Headquarters III Corps, Fort Hood Directorate of Public Works (DPW)
Technical Exhibit “A”
Renovate Admin Facility Building 38022
SPECIFICATIONS
April 25, 2016
Contract No. W91151‐15‐C‐XXXX
Directorate of Public Works Engineering Division US Army, III Corps 4612 Engineer Dr.
Fort Hood, TX 76544
S U
B M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C
T
IO
N C
O D
E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C
T
IO
N C
O D
E
D A
T E
O F
A C
T
IO
N
(a) (b) (c) (d) (e) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)
01 32 01.00 10 SD-01 Preconstruction Submittals Project Schedule 3.4
01 35 23.00 40 SD-01 Preconstruction Submittals Contractor's Health and Safety 1.3.1 Plan SD-06 Test Reports Gas Protection 1.14 SD-07 Certificates Protection Plan 1.3.2 License Certificates 1.11
01 35 29 SD-01 Preconstruction Submittals Activity Hazard Analysis Crane Critical Lift Plan Crane Operators Confined Space Entry Permit SD-06 Test Reports Accident Reports Regulatory Citations and 1.11.1 Violations
01 45 01.00 20 SD-03 Product Data Contractor Quality Control Plan 3.2
(QCP)
01 57 20.00 10 SD-01 Preconstruction Submittals Air Program Submittals Contractor Hazardous Material 3.3.1 Inventory and Consumption Log Appointment of an Environmental Manager SD-11 Closeout Submittals Contractor Hazardous Material 3.3.1 Inventory and Consumption Log Air Program Submittals Emission Inventory Weight Tickets 3.9.2
01 77 00 SD-10 Operation and Maintenance Data Equipment/Product Warranty List SD-11 Closeout Submittals Certification of EPA Designated Items Form DD1354 (and Appendix D where applicable) Videos Final Operation and Maintenance Manuals Final Record Drawings Inventory of Contractor Furnished and Installed Equipment
02 41 00 SD-01 Preconstruction Submittals
Demolition Plan
Utility Cut and Cap Plan
SD-07 Certificates
Asbestos and Lead Based Paint
Notification Forms submitted to
Texas Department of State Health
Services
SD-11 Closeout Submittals
Receipts
02 82 00 SD-03 Product Data
Material Safety Data Sheets 1.3.8
(MSDS) for all materials
SD-06 Test Reports
Air sampling results 1.5.5
Asbestos disposal quantity report 3.3.3.2
Clearance sampling 3.2.7.3
Asbestos Survey Report 1.3.10.1
SD-07 Certificates
Asbestos hazard abatement plan 1.3.9
Testing laboratory 1.3.10
Private qualified person 1.5.1 documentation
Contractor's license 1.5.4
Competent person 1.5.2
Worker's license 1.5.3
Landfill approval 1.3.11
Employee training 1.3.3
Medical certification 1.3.12
Waste shipment records 1.3.11
Respiratory Protection Program 1.3.6
Delivery tickets 1.3.11
Notifications 1.3.4
Notifications to Texas
Department of State Health
Services
SD-11 Closeout Submittals
Notifications 1.3.4
Permits and licenses 1.3.4
D
IV
IS
IO
N
C L
A S
S
IF
IC
A
T
IO
N G
O V
T O
R A
/E R
E V
IE
W
E R
CONTRACTO CONTR APPROVING
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH
SUBMITTAL REGISTER CONTRACT NO.
Renovate Admin Facility Bldg 38022 CONTRACTOR
B E
T A
N B
T A
B L
E O
F C
O N
T E
N T
S
A C
T
IV
IT
Y
N O
T R
A N
S M
IT
T
A L
N O
S P E C
S E C T DESCRIPTION ITEM SUBMITTED
P A
R A
G R
A P
H
REMARKS
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
(f) (l)
FIO
FIO
G
FIO
FIO
G
FIO
FIO
FIO
D E
M O
L
IT
IO
N
A S
B E
S T
O S
R E
M E
D
IA
T
IO
N
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
02 82 18.00 20 SD-06 Test Reports
Air sampling results 1.5.4
Clearance sampling 3.2.8.2
SD-07 Certificates
Mold remediation plan 1.3.9
Private qualified person documentation (Mold assessors, remediators)
Contractor's license 1.5.3
Responsible person
Notifications 1.3.4
Notifications 1.3.4
SD-11 Closeout Submittals
Notifications 1.3.4
Notifications 1.3.4
02 82 33.13 20 SD-03 Product Data
Vacuum Filters 1.6.4
Respirators 1.6.1
SD-06 Test Reports sampling results 1.5.2.3
Occupational and Environmental 1.5.2.3
Assessment Data Report
SD-07 Certificates
Qualifications of CP 1.5.1.1
Testing Laboratory 1.5.1.3
Occupant Notification 3.1.1.1
Training Certification 1.5.1.2
Notification of the
Commencement of LBP Hazard
Abatement activities
Third Party Consultant 1.5.1.4
Qualifications
Lead-based paint/paint with lead 1.5.3 removal/control plan
Respiratory Protection Program 1.5.2.6
Hazard Communication Program 1.5.2.7 approved hazardous waste treatment, storage, or disposal facility
Lead Waste Management Plan 1.5.2.8
Clearance Certification 3.5.1.1
SD-11 Closeout Submittals hazardous waste manifest 3.5.2.1
03 30 00 SD-02 Shop Drawings
Reinforcing steel 1.4.2.1
SD-05 Design Data mix design 2.3.1
SD-06 Test Reports
Compressive strength tests 3.12.2.2
Slump Tests 3.12.2.1
SD-07 Certificates
Reinforcing Bars 2.5.1
04 01 41 SD-03 Product Data
Cleaning and Restoration
Methods
04 20 00 SD-03 Product Data
Shop Drawings
Reinforcing Steel
Local/Regional Materials 1.5.1
Masonry Blends being used; to include each type of rock included in blend
Environmental Data
Brick
Concrete Masonry Units (CMU) 2.2
Water-Repellant Admixture 2.5
SD-04 Samples
Concrete Masonry Units (CMU) 2.2
Clay or Shale Brick 2.1
SD-08 Manufacturer’s Instructions
Masonry Cement 2.4.2
05 12 00 SD-02 Shop Drawings
Fabrication drawings 1.6.1
SD-06 Test Reports
Bolts, nuts, and washers 2.2
SD-07 Certificates
Steel 2.1
Galvanizing 2.5
AISC Quality Certification 1.4
AISC Fabrication Plant Quality
Certification
05 40 00 SD-02 Shop Drawings
Framing Components 1.5.1
SD-03 Product Data studs,joists 2.1
SD-05 Design Data
Metal framing calculations 1.5.2
Welds 3.1.1
05 50 00 SD-02 Shop Drawings steel stairs 2.20 structural steel door frames 2.22
Floor gratings and roof walkways 2.9
Handrails 2.12
Ladders 2.13
Roof hatch 3.14
SD-03 Product Data
Floor gratings and roof walkways 2.9
Handrails 2.12
Ladders 2.13
Steel stairs 2.20
Structural steel door frames 2.22
Roof hatch 3.14
C A
S T
-IN
-P
L A
C E
C O
N C
R E
T E
R E
M O
V A
L /C
O N
T R
O L
A N
D D
IS
P
O S
A L
O F
P A
IN
T
W
IT
H L
E A
D
FIO
FIO
FIO
E N
G
IN
E E
R
IN
G C
O N
T R
O L
A N
D D
IS
P
O S
A L
O
F M
O L
D C
O N
T A
M
IN
A T
E D
M A
T E
R
IA
L S
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G
G
FIO
FIO
FIO
FIO
FIO
G
FIO
FIO
FIO
FIO
FIO
G G
G
FIO
FIO
G
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
R E
S T
O R
A T
IO
N
D
M
S
O N
R Y
S T
R U
C T
U R
A L
S T
E E
L C
O L
D
- F
O R
M E
T A
L F
R A
M
IN
G M
E T
A L
: M
IS
C E
L L
A N
E O
U S
A N
D F
A B
R
IC
A T
IO
06 20 00 SD-03 Product Data
Cabinetry hardware
SD-04 Samples
Cabinetry and counter top
Moldings
Fascias and Trim 2.3
07 21 17 SD-03 Product Data
