ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
ELECTRICAL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
UNITED STATES ARMY GARRISION DAEGU
DIRECTORATE OF PUBLIC WORK
UNIT #15746, APO AP 96218-5746
DATE:
SHEET OF
CAMP WALKER
D - 19 - 09
E-1
GRAPHIC SCALE
SCALE: 1 : 200
4000 8000
J1-00579-9J
92.8
BIBB
92.9
SCO
W/V
W/VW/V
W/V
W/V
W/VW/V
W/P
W/P
E/P
E/P
W/PE/P
E/P
E/P
E/P
E/P
E/P E/P
W/V
S/PS/P
S/P
W/V
S/P
S/P
S/P
S/P
S/P
W/V
FHT
LP
S/B
PM
J
S
T
G
C
E
S
S
FDC
BLDG. #142
BL
DG.
B L D
G
TRASH
T R
A S H
S
O
S
S
L
IF
T
S T A T
IO
N
FANFAN
F A N
F A N
FA
N
FA
N
SHEDSHED
S H E D
S H E D
SHED
SHED
208Y/120V
22.9KV
300KVA
TX80
208Y/120V
22.9KV
45KVA
TX57
CATV
CATV
C A T V
C A T V
CATV
C A
TV
CATV
CAT
V
CAT
V
2-#8WP
2-#8WP
3-#6 WP
3-#1 WP
3-#1 WP
E
120Y/240V
22.9KV
167KVA
TX58
CAT
V
E
E
3-#6 WP
CATV
OPI
S
1-3C CABLE
N
SCALE : 1 / 200- E1
P-1 ELECTRICAL SITE PLAN
N O T E S
CAULKING MATERIAL SHALL BE VERIFIED BY F&ES OFFICE PRIOR TO CONSTRUCTION.
BOTH SIDE OF FIRE WALLS, FIRE-PARTITIONS AND FIRE-RATED PIPE CHASE WALLS.
ALL PIPE PENETRATIONS SHALL BE SEALED WITH FIRE RATED CAULKING MATERIAL ON
1.
SPECIFICATIONS FOR O&MA PROJECTS, AND SPECIFICATIONS.
ELECTRICAL CODE, NATIONAL ELECTRICAL SAFETY CODE, FIRE CODE, TECHNICAL STANDARD
ALL ELECTRICAL WORK SHALL CONFORM TO THE LATEST REQUIREMENTS OF THE NATIONAL
L E G E N D
NEWEXSTREMOVE
WIRING CONCEALED IN UNDERGROUND
2.
3.
4.
5. SALVAGEABLE MATERIAL SHALL BE TURN IN TO DPW.
OVERHEAD SECONDARY LINE
CATV CATV CATV
W/P W/P W/P
CONSTRUCTION.
CONTRACTOR SHALL COORDINATE WITH AREA DPW, SIGNAL BRIGADE, CATV BEFORE
DEVICES. THE CHANGES SHALL BE APPROVED BY THE CONTRACTING OFFICE.
SHALL BE RESPONSIBLE TO RESIZE AND PROVIDE THE REQUIRED WIRING AND OVER CURRENT
IF EQUIPMENT OTHER THAN INDICATED ON THE PLANS ARE PROVIDED, THEN THE CONTRACTOR
1.
SCOPE OF WORK
2.
A. REPAIR/MAINTENANCE
COMMUNICATION LINE AND ASSOCIATED ACCESSORIES AS SHOWN ON DRAWING.
REMOVE EXISTING TRANSFORMER, OVERHEAD POWER LINE, POLES, RAISED CABLE, CATV LINE, LINE TO EXISTING TRANSFORMER "TX-58"
DISCONNECT EXISTING PRIMARY POWER
3.
G
2SET OF 3-#4/0 IN 104mmC
OVERHEAD CATV AND LAN
E/P
3-#6 WP
3-#6 WP
3-#6 WP
3-#6 WP
2-#8WP
KIM, CK
SIN, YS
ELECTRICAL SITE PLAN
LEAK DETECTION CONTROL PANEL
CONCRETE POLE 10~12M
WOODEN POLE 10M
ABANDON EXISTING UNDERGROUND PRIMARY POWER LINE AS SHOWN ON DRAWING.
EXISTING FOC SPLICE CAN
EP EP EP
E/P
R
R
AND ASSOCIATED ACCESSORIES AS SHOWN ON DRAWING.
REARRANGE EXISTING OVERHEAD LIGHTING POWER LINE, RELOCATE LIGHTING FIXTURES
2-#8WP
2-#8WP
5 5
19 JUN 19
DEMOLITION OF BUILDING 140, 141 AND 142
| J1-00579-9J |
| J1-00579-9J_Drawing |
| J1-00579-9J_C |
| J1-00579-9J_C01 |
| J1-00579-9J_C02 |
| J1-00579-9J_AE |
| J1-00579-9J_AE01 |
| J1-00579-9J_AE02 |
J1-00579-9J_E01
File details come from the government source that posted it.