(Modification Document) W90VN922R00220001.pdf
PDF 352 KB Posted
- Solicitation number
- W90VN922R0022
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011734599
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See next page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 41
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Mar-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90VN922R0022
X 9B. DATED (SEE ITEM 11)
09-Mar-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Mar-2022
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO DAEGU, UNIT #15682
APO AP 96218-5682
UNITED STATES
W90VN9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W90VN922R0022
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-APR-2022 TO
31-MAR-2027
N/A DPW, USAG DAEGU
DAEGU - AREA 4
APO AP 96218
KOREA, SOUTH
FOB: Destination
WT4KB6
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-MAY-2022 TO
30-APR-2027
N/A DPW, USAG DAEGU
DAEGU - AREA 4
APO AP 96218
KOREA, SOUTH
FOB: Destination
WT4KB6
The following have been added by full text:
The purpose of this amendment is to:
A. revise W90VN922R0022 PWS as submitted below:
Before Revised N/A 2.4.3.5 General Fund Enterprise Business System
(GFEBS) Project Manager Coordinator.
N/A
N/A 2.4.3.5.1 GFEBS Certification. N/A
2.15.5 DoD Cybersecurity Awareness Training.
N/A
2.15.5 All Contractor employees and associated
subcontractor employees must complete the DoD Cybersecurity Awareness training before issuance of network access and annually thereafter. All Contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoD 8140.01 & 8570.01-M and AR 25-2 within six (6) months of appointment to Cybersecurity IA/IT functions. Per DoD
8140.01 & 8570.01-M and AR 25-2, the Contractor employees supporting Cybersecurity IA/IT functions shall be appropriately certified within 30 calendar days after contract award. The baseline certification as stipulated in DoD 8140.01 & 8570.01-M must be completed upon contract award.
8.1.6.5 Check & test operation of coil condenser fan
motor, compressor, blower/motors, speed control switch and Freon gas. And fill out the Freon gas if the gas is insufficient.
8.1.6.5 Check & test operation of coil condenser fan
motor, compressor, blower/motors, speed control switch and refrigerant. And fill out the refrigerant if it is insufficient.
8.5.4 All equipment and vehicles used under this
contract will be subject to inspect by the COR at any time to ensure the all equipment are both operational and safe. The Contractor shall make immediate action to correct all deficiencies found by the COR.
The Contractor shall ensure that all equipment utilized during the performance of this contract is in operational and safe condition. Upon completion of the work, the Contractor shall remove all tools from the work area and leave the area disinfected and free of debris
8.5.4 The Contractor shall ensure that all equipment
and vehicles utilized during the performance of this contract are in operational and safe condition and will be subject to inspection by the COR at all times. The Contractor shall make immediate action to correct all deficiencies found by the COR. Upon completion of the work, the Contractor shall remove all tools from the work area and leave the area disinfected and free of debris.
8.5.5 The Contractor shall be responsible for
providing and using appropriate safety equipment and gear for performance under this contract to prevent Contractor injuries and warn the general public.
8.5.5 The Contractor shall be responsible for providing
and using appropriate safety equipment and gear for performance under this contract to prevent Contractor injuries and protect the general public.
B. Revised Ordering Period
• Period of Performance (POP). The POP consists of five (5) 1 year ordering periods. The POP is as follows:
Phase-in/out Period N/A Base Ordering Period 1 May 2022 or date of award – 31 March 2023 1st Ordering Period 1 May 2023 – 30 April 2024 2nd Ordering Period 1 May 2024 – 30 April 2025 3rd Ordering Period 1 May 2025 – 30 April 2026
4th Ordering Period 1 May 2026 – 30 April 2027
C. Add Paragraph 4.2 to the BPA Administrative Data “4.2 In accordance with AFARS 5113.303-6 The Government will Ensure that individuals equitably distribute calls among suppliers with BPAs; Orders will be rotated amongst vendors participating in this BPA.
D. Solicitation due date is hereby extended form 24 March 2022 @1300 to 31 March 2022 @1300 (Korean Local Date/Time).
E. There are no other changes to the solicitation with this amendment.
The following have been modified:
BPA ADMINISTRATION DATA
1. BPA ADMINISTRATION: 411th Contracting Support Brigade (CSB) RCO-Daegu will administer this BPA.
The Contractor shall, after receipt of this BPA, direct all questions concerning this BPA to:
411th Contracting Support Brigade RCO-Daegu Office Bldg. #1815, Camp Henry Unit 15682, APO AP 96218-5682 Tel) 05033-63-5687 (Commercial), 763-5687 (DSN)
A. ORDERING PERIOD: 1 April 2022 or date of award – 31 March 2027
Any order issued during the effective period of this agreement and not completed within that time shall be completed by the Contractor within the time specified in the call. This agreement shall govern the Contractor’s and Government’s rights and obligations with respect to that call to the same extent as if the order were completed during the agreement’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 30 June 2027.