Insulation 3.3.1
Vapor retarder
SD-08 Manufacturer’s Instructions
Insulation 3.3.1
07 24 00 SD-03 Product Data
Sheathing board 2.2
Vapor Barrier
Thermal insulation 2.6
Adhesive
Mechanical Fasteners 2.5
Accessories 2.12
Base coat 2.7
Portland cement 2.8
Reinforcing fabric 2.9
Finish coat 2.10
Joint Sealant 2.13
Sealant Primer
Bond breaker 2.14
Backer Rod 2.15
Insulation Board
Warranty
SD-04 Samples
Sample Boards
SD-07 Certificates
Qualifications of EIFS 1.4.1
Manufacturer
Qualification of EIFS Installer 1.4.2
Qualification of Sealant
Applicator
SD-08 Manufacturer’s Instructions
Installation 3.3
SD-10 Operation and Maintenance
Data
EIFS
07 41 13 SD-02 Shop Drawings
Flashing and Accessories
Gutter/Downspout Assembly
SD-03 Product Data
Roof panels
FACTORY-APPLIED COLOR
FINISH
Accessories 2.4
Fasteners
SD-04 Samples
Roof Panels
SD-06 Test Reports
Fire Rating Test Report 2.6.2
Factory Finish and Color 2.2
Performance Requirements
SD-08 Manufacturer’s Instructions
INSTALLATION MANUAL
07 55 00 SD-03 Product Data
Insulation Board 2.2
Membrane Roofing
Fasteners
Sheet Metal Design Materials
Caulking
Contractors Qualifications
2-Roof Vents
Scuppers and Curbs Designs
Parapet Wall Flashing Designs
Fascia Designs and Colors
SD-04 Samples
Membrane Roofing
Insulation Board 2.2
Fasteners
Fascia
2-Way Roof Vent
SD-08 Manufacturer’s Instructions
Installation
SD-11 Closeout Submittals
Manufacturers Final Inspection
Quality Verification Report
07 57 14 SD-03 Product Data
Polyurethane foam
SD-07 Certificates
Qualification of Manufacturer
Qualification of Applicator
07 60 00 SD-02 Shop Drawings
Flashing at roof penetrations 3.1.27
07 84 00 SD-03 Product Data
Firestopping Materials 2.1
07 92 00 SD-03 Product Data
Sealants 2.1
Backstops 2.4
08 11 13 SD-03 Product Data
Doors 2.1
Frames 2.4
Accessories 2.2
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G
FIO
FIO
FIO
FIO
G G
M E
T A
L R
O O
F P
A N
E L
S M
E M
B R
A N
E R
O O
F
IN
G F
IN
IS
H
C
P E
N T
R Y
F
IB
E R
G L
A S
S
IN
S U
L A
T
IO
X
T E
R
IO
R
IN
S U
L A
T
IO
N A
N D
F
IN
IS
H
S Y
S T
E M
S S
P R
A Y
P
L
Y U
R E
T H
A N
E
F L
A S
H
IN
G A
N D
S H
E
T
IR
E S
T O
P P
I
JO
IN
A
L A
N T
S
S T
E
O R
D F
R A
Weatherstripping
08 11 16 SD-02 Shop Drawings
Doors and frames 2.1
SD-08 Manufacturer’s Instructions
Doors and frames 2.1
08 14 00 SD-03 Product Data
Doors 2.1
Fire resistance rating 2.1.7
08 33 23 SD-02 Shop Drawings
Overhead Coiling Doors 2.1
Counterbalancing Mechanism 1.6
Counterbalancing Mechanism 2.3
Manual Door Operators 1.6
Manual Door Operators 2.4
Electric Door Operators 1.6
Electric Door Operators 2.5
Bottom Bar 2.1.4
Guides 1.5
Mounting Brackets 2.3.1
Overhead Drum 2.1.10
Hood 1.6
Painting 1.6
Installation Drawings 1.5
SD-03 Product Data
Overhead Coiling Doors 2.1
Hardware 2.2
Counterbalancing Mechanism 1.6
Counterbalancing Mechanism 2.3
Manual Door Operators 1.6
Manual Door Operators 2.4
Electric Door Operators 1.6
Electric Door Operators 2.5
Fire-Rated Door Assembly 2.6
SD-05 Design Data
Overhead Coiling Doors 2.1
Hardware 2.2
Counterbalancing Mechanism 1.6
Counterbalancing Mechanism 2.3
Manual Door Operators 1.6
Manual Door Operators 2.4
Electric Door Operators 1.6
Electric Door Operators 2.5
Fire-Rated Door 1.2
SD-10 Operation and Maintenance
Data
Operation and Maintenance 1.5
Manuals
Overhead Coiling Door 1.6
Assemblies
Materials 1.6
Devices 1.6
Procedures 1.6
Manufacture's Brochures 1.6
Parts Lists 1.6
Cleaning 3.3.2
08 34 19.10 20 SD-02 Shop Drawings
Rolling service doors 2.1
Rolling fire doors
SD-03 Product Data
Rolling service doors 2.1
Motors 2.4.2
Controls 2.4.3
SD-08 Manufacturer’s Instructions
Rolling service doors 2.1
SD-10 Operation and Maintenance
Data
Rolling service doors 2.1
08 36 13 SD-02 Shop Drawings
Doors 2.2
SD-03 Product Data
Doors 2.2
Electric operators 2.6
SD-08 Manufacturer’s Instructions
Doors 2.2
SD-10 Operation and Maintenance
Data
Doors 2.2
08 36 19 SD-02 Shop Drawings
Doors 2.2
SD-03 Product Data
Doors 2.2
Motors 2.4.1
Controls 2.4.2
SD-08 Manufacturer’s Instructions
Doors 2.2
SD-10 Operation and Maintenance
Data
Doors 2.2
08 51 13.00 20 SD-02 Shop Drawings
Windows 2.1
Fabrication Drawings
SD-03 Product Data
Windows 2.1
Hardware 2.2.5.1
Weatherstripping 2.2.2
Accessories 2.2.5
SD-05 Design Data
Structural calculations for deflection
08 60 45 SD-02 Shop Drawings
A L
U M
IN
U
M W
IN
D
O W
S
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G
G G
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G
FIO
FIO
G G G
FIO
G
G
FIO
FIO
FIO
FIO
FIO
W O
O D
D O
O R
S O
V E
R H
E A
D C
O
IL
IN
G
D O
O R
S R
O L
L
IN
G S
E R
V
IC
E D
O O
R S
S E
C T
IO
N
V E
R H
E A
D D
O O
R S
V E
R T
IC
A
L L
IF
T
D O
O R
S E
S
A L
U M
IN
U
M D
O O
R S
A
Shop Drawings 3.2
SD-03 Product Data
SKYLIGHTS AND 2.1
TRANSLUCENT PANELS
Warranty 1.6
SD-06 Test Reports
Test Reports 2.1
SD-07 Certificates
Systems 2.5
Qualifications 1.4
08 71 00 SD-02 Shop Drawings
Keying system 2.3.6
SD-03 Product Data
Hardware items 2.3
SD-11 Closeout Submittals
Key Bitting 1.3
08 81 00 SD-02 Shop Drawings
Installation
SD-03 Product Data
Insulating Glass
Glazing Accessories 1.3
SD-07 Certificates
Insulating Glass
Laminated Glass
08 91 00 SD-02 Shop Drawings
Wall louvers 1.4
Wall louvers 1.5
SD-03 Product Data
Metal Wall Louvers 2.2
09 29 00 SD-03 Product Data
Cementitious backer units
Gypsum Board 2.1.1
Accessories 2.1.7
SD-08 Manufacturer’s Instructions
Material Safety Data Sheets
09 30 00 SD-03 Product Data
Tile 2.1
Adhesive
SD-04 Samples
Tile 2.1
Grout 2.3
09 51 00 SD-03 Product Data
Acoustical Ceiling Systems
SD-07 Certificates
Acoustic Ceiling Tiles and
Suspension System
09 65 00 SD-03 Product Data
Resilient Flooring and
Accessories
Adhesives 2.4
SD-08 Manufacturer’s Instructions
Surface Preparation 3.2
Installation
09 68 00 SD-03 Product Data
Carpet 2.1
Installation 3.4
SD-04 Samples
Carpet 2.1
SD-07 Certificates
Carpet 2.1
09 90 00 SD-03 Product Data
Coating 3.4.4
SD-08 Manufacturer’s Instructions
Manufacturer's Material Safety 1.6.2
Data Sheets
10 14 02 SD-02 Shop Drawings
Shop Drawings
10 21 13 SD-02 Shop Drawings
Installation Drawings
Fabrication Drawings
SD-03 Product Data
Colors And Finishes 2.6
Partition Panels and Doors 2.2
Anchoring Devices and 2.1.3
Fasteners
Hardware and Fittings 2.1.5
10 22 13 SD-03 Product Data
Wire mesh partitions 1.4
10 26 13 SD-03 Product Data
Corner Guards 2.2
10 28 13 SD-03 Product Data
Finishes
Accessory Items
10 44 16 SD-03 Product Data
Fire Extinguishers 2.1
Accessories
Cabinets 2.3
Wall Brackets 2.4
