Y , D

IS

T

R

IB

U T

IO

N

, V E

N T

IL

A

T

IO

N , A

N D

E X

H A

U S

T S

Y S

T E

Fan-Powered Terminal Units

Dual Duct Terminal Units

Ceiling Induction Terminal Units

Reheat Units 2.11.2.5

Unit Ventilators 2.11.3

Energy Recovery Devices 2.12

23 01 30.41 SD-01 Preconstruction Submittals

Record of Existing Conditions 3.2.1

Coordination Plan 3.2.2

NADCA Firm 1.4.1

NADCA Team Assistants 1.4.1

NADCA Air System Cleaning 1.4.1

Specialist (ASCS)

NADCA Supervisor Qualifications 1.4.1

Records of Experience in the 1.4.2

Field of HVAC System Cleaning

NADCA Work Execution 1.6.1

Schedule

SD-06 Test Reports

Testing Procedures Summary 3.7

Gravimetric Analysis

Post-Project Report 3.7

23 03 00.00 20 SD-03 Product Data

Certification 1.4.5.3

23 05 15 SD-01 Preconstruction Submittals

Material, Equipment, and Fixture 1.2

Lists

SD-02 Shop Drawings

Record Drawings 1.2

Connection Diagrams 1.2

Installation Drawings 3.1

SD-03 Product Data

Pipe and Fittings 2.2

Piping Specialties 2.3

Valves 2.4

Miscellaneous Materials 2.5

Supporting Elements 2.6

Equipment Foundation Data 1.2

SD-04 Samples

Manufacturer's Standard Color 1.2

Charts

SD-05 Design Data

Pipe and Fittings 2.2

Piping Specialties 2.3

Valves 2.4

SD-06 Test Reports

Hydrostatic Tests 3.1

Air Tests 3.1

Valve-Operating Tests 3.1

Drainage Tests 3.1

Pneumatic Tests 3.1

Non-Destructive Electric Tests 3.1

System Operation Tests 3.1

SD-07 Certificates

Record of Satisfactory Field 1.4.2

Operation

List of Qualified Permanent 1.4.3

Service Organizations

Listing of Product Installations 1.2

Records of Existing Conditions 1.2

Surface Resistance 3.1

Shear and Tensile Strengths 3.1

Temperature Ratings 3.1

Bending Tests 3.1

Flattening Tests 3.1

Transverse Guided Weld Bend 3.1

Tests

SD-10 Operation and Maintenance

Data

Operation and Maintenance 3.12

Manuals

23 05 48.00 40 SD-02 Shop Drawings

Installation Drawings 1.2

Outline Drawings 1.2

SD-03 Product Data

Equipment and Performance 1.2

Data

Isolators 2.3

SD-06 Test Reports

Type of Isolator 2.1

Type of Base 2.1

Allowable Deflection 2.1

Measured Deflection 2.1

23 05 93 SD-01 Preconstruction Submittals

Records of Existing Conditions 1.3

Records of Existing Conditions 1.3.3

TAB Firm 1.5.4.1

TAB team assistants 1.2

TAB team engineer 1.2

TAB Specialist 1.5.4.2

TAB team field leader 1.2

SD-02 Shop Drawings

TAB Schematic Drawings and 1.3.3

Report Forms

SD-03 Product Data

Equipment and Performance 1.3

Data

TAB Related HVAC Submittals 1.5.4.4

TAB Procedures 1.5.2

Calibration 1.5.2

Systems Readiness Check 1.3.3

TAB Execution 1.5.5

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

H V

A C

S Y

S T

E M

C L

E A

N

IN

G B

A S

I

C

C O

M M

O N

P

IP

IN

G

F O

R H

V A

C V

IB

R

A T

IO

N

A N

D S

E

IS

IC

N

T R

O L

S F

O R

H V

A C

P

IP

IN

G

A

TAB Verification 1.5.5.3

SD-06 Test Reports

DALT and TAB Work Execution 3.7

Schedule

DALT and TAB Procedures 3.7

Summary

Design review report 1.3.3

Design review report 1.7.3.1

Design review report 3.7

Pre-Final DALT report 1.5.3

Pre-Final DALT report 1.7.3

Pre-Final DALT report 3.3.5

Final DALT report 1.5.3

Final DALT report 1.7.3