B. BPA Master Dollar Limit: KRW 1,671,884,320.00 / $1,403,850.39 (Current exchange rate: $1=W1190.9277)
BPA Call Limit: Authorized individual(s) whose organizational component is 411th CSB/Korea shall not exceed $150,000.00 (KRW178,639,115) per Call Order by the Contracting Officer.
For the authorized individual(s) whose organizational component is not 411th CSB/Korea shall not exceed $20,000.00 (KWR23,818,554) per Call Order by Call Officer.
All Orders/Calls that individually exceed $20,000.00 (KWR23,818,554) shall be submitted to the 411th CSB for processing.
C. PSC Codes: J709
2. IMPORTANT NOTICE:
2.1. The Contractor shall not accept any instructions issued by any person other than the Contracting Officer or individual authorized to place BPA Calls acting within the limits of their authority. No oral statements of any person, whomsoever, will in any manner or degrees modify, or otherwise affect the terms and conditions of this BPA or subsequent BPA Calls. The Contracting Officer shall be the only person authorized to approve changes in any of the requirements under this BPA, and notwithstanding any provisions contained elsewhere in this BPA, said authority shall remain solely with the Contracting Officer.
2.2. No information other than that which may be contained in any authorized amendment to this solicitation or any authorized modification to any resulting BPA issued by the Contracting Officer, which may be received from any person employed by the U.S. Government or otherwise, shall be considered as grounds for deviation from any provisions, conditions or other terms of these documents.
2.3 Attachment 1 PRICE SCHEDULE FOR BPA CLEANING OF SUPPLY AND RETURN DUCTS SERVICES IN AREA IV in incorporated into this solicitation, and subsequent agreement by reference.
3. INDIVIDUALS AUTHORIZED TO PLACE ORDERS:
3.1 PURCHASE LIMITATION: Authorized individual(s) whose organizational component is 411th CSB/Korea shall not exceed $150,000.00 per Call Order by the Contracting Officer. For the authorized individual(s) whose organizational component is not 411th CSB/Korea shall not exceed $20,000.00 per Call Order by Call Officer. All Orders/Calls that individually exceed $20,000.00 shall be submitted to the 411th CSB for processing.
3.2 AUTHORIZED INDIVIDUALS: A list of individuals authorized to purchase against this BPA, identified either by title of position or by name of individual, organizational component, and the dollar limitation per purchase for each position title or individual shall be provided to the Contractor by the Contracting Officer in a separate letter.
No order shall be placed by the individuals or accepted by the Contractor that exceeds the specified single purchase limit in the authorization letter, nor shall orders be intentionally split for the purpose of circumventing the authorized limit. The Contract Specialists at the 411th CSB may issue calls within the dollar limits specified in the FAR and when the BPA Call amount exceeds the BPA Call Officer’s specified BPA Call limits.
3.3. UNAUTHORIZED INDIVIDUALS: Calls placed by unauthorized individuals and accepted by the Contractor will not be approved for payment. Therefore, it is the responsibility of the Contractor to accept only those calls placed against this BPA by an authorized call officer. This authority may not be re-delegated.
3.4 The Call Officer shall not perform the duties of the COR.
3.5. The Contracting Officer will notify the Contractor of any changes to the call authorization list.
4. ISSUING CALLS AGAINST THIS BPA: A purchase or “Call” shall be on the basis of an authorized purchase request. A record shall be maintained for each call placed against this BPA.
4.1 Each call placed by an authorized call order from 411th CSB, will be assigned a four digit numeric serial number or call number, beginning with 0001 through 9999.
4.2 In accordance with AFARS 5113.303-6 The Government will Ensure that individuals equitably distribute calls among suppliers with BPAs; Orders will be rotated amongst vendors participating in this BPA.
5. ADMINISTRATIVE RESPONSIBILITIES:
5.1. CONTRACTOR: The Contractor shall be responsible for supplying the following:
(1) Preparation of the delivery tickets.
(2) Submission of an itemized invoice and receiving reports (DD Form 250).