Replacement Parts
SD-07 Certificates
Fire Extinguishers 2.1
Manufacturer's Warranty with 2.1
Inspection Tag
11 68 13 SD-02 Shop Drawings
Configuration
Shop Drawings 1.5.5
S K
Y L
IG
H
T S
A
A N
S L
U C
E N
T P
A N
E L
S D
O
R D
W A
R E
G L
A Z
IN
G
M E
T A
L W
A
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G Y
P S
U M
B O
A R
D
C E
R A
M
IC
T
IT
L E
Q
U A
R R
Y T
IT
L
E
A N
D P
A V
O U
S T
IC
A
L C
E
IL
IN
G
S R
E S
IL
IE
O
O R
IN
G
C A
R P
E T
P A
IN
T
S A
A
T
IN
G S
IN
T
E
IOR
IL
M P
A R
T M
E N
T S
W
S
W A
L L
A N
D C
O R
N E
R G
U A
R D
S
T O
IL
E
T A
C C
E S
S O
R
IE
S F
IR
E
E X
T
IN
G U
IS
H
E
Fall Height
Equipment 2.2
Equipment Identification 1.3.4
Delivery, Storage and Handling 1.6
Manufacturer Qualification 1.5.1
Materials 2.1
SD-04 Samples
Color 2.1.5
SD-06 Test Reports
Recycled Plastic 2.1.3
Wood Finishes
SD-07 Certificates
Materials 2.1
Manufacturer Qualification 1.5.1
Installer Qualification 1.5.2
Manufacturer's Representative 1.5.3
Substitution
SD-10 Operation and Maintenance
Data
Maintenance Instructions 1.8
12 24 13 SD-03 Product Data
Window Shades 2.1
Hardware 1.3
SD-08 Manufacturer’s Instructions
Window Shades 2.1
13 34 19 SD-01 Preconstruction Submittals
Manufacturer's Qualifications 1.6.2
SD-02 Shop Drawings
Shop and Detail Drawings
SD-05 Design Data descriptive and technical literature building design analysis
21 12 00 SD-02 Shop Drawings
Standpipe system 1.4.4
SD-03 Product Data
Pipe and fittings 2.1.1
Mechanical couplings 2.1.1
Pipe hangers and supports 2.1.2
Valves 2.1.3
Fire department connections 2.1.9
Alarm valves 2.1.10
Water motor alarms 2.1.11
Pressure switch 2.1.12
Waterflow detector 2.1.13
Fire hose cabinets 2.1.14
Valve tamper switch 2.1.15
Backflow preventer 2.1.17
Buried Pipe and fittings 2.2.1
SD-06 Test Reports
Preliminary tests 3.8.1
Acceptance tests 3.8.2
SD-07 Certificates
Qualifications of installer 1.6.1
SD-10 Operation and Maintenance
Data
Alarm valves 2.1.10
Backflow preventer 2.1.17
SD-11 Closeout Submittals
System as-built drawings 1.6.2
21 13 00.00 20 SD-02 Shop Drawings
Sprinkler heads and piping 1.4 system layout
Electrical wiring diagrams 1.4.8
SD-03 Product Data
Piping 2.2
Alarm valves 2.2.4
Valves 2.2.8
Water motor alarms 2.2.5
Sprinkler heads 2.2.2
Pipe hangers and supports 2.2.7
Flow switch 2.2.6
Fire department connections 2.2.13
Excess pressure pump 2.2.14
Mechanical couplings 2.2.1
Backflow Preventer 2.2.9
SD-05 Design Data
Sprinkler system design 1.4
SD-06 Test Reports
Preliminary tests 3.2.1
SD-07 Certificates
Qualifications of installer 1.6.1
SD-10 Operation and Maintenance
Data
Alarm valves 2.2.4
Excess pressure pump 2.2.14
Backflow preventer 2.2.9
SD-11 Closeout Submittals
As-built drawings 1.4.9
21 13 00.00 40 SD-01 Preconstruction Submittals
Record of Existing Conditions 1.2
SD-02 Shop Drawings
Supporting Elements 2.2.3
Fire-Department Connections 2.2.4
Fire Alarm System 2.2.9.1
Sprinkler Heads 2.2.8
Valves 2.2.9
SD-03 Product Data
Underground Piping Materials 2.2.1
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G
G G G
FIO
FIO
FIO
FIO
FIO
G
G
G
G G G G
G
G G G G G G
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G
G
FIO
FIO
G
G
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G G G G
G
F
IR
E
- S
P L
A Y
G R
O U
N D
E Q
U
IP
M E
N T
R O
L L
W
D
A
D E
S
M E
T A
L B
U
IL
D
G
Y
S T
E M
S S
T A
N D
P
IP
E S
Y S
T E
M S
W E
T
- P
IP
E
F
IR
E S
U P
R E
S S
IO
N
S P
R
IN
K L
E
Aboveground Piping Materials 2.2.2
Valves 2.2.9
Fire-Department Connections 2.2.4
Riser Alarm Equipment 2.2.5
Air Compressor 2.2.6.1
Standpipe Equipment and Fire 2.2.7
Hose Cabinet Stations
Sprinkler Heads 2.2.8
Materials 2.3
Supporting Elements 2.2.3
Equipment and Performance 2.1
Data
SD-05 Design Data
Design Analysis and Calculations Part 2
SD-06 Test Reports
Pressure Tests 3.3.6
System Operating Tests 3.3.3
Air Tests 3.3.3
Valve-Operating Tests 3.3.3
Drainage Tests 3.3.3
21 13 16.00 20 SD-02 Shop Drawings
Sprinkler heads and piping 1.3.8 system layout
Electrical wiring diagrams 1.3.8
SD-03 Product Data
Piping 2.1
Valves 2.1.10
Water motor alarms 2.1.5
Sprinkler heads 2.1.2
Pipe hangers and supports 2.1.9
Fire department connections 2.1.14
Low air pressure supervisory 2.1.7 switch
Dry pipe valves 2.1.4
Air compressor 2.1.8
Mechanical couplings 2.1.1
Backflow Preventers 2.1.10.1
Pressure Switch 2.1.6
SD-05 Design Data
Sprinkler system design 1.3
SD-06 Test Reports
Preliminary tests 3.2.1
SD-07 Certificates
Qualifications of installer 1.5.1
SD-10 Operation and Maintenance
Data
Dry pipe valves 2.1.4
Air compressor 2.1.8
SD-11 Closeout Submittals
As-built drawings of each system 1.3.9
21 13 18.00 10 SD-02 Shop Drawings
Shop Drawings 1.4.3
As-Built Drawings 3.8
SD-03 Product Data
Fire Protection Specialist 1.4.1
Installer Qualifications 1.4.2
List of Submittals 1.4.1
Materials and Equipment 2.1
Spare Parts 1.6
OnSite Training 3.9
SD-05 Design Data
Sway Bracing 3.3.1
Hydraulic Calculations 1.2.1.2
Storage Batteries 2.13.4.1
SD-06 Test Reports
Preliminary Tests 3.7
Final Acceptance Tests 3.8
SD-07 Certificates
Inspection by Fire Protection 3.2
Specialist
SD-10 Operation and Maintenance
Data
Operating and Maintenance 3.9
Instructions
21 13 20.00 20 SD-02 Shop Drawings
Fire extinguishing system 1.3.1.1
SD-03 Product Data
Pipe, fittings, and mechanical 2.19.1 couplings
[Deluge] [Pre-action] valves 2.1.3
Valves 2.19.5
Water motor alarms 2.11.1
Sprinkler heads 2.1.1
Monitor nozzles 2.16
Hose and nozzles 2.17
Pipe hangers and supports 2.19.4
Pressure switch 2.11.3.1
Fire department inlet connections 2.19.11
Tank mounted air compressor 2.12
Air pressure regulating device 2.12
Air compressor 2.3.1 trouble alarm 2.11.4
Detection devices 2.2
Storage batteries 2.2.2.1
Alarm bells 2.11.2
Alarm horns 2.11.2
Annunciator panel 2.2.1.3
Foam hydrants 2.18
AFFF concentrate storage tanks 2.15.3
Proportioning equipment 2.14
AFFF concentrate 2.13
FIO
G G G G
G G G G G G
FIO
FIO
FIO
FIO
FIO
G G
FIO
FIO
G
G G G
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G G
G
G
FIO
FIO
G
FIO
G
FIO
G
FIO
G G G G G
G
G
G
FIO
G
G G G G G
G G G G G G
G G G G G G
S U
P R
E S
S
IO
N S
P R
IN
K
L E
R S
Y S
T E
M S
D R
Y
- P
IP
E
F
IR
E S
P R
IN
K
L E
R S
Y S
T E
M S
P R
E A
C T
IO
N
A N
D D
E L
U G
E S
P R
IN
K
L
S T
E M
S , F
IR
E
P R
O T
E C
T
IO
N F
O A
M F
IR
E
Strainers 2.19.3
Manual release stations 2.5
Backflow preventers 2.19.12
Control panel 2.2.1
Battery charger 2.2.2.2
SD-05 Design Data
Hydraulic calculations 1.3.1.2
Pressure discharge graphs or 1.3.1.2 tables