Final DALT report 3.3.8

TAB report for Season 1 1.5.6.2

TAB report for Season 1 3.7

TAB report for Season 2 1.5.6.2

TAB report for Season 2 3.7

SD-07 Certificates

Independent TAB agency and 1.5.1 personnel qualifications

Independent TAB agency and 1.5.1 personnel qualifications

Advance notice of Pre-Final 3.3.2

DALT field work

Completed Pre-Final DALT Work 3.7

Checklist

Completed Pre-Final DALT Work 3.7

Checklist

Advance Notice of Season 1 TAB 3.7

Field Work

Completed Season 1 Pre-TAB 3.7

Work Checklist

Completed Season 1 Pre-TAB 3.7

Work Checklist

Advance Notice of Season 2 TAB

Field Work

Completed Season 2 Pre-TAB 3.7

Work Checklist

TAB Firm 1.5.4.1

DALT and TAB Submittal and 1.7.1

Work Schedule

DALT and TAB Submittal and 1.7.3

Work Schedule

Design review report 1.3.3

Design review report 1.7.3.1

Design review report 3.7

Pre-field DALT preliminary 1.7.3.2 notification

Pre-field TAB engineering report 1.7.3.3

Advanced notice for Season 1 1.7.3

TAB field work

Prerequisite HVAC Work Check 1.7.3

Out List For Season 1

Advanced notice for Season 2

TAB field work

Prerequisite HVAC Work Check

Out List For Season 2

23 07 00 SD-02 Shop Drawings

MICA Plates 3.2.2.4

Pipe Insulation Systems 2.3

Pipe Insulation Systems 3.2

Duct Insulation Systems 3.3

Equipment Insulation Systems 3.4

SD-03 Product Data

Certification 1.4.2

Pipe Insulation Systems 2.3

Pipe Insulation Systems 3.2

Duct Insulation Systems 3.3

Equipment Insulation Systems 3.4

SD-04 Samples

Thermal Insulation 2.2.1.3

Display Samples 3.1.1

SD-08 Manufacturer’s Instructions

Pipe Insulation Systems 2.3

Pipe Insulation Systems 3.2

Duct Insulation Systems 3.3

Equipment Insulation Systems 3.4

23 08 00.00 10 SD-02 Shop Drawings

Commissioning Plan 1.5.2.2

SD-03 Product Data

Pre-Functional Performance Test 3.2.1

Checklists

Functional Performance Tests 3.2.2

SD-06 Test Reports

Commissioning Report 3.3

SD-07 Certificates

Commissioning Firm 1.5.1

Commissioning Specialist 1.5.2

23 08 01.00 20 SD-06 Test Reports

Preliminary review report 1.4.5.1

Smoke tests report 1.4.5.2

Fan operating points report 1.4.5.3

Static pressure report 1.4.5.4

Volume and velocity flow rates 1.4.5.5 report

Pitot traverse report 1.4.5.6

SD-07 Certificates

Test agency Qualifications 1.4.2.1

Record of Document Submittal to 1.4.2.2

Testing Agency

Work plan 1.4.2.3

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G

G

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G

G

G G

FIO

T E

S T

IN

G

, A D

JU

S

T

IN

G , A

N D

B A

L A

N C

IN

G

F O

R H

V A

C T

H E

R M

A L

IN

S

U L

A T

IO

N

F O

R M

E C

H A

N

IC

A L

S Y

S T

E M

S C

O M

M

IS

IO

N

IN

G

A

C S

Y S

T E

M S

T E

S T

IN

G

IN

D

U S

T R

IA

L

V E

N T

IL

A

T

IO

N S

Y S

T E

List of test instruments 1.4.2.4

23 09 13.34 40 SD-03 Product Data

Self-Contained Temperature 2.1

Control Valves

Self-Contained 2.2

Temperature-Regulator Valves

Rate-of-Flow Controller 2.3

Nonmodulating Float Valve 2.4

Water Pressure Regulating Valve 2.5

Water Pressure Relief Valve 2.6

Pilot-Operated Pressure-Relief 2.7

Valve

Relief Valves for Electric Water 2.8

Heaters

Sample Warranty 1.4

SD-07 Certificates

