SEE ARCH. & MECH. DRAWINGS

(1- STORY BUILDING)

REMOVE EXISTING BUILDING, S-141

LEGEND:

ITEM TO REMOVE

92.6

BLDG

92.6

BLDG

92.6

BLDG

92.5

BLDG92.5

BLDG

92.6

BLDG

92.6

BLDG

92.5

BLDG

92.6

BLDG

92.6

BLDG

92.5

BLDGBLDG

92.9

BLDG

93.9

BLDG

92.5

BLDG

92.6

BLDG 92.6

BLDG

92.9

BLDG

92.9

BLDG

93.0

BLDG

92.9

BLDG

95.2

BLDG

95.2

BLDG

94.6

BLDG

94.2

BLDG

94.2

BLDG

94.9

BLDG

94.2

BLDG

94.1

BLDG

94.1

BLDG

94.4

BLDG

94.0

BLDG

94.1

BLDG

94.1

BLDG

91.7

ENCL

91.4

TRASH

91.4

TRASH

92.4

SWALK

91.7

SWALK 91.7

SWALK

91.7

SWALK91.7

SWALK

91.5

SWALK

91.5

SWALK

91.4

SWALK

91.4

SWALK

91.3

SWALK

91.2

SWALK

91.4

SWALK92.0

SWALK

92.1

SWALK 92.0

SWALK

91.4

SWALK

92.6

SWALK

SWALK

92.6

SWALK

92.6

SWALK 92.6

SWALK

92.6

SWALK

92.6

SWALK

92.6

SWALK

92.2

SWALK

92.1

SWALK

92.1

SWALK

92.2

SWALK

92.3

SWALK

92.3

SWALK

92.3

SWALK

92.3

SWALK

92.2

SWALK

92.1

SWALK

92.1

SWALK

92.1

SWALK 92.0

SWALK

92.0

SWALK92.1

SWALK

92.6

SWALK

92.6

SWALK

92.2

SWALK

92.6

SWALK

92.3

SWALK

92.7

92.7

SWALK

92.3

SWALK

92.1

SWALK

92.2

SWALK

92.0

SWALK

92.0

SWALK

92.2

SWALK

92.3

SWALK

92.3

SWALK

SWALK

92.9

SWALK

93.0

SWALK

93.0

SWALK

92.9

SWALK

93.2

SWALK

92.9

SWALK

93.0

SWALK

93.0

SWALK

93.3

SWALK

93.9

SWALK

93.9

SWALK

93.9

SWALK

93.9

SWALK

93.9

SWALK

92.8

SWALK

94.2

SWALK

94.5

SWALK

94.3

SWALK

94.3

SWALK

94.2

SWALK

93.9

SWALK

94.1

SWALK

94.0

SWALK

94.1

SWALK

94.1

SWALK

94.1

SWALK

94.0

SWALK

94.2

SWALK

94.2

SWALK

94.4

SWALK

94.3

SWALK

94.2

SWALK

94.1

SWALK

94.2

SWALK

94.3

SWALK

94.2

SWALK

93.0

SWALK

93.5

SWALK

94.0

SWALK

94.0

SWALK

93.4

SWALK

93.0

SWALK

92.6

FENCE

92.6

FENCE

92.6

FENCE

92.6

FENCE

92.6

FENCE

92.6

FENCE

92.6

FENCE

94.0

W-FENCE

94.0

W-FENCE

94.0

W-FENCE

94.0

W-FENCE

92.6

W-FENCE

92.6

W-FENCE

92.7

W-FENCE

93.0

W-FENCE

92.7

W-FENCE

W-FENCE

94.2

W-FENCE

94.3

W-FENCE

94.2

W-FENCE

94.2

W-FENCE

W-FENCE

92.9

W-FENCE

92.9

W-FENCE

92.5 84 92.6

W-FENCE 92.6

W-FENCE 92.6

W-FENCE

94.2

92.4

SMH

92.5

SMH

95.1

SMH

95.1

SMH

95.0

SMH

94.2

SMH

94.1

SMH

92.7

SMH

92.6

SMH

92.8

SMH

92.8

SMH

91.9

INLET

91.9

INLET91.9

INLET

91.9

INLET

91.2

INLET

91.2

INLET

91.4

INLET

91.4

INLET

92.3

INLET

92.3

INLET

94.5

INLET

94.2

INLET

94.3

INLET