Battery standby power 1.3.1.2 requirements calculations
System surge analysis 1.3.1.2
SD-06 Test Reports
2-wire smoke detectors 2.7
Preliminary tests 3.8.1
Acceptance tests 3.8.2 diaphragm pressure 2.14.1 proportioning tanks
SD-07 Certificates
Qualifications of installer 1.5.1
AFFF containment and disposal 1.3.1.3 plan
Backflow preventers 2.19.12
SD-10 Operation and Maintenance
Data
[Deluge] [Pre-action] valves 2.1.3
Tank mounted air compressor 2.12
Proportioning equipment 2.14
Control panel 2.2.1
AFFF concentrate storage tanks 2.15.3
Monitor nozzles 2.16 fire extinguishing system 1.3.1.1
SD-11 Closeout Submittals
As-built drawings for the fire 1.3.1.4 extinguishing system
21 13 24.00 10 SD-02 Shop Drawings
Detail Drawings 1.4.3
As-built Drawings 1.4.1
SD-03 Product Data
Materials and Equipment 2.1
Spare Parts 1.5
AFFF System 1.2
Installer's Qualifications 1.4.2
Post-discharge Test 3.6.4
Requirements
SD-06 Test Reports
Test Reports 3.6.4
SD-07 Certificates
Materials and Equipment 2.1
SD-10 Operation and Maintenance
Data
Operation and Maintenance 3.8
Manuals
21 13 26.00 40 SD-01 Preconstruction Submittals
Material, Equipment, and Fixture
Lists Part 2
Record of Existing Conditions 1.4
SD-02 Shop Drawings
Connection Diagrams Part 2
Control Diagrams Part 2
Installation Drawings 1.4
SD-03 Product Data
Equipment and Performance
Data Part 2
Equipment Foundation Data Part 2
Piping Materials Part 2
Aboveground Piping Systems 2.3.7
Valves Part 2
Detection Systems 2.3.5
Alarms Part 2
Sprinkler Heads Part 2
Supporting Elements Part 2
SD-04 Samples
Manufacturer's Standard Color 3.1.3
Charts
SD-05 Design Data
Design Analysis and Calculations Part 2
SD-06 Test Reports
Pressure Tests 3.2
System Tests 3.2
Operating Tests 3.2
SD-07 Certificates
Listing of Product Installations 1.3
Piping Materials Part 2
Aboveground Piping Systems 2.3.7
Valves Part 2
Detection Systems 2.3.5
Alarms Part 2
Air Compressor Part 2
Sprinkler Heads Part 2
Supporting Elements Part 2
SD-10 Operation and Maintenance
Data
Operation and Maintenance 3.4.1
Manuals
21 21 01.00 10 SD-02 Shop Drawings
Piping layout 1.3
Electrical wiring diagrams 1.3.1
SD-03 Product Data
Storage cylinders
G
G G G G
G
G
G
G G G G
G
G
G
G
G G G G G G
G G
G
G
G
G
FIO
G
G
FIO
G G
G G G G G
G
G
G G
G
G G G
G G G G G G
G G
G G G
G
G
G
FIO
FIO
G
FIO
A Q
U E
O U
S F
IL
M
-F O
R M
IN
G
F O
A M
(A F
F F
F
IR
E
P R
O T
E C
T
IO
N S
Y S
T E
M X
T
IN
G U
IS
H
IN
G
F O
R A
IR
C
R A
F T
H A
N G
A R
S D
E L
U G
E F
IR
E
- S U
P R
E S
S
IO
N S
P R
IN
K
L E
R S
Y S
T E
Discharge head
Manifolds
Discharge alarm 2.9
Pipe and fittings 2.3
Pipe hangers and supports 2.4.3
Actuating stations 2.6
Pressure switch 2.6.3
Control panel 2.6.5
Smoke detectors 2.7.1
Heat activated detectors 2.7.2
Alarm horns 2.9.2
Visual alarms 2.9.3
Dampers 2.11
Main and reserve switch
Warning signs 2.9
Storage batteries 2.6.6.1
Battery charger 2.6.6.2
SD-05 Design Data
System calculations 1.3.2
Calculations substantiating 2.6.6.1 battery capacity
Open-area smoke detectors 1.3.2 calculations
SD-06 Test Reports
Preliminary tests 3.5.1
SD-07 Certificates
Qualifications of installer 1.5.1
SD-10 Operation and Maintenance
Data
Discharge head
Control panel 2.6.5
21 21 03.00 10 SD-02 Shop Drawings
Installation Drawings 1.4.3
SD-03 Product Data
Similar Services 1.4
Standard Products 2.1
Preliminary Tests 3.2
Final Acceptance Tests 3.3
Field Training 3.4
SD-06 Test Reports
Preliminary Tests 3.2
Final Acceptance Tests 3.3
SD-07 Certificates
Installation Technician 1.4.2
Installation Drawings 1.4.3
SD-10 Operation and Maintenance
Data
Operation and Maintenance 3.4
Instructions
21 30 00 SD-01 Preconstruction Submittals
Fire Pump Installation Related 1.3
Submittals
Fire Protection Specialist 1.7.1
SD-02 Shop Drawings
Installation Drawings 3.3.1
As-Built Drawings 3.11.2
Piping Layout 3.3.2
Pump Room 3.3.2
SD-03 Product Data
Catalog Data 2.1
Spare Parts 1.6
Preliminary Tests 3.8.2
Field Tests 3.8
Manufacturer's Representative 1.7.6
Field Training 3.11.1
Army Final Acceptance Test 3.8.3
Navy Formal Inspection and
Tests
SD-06 Test Reports
Preliminary Tests 3.8.2
Army Final Acceptance Test 3.8.3
SD-07 Certificates
Fire Protection Specialist 1.7.1
Qualifications of Welders 1.7.2
Qualifications of Installer 1.7.3
Preliminary Test Certification 1.7.4
Final Test Certification 1.7.5
SD-10 Operation and Maintenance
Data
Operating and Maintenance 3.11.1
Instructions
Flow Meter 2.17
22 00 00 SD-03 Product Data
Fixtures 2.4
Flush valve water closets 2.4.1
Flush valve urinals 2.4.2
Flush tank water closets
Wall hung lavatories 2.4.4
Countertop lavatories 2.4.5
Kitchen sinks 2.4.6
Service sinks
Drinking-water coolers 2.4.8
Plastic shower stalls
Plastic bathtub liners
Plastic bathtub wall surrounds
Water heaters 2.10
Pumps 2.12
Backflow prevention assemblies
Shower Faucets 2.6.2
Swimming Pool [and Spa]
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G G
FIO
G G G
FIO
FIO
FIO
G
G
G
G
G
G G G
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G G
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
C L
E A
N A
G E
N T
F
IR
E E
X T
IN
G
U
IS
H
T C
H E
M
IC
A L
F
IR
E E
X T
IN
G
U
IS
H
IN
G S
Y S
T E
M F
IR
E
P U
M P
S P
L U
M B
IN
G
, G E
N E
R
Suction Fittings
Pool Water Pump safety vacuum release system
Vibration-Absorbing Features 3.4
SD-06 Test Reports
Tests, Flushing and Disinfection 3.8
Test of Backflow Prevention 3.8.1.1
Assemblies
SD-07 Certificates
Materials and Equipment
SD-10 Operation and Maintenance
Data
Plumbing System 3.8.1
22 05 48.00 20 SD-02 Shop Drawings
Inertia bases 2.7
Machinery bases 2.6
Platforms 2.6
Rails 2.6
Saddles 2.6
SD-03 Product Data
Isolators 2.3
Flexible connectors 2.8
Flexible duct connectors 2.9
Pipe guides 2.11
Seismic snubbers 2.10
Vertical stops 3.1.3
Thrust restraints 2.12
Inertia bases 2.7
Machinery bases 2.6
Machinery foundations and 3.1.13 subbases
Platforms 2.6
Rails 2.6
Saddles 2.6
Machinery manufacturer's sound 1.4.2 data
SD-05 Design Data
Inertia bases 2.7
Machinery bases 2.6
Platforms 2.6
Rails 2.6
Saddles 2.6 machinery 1.4.3 machinery over 136 kilograms 1.4.4 machinery over 300 pounds 1.4.4
SD-06 Test Reports
Seismic snubbers 2.10
Equipment vibration tests 3.2.3.1
Equipment sound level tests 3.2.3.2
Protected spring isolators 2.4
SD-08 Manufacturer’s Instructions
Vibration and noise isolation 3.1.1 components
Seismic protection components 2.13
22 07 19.00 40 SD-03 Product Data
Adhesives 2.3
Coatings 2.3
Insulating Cement
Insulation Materials 2.3