Listing of Product Installation 1.3

Certificates of Conformance 1.4

Manufacturer's Warranty 3.3

SD-06 Test Reports

Test Reports 3.2

23 09 23 SD-02 Shop Drawings

DDC Contractor Design Drawings 3.3.1

Draft As-Built Drawings 3.3.2

Final As-Built Drawings 3.3.3

SD-03 Product Data

Manufacturer's Catalog Data 2.1.1

Manufacturer's Catalog Data 2.14.1

Programming Software 2.14.5

GPPC Application Programs 2.14.5

AGC Application Programs 2.14.6

XIF files 2.14.1

Draft LNS Database 3.6.3

Final LNS Database 1.3.1

Final LNS Database 3.7.4

LNS Plug-in 2.14.4

LNS Plug-in 2.14.6

SD-06 Test Reports

Existing Conditions Report 3.1

Start-Up and Start-Up Testing 3.6.2

Report

PVT Procedures 3.7.1

PVT Report 3.7.3

Pre-Construction QC Checklist 1.6

Post-Construction QC Checklist 1.6

SD-10 Operation and Maintenance

Data

Operation and Maintenance 1.8

(O&M) Instructions

Training Documentation 3.9.1

SD-11 Closeout Submittals

Closeout QC Checklist 1.6

23 09 53.00 20 SD-02 Shop Drawings

Control system diagrams 1.7.1

Ladder diagram 1.7.2

Operating parameters 1.7.3

Automatic control valve 1.7.4 schedules

Damper schedules 1.7.5

Sequence of operation 1.7.8

Arrangement drawing 1.7.9

Wiring diagram 1.7.6

Compressed air station 1.7.7 schematic

Control panel schematics 1.7.7

SD-03 Product Data

Actuators 2.2

Valves 2.3

Dampers 2.4

Fire protection devices 2.5

Sensors 2.6

Thermostats 2.8

Sunshields 2.9

Pressure switches 2.10.1

Indicating devices 2.11

Controllers 2.13

Pressure gages 2.12

Control panels 2.15

Air Compressor 2.16.1

Refrigerated air dryer 2.16.2

Air filtration system 2.16.2

Compressed air station 2.16.2 specialties

VAV Terminal unit controls 2.17

SD-06 Test Reports

Commissioning procedures 1.9.6

Calibration adjustment and 1.9.7 commissioning reports

Site testing procedures 1.9.5

Performance verification test 3.3.5

SD-07 Certificates

Certification of completion 3.3.4

SD-08 Manufacturer’s Instructions

Training course documentation 3.4.1

SD-10 Operation and Maintenance

Data

Space temperature control 1.9.8 system

SD-11 Closeout Submittals

Qualified service organization list 3.5

23 11 25 SD-02 Shop Drawings

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G

FIO

FIO

G G

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

C O

N T

R O

L S

V A

L V

E S

, S E

L F

-C O

N T

A

IN

E D

L O

N W

O R

K S

D

IR

E C

T D

IG

IT

A L

C O

N T

R O

L F

O R

H V

A C

A N

D O

T H

E R

B U

IL

D

IN

G

C O

N T

R O

L S

Y S

T E

M S

S P

A C

E T

E M

P E

R A

T U

R E

C O

N T

R O

L S

Y S

T E

Gas Piping System 1.5.3

Gas Piping System 2.2

Gas Piping System 3.3

SD-03 Product Data

Pipe and Fittings 1.6.1

Gas equipment connectors 1.5.3

LPG containers and accessories 2.9

Gas Piping System 1.5.3

Gas Piping System 2.2

Gas Piping System 3.3

Pipe Coating Materials 2.1

Pressure regulators 2.6

Risers 2.4

Transition fittings 2.2.13

Valves 2.3

Warning and identification tape 2.2.9

SD-06 Test Reports

Testing 3.18

Pressure Tests 3.18.1

Pressure Tests for Liquified 3.18.2

Petroleum Gas

Test With Gas 3.18.3

SD-07 Certificates

Welders procedures and 1.5.1 qualifications assigned number, letter, or 1.5.1 symbol