(3) Preparation of a Call Register.
5.2. CONTRACTING OFFICER’S REPRESENTATION (COR): The COR is responsible for conducting inspection for quality, quantity count, and final acceptance of the services performed at the receiving point.
5.3. CALL OFFICER: The Call Officer is responsible for –
5.3.1. Maintain Call records, and obtain fund availability from his/her certified fund officer for the organization prior to placing Calls.
5.3.2. Checking the accuracy of the invoices, delivery tickets, and call register’s individual line items, extensions, and totals.
5.3.3. Maintaining invoices, call registers, and delivery tickets for a period of 12 months or until completion of Periodic Review by the KO or the KO’s representative.
5.3.4. Submission of an invoice copy and a copy of the monthly call register to the KO, 411th Contracting Support Brigade, RCO-Daegu, via email to the Contracting Officer or Contract Specialist.
5.3.5. Call Officer will not perform the duties of the Receiving Officer.
5.3.6. The Call Officer will issue the Call Order by rotation with multiple-award BPA holder to provide a fair opportunity for each order exceeding the micro-purchase threshold, but not exceeding the simplified acquisition threshold.
6. DELIVERY TICKETS:
6.1 MINIMUM DELIVERY TICKET INFORMATION: All services furnished under this BPA shall be accompanied by Delivery Tickets which shall contain the following minimum information. All delivery tickets will be countersigned by the Receiving Officer at delivery point upon receipt of services called under this Agreement.
The Contractor shall forward all delivery tickets which countersigned by the COR to the Call Officer. One (1) copy will be retained by the Contractor and original delivery tickets will be maintained by the Call Officer.
(1) Name of Contractor
(2) BPA Number
(3) Call Number
(4) Name of using Unit
(5) Service Location
(6) Itemized list of supplies and quantities furnished
(7) Itemized list of services provided
(8) Date of service provided
(9) Receiving Officer’s information
6.2 RECEIVING OFFICER CERTIFICATION: The Receiving Officer shall recognize the following statement on each daily delivery ticket, and provide verification sign for each Call upon receipt of services purchased under the BPA:
“I certify that all supplies/services called for in the BPA have been received in accordance with the terms specified in the order.” The Receiving Officer’s complete signature block must follow the statement and minimally include:
Signature of Receiving Officer and Date Printed Name and Rank Unit and Telephone Number
7. INVOICE SUBMISSION FOR PAYMENT ON CALLS UNDER $20,000.00: For all invoices where the total cost is less than $20,000.00, the COR will provide service completion confirmation by delivery ticket or sales slip to the BPA Call Officer for payment purposes.
7.1. SUMMARY INVOICE: A summary invoice shall be submitted to the Call Officer at least monthly or upon expiration of this BPA, whichever occurs first, for all services performed during a billing period, identifying the delivery tickets covered therein for services performed, stating their total dollar value, and supported by receipt copies of delivery tickets.
7.1.1. Summary invoices shall consist of the following information:
7.1.1.1. Billing period which includes the starting and ending dates – 1st through the end of the month
7.1.1.2. Name and address to which payment is to be sent (shall be the same as that in the BPA or on a proper notice of assignment).
7.1.1.3. Name (where practicable), title, phone number, and mailing address of person to be notified in the event of a defective invoice.
7.1.1.4. Any other information identifying the delivery tickets covered, stating their extension of each item, sub-total per call, less applicable discount and total amount.
7.1.2. If an invoice is incomplete or inaccurate the Call Officer will return the unsigned invoice to the Contractor for correction and resubmission.
7.2. CONTRACTOR CERTIFICATION: The Contractor shall complete the following statement at the bottom of each invoice:
“I certify that net amount due as reflected on this invoice has not been received and this invoice and this is proper for payment”.
The Contractor’s complete signature block must follow and minimally include:
Signature of Contractor Representative and Date:
Printed Name and Title:
7.2.1. Distribution: Copy of the DD Form 250, invoice, call register and consolidated delivery tickets shall be forwarded to the appropriated Finance Office via email for each submittal.
8. PAYMENT(s): Request for payment, invoicing, and payment status will be referred to the 175th Finance Command, information found on Page 1, Bock 18a, of the SF1449 of the BPA, Order for Supplies or Services.
8.1. The payment for NET 30 days shall be computed from the date the Contracting Officer or Call Officer approved the BPA Call Register (Form 58).