Jacketing 2.3
Tape 2.3
SD-08 Manufacturer’s Instructions
Installation Manual 1.2
22 14 29.00 40 SD-03 Product Data
Manufacturer's Catalog Data 2.1
Pump Performance Curve 2.2.1
Pump and Motor Specifications 2.2.1
Spare Parts 1.5
Special Tools 1.5
Wet-Pit Sump Pumps 2.2
Submersible Pumps 2.3
Accessories 2.3
SD-06 Test Reports
Hydrostatic Leak 3.2.2
Static Heads 3.2.2
Pump Flow Capacity 3.2.2
SD-07 Certificates
Manufacturer's Certification of
Bearing Life
SD-08 Manufacturer’s Instructions
Manufacturer's Installation 2.1
Instructions
Vibration Specifications 2.1
22 15 14.00 40 SD-03 Product Data
Equipment and Performance 1.4
Data
Underground Piping Materials
Aboveground Piping Materials 2.1
Piping Specialties 2.2
Supporting Elements 2.5
Air Compressors
Valves 2.3
Accessories 3.1.1
Miscellaneous Materials 2.4
Vibration Isolation 3.1.5
SD-06 Test Reports
Hydrostatic Testing 3.2.1
Compressed Air Systems Testing 3.2
Valve-Operating Tests 3.2.1
Drainage Tests 3.2.1
Pneumatic Testing 3.2.1
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
P U
R P
O S
E P
L U
M B
IN
G
P
IP
U
L A
T
IO
N S
U M
P P
U M
P S
G E
N E
R A
L S
E R
V
IC
E C
O M
P R
E S
S E
D -A
IR
S
Y S
T L
O W
P R
E S
S U
R E
FIO
M E
C H
A N
IC
A
L S
O U
N D
, V
IB
R A
T
IO
N , S
E
IS
M
IC
C O
N T
R O
L
FIO
FIO
FIO
FIO
FIO
SD-10 Operation and Maintenance
Data
Operation and Maintenance 1.5
Manuals
22 31 00 SD-02 Shop Drawings
Installation 3.2
SD-03 Product Data
Softening Equipment 2.2
Spare Parts 1.4
Field Instructions 3.3.2
SD-06 Test Reports
Softening Equipment 2.2
Piping 3.4.2
SD-10 Operation and Maintenance
Data
Operating and Maintenance 3.3.2
Instructions
23 00 00 SD-03 Product Data
Metallic Flexible Duct 2.8.1.1
Insulated Nonmetallic Flexible
Duct Runouts
Duct Connectors 2.8.1.2
Duct Access Doors 2.8.2
Fire Dampers 2.8.3
Manual Balancing Dampers 2.8.4
Automatic Smoke-Fire Dampers
Automatic Smoke Dampers
Sound Attenuation Equipment 2.8.8
Acoustical Duct Liner 2.8.8.2
Diffusers 2.8.9.1
Registers and Grilles
Louvers 2.8.10
Air Vents, Penthouses, and 2.8.11
Goosenecks
Centrifugal Fans 2.9.1.1
In-Line Centrifugal Fans 2.9.1.2
Axial Flow Fans 2.9.1.3
Panel Type Power Wall 2.9.1.4
Ventilators
Centrifugal Type Power Wall 2.9.1.5
Ventilators
Centrifugal Type Power Roof 2.9.1.6
Ventilators
Propeller Type Power Roof 2.9.1.7
Ventilators
Air-Curtain Fans 2.9.1.8
Ceiling Exhaust Fans 2.9.1.9
Air Handling Units 2.10
Room Fan-Coil Units 2.11.1
Coil Induction Units
Constant Volume, Single Duct 2.11.2.1
Terminal Units
Variable Volume, Single Duct 2.11.2.2
Terminal Units
Variable Volume, Single Duct, 2.11.2.3
Fan-Powered Terminal Units
Dual Duct Terminal Units
Ceiling Induction Terminal Units
Reheat Units 2.11.2.5
Unit Ventilators 2.11.3
Energy Recovery Devices 2.12
Test Procedures 1.4.5
Diagrams
SD-06 Test Reports
Performance Tests 3.11
Damper Acceptance Test 3.9
SD-08 Manufacturer’s Instructions
Manufacturer's Installation 3.2
Instructions
Operation and Maintenance 3.13.2
Training
SD-10 Operation and Maintenance
Data
Operation and Maintenance 3.13.1
Manuals
Fire Dampers 2.8.3
Manual Balancing Dampers 2.8.4
Automatic Smoke-Fire Dampers
Automatic Smoke Dampers
Centrifugal Fans 2.9.1.1
In-Line Centrifugal Fans 2.9.1.2
Axial Flow Fans 2.9.1.3
Panel Type Power Wall 2.9.1.4
Ventilators
Centrifugal Type Power Wall 2.9.1.5
Ventilators
Centrifugal Type Power Roof 2.9.1.6
Ventilators
Propeller Type Power Roof 2.9.1.7
Ventilators
Air-Curtain Fans 2.9.1.8
Ceiling Exhaust Fans 2.9.1.9
Air Handling Units 2.10
Room Fan-Coil Units 2.11.1
Coil Induction Units
Constant Volume, Single Duct 2.11.2.1
Terminal Units
Variable Volume, Single Duct 2.11.2.2
Terminal Units
Variable Volume, Single Duct, 2.11.2.3
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
T E
M S
W
A T
E R
S O
F T
E N
E R
S
C A
T
IO
N -E
X C
H A
N
(S
D
IU
M C
Y C
L E
A
IR
S
U P
P L
Y , D
IS
T
R
IB
U T
IO
N
, V E
N T
IL
A
T
IO
N , A
N D
E X
H A
U S
T S
Y S
T E
Fan-Powered Terminal Units
Dual Duct Terminal Units
Ceiling Induction Terminal Units
Reheat Units 2.11.2.5
Unit Ventilators 2.11.3
Energy Recovery Devices 2.12
23 01 30.41 SD-01 Preconstruction Submittals
Record of Existing Conditions 3.2.1
Coordination Plan 3.2.2
NADCA Firm 1.4.1
NADCA Team Assistants 1.4.1
NADCA Air System Cleaning 1.4.1
Specialist (ASCS)
NADCA Supervisor Qualifications 1.4.1
Records of Experience in the 1.4.2
Field of HVAC System Cleaning
NADCA Work Execution 1.6.1
Schedule
SD-06 Test Reports
Testing Procedures Summary 3.7
Gravimetric Analysis
Post-Project Report 3.7
23 03 00.00 20 SD-03 Product Data
Certification 1.4.5.3
23 05 15 SD-01 Preconstruction Submittals
Material, Equipment, and Fixture 1.2
Lists
SD-02 Shop Drawings
Record Drawings 1.2
Connection Diagrams 1.2
Installation Drawings 3.1
SD-03 Product Data
Pipe and Fittings 2.2
Piping Specialties 2.3
Valves 2.4
Miscellaneous Materials 2.5
Supporting Elements 2.6
Equipment Foundation Data 1.2
SD-04 Samples
Manufacturer's Standard Color 1.2
Charts
SD-05 Design Data
Pipe and Fittings 2.2
Piping Specialties 2.3
Valves 2.4
SD-06 Test Reports
Hydrostatic Tests 3.1
Air Tests 3.1
Valve-Operating Tests 3.1
Drainage Tests 3.1
Pneumatic Tests 3.1
Non-Destructive Electric Tests 3.1
System Operation Tests 3.1
SD-07 Certificates
Record of Satisfactory Field 1.4.2
Operation
List of Qualified Permanent 1.4.3
Service Organizations
Listing of Product Installations 1.2
Records of Existing Conditions 1.2
Surface Resistance 3.1
Shear and Tensile Strengths 3.1
Temperature Ratings 3.1
Bending Tests 3.1
Flattening Tests 3.1
Transverse Guided Weld Bend 3.1
Tests
SD-10 Operation and Maintenance
Data
Operation and Maintenance 3.12
Manuals
23 05 48.00 40 SD-02 Shop Drawings
Installation Drawings 1.2
Outline Drawings 1.2
SD-03 Product Data
Equipment and Performance 1.2
Data
Isolators 2.3
SD-06 Test Reports
Type of Isolator 2.1
Type of Base 2.1
Allowable Deflection 2.1
Measured Deflection 2.1
23 05 93 SD-01 Preconstruction Submittals
Records of Existing Conditions 1.3
Records of Existing Conditions 1.3.3
TAB Firm 1.5.4.1
TAB team assistants 1.2
TAB team engineer 1.2
TAB Specialist 1.5.4.2
TAB team field leader 1.2
SD-02 Shop Drawings
TAB Schematic Drawings and 1.3.3
Report Forms
SD-03 Product Data
Equipment and Performance 1.3
Data
TAB Related HVAC Submittals 1.5.4.4
TAB Procedures 1.5.2
Calibration 1.5.2
Systems Readiness Check 1.3.3
TAB Execution 1.5.5
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
H V
A C
S Y
S T
E M
C L
E A
N
IN
G B
A S
I
C
C O
M M
O N
P
IP
IN
G
F O
R H
V A