SD-08 Manufacturer’s Instructions

PE pipe and fittings 1.5.2 pipe coating materials 2.1

SD-10 Operation and Maintenance

Data

Gas facility system and 1.3.1 equipment operation

Gas facility system maintenance 1.3.2

Gas facility equipment 1.3.3 maintenance

23 21 13.00 20 SD-02 Shop Drawings

Hot water heating system 1.3.1

SD-03 Product Data

Convectors 2.4.2

Finned tube radiators 2.4.1

Pumps 2.3.1

Expansion tanks 2.3.2

Flow measuring equipment 2.3.5

Backflow preventers 2.3.4

External air separation tanks 2.3.3

Hot water heating pipe 2.1.1

SD-06 Test Reports

Hydrostatic test of piping system 3.3.1

Auxiliary equipment and 3.3.2 accessory tests

SD-07 Certificates

Backflow preventer certification 1.5.4

Report of prior installations 1.5.2.1

Welding procedures 1.5.2.2

Welder's qualifications 1.5.2.3

SD-10 Operation and Maintenance

Data

Convectors 2.4.2

Finned tube radiators 2.4.1

23 21 13.23 20 SD-01 Preconstruction Submittals

Valves 2.1.7

Packing 2.1.7.1

Gaskets 2.1.4

SD-02 Shop Drawings

[HTW][MTW] System connection 1.3.2

SD-03 Product Data

Valves 2.1.7

Strainers 2.1.8

Pipe 2.1.2

Pipe fittings 2.1.3

Heat exchanger 2.1.14.1

Steam producer 2.1.14.2

Expansion joints 3.2.7

SD-07 Certificates

Welding procedure specifications 1.3.6.1

Performance qualification record 1.3.6.1

Previous qualifications 1.3.6.1

Valves 2.1.7

Gaskets 2.1.4

23 23 00 SD-02 Shop Drawings

Refrigerant Piping System 2.3

SD-03 Product Data

Refrigerant Piping System 2.3

Spare Parts 1.5.2

Qualifications 1.3.1

Refrigerant Piping Tests 3.5

Demonstrations 3.4

Verification of Dimensions 3.1

SD-06 Test Reports

Refrigerant Piping Tests 3.5

SD-07 Certificates

Service Organization 2.1

SD-10 Operation and Maintenance

Data

Maintenance 1.5

Operation and Maintenance 3.4

Manuals

23 25 00 SD-03 Product Data

G G G

G G

G G

FIO

G

G

G G G G

G

G G G G G G

FIO

FIO

FIO

G

G G

G

G G

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

L O

W T

E M

E P

E R

A T

U R

E W

A T

E R

(L T

W ) H

E A

T

IN

G S

Y S

T E

M [H

IG

H

] [M E

D

IU

M ] T

E M

P E

R A

T U

T

E R

S Y

S T

E M

W

IT

H

IN

B U

IL

D

IN

G

S R

E F

R

IG

E R

A N

T P

IP

A C

IL

IT

Y G

A S

P

IP

Water Treatment System 2.6.4.1

Water Analysis 2.5

Spare Parts 1.6

Field Instructions 3.4

Tests 3.5

Training Course 3.4

SD-06 Test Reports

Condenser Water QA Tests 3.5.5.1

Steam Boiler Water QA Tests 3.5.5.4

SD-10 Operation and Maintenance

Data

Water Treatment System 2.6.4.1

23 31 13.00 40 SD-01 Preconstruction Submittals

Material, Equipment, and Fixture

Lists Part 2

Records of Existing Conditions 2.1.1

SD-02 Shop Drawings

Connection Diagrams 2.1

Record Drawings 1.3

Offset Fitting Configurations 2.3.1

Offset Fitting Configurations 2.3.4

SD-03 Product Data

Equipment and Performance 2.1.1

Data

Galvanized Steel Ductwork 2.2.1

Materials

Brazing Materials 2.2.2

Mill-Rolled Reinforcing and 2.2.3

Supporting Materials

Round Sheet Metal Duct Fittings 2.3.1

Round, High-Pressure, 2.3.2

Double-Wall Sheet Metal Ducts

Turning Vanes 2.3.5

Sound Traps 2.3.7

Flexible Connectors 2.3.8

Flexible Duct Materials 2.3.11

Power Operated Dampers 2.3.14

Fire Dampers and Wall Collars 2.3.15

Gravity Backdraft and Relief 2.3.13

Dampers

Manual Volume Dampers 2.3.12

SD-05 Design Data

Design Analysis and Calculations 2.1

Design Analysis and Calculations 2.1.1