94.3

INLET

91.6

MH

91.7

MH

91.7

MH

91.7

MH

91.7

MH

91.8

MH

92.3

MH

92.3

MH

92.4

MH

92.5

MH

92.5

BIBB

92.6

BIBB

92.8

BIBB

94.1

BIBB

92.9

BIBB

92.6

TMH

92.6

TMH

92.6

92.6

SCO

92.9

SCO

92.6

SCO

94.2

SCO

94.3

SCO

94.1

SCO

94.1

SCO

92.9

93.2

R-WALL

92.6

R-WALL

92.5

R-WALL

92.6

R-WALL

92.4

DMH

92.5

GROUNDING

92.8

PAD

92.7

PAD

92.6

PAD

91.6

LP

92.6

SHRUB

92.6

SHRUB

92.6

SHRUB

92.7

SHRUB

92.6

SHRUB92.6

SHRUB

92.7

SHRUB

92.5

SHRUB

92.5

SHRUB

92.5

SHRUB

92.5

SHRUB

92.5

SHRUB

92.6

SHRUB 92.6

SHRUB

92.6

SHRUB 91.6

SHRUB

91.4

WV

91.5

WV

91.4

WV

91.4

WV

91.9

WV

91.7

WV

92.1

WV

92.2

WV

92.2

WV

91.8

POST

91.7

KOOTER

92.1

TREE

92.1

TREE

92.1

TREE

92.0

TREE

92.2

TREE

92.3

TREE

92.3

TREE

92.6

TREE

92.5

TREE

92.4

TREE

92.3

TREE

92.4

TREE

92.4

TREE

92.6

TREE

92.5

TREE

90.8

TREE

92.9

TREE

93.2

TREE

93.2

TREE

93.0

TREE

92.9

TREE

93.1

TREE

92.9

TREE

93.9

TREE

94.5

TREE

94.3

TREE

94.2

TREE

94.2

TREE

94.1

TREE

94.1

TREE

93.6

TREE

94.2

TREE

94.2

TREE

94.3

TREE

94.2

TREE

94.1

TREE

94.1

TREE

94.1

TREE

94.1

TREE

94.1

TREE

94.1

TREE

92.5

PLANTER

92.5

PLANTER 92.5

PLANTER

92.6

PLANTER

92.6

PLANTER

92.5

PLANTER

92.5

PLANTER

92.6

PLANTER

92.5

PLANTER

92.6

92.9

PLANTER

92.8

PLANTER

92.6

PLANTER

91.4

PLANTER

92.6

PLANTER

92.7

PLANTER

92.7

PLANTER

92.6

PLANTER

92.7

PLANTER

92.8

PLANTER

92.8

PLANTER

92.9

PLANTER

92.9

PLANTER

92.9

PLANTER

92.9

PLANTER

94.1

PLANTER

94.2

PLANTER

94.2

PLANTER

94.2

PLANTER

94.1

PLANTER

94.1

PLANTER

94.1

PLANTER

92.4

EP

92.4

EP

92.3

EP

91.8

EP

92.3

EP

92.2

EP

91.7

EP

93.0

EP

94.7

EP

92.7

EP

94.1

EP

91.6

SB

91.5

SB 91.5

SB

91.4

AC

91.2

AC

91.2

AC

91.5

AC

91.6

AC

91.6

AC

91.6

AC

91.5

AC

91.5

AC

91.5

AC

91.6

AC

91.7

AC

91.8

AC

92.0

AC

92.1

AC

92.3

AC

92.6

AC

92.5

AC

92.1

AC

92.2

AC

91.9

AC

91.7

AC

91.8

AC

91.8

AC

91.7

AC

91.6

AC

91.5

AC

91.6

AC

91.5

AC

91.5

AC

91.8

AC

91.8

AC

91.8

AC

92.0

AC

93.5

AC

93.6

AC

93.7

AC

93.7

AC

93.8

AC

93.9

AC

94.0

AC

94.1

AC

93.9

AC

93.9

AC

93.9

AC

94.0

AC

94.0

AC

94.0

AC94.0

AC

94.1

AC

94.1

AC

93.1

AC

93.0

AC

92.9

AC

92.6

AC

93.3

C-FENCE

92.6

G-WIRE

92.5

G-WIRE

92.8

CAV

92.6

CAV