C V
IB
R
A T
IO
N
A N
D S
E
IS
IC
N
T R
O L
S F
O R
H V
A C
P
IP
IN
G
A
TAB Verification 1.5.5.3
SD-06 Test Reports
DALT and TAB Work Execution 3.7
Schedule
DALT and TAB Procedures 3.7
Summary
Design review report 1.3.3
Design review report 1.7.3.1
Design review report 3.7
Pre-Final DALT report 1.5.3
Pre-Final DALT report 1.7.3
Pre-Final DALT report 3.3.5
Final DALT report 1.5.3
Final DALT report 1.7.3
Final DALT report 3.3.8
TAB report for Season 1 1.5.6.2
TAB report for Season 1 3.7
TAB report for Season 2 1.5.6.2
TAB report for Season 2 3.7
SD-07 Certificates
Independent TAB agency and 1.5.1 personnel qualifications
Independent TAB agency and 1.5.1 personnel qualifications
Advance notice of Pre-Final 3.3.2
DALT field work
Completed Pre-Final DALT Work 3.7
Checklist
Completed Pre-Final DALT Work 3.7
Checklist
Advance Notice of Season 1 TAB 3.7
Field Work
Completed Season 1 Pre-TAB 3.7
Work Checklist
Completed Season 1 Pre-TAB 3.7
Work Checklist
Advance Notice of Season 2 TAB
Field Work
Completed Season 2 Pre-TAB 3.7
Work Checklist
TAB Firm 1.5.4.1
DALT and TAB Submittal and 1.7.1
Work Schedule
DALT and TAB Submittal and 1.7.3
Work Schedule
Design review report 1.3.3
Design review report 1.7.3.1
Design review report 3.7
Pre-field DALT preliminary 1.7.3.2 notification
Pre-field TAB engineering report 1.7.3.3
Advanced notice for Season 1 1.7.3
TAB field work
Prerequisite HVAC Work Check 1.7.3
Out List For Season 1
Advanced notice for Season 2
TAB field work
Prerequisite HVAC Work Check
Out List For Season 2
23 07 00 SD-02 Shop Drawings
MICA Plates 3.2.2.4
Pipe Insulation Systems 2.3
Pipe Insulation Systems 3.2
Duct Insulation Systems 3.3
Equipment Insulation Systems 3.4
SD-03 Product Data
Certification 1.4.2
Pipe Insulation Systems 2.3
Pipe Insulation Systems 3.2
Duct Insulation Systems 3.3
Equipment Insulation Systems 3.4
SD-04 Samples
Thermal Insulation 2.2.1.3
Display Samples 3.1.1
SD-08 Manufacturer’s Instructions
Pipe Insulation Systems 2.3
Pipe Insulation Systems 3.2
Duct Insulation Systems 3.3
Equipment Insulation Systems 3.4
23 08 00.00 10 SD-02 Shop Drawings
Commissioning Plan 1.5.2.2
SD-03 Product Data
Pre-Functional Performance Test 3.2.1
Checklists
Functional Performance Tests 3.2.2
SD-06 Test Reports
Commissioning Report 3.3
SD-07 Certificates
Commissioning Firm 1.5.1
Commissioning Specialist 1.5.2
23 08 01.00 20 SD-06 Test Reports
Preliminary review report 1.4.5.1
Smoke tests report 1.4.5.2
Fan operating points report 1.4.5.3
Static pressure report 1.4.5.4
Volume and velocity flow rates 1.4.5.5 report
Pitot traverse report 1.4.5.6
SD-07 Certificates
Test agency Qualifications 1.4.2.1
Record of Document Submittal to 1.4.2.2
Testing Agency
Work plan 1.4.2.3
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G
G
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G
G
G G
FIO
T E
S T
IN
G
, A D
JU
S
T
IN
G , A
N D
B A
L A
N C
IN
G
F O
R H
V A
C T
H E
R M
A L
IN
S
U L
A T
IO
N
F O
R M
E C
H A
N
IC
A L
S Y
S T
E M
S C
O M
M
IS
IO
N
IN
G
A
C S
Y S
T E
M S
T E
S T
IN
G
IN
D
U S
T R
IA
L
V E
N T
IL
A
T
IO
N S
Y S
T E
List of test instruments 1.4.2.4
23 09 13.34 40 SD-03 Product Data
Self-Contained Temperature 2.1
Control Valves
Self-Contained 2.2
Temperature-Regulator Valves
Rate-of-Flow Controller 2.3
Nonmodulating Float Valve 2.4
Water Pressure Regulating Valve 2.5
Water Pressure Relief Valve 2.6
Pilot-Operated Pressure-Relief 2.7
Valve
Relief Valves for Electric Water 2.8
Heaters
Sample Warranty 1.4
SD-07 Certificates
Listing of Product Installation 1.3
Certificates of Conformance 1.4
Manufacturer's Warranty 3.3
SD-06 Test Reports
Test Reports 3.2
23 09 23 SD-02 Shop Drawings
DDC Contractor Design Drawings 3.3.1
Draft As-Built Drawings 3.3.2
Final As-Built Drawings 3.3.3
SD-03 Product Data
Manufacturer's Catalog Data 2.1.1
Manufacturer's Catalog Data 2.14.1
Programming Software 2.14.5
GPPC Application Programs 2.14.5
AGC Application Programs 2.14.6
XIF files 2.14.1
Draft LNS Database 3.6.3
Final LNS Database 1.3.1
Final LNS Database 3.7.4
LNS Plug-in 2.14.4
LNS Plug-in 2.14.6
SD-06 Test Reports
Existing Conditions Report 3.1
Start-Up and Start-Up Testing 3.6.2
Report
PVT Procedures 3.7.1
PVT Report 3.7.3
Pre-Construction QC Checklist 1.6
Post-Construction QC Checklist 1.6
SD-10 Operation and Maintenance
Data
Operation and Maintenance 1.8
(O&M) Instructions
Training Documentation 3.9.1
SD-11 Closeout Submittals
Closeout QC Checklist 1.6
23 09 53.00 20 SD-02 Shop Drawings
Control system diagrams 1.7.1
Ladder diagram 1.7.2
Operating parameters 1.7.3
Automatic control valve 1.7.4 schedules
Damper schedules 1.7.5
Sequence of operation 1.7.8
Arrangement drawing 1.7.9
Wiring diagram 1.7.6
Compressed air station 1.7.7 schematic
Control panel schematics 1.7.7
SD-03 Product Data
Actuators 2.2
Valves 2.3
Dampers 2.4
Fire protection devices 2.5
Sensors 2.6
Thermostats 2.8
Sunshields 2.9
Pressure switches 2.10.1
Indicating devices 2.11
Controllers 2.13
Pressure gages 2.12
Control panels 2.15
Air Compressor 2.16.1
Refrigerated air dryer 2.16.2
Air filtration system 2.16.2
Compressed air station 2.16.2 specialties
VAV Terminal unit controls 2.17
SD-06 Test Reports
Commissioning procedures 1.9.6
Calibration adjustment and 1.9.7 commissioning reports
Site testing procedures 1.9.5
Performance verification test 3.3.5
SD-07 Certificates
Certification of completion 3.3.4
SD-08 Manufacturer’s Instructions
Training course documentation 3.4.1
SD-10 Operation and Maintenance
Data
Space temperature control 1.9.8 system
SD-11 Closeout Submittals
Qualified service organization list 3.5
23 11 25 SD-02 Shop Drawings
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G
FIO
FIO
G G
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
C O
N T
R O
L S
V A
L V
E S
, S E
L F
-C O
N T
A
IN
E D
L O
N W
O R
K S
D
IR
E C
T D
IG
IT
A L
C O
N T
R O
L F
O R
H V
A C
A N
D O
T H
E R
B U
IL
D
IN
G
C O
N T
R O
L S
Y S
T E
M S
S P
A C
E T
E M
P E
R A
T U
R E
C O
N T
R O
L S
Y S
T E
Gas Piping System 1.5.3
Gas Piping System 2.2
Gas Piping System 3.3
SD-03 Product Data
Pipe and Fittings 1.6.1
Gas equipment connectors 1.5.3
LPG containers and accessories 2.9
Gas Piping System 1.5.3
Gas Piping System 2.2
Gas Piping System 3.3
Pipe Coating Materials 2.1
Pressure regulators 2.6
Risers 2.4
Transition fittings 2.2.13
Valves 2.3
Warning and identification tape 2.2.9
SD-06 Test Reports
Testing 3.18
Pressure Tests 3.18.1
Pressure Tests for Liquified 3.18.2
Petroleum Gas
Test With Gas 3.18.3
SD-07 Certificates