8.2. Payment over $20,000.00 will be received after invoice submission and approval through WAWF.
9. PAYMENT(S)/ELECTRONIC FUNDS TRANSFER: Reference FAR clause 52.232-33 Payment by electronic Funds Transfer-System for Award management (Oct 2018). This clause requires that payments be made by electronic funds transfer by the Finance Office. The Contractor shall provide information required concerning the financial institution to receive electronic funds transfers to the designated payment office.
10. DISPUTES: In furtherance of the Federal policy and the Administrative Disputes Resolution Act of 1990, ADR Act, Public Law 101-552, U.S.C. sec. 571 the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of the parties. Interested parties are encouraged to use Alternate Dispute Resolution Procedures to the maximum extent practicable in accordance with the authority and the requirements of the ADR Act.
PERFORMANCE WORK STATEMENT
Performance Work Statement (PWS)
Cleaning of Supply & Return Air Ducts, Chimney, Fan Coil Units, Dryer Ducts and A/C Units, USAG Daegu
1.0 Introduction.
This is a non-personal services contract to provide Base Operation and Support Services for the U.S. Army Garrison Daegu. The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS). Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this PWS.
1.1 Background. US Army Garrison Daegu is responsible for this cleaning of air supply & return ducts, chimney, fan coil units, dryer duct and air conditioning units service for facilities at various locations in Daegu, Waegwan and Busan Area (Camps Henry, George, Walker, Carroll, Busan Storage Center and Pier #8), DPW, USAG Daegu.
1.2 Objectives.
The Contractor shall ensure all work accomplished in the performance of this PWS meets all maintenance and repair standards consistent with the original equipment manufacturer’s recommendations; all applicable Federal, State, and local laws, regulations, and directives to include, but not limited to, the applicable publications listed in Section 7.0, Related Documents.
The Government is committed to provide a safe, periodic and timely services of air supply & return ducts, chimney, fan coil units, dryer duct and air conditioning units cleaning for USAG Daegu. A many number of air duct, chimney, fan coil units, dryer duct and air conditioning units are being utilized on a daily basis for the unit missions. The safe, periodic and timely cleaning services are critical to maintaining the overall life expectancy and safe operating conditions of the air ventilation systems. Without this contract, elevators would have to be taken out of service due to a lack of maintenance and required safety certifications.
1.2.1 The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conforms to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract. Without additional expense to the Government, the Contractor shall obtain/ensure subcontractors obtain all licenses, and permits required to perform this work under this contract. The intent is to establish work requirements that are performance-based and results oriented. This approach is intended to allow the Contractor to determine the best and most cost effective ways to fulfill base operations and their component needs, emphasizing innovation and commercial best practices.
1.3 Climatic Conditions. N/A
1.4 Facility Access.
The Contractor shall ensure access to all fire detection and suppression systems in case of emergencies or for other Fire Department purposes. The Contractor shall inform the Camp Walker/Carroll/BSC Fire Department point-of-contact (POC), prior to outages that will impact the function of the system, special problems or circumstances, which require Camp Walker/Carroll/BSC Fire Department inspection. The Fire Department will reset alarm systems to operational status.
1.5 Traffic Flow. N/A
1.6 Drainage. N/A
1.7 Restoration of Landscape Damage. N/A
1.8 Dust Suppression. N/A
1.9 Utility Location. N/A
1.10 Excavation Permits. N/A
2.0 Requirements
2.1 Description of Services. See Section 5.0 for the specific Common Level of Support
(CLS).
2.1.1 Non-Personal Services.
The personnel rendering the services are not subject; either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.
2.2 General Information.
Period of Performance (POP). The POP consists of five (5) 1 year ordering periods. The POP is as follows:
Phase-in/out Period N/A Base Ordering Period 1 May 2022 or date of award – 31 March 2023 1st Ordering Period 1 May 2023 – 30 April 2024 2nd Ordering Period 1 May 2024 – 30 April 2025 3rd Ordering Period 1 May 2025 – 30 April 2026
4th Ordering Period 1 May 2026 – 30 April 2027
2.2.1 Transition (Phase In/Phase Out).
The Contractor shall prepare and submit (within ten (10) business days after contract award), a Phase- In/Phase-Out Plan to be implemented by the Contractor. The Contractor shall provide sufficient experienced personnel during the phase-in and phase-out period to ensure that the services are maintained at the required level of proficiency. During the phase-in, the Contractor shall observe all operations pertinent to the requirements of the PWS, to include office functions, procedures, and operations, repair/maintenance operations, and any other operations as deemed necessary by the Contractor that will enable Contractor personnel to become both knowledgeable in, and familiar with, their assigned areas of responsibility. The Contractor shall commence all operations required by this PWS as of the first day of the contract period. Therefore, on the initial day of performance, the Contractor shall provide a work force which is fully qualified and capable of performing all work required under this contract.