94.1

CAV

93.0

TR

92.7

TR

92.5

TR

92.5

TR

93.3

TR

93.3

TR

93.1

TR

93.4

TR

92.5

SP

92.4

SP

92.4

SP

92.2

SP

92.0

SP

91.9

SP

92.0

SP

92.3

SP

92.6

SP

92.3

MIRROR

92.0

GMH

92.0

GMH

90.2

COMMH

90.2

COMMH

92.1

EMH

92.1

EMH

92.7

EMH

92.7

EMH

94.0

EMH

94.2

EMH

94.1

EMH

93.2

WELL

94.5

DITC

H

94.6

DITC

H

94.6

DITC

H

94.6

DITC

H

94.6

DITC

H

94.6

DITC

H

94.3

FTANK

94.2

FTANK

93.2

FTANK

93.0

FTANK

93.2

FTANK

94.2

MONITOR

94.3

SUMP

94.2

SUMP

94.2

SUMP

94.2

SUMP

93.0

ELEC

94.1

ELEC

W/VW/V

W/V

W/V

W/VW/V

E/P

E/P

E/P

E/P

E/P E/P

E/P

E/P

E/P

E/P E/P

W/V

S/PS/P

S/P

W/V

S/P

S/P

S/P

S/P

S/P

FHT

LP

S/B

PM

J

ITE

MEL

EC

S

T

G

C

E

E

S

S

S

S

S

SCO

FDC

TRASH

T R

A S H

E

S

O

S

(P

VC

, D

0)

S

S

S

S

S

S

S

SS

S

(PVC, D=150)

S

S

S

S

S

(P V C , D

S

(P

VC

, D

0)

S

L

IF

T

S T A T

IO

N

FANFAN

F A N

F A N

FA

N

FA

N

(PVC, D=100)

S

(P V C , D

D

SD (R

CP

, D

0)

(R C P D

S

D

(RCP, D=760)

SD

(R C P D

S D

(PVC

, D

200)

(RCP, D=450)SD

FAN

TRASH

S D (R

C P

D

(D=200, ASSUMED)

W

(D 0, A

SS

UM

ED)

W

W (D

A S S

U M

E D

W (D

A S S U

M E D

(D

A S S

U M

E D

WW

(D

A S S

U M

E D

W (D

A S S

U M

E D

W

(D=32, ASSUMED)

(D

A S S U

M E D

W

W (D

, A

SS

UM

ED)

FOL

FO

L

F O

L

F O

L

FO

L

FO

L

(PVC, D=200)

SHED SHED

SHED

SHED

S H E D

S H E D

BL

DG.

B L D

G

BLDG. #142

S

G

AND SHRUBS

REMOVE EXISTING TREES

SCALE : 1 / 200

CAMP WALKER

KU, HUN MO

CIVIL

AS SHOWN

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

UNITED STATES ARMY GARRISON DAEGU

DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

UNIT #15746, APO AP 96218-5746

DATE:

C-2

CHI, K. K.

GRAPHIC SCALE

SCALE: 1 : 200

4000 8000

N

DEMOLITION OF BUILDING 140, 141 AND 142

SITE LAYOUT PLAN

J1-00579-9J

19 JUN 19

SITE LAYOUT PLAN

SCOPE OF WORK

GENERAL NOTES:

SUBMISSION OF CONTRACT PROPOSAL.

DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO

1. THE CONTRACTOR SHOULD VERIFY ALL EXISTING CONDITIONS AND

IF REQUIRED.

DETOUR ROAD FOR VEHICLES DURING CONSTRUCTION PERIOD

5. CONTRACTOR SHOULD PROVIDE TEMPORARY ACCESS ROAD AND

ON THE PROJECT.

BY THE CONTRACTING OFFICER PRIOR TO COMMENCING WORK

PORTION OF THE JOB BY THE COR AND SHOULD BE APPROVED

2. THE CONTRACTOR SHOULD SUBMIT SHOP DRAWINGS FOR ANY

CONTRACTING OFFICER.