Welders procedures and 1.5.1 qualifications assigned number, letter, or 1.5.1 symbol
SD-08 Manufacturer’s Instructions
PE pipe and fittings 1.5.2 pipe coating materials 2.1
SD-10 Operation and Maintenance
Data
Gas facility system and 1.3.1 equipment operation
Gas facility system maintenance 1.3.2
Gas facility equipment 1.3.3 maintenance
23 21 13.00 20 SD-02 Shop Drawings
Hot water heating system 1.3.1
SD-03 Product Data
Convectors 2.4.2
Finned tube radiators 2.4.1
Pumps 2.3.1
Expansion tanks 2.3.2
Flow measuring equipment 2.3.5
Backflow preventers 2.3.4
External air separation tanks 2.3.3
Hot water heating pipe 2.1.1
SD-06 Test Reports
Hydrostatic test of piping system 3.3.1
Auxiliary equipment and 3.3.2 accessory tests
SD-07 Certificates
Backflow preventer certification 1.5.4
Report of prior installations 1.5.2.1
Welding procedures 1.5.2.2
Welder's qualifications 1.5.2.3
SD-10 Operation and Maintenance
Data
Convectors 2.4.2
Finned tube radiators 2.4.1
23 21 13.23 20 SD-01 Preconstruction Submittals
Valves 2.1.7
Packing 2.1.7.1
Gaskets 2.1.4
SD-02 Shop Drawings
[HTW][MTW] System connection 1.3.2
SD-03 Product Data
Valves 2.1.7
Strainers 2.1.8
Pipe 2.1.2
Pipe fittings 2.1.3
Heat exchanger 2.1.14.1
Steam producer 2.1.14.2
Expansion joints 3.2.7
SD-07 Certificates
Welding procedure specifications 1.3.6.1
Performance qualification record 1.3.6.1
Previous qualifications 1.3.6.1
Valves 2.1.7
Gaskets 2.1.4
23 23 00 SD-02 Shop Drawings
Refrigerant Piping System 2.3
SD-03 Product Data
Refrigerant Piping System 2.3
Spare Parts 1.5.2
Qualifications 1.3.1
Refrigerant Piping Tests 3.5
Demonstrations 3.4
Verification of Dimensions 3.1
SD-06 Test Reports
Refrigerant Piping Tests 3.5
SD-07 Certificates
Service Organization 2.1
SD-10 Operation and Maintenance
Data
Maintenance 1.5
Operation and Maintenance 3.4
Manuals
23 25 00 SD-03 Product Data
G G G
G G
G G
FIO
G
G
G G G G
G
G G G G G G
FIO
FIO
FIO
G
G G
G
G G
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
L O
W T
E M
E P
E R
A T
U R
E W
A T
E R
(L T
W ) H
E A
T
IN
G S
Y S
T E
M [H
IG
H
] [M E
D
IU
M ] T
E M
P E
R A
T U
T
E R
S Y
S T
E M
W
IT
H
IN
B U
IL
D
IN
G
S R
E F
R
IG
E R
A N
T P
IP
A C
IL
IT
Y G
A S
P
IP
Water Treatment System 2.6.4.1
Water Analysis 2.5
Spare Parts 1.6
Field Instructions 3.4
Tests 3.5
Training Course 3.4
SD-06 Test Reports
Condenser Water QA Tests 3.5.5.1
Steam Boiler Water QA Tests 3.5.5.4
SD-10 Operation and Maintenance
Data
Water Treatment System 2.6.4.1
23 31 13.00 40 SD-01 Preconstruction Submittals
Material, Equipment, and Fixture
Lists Part 2
Records of Existing Conditions 2.1.1
SD-02 Shop Drawings
Connection Diagrams 2.1
Record Drawings 1.3
Offset Fitting Configurations 2.3.1
Offset Fitting Configurations 2.3.4
SD-03 Product Data
Equipment and Performance 2.1.1
Data
Galvanized Steel Ductwork 2.2.1
Materials
Brazing Materials 2.2.2
Mill-Rolled Reinforcing and 2.2.3
Supporting Materials
Round Sheet Metal Duct Fittings 2.3.1
Round, High-Pressure, 2.3.2
Double-Wall Sheet Metal Ducts
Turning Vanes 2.3.5
Sound Traps 2.3.7
Flexible Connectors 2.3.8
Flexible Duct Materials 2.3.11
Power Operated Dampers 2.3.14
Fire Dampers and Wall Collars 2.3.15
Gravity Backdraft and Relief 2.3.13
Dampers
Manual Volume Dampers 2.3.12
SD-05 Design Data
Design Analysis and Calculations 2.1
Design Analysis and Calculations 2.1.1
SD-06 Test Reports
Ductwork Leakage Tests 3.4.2
Operational Tests 3.4.1
SD-07 Certificates
Listing of Product Installations 3.2
Galvanized Steel Ductwork 2.2.1
Materials
Brazing Materials 2.2.2
Mill-Rolled Reinforcing and 2.2.3
Supporting Materials
Round Sheet Metal Duct Fittings 2.3.1
Round, High-Pressure, 2.3.2
Double-Wall Sheet Metal Ducts
Turning Vanes 2.3.5
Dampers 2.3.6
Sound Traps 2.3.7
Flexible Connectors 2.3.8
SD-10 Operation and Maintenance
Data
Operation and Maintenance 3.6
Manuals
Power Operated Dampers 2.3.14
Fire Dampers and Wall Collars 2.3.15
23 34 23.00 40 SD-02 Shop Drawings
Shop Drawings 2.1
Installation Drawings 3.1
SD-03 Product Data
Housing 2.2
Fan 2.3
Motor 2.5
Bases 2.6
Roof Curbs 2.7
Dampers 2.8
Screens 2.9
Sound Baffles 2.10
SD-06 Test Reports
Final Test Reports 3.2.3
SD-11 Closeout Submittals
Record Drawings 3.3
23 35 00.00 10 SD-02 Shop Drawings
Detail Drawings 1.4.1
Exhaust System Installation 3.4
SD-03 Product Data
Related Submittals 1.4.2
Ductwork Components 2.4
Materials and Equipment 2.1
Spare Parts 1.6
Field Instructions 3.6
Final Acceptance Tests 3.7
Onsite Training 3.6
Exhaust System Specialist 1.4.2
SD-06 Test Reports
Final Acceptance Tests 3.7
SD-07 Certificates
Inspection 3.3
SD-10 Operation and Maintenance
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G G
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G
FIO
G G
FIO
FIO
G
FIO
FIO
FIO
C H
E M
IC
A
L T
R E
A T
M E
N T
O F
W A
T E
R F
O R
M E
C H
A N
IC
A
L S
Y S
T E
M S
M E
T A
L D
U C
T S
H V
A C
P O
W E
R V
E N
T
IL
A T
O R
S O
V E
R H
E A
D V
E H
IC
L
E T
A
IL
P
IP
E [ A
N D
W E
L D
IN
G
F E
X H
A U
S T
R E
M O
V A
L S
Y S
T E
M (S
Data
Exhaust System 1.2
Operation and Maintenance 3.6
Manuals
23 35 19.00 20 SD-02 Shop Drawings
Industrial ventilation and exhaust 1.2.4 systems
SD-03 Product Data
Fans 2.1
Dampers 2.7
Flexible connectors 2.8.3
Flexible duct 2.8.4
Gaskets 2.8.5
Protective coating materials 2.8.6
Sealants 2.8.7
Access ports 2.9.1
Damper regulators 2.9.2
Blast gates 2.9.3
Vibration isolators 2.10.5
Ductwork, Dust and Fume 2.11
Collection
Steel ducts 2.12
Fiberglass ductwork 2.14
Thermoplastic ductwork 2.13
Vehicle tail pipe exhaust system 2.15
Welding fume exhaust system 2.16
Local/Regional Materials 1.8.1
SD-07 Certificates
Welding procedures 1.4.4
Welding test agenda 3.1.11
Welding test procedures 1.4.4
Welders' identification 1.4.1
Fiberglass fan servicer 1.4.2 experience information
SD-06 Test Reports
Fan tests 2.1.1 start-up tests 1.2.5
Sound level tests 3.2.6
SD-10 Operation and Maintenance
Data
Fans 2.1
Vehicle tail pipe exhaust system 2.15
Welding fume exhaust system 2.16
Industrial ventilation and exhaust 1.2.4 systems
SD-11 Closeout Submittals
Posted operating instructions 1.6
23 36 00.00 40 SD-01 Preconstruction Submittals
Records of Existing Conditions 1.3
SD-02 Shop Drawings
Bypass Single-Duct Air Terminal 2.1
Units
Dual-Duct Air Terminal Units 2.2
Fan-Powered Air Terminal Units 2.3
Induction Air Terminal Units 2.4
Shutoff Single-Duct Air Terminal 2.5
Units
Integral-Diffuser Air Terminal 2.6
Units
High-Pressure Dual-Duct Mixing
Boxes
Low-Pressure Dual-Duct Mixing 2.7
Boxes