SD-06 Test Reports

Ductwork Leakage Tests 3.4.2

Operational Tests 3.4.1

SD-07 Certificates

Listing of Product Installations 3.2

Galvanized Steel Ductwork 2.2.1

Materials

Brazing Materials 2.2.2

Mill-Rolled Reinforcing and 2.2.3

Supporting Materials

Round Sheet Metal Duct Fittings 2.3.1

Round, High-Pressure, 2.3.2

Double-Wall Sheet Metal Ducts

Turning Vanes 2.3.5

Dampers 2.3.6

Sound Traps 2.3.7

Flexible Connectors 2.3.8

SD-10 Operation and Maintenance

Data

Operation and Maintenance 3.6

Manuals

Power Operated Dampers 2.3.14

Fire Dampers and Wall Collars 2.3.15

23 34 23.00 40 SD-02 Shop Drawings

Shop Drawings 2.1

Installation Drawings 3.1

SD-03 Product Data

Housing 2.2

Fan 2.3

Motor 2.5

Bases 2.6

Roof Curbs 2.7

Dampers 2.8

Screens 2.9

Sound Baffles 2.10

SD-06 Test Reports

Final Test Reports 3.2.3

SD-11 Closeout Submittals

Record Drawings 3.3

23 35 00.00 10 SD-02 Shop Drawings

Detail Drawings 1.4.1

Exhaust System Installation 3.4

SD-03 Product Data

Related Submittals 1.4.2

Ductwork Components 2.4

Materials and Equipment 2.1

Spare Parts 1.6

Field Instructions 3.6

Final Acceptance Tests 3.7

Onsite Training 3.6

Exhaust System Specialist 1.4.2

SD-06 Test Reports

Final Acceptance Tests 3.7

SD-07 Certificates

Inspection 3.3

SD-10 Operation and Maintenance

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G G

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G

FIO

G G

FIO

FIO

G

FIO

FIO

FIO

C H

E M

IC

A

L T

R E

A T

M E

N T

O F

W A

T E

R F

O R

M E

C H

A N

IC

A

L S

Y S

T E

M S

M E

T A

L D

U C

T S

H V

A C

P O

W E

R V

E N

T

IL

A T

O R

S O

V E

R H

E A

D V

E H

IC

L

E T

A

IL

P

IP

E [ A

N D

W E

L D

IN

G

F E

X H

A U

S T

R E

M O

V A

L S

Y S

T E

M (S

Data

Exhaust System 1.2

Operation and Maintenance 3.6

Manuals

23 35 19.00 20 SD-02 Shop Drawings

Industrial ventilation and exhaust 1.2.4 systems

SD-03 Product Data

Fans 2.1

Dampers 2.7

Flexible connectors 2.8.3

Flexible duct 2.8.4

Gaskets 2.8.5

Protective coating materials 2.8.6

Sealants 2.8.7

Access ports 2.9.1

Damper regulators 2.9.2

Blast gates 2.9.3

Vibration isolators 2.10.5

Ductwork, Dust and Fume 2.11

Collection

Steel ducts 2.12

Fiberglass ductwork 2.14

Thermoplastic ductwork 2.13

Vehicle tail pipe exhaust system 2.15

Welding fume exhaust system 2.16

Local/Regional Materials 1.8.1

SD-07 Certificates

Welding procedures 1.4.4

Welding test agenda 3.1.11

Welding test procedures 1.4.4

Welders' identification 1.4.1

Fiberglass fan servicer 1.4.2 experience information

SD-06 Test Reports

Fan tests 2.1.1 start-up tests 1.2.5

Sound level tests 3.2.6

SD-10 Operation and Maintenance

Data

Fans 2.1

Vehicle tail pipe exhaust system 2.15

Welding fume exhaust system 2.16

Industrial ventilation and exhaust 1.2.4 systems

SD-11 Closeout Submittals

Posted operating instructions 1.6

23 36 00.00 40 SD-01 Preconstruction Submittals

Records of Existing Conditions 1.3

SD-02 Shop Drawings

Bypass Single-Duct Air Terminal 2.1

Units

Dual-Duct Air Terminal Units 2.2

Fan-Powered Air Terminal Units 2.3

Induction Air Terminal Units 2.4

Shutoff Single-Duct Air Terminal 2.5

Units

Integral-Diffuser Air Terminal 2.6

Units

High-Pressure Dual-Duct Mixing

Boxes

Low-Pressure Dual-Duct Mixing 2.7

Boxes

Record Drawings 3.3

SD-03 Product Data

Bypass Single-Duct Air Terminal 2.1