CONTRACTORS EXPENSE TO THE SATISFACTION OF THE

DAMAGED BY DISMANTLING, DEMOLISHING, OR REMOVING AT THE

RESTORATION TO THEIR ORIGINAL CONDITIONS OF THE ITEMS

3. THE CONTRACTOR SHOULD BE RESPONSIBLE FOR REPAIR/

ITEMS WHICH WILL INTERFERE WITH THE CONSTRUCTION OPERATIONS.

UNDERGROUND ROCK BASE, EXISTING UTILITY LINES, AND OTHER

CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS

4. THE SITE INDICATED ON THE DRAWING SHOULD BE GRADED AND

AND OTHER UTILITY MARKERS IN THE PROJECT LIMIT.

6. CONTRACTOR SHALL RESTORE/REESTABLISH SURVEY MONUMENTS

FROST DEPTH UNLESS OTHERWISE NOTED.

8. WATER AND SEWER LINE SHOULD HAVE A MINIMUM COVER OF

WITHOUT ANY ADDITIONAL COST.

INCLUDING FALSEWORK SUCH AS FORMWORKS AND SHORING

9. CONTRACTOR SHOULD PROVIDE ANY NECESSARY RESOURCES

LAWS AND REGULATIONS.

GOVERNMENT LEASED PROPERTY IN ACCORDANCE WITH LOCAL

DISPOSAL OF WASTE MATERIALS SHOULD BE OUTSIDE U.S

CONTRACTOR BY THE GOVERNMENT.

AREA AND NO LAY DOWN AREA SHALL BE PROVIDED FOR THE

OFFICES AND STORAGE AREAS SHALL BE WITHIN THE CONSTRUCTION

LOCATION APPROVED/INDICATED BY C.O.R. ADMINISTRATIVE FIELD

TEMPORARY FACILITIES ACCORDING TO O&MA SPEC. AT THE

CONTRACTOR SHOULD PROVIDE AND MAINTAIN THE CONTRACTOR’S

APPROVAL PRIOR TO COMMENCING THE WORK.

SUBMITTAL TO THE DESIGN AND TECHNICAL REVIEW BRANCH FOR

THE CONTRACTOR SHOULD PREPARE AND SUBMIT MATERIAL

TRAFFIC AND OPERATIONS.

FOR THE PROTECTION AND SAFETY OF THE PUBLIC AND/OR MILITARY

PROTECTIVE FACILITIES AND SHALL TAKE ALL NECESSARY PRECAUTIONS

SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES AND OTHER

CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL NECESSARY

MILLIMETERS AND STATIONS AND ELEVATIONS ARE IN METERS.

UNLESS OTHERWISE NOTED ALL THE DIMENSIONS ARE IN

TO DPW

SALVAGEABLE MATERIAL WITHIN PROJECT LIMIT SHALL BE RETURNED

14.

13.

10.

11.

12.

15.

#2 (GENERAL REQUIREMENTS)

#1 (REPAIR/MAINTENANCE)

AND CONCRETE PAVEMENT

REMOVE EXISTING CONCRETE SIDEWALK

SIDEWALK AND PAVEMENT

REMOVE EXISTING CONCRETE

REMOVE EXISTING PLANTERS

CUT AND PLUG

REMOVE EXISTING WATER LINES,

SEE ARCH. & MECH. DRAWINGS

(1- STORY BUILDING)

REMOVE EXISTING BUILDING, S-142

SEE ARCH. & MECH. DRAWINGS

(1- STORY BUILDING)

REMOVE EXISTING BUILDING, S-140

REMOVE EXISTING WOODEN FENCE

AND SURFACE CLEANOUTS

REMOVE EXISTING SEWER LINES

REMOVE EXISTING CONCRETE PADS

SEE ARCH. DRAWINGS

REMOVE EXISTING BUILDING, SHED(S)

PROJECT WORK LIMITS

1. SEE GENERAL AND REMOVAL NOTES ON DRAWING REF. NO. C-2.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

CONCRETE PAD(S)

FUEL PIPING SYSTEM, SUMPS AND

REMOVE EXISTING FUEL OIL TANKS,

(BY ENVIRONMENTAL DIV.)