Record Drawings 3.3
SD-03 Product Data
Bypass Single-Duct Air Terminal 2.1
Units
Dual-Duct Air Terminal Units 2.2
Fan-Powered Air Terminal Units 2.3
Induction Air Terminal Units 2.4
Shutoff Single-Duct Air Terminal 2.5
Units
Integral-Diffuser Air Terminal 2.6
Units
High-Pressure Dual-Duct Mixing
Boxes
Low-Pressure Dual-Duct Mixing 2.7
Boxes
Spare Parts 1.3
SD-10 Operation and Maintenance
Data
Operation and Maintenance 3.3
Manuals
23 37 13.00 40 SD-01 Preconstruction Submittals
Material, Equipment, and Fixture 2.1
Lists
Records of Existing Conditions 2.1
SD-02 Shop Drawings
Fabrication Drawings 2.1
Installation Drawings 3.1
SD-03 Product Data
Equipment and Performance 1.3
Data
SD-04 Samples
Manufacturer's Standard Color 2.1
Chart
SD-10 Operation and Maintenance
Data
Type TS Supply Troffer 2.2.25
Type TSR Combination Supply 2.2.27
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
F U
M E
N
D U
S T
R
IA
L V
E N
T
IL
A T
IO
N
A N
D E
X H
A U
S T
A
IR
T E
R M
IN
A
L U
N
IT
S D
IF
F
U S
E R
S , R
E G
IS
T
E R
S , A
N D
G R
IL
and Return Troffer
23 41 13.00 40 SD-02 Shop Drawings
Installation Drawings 3.2
SD-03 Product Data
Physical Characteristics 1.1
Performance Data 1.1
Air Filters 2.1
Filter Gages 2.2
Manometers 2.2
SD-06 Test Reports
Test Reports 3.3
SD-07 Certificates
Air Filters 2.1
Filter Gages 2.2
Manometers 2.2
23 52 00 SD-02 Shop Drawings
Detail Drawings 1.5
SD-03 Product Data
Materials and Equipment 2.1.1
Spare Parts 1.5
Water Treatment System 2.17
Boiler Water Treatment 2.17
Heating System Tests 3.10
Fuel System Tests 3.13
Unit Heaters 2.9
Welding 1.3
Qualifications 3.10
Field Instructions 3.12
Tests 3.4
SD-06 Test Reports
Heating System Tests 3.10
Fuel System Tests 3.13
Water Treatment Testing 3.10.1
SD-07 Certificates
Bolts 2.12.12.3
Continuous Emissions Monitoring 2.12.2
Energy Star 2.1.3
SD-10 Operation and Maintenance
Data
Operation and Maintenance 3.12
Instructions
Water Treatment System 2.17
23 52 33.03 20 SD-02 Shop Drawings
Boiler 1.3.2.1
Boiler 1.3.5.1
Boiler room auxiliary equipment 1.3.2.2
Burners 1.3.2.3
Dampers, stacks, and breechings 1.3.2.4
Fuel oil equipment 1.3.2.5
Piping and specialty items 1.3.2.6
Ball joint installation details 1.3.2.7
Reproducible drawings 1.3.2.8
SD-03 Product Data
Insulation types and installation 2.10.13 procedures
Boiler 1.3.2.1
Boiler 1.3.5.1
Local/Regional Materials 1.8.1
Environmental Data 1.8.2
SD-05 Design Data
Engineering Calculations 1.3.3.1
SD-06 Test Reports
Boiler predicted performance 1.3.4
Economizer performance 1.3.4
Variable speed motor controller 2.9.5
Hydrostatic and leak tightness 3.2.1.2 tests
Preliminary operation 3.2.2
General startup requirements 3.2.3
Fuel oil tanks 3.2.4
Boilers and auxiliaries tests and 3.2.5 inspections
Aquatic toxicity 1.7.1.2
SD-07 Certificates
Compatibility of boiler 1.5.6.2 components and equipment
System and equipment 1.5.6.3 installation
Tank calibration 1.5.6.4
Backflow preventer 1.5.6.5
Identical equipment 2.1.1
SD-10 Operation and Maintenance
Data
Boiler 1.3.2.1
Boiler 1.3.5.1
23 52 43.00 10 SD-02 Shop Drawings
Detailed Drawings 1.4.3
Boiler Setting 2.3.12
SD-03 Product Data
Support Steel 3.2.5.2
Spare Parts 1.6
Welding 1.4.1
Framed Instructions 3.6
Performance Tests 3.4.10
SD-06 Test Reports
Testing 3.4
SD-10 Operation and Maintenance
Data
Operating and Maintenance 3.7
Instructions
H E
A T
R E
C O
V E
R Y
B O
IL
E
R S
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
P A
N E
L F
IL
T
E R
S H
E A
T
IN
G B
O
IL
E R
S W
A T
E R
-T U
B E
B O
IL
E
R S
, O
IL
/G A
S O
R
IL
23 52 43.00 20 SD-02 Shop Drawings
Fuel train 1.3.1
Wiring diagram 1.3.1
SD-03 Product Data
Boilers 2.1
Boiler trim and control equipment 2.3
Burners and control equipment 2.2
Stack, breeching, and supports 2.3.18
Local/Regional Materials 1.6.1
Environmental Data 1.6.2
SD-06 Test Reports
Operational tests 3.4.1
Water analysis 1.3.2
SD-07 Certificates
Boilers 2.1
Boilers 2.1
Burners and control equipment 2.2
Burners and control equipment 2.2
Boiler trim and control equipment 2.3
Boiler trim and control equipment 2.3
SD-08 Manufacturer’s Instructions
Boilers 2.1
Feedwater treatment feeder 2.3.7
SD-10 Operation and Maintenance
Data
Boilers 2.1
SD-11 Closeout Submittals boilers 2.1
23 52 46.00 20 SD-02 Shop Drawings
Fuel trains 1.3.1
Wiring diagrams 1.3.1
SD-03 Product Data
Boilers 2.1
Boiler trim and control equipment 2.3
Burners and control equipment 2.2
Stack, breeching, and supports 2.3.20
SD-06 Test Reports
Operational tests 3.5.1
SD-07 Certificates
Boilers 2.1
Boilers 2.1
Burners and control equipment 2.2
Burners and control equipment 2.2
Boiler trim and control equipment 2.3
Boiler trim and control equipment 2.3
Water analysis 1.3.2
SD-08 Manufacturer’s Instructions
Boilers 2.1
Feedwater treatment system 2.3.9
SD-10 Operation and Maintenance
Data
Boilers 2.1
SD-11 Closeout Submittals boilers 2.1
23 54 16.00 10 SD-02 Shop Drawings
Detail Drawings 1.3
Installation 3.2
SD-03 Product Data
Spare Parts 1.5
SD-06 Test Reports
Testing, Adjusting, and Balancing 3.4
SD-10 Operation and Maintenance
Data
Operation and Maintenance 3.3
Instructions
23 54 19 SD-03 Product Data
Self-contained furnaces 2.1
Vent connections 2.2
Controls 2.3
Dampers 2.4
Air filters 2.6
Humidifiers 2.5
Unit heaters 2.7
Seismic isolators
Vibration isolators 2.1
System Diagrams 1.4.6
Similar Services 1.4.3
SD-06 Test Reports
Self-contained furnace - field 3.10.1 acceptance test plan
Self-contained furnace - field 3.10.2 acceptance test report
Tests 3.4.1
SD-08 Manufacturer’s Instructions
Self-contained furnaces - 3.1 installation instructions
Vent connections - installation 3.1 instructions
Controls - installation instructions 3.1
Dampers - installation 3.1 instructions
Air filters - installation instructions 3.1
Humidifiers - installation 3.1 instructions
Unit heaters - installation 3.1 instructions
SD-10 Operation and Maintenance
Data
Self-contained furnaces 2.1
Vent connections 2.2
L O
W P
R E
S S
U R
E W
A T
E R
H E
A T
IN
G
B O
IL
E
(U
D
E R
,0
B T
U /H
R O
U T
P U
T
L O
W P
R E
S S
U R
E W
A T
E R
H E
A T
IN
G
B O
IL
E
(O
E
R
,0
B
T U
/H R
O U
T P
U T
H
E A
T
IN
G S
Y S
T E
M
G A
S -F
IR
E
D H
E A
T E
R S
B U
IL
D
IN
G
H E
A T
IN
G
S Y
S T
E M
S , W
A R
M A
IR
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G G G G G
FIO
FIO
G
FIO
FIO
FIO
FIO
FIO
FIO
FIO
FIO
G
G
FIO
FIO
FIO
FIO
G
FIO
FIO
Controls 2.3
Dampers, 2.4
Humidifiers 2.5
Unit heaters 2.7
SD-11 Closeout Submittals
Field Training 3.10
23 57 10.00 10 SD-02 Shop Drawings
Heating…