2.2.2 Phase-out.
During the thirty (30) business day transition period immediately prior to the end of the previous contract, the Contractor shall permit the successor Contractor (and the successor Contractor's employees) to observe and become familiar with any and all operations under the contract. The Contractor shall not defer any needed repairs or maintenance for the purpose of transferring responsibility to the successor Contractor.
The Contractor shall fully cooperate with the successor Contractor and the Government so as not to interfere with their work or duties.
2.2.3 Place of Performance and Hours of Operation.
2.2.3.1 Place of Performance (expanded description).
The work to be performed under this requirement will be performed throughout the entire area occupied by Camps Henry/George/Walker/Carroll/BSC and at any pertinent locations in Area IV. A location information for Camps Henry/George/Walker/Carroll/BSC will be informed after the BPA call be issued.
2.2.3.2 Hours of Operation.
The Contractor shall conduct business, between the hours of 0800 to 1700, Monday through Friday, excluding Federal holidays or when the Government facilities are closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. A Direc to ra te o f Publ ic Work (DPW) Work Reception (WR, from 08:00~17:00 hours in normal workdays) and Fire Department (FD, work order reception function will be made during 17:00~08:00 hours in normal workdays and 24 hours in holidays.) will be operated 24 hours a day, 7 days a week and be capable of response to DMOs and/or customer requests outside of standard working hours.
2.2.3.3 Installation Closures.
When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a recognized Federal holiday, and when routine work is not scheduled for that day; or reschedule the work for the next business day following the closure.
2.2.3.4 Inclement Weather Delay.
If the Contractor determines unsafe weather conditions for continued operations, the Contractor shall notify the KO or designated Government representative/COR two (2) hours prior to curtailing operations due to inclement weather.
The Contractor shall obtain KO/COR approval to resume operations.
2.2.3.5 The Contractor shall coordinate with DPW in preparation for and during emergency operations situations such as inclement weather, flood, active shooter, fire or other emergency situations. The Contractor may be called upon to deliver a wide variety of services to the installation through an emergency DMO/PWO in support of emergency response. The Contractor shall be required to provide all normal services during an emergency response unless otherwise directed by the KO, however emergency response requirements will take precedence over normal DMO/PWO activities.
2.2.3.6 Federal Holidays.
The Contractor’s performance shall not be required on the Federal public holidays listed below.
Holidays occurring on weekends will be observed as directed by the Federal calendar (5 U.S.C.
6103).
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day Juneteenth National Independence Day
ROK Legal Holidays
(1) 1 January (New Year)
(2) Lunar New Year (31 December, 1 and 2 January on the Lunar Calendar)
(3) 1 March (Independence Movement Day)
(4) 1 May (Labor Day)
(5) 5 May (Children's Day)
(6) Buddha's Birthday (8 April on the Lunar Calendar)
(7) 6 June (Memorial Day)
(8) 17 July (Constitution Day)
(9) 15 August (Liberation Day)
(10) Chu-Suk (14, 15, and 16 August on the Lunar Calendar)
(11) 3 October (National Foundation Day)
(12) 9 October (Hangul Proclamation Day)
(13) 25 December (Christmas Day)
2.2.3.7 Travel/Temporary Duty. N/A
2.3 Emergency Services.
2.3.1 Emergency Medical Treatment.
The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO or designated Government representative/COR no later than (NLT) two (2) hours of the incident. The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel. However, the Government will provide, on an emergency basis, medical services for injuries incurred while an employee is performing under the contract. The Contractor shall reimburse the Government for emergency medical services provided, upon receipt of invoice from the medical facility. Reimbursement shall be made to the US Government.
2.3.2 Accident Reporting.
The Contractor shall comply with Operational Safety and Health Administration (OSHA) for record keeping and reporting of all accidents resulting in death, injury, occupational disease, or adverse environmental impact. The Contractor shall provide a verbal report to the KO or designated Government representative/COR within one (1) hour of each such occurrence. A completed typed original plus one (1) copy of ENG Form 3394 United States Army Corps of Engineers Accident Investigation Report (or equivalent reporting form) shall be delivered to the KO or designated Government representative/COR within five (5) business days of occurrence, whenever an accident involving personal injury or Government owned property occurs.