Units

Dual-Duct Air Terminal Units 2.2

Fan-Powered Air Terminal Units 2.3

Induction Air Terminal Units 2.4

Shutoff Single-Duct Air Terminal 2.5

Units

Integral-Diffuser Air Terminal 2.6

Units

High-Pressure Dual-Duct Mixing

Boxes

Low-Pressure Dual-Duct Mixing 2.7

Boxes

Spare Parts 1.3

SD-10 Operation and Maintenance

Data

Operation and Maintenance 3.3

Manuals

23 37 13.00 40 SD-01 Preconstruction Submittals

Material, Equipment, and Fixture 2.1

Lists

Records of Existing Conditions 2.1

SD-02 Shop Drawings

Fabrication Drawings 2.1

Installation Drawings 3.1

SD-03 Product Data

Equipment and Performance 1.3

Data

SD-04 Samples

Manufacturer's Standard Color 2.1

Chart

SD-10 Operation and Maintenance

Data

Type TS Supply Troffer 2.2.25

Type TSR Combination Supply 2.2.27

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

F U

M E

N

D U

S T

R

IA

L V

E N

T

IL

A T

IO

N

A N

D E

X H

A U

S T

A

IR

T E

R M

IN

A

L U

N

IT

S D

IF

F

U S

E R

S , R

E G

IS

T

E R

S , A

N D

G R

IL

and Return Troffer

23 41 13.00 40 SD-02 Shop Drawings

Installation Drawings 3.2

SD-03 Product Data

Physical Characteristics 1.1

Performance Data 1.1

Air Filters 2.1

Filter Gages 2.2

Manometers 2.2

SD-06 Test Reports

Test Reports 3.3

SD-07 Certificates

Air Filters 2.1

Filter Gages 2.2

Manometers 2.2

23 52 00 SD-02 Shop Drawings

Detail Drawings 1.5

SD-03 Product Data

Materials and Equipment 2.1.1

Spare Parts 1.5

Water Treatment System 2.17

Boiler Water Treatment 2.17

Heating System Tests 3.10

Fuel System Tests 3.13

Unit Heaters 2.9

Welding 1.3

Qualifications 3.10

Field Instructions 3.12

Tests 3.4

SD-06 Test Reports

Heating System Tests 3.10

Fuel System Tests 3.13

Water Treatment Testing 3.10.1

SD-07 Certificates

Bolts 2.12.12.3

Continuous Emissions Monitoring 2.12.2

Energy Star 2.1.3

SD-10 Operation and Maintenance

Data

Operation and Maintenance 3.12

Instructions

Water Treatment System 2.17

23 52 33.03 20 SD-02 Shop Drawings

Boiler 1.3.2.1

Boiler 1.3.5.1

Boiler room auxiliary equipment 1.3.2.2

Burners 1.3.2.3

Dampers, stacks, and breechings 1.3.2.4

Fuel oil equipment 1.3.2.5

Piping and specialty items 1.3.2.6

Ball joint installation details 1.3.2.7

Reproducible drawings 1.3.2.8

SD-03 Product Data

Insulation types and installation 2.10.13 procedures

Boiler 1.3.2.1

Boiler 1.3.5.1

Local/Regional Materials 1.8.1

Environmental Data 1.8.2

SD-05 Design Data

Engineering Calculations 1.3.3.1

SD-06 Test Reports

Boiler predicted performance 1.3.4

Economizer performance 1.3.4

Variable speed motor controller 2.9.5

Hydrostatic and leak tightness 3.2.1.2 tests

Preliminary operation 3.2.2

General startup requirements 3.2.3

Fuel oil tanks 3.2.4

Boilers and auxiliaries tests and 3.2.5 inspections

Aquatic toxicity 1.7.1.2

SD-07 Certificates

Compatibility of boiler 1.5.6.2 components and equipment

System and equipment 1.5.6.3 installation

Tank calibration 1.5.6.4

Backflow preventer 1.5.6.5

Identical equipment 2.1.1

SD-10 Operation and Maintenance

Data

Boiler 1.3.2.1

Boiler 1.3.5.1

23 52 43.00 10 SD-02 Shop Drawings

Detailed Drawings 1.4.3

Boiler Setting 2.3.12

SD-03 Product Data

Support Steel 3.2.5.2

Spare Parts 1.6

Welding 1.4.1

Framed Instructions 3.6

Performance Tests 3.4.10

SD-06 Test Reports

Testing 3.4

SD-10 Operation and Maintenance

Data