EXISTING TREES TO REMAIN, 17EA

VALVES AND VALVE BOXES

REMOVE EXISTING WATER GATE

ITEM TO ABANDON

ACCOMPLISH THE CIVIL SCOPE OF WORK.

PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED TO

OF THE ARMY INSTALLATION MANAGEMENT COMMAND" FORM AS A

O & MA PROJECT, KOREA, REVISION1, 30 OCTOBER 2015, DEPARTMENT

COMMAND" AND "STANDARD TECHNICAL SPECIFICATIONS FOR

2015, DEPARTMENT OF THE ARMY INSTALLATION MANAGEMENT

DETAIL DRAWINGS, FOR O & MA PROJECT, KOREA, 30 NOVEMBER

7. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD

REMOVAL NOTES

1.

2.

3.

4.

5.

6.

7.

9.

10.SEE THE ELEC. DRAWINGS FOR ELEC. REMOVAL WORKS.

REMOVAL OF 17EA TREES WILL BE BY ENVIRONMENTAL DIVISION.

TO THE BUILDING SHALL BE REMOVED AND CUT & CAPPED.

THE LOCATION OF UTILITY LINES. ALL UTILITY LINES CONNECTED

ARE SHOWN ON THE DRAWING OR NOT, CONTRACTOR SHALL VERIFY

EXISTING UTILITY LINES (WATER, SEWER, STORM DRAIN, AND FUEL OIL)

AND ENVIRONMENTAL DIVISION.

DURING EXCAVATIONS OF FUEL LINE AND SUMP PUMPS TO THE COR

CONTRACTOR SHOULD REPORT ANY CONTAMINATED SOIL DISCOVERED

ABANDONED IN ACCORDANCE WITH THE GUIDANCE OF COR.

REMOVAL WORK SHALL BE REMOVED OR CUT AND CAPPED OR

REMOVAL OF UNDERGROUND UTILITY LINES FOUND DURING THE

KOREA, USFK PAM 200-1.

APPLICABLE KOREAN ENVIRONMENTAL GOVERNING STANDARDS FOR

ALL DISPOSAL WORK SHALL BE IN ACCORDANCE WITH THE

EXISTING CHAIN-LINK FENCE, ETC.

FOR THE PROJECT LIMITS, I.E. EDGE OF PAVEMENT, EDGE OF ROADWAY,

EXISTING GROUND FEATURES SHALL BE USED AS A DEMARCATION

AS INDICATED AND REQUIRED.

THE ITEMS WITHIN THE PROJECT BOUNDARY SHALL BE REMOVED

LIMITS INDICATED, UNLESS OTHERWISE NOTED.

ALL REMOVAL WORKS SHALL BE CONFINED WITHIN THE PROJECT

REMOVE EXISTING FUEL OIL LINE

11.

W/V

W /V

W /V

W/VW/V

W/V

LINES (AS REQUIRED)

ELEC. POWER, TELEPHONE, CONTROL

LINES SUCH AS WATER, IRRIGATION,

REROUTE UNDER GROUND UTILITY

12.

2 5

D - 19 - 09

REROUTE UNDER GROUND UTILITY LINES (AS REQURED).

REMOVE EXISTING SEWER LINES AND SURFACE CLEANOUTS.

REMOVE EXISTING FUEL OIL LINES.

REMOVE EXISTING FUEL OIL TANKS, FUEL PIPING SYSTEM, SUMPS.

REMOVE EXISTING WOODEN FENCE.

REMOVE EXISTING PLANTERS.

REMOVE EXISTING TREES AND SHRUBS.

REMOVE EXISTING HOSE BIBS.

REMOVE EXISTING WATER LINES, CUT AND PLUG.

REMOVE EXISTING WATER GATE VALVES AND VALVE BOXES.

REMOVE EXISTING CONCRETE PADS.

REMOVE EXISTING CONCRETE SIDEWALK AND CONCRETE PAVEMENT.

REMOVE EXISTING HOSE BIBS

J1-00579-9J
J1-00579-9J_Drawing
J1-00579-9J_C
J1-00579-9J_C01
J1-00579-9J_C02
J1-00579-9J_AE
J1-00579-9J_AE01
J1-00579-9J_AE02

J1-00579-9J_E01