2.4 Contract Administration and Management.
2.4.1 Post Award Conference/Performance Evaluation Meetings.
The Contractor shall attend the post award conference convened by the Contracting Activity or Contract Administration Office as agreed upon and stated in the contract award document. The KO, COR and DPW management will meet monthly with the Contractor to review the Contractor's performance. Written minutes of meetings will be recorded by the Contractor and signed by both the Project Manager (PM) and the KO. The written minutes will be distributed within five (5) business after the meeting. If the Government does not concur with any portion of the minutes, recorded by the Contractor, the non-concurrence shall be provided in writing by the KO/COR within two (2) workdays following receipt of the minutes. Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.
2.4.2 The following provides the roles and their respective authority during the performance of the contract:
2.4.2.1 Contracting Officer (KO).
The KO is the only person authorized to make any changes in any of the requirements listed on this PWS;
notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO. In the event the Contractor makes any change at the direction of any person other than the KO, the change will be considered to have been made without authority and solely at the risk and expense of the Contractor. All contract administration will be effected by the KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviations from the terms and conditions shall be effected without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this
PWS.
2.4.2.2 Contracting Officer’s Representative (COR).
The KO will appoint a COR during the performance of this requirement. Additional Government personnel may be designated to assist in contract oversight IAW (Army Regulation) AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR and shall be trained and appointed IAW Department of Defense Instruction (DoDI) 5000.72, Department of Defense (DoD) Standard for Contracting Officer’s Representative (COR) Certification. The COR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR will perform IAW the responsibilities and duties identified in the appointment letter.
2.4.2.3 COR Authority.
A letter of designation will be issued to the COR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.
2.4.2.4 COR or Designated Government Representative Functions.
The COR or designated Government representative shall monitors all technical aspects of the contract and assists in contract administration. The COR or designated Government representative is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract;
perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Property, and provides direction or assistance for site entry requests of Contractor personnel.
2.4.2.4.1 The Contractor shall not in any way represent the United States (U.S.) Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).
2.4.3 Contractor Key Personnel.
Shall be designated in writing to the KO at the start of the contract. These key personnel shall be available 24/7/365 including Federal holidays. These individuals designated as key personnel shall be able to understand, speak, read, and write the English language.
2.4.3.1 Project Manager (PM) or Contract Manager (CM).
The Contractor shall provide a Project Manager (PM) or Contract Manager (CM) who is responsible for the performance of the work. The PM or CM shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. The PM or CM shall have a baccalaureate degree from an accredited College or University and five (5) years of experience in base support management or a contract similar in scope and breadth to this solicitation. The name of the PM or CM shall be provided to the KO and shall be present and on-site and available during normal duty hours. In the circumstances when the PM or CM is not available, the Contractor shall designate an alternate who can perform the same duties during the absence.
2.4.3.2 Operations and Maintenance Superintendent (O&M Superintendent) N/A
2.4.3.3 Quality Control Manager (QCM)
The Contractor shall designate a full time QCM on site during normal duty hours. As a minimum, the QCM shall possess work experience in process control, quality data analysis, quality auditing, statistical sampling, and subcontractor quality control. The QCM shall have at least two (2) years of relative experience, and shall be responsible for the overall management and implementation of the Contractor's Quality Control Plan.
2.4.3.4 Quality Control Inspectors (QCI)
The Contractor shall designate QCI personnel sufficient to monitor Contract work to assure compliance with Government requirements. QCIs shall have two (2) years of documented experience in quality control of construction and/or maintenance of building equipment.
2.4.3.5 General Fund Enterprise Business System (GFEBS) Project Manager Coordinator.
N/A
2.4.3.5.1 GFEBS Certification. N/A
2.4.4 Contractor Requirements.
2.4.4.1 U.S. Residency. N/A
2.4.4.2 Common Access Card (CAC) to access Government systems. N/A
2.4.4.3 Qualification Standards.
The Contractor shall inspect, repair, and maintain systems and components associated with facilities listed in real property records as required throughout this contract utilizing properly trained, skilled, and qualified employees or subcontractor personnel.