Operating and Maintenance 3.7

Instructions

H E

A T

R E

C O

V E

R Y

B O

IL

E

R S

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

P A

N E

L F

IL

T

E R

S H

E A

T

IN

G B

O

IL

E R

S W

A T

E R

-T U

B E

B O

IL

E

R S

, O

IL

/G A

S O

R

IL

23 52 43.00 20 SD-02 Shop Drawings

Fuel train 1.3.1

Wiring diagram 1.3.1

SD-03 Product Data

Boilers 2.1

Boiler trim and control equipment 2.3

Burners and control equipment 2.2

Stack, breeching, and supports 2.3.18

Local/Regional Materials 1.6.1

Environmental Data 1.6.2

SD-06 Test Reports

Operational tests 3.4.1

Water analysis 1.3.2

SD-07 Certificates

Boilers 2.1

Boilers 2.1

Burners and control equipment 2.2

Burners and control equipment 2.2

Boiler trim and control equipment 2.3

Boiler trim and control equipment 2.3

SD-08 Manufacturer’s Instructions

Boilers 2.1

Feedwater treatment feeder 2.3.7

SD-10 Operation and Maintenance

Data

Boilers 2.1

SD-11 Closeout Submittals boilers 2.1

23 52 46.00 20 SD-02 Shop Drawings

Fuel trains 1.3.1

Wiring diagrams 1.3.1

SD-03 Product Data

Boilers 2.1

Boiler trim and control equipment 2.3

Burners and control equipment 2.2

Stack, breeching, and supports 2.3.20

SD-06 Test Reports

Operational tests 3.5.1

SD-07 Certificates

Boilers 2.1

Boilers 2.1

Burners and control equipment 2.2

Burners and control equipment 2.2

Boiler trim and control equipment 2.3

Boiler trim and control equipment 2.3

Water analysis 1.3.2

SD-08 Manufacturer’s Instructions

Boilers 2.1

Feedwater treatment system 2.3.9

SD-10 Operation and Maintenance

Data

Boilers 2.1

SD-11 Closeout Submittals boilers 2.1

23 54 16.00 10 SD-02 Shop Drawings

Detail Drawings 1.3

Installation 3.2

SD-03 Product Data

Spare Parts 1.5

SD-06 Test Reports

Testing, Adjusting, and Balancing 3.4

SD-10 Operation and Maintenance

Data

Operation and Maintenance 3.3

Instructions

23 54 19 SD-03 Product Data

Self-contained furnaces 2.1

Vent connections 2.2

Controls 2.3

Dampers 2.4

Air filters 2.6

Humidifiers 2.5

Unit heaters 2.7

Seismic isolators

Vibration isolators 2.1

System Diagrams 1.4.6

Similar Services 1.4.3

SD-06 Test Reports

Self-contained furnace - field 3.10.1 acceptance test plan

Self-contained furnace - field 3.10.2 acceptance test report

Tests 3.4.1

SD-08 Manufacturer’s Instructions

Self-contained furnaces - 3.1 installation instructions

Vent connections - installation 3.1 instructions

Controls - installation instructions 3.1

Dampers - installation 3.1 instructions

Air filters - installation instructions 3.1

Humidifiers - installation 3.1 instructions

Unit heaters - installation 3.1 instructions

SD-10 Operation and Maintenance

Data

Self-contained furnaces 2.1

Vent connections 2.2

L O

W P

R E

S S

U R

E W

A T

E R

H E

A T

IN

G

B O

IL

E

(U

D

E R

,0

B T

U /H

R O

U T

P U

T

L O

W P

R E

S S

U R

E W

A T

E R

H E

A T

IN

G

B O

IL

E

(O

E

R

,0

B

T U

/H R

O U

T P

U T

H

E A

T

IN

G S

Y S

T E

M

G A

S -F

IR

E

D H

E A

T E

R S

B U

IL

D

IN

G

H E

A T

IN

G

S Y

S T

E M

S , W

A R

M A

IR

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G G G G G

FIO

FIO

G

FIO

FIO

FIO

FIO

FIO

FIO

FIO

FIO

G

G

FIO

FIO

FIO

FIO

G

FIO

FIO

Controls 2.3

Dampers, 2.4

Humidifiers 2.5

Unit heaters 2.7

SD-11 Closeout Submittals

Field Training 3.10

23 57 10.00 10 SD-02 Shop Drawings

Heating…