A) Prime Contractor’s License/Registration: The Prime Contractor shall possess i) current and valid business license (사업자등록증) for the business category of a valid Hygiene Management Permission License under
Management of Public Health Act (공중위생영업중 위생관리 용역업) issued by the Republic of Korea (ROK) Government, and ii) and unexpired (within 1 year from the date of solicitation) Annual Hygiene Training Certificate
(정기위생교육필증) issued by Korean Facility Hygiene Management Association (한국건물위생관리협회) at the closing date of this solicitation. These licensing and certification shall maintain throughout the life of BPA, and a copy of it shall be submitted to the Contracting Officer (KO) as a part of technical proposal. This certificate shall be renewed every year and a copy of certification shall be provided to the COR.
B) Prime Contractor’s Prior Experience: The Contractor shall have at least two (2) years of experience within last five (5) years from the closing date of the solicitation for duct cleaning services. Relevant past performance shall be the “same or similar” as determined by the U.S Government, for services on size, scope and complexity. The Contractor shall provide all necessary information of prior experience as a part of technical evaluation factor when submitting the proposal. The experience of a Subcontractor cannot be substituted for the Prime Contractor’s experience. The offeror shall provide evidence of relevant past experience as required below:
- Title of the contract/project
- A brief description of work completed
- Amount of contract
- Length of contract/project (year/month/date – year/month/date)
- Complete name of point of contact for client organization.
C) Key Personnel: Project manager (PM) or contract manager (CM) stated in para. 2.4.3.1.
2.4.4.4 Contractor Identification.
The Contractor shall ensure that personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees. The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed. Contractor owned/leased vehicles and equipment should be identified.
2.4.4.5 Standards of Conduct.
Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The
Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation. The removal of such a person shall not relieve the Contractor of the requirement to provide personnel to perform adequate and timely service.
2.4.4.6 Contractor Hiring Restrictions.
The Contractor shall not hire or sub-contract with off-duty or former Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct.
2.4.5 Business Relations.
The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the KO corrective action plans, timely identification of issues, and effective management of subcontractors. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.
2.4.6 Manual Operations. N/A
2.4.7 Interactive Customer Evaluation (ICE). N/A
2.5 Work Management.
2.5.1 Coordination.
As a part of the work scheduling process, the Contractor shall coordinate all work with the Building/Facility Manager in charge of the facility where the work is to be done.
2.5.2 Work Clearance. N/A
2.5.3 Work Status. N/A
2.5.4 General Fund Enterprise Business System (GFEBS). N/A
2.5.4.1 N/A
2.5.4.2 N/A
2.5.5 Work Standards.
The technical specifications within this PWS define the quality of maintenance and repair accomplished under this Contract. When a standard is not directed, the Contractor shall perform required work to meet industry trade customs and practices and manufacturer's recommendations. If floors, cabinets, appliances, foundations, and other items are removed in order to gain access to the system component to be repaired, the Contractor shall return any repaired area to a condition comparable to the original construction after work is completed. Any Government- or occupant-owned property damaged by the Contractor shall be repaired or replaced immediately at contractor’s expense.
2.5.6 Disposal. N/A
2.5.6.1 N/A
2.5.7 Environmental Requirements.
The Contractor shall meet all requirements of the DPW Environmental (ENV) as identified in below:
The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract.
In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective action and notifying the Contracting Officer’s Representative (COR) and the EMS Manager.
For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the EMS Manager.
All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange EMS training for appropriate staff.
Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.
The responsibilities of all contractor personnel include, but are not limited to:
(1) Recycling all eligible material, including glass, paper (including magazines), plastic, aluminum, and cardboard to the maximum extent practicable;
(2) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content;
(3) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling; and
(4) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.
Any questions regarding EMS may be directed to the Installation EMS Manager or COR.
2.5.7.1 Particulate Matter.
The Contractor shall use water, or suitable oil or chemicals approved by DPW-ENV, to control dust in the demolition of structures, work operations, work performed on a road, street, or parking area, in the clearing of land.
2.5.7.2 Construction (Storm Water) permits. N/A
2.5.7.3 Utility Clearances. N/A
2.5.7.4 As-Built Drawings. N/A
2.5.7.5 Maintenance of Work Site.
The Contractor shall remove from the work area, at the end of each day and completion of the job, all waste, material, and by-products resulting from work performed. If applicable, the Contractor shall return usable material to a designated storage area for reuse. The Contractor shall ensure all job sites are secured during inclement weather to avoid damages or windblown materials.
2.5.7.6 Installation Recycling Program.
The Installation Recycling Program is a resources conservation effort managed and operated by the DPW-ENV IAW DoD regulations.
2.5.7.7 Actions and Delivery. N/A
2.5.7.8 Facilities, Systems, and Equipment Identified for Future Replacement.
Regardless of whether specific facilities, systems, or equipment have been identified for future replacement by the Government, the Contractor shall perform maintenance and repair of the equipment as outlined in this PWS, unless otherwise directed by the KO.
2.5.7.9 New Components.
New components shall match or exceed existing components in both manufacture and quality.
The Contractor shall consider aesthetics (i.e., color, texture, and quality) in material selection. If existing aesthetics cannot be matched, the Contractor shall submit variations to the KO/COR for acceptability prior to installation. New components for Historic Buildings need to be reviewed and approved by DPW-ED, historic resources. Buildings identified in each BPA call, Historic Real Property Inventory as a historic building or structure will have all work comply with the National Historic Preservation Act, Section 106 (http://www.achp.gov/work106.html) and the Secretary of Interior Standards of Treatment of Historic Properties (https://www.nps.gov/tps/standards.htm).
2.5.7.10 Energy Conservation Standards. N/A
2.6 Demand Maintenance Orders (DMOs). N/A
2.6.1 Direc tora te o f Publ ic Work (DPW) Work Reception (WR). N/A
2.6.2 DMO Call Receipt and Entry. N/A
2.6.3 Completed Work. N/A
2.6.4 Materials. N/A
2.7 Preventive Maintenance Orders (PMOs). N/A
2.7.1 N/A
2.7.2. Process. N/A
2.7.2.1 N/A
2.7.3 Approved preventive maintenance schedule. N/A
2.7.4 PMO Stickers/Log. N/A
2.7.5 Operations & Maintenance (O&M) Library. N/A
2.8 Operations Work Orders (OWOs). N/A
2.9 Project Work Orders (PWOs). N/A
2.9.1. N/A
2.9.2 Conversion of DMO to PWO. N/A
2.9.3 Conversion during Execution. N/A
2.9.4 Conversion Prior to Execution. N/A
2.9.5 Cost Estimates for DMO Generated PWOs. N/A
2.9.6 Preparation of Detailed Estimates. N/A
2.9.7 Subcontract Work. N/A
2.9.8 Specialty Subcontracting Work. N/A
2.9.9 Execution of PWO Work. N/A
2.9.10 Wage Rates for PWOs. N/A
2.9.11 PWO Bi-weekly Meetings. N/A
2.9.12 PWO Records. N/A
2.9.13 PWO Reporting Requirements. N/A
2.10 Warranty Program. N/A
2.10.1 Warranty Enforcement Manager. N/A
2.10.2 Warranty Management. N/A
2.10.3 Routing of Warranty DMOs. N/A
2.10.4 Warranty Records. N/A
2.10.5 Exception. N/A
2.11 Technical Document Library Operation.
The Contractor shall store, maintain and make technical documents available to all Government personnel and others approved by DPW upon request. If electronic versions are available, the Contractor shall provide these via e-mail or other electronic media. If no electronic copy is available, the hardcopies will be scanned and sent to the Government personnel and others approved by DPW. Contractor shall obtain and record adequate contact information from the borrower, and the documents will be checked out for no longer than five (5) days. In the case where only one hardcopy exists and the document cannot be scanned; the documents shall be made available for reference or for copies. The Contractor, to the maximum intent possible, shall maintain all warranty documents in an electronic data base.
2.12 Maintain As-Builts. N/A
2.13 Historic Property or Archaeological Site. N/A
2.13.1 Repair and Replacement. N/A
2.14 Security
2.14.1 Access and General Protection/Security Policy and Procedures.
The Contractor and all associated subcontractors employees shall comply with applicable installation, facility, and local security policies and procedures. The Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by DoD, Headquarters Department of the Army (HQDA), and local policy. The KO/COR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or installation changes.
2.14.2 Rules, regulations, direction, and requirements issued by the Commander apply to the Contractor.
The Contractor shall become acquainted with and comply with all Government regulations as posted, or as required by the KO. Regulations, manuals, and technical documents applicable to this Contract are listed in Section 6.0 of this PWS. Control for classified publications requirements can be located in AR 380-5, Department of The Army Information Security Program, and secured in a filing type cabinet with a built-in locking device with tumblers and General Services Administration (GSA) approved security container.
2.14.3 Government Vehicles. N/A
2.14.4 Contractor Vehicle Registration. The Contractor shall maintain a list of all Contractor-owned or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .