SEE ARCH. & MECH. DRAWINGS
(1- STORY BUILDING)
REMOVE EXISTING BUILDING, S-141
LEGEND:
ITEM TO REMOVE
92.6
BLDG
92.6
BLDG
92.6
BLDG
92.5
BLDG92.5
BLDG
92.6
BLDG
92.6
BLDG
92.5
BLDG
92.6
BLDG
92.6
BLDG
92.5
BLDGBLDG
92.9
BLDG
93.9
BLDG
92.5
BLDG
92.6
BLDG 92.6
BLDG
92.9
BLDG
92.9
BLDG
93.0
BLDG
92.9
BLDG
95.2
BLDG
95.2
BLDG
94.6
BLDG
94.2
BLDG
94.2
BLDG
94.9
BLDG
94.2
BLDG
94.1
BLDG
94.1
BLDG
94.4
BLDG
94.0
BLDG
94.1
BLDG
94.1
BLDG
91.7
ENCL
91.4
TRASH
91.4
TRASH
92.4
SWALK
91.7
SWALK 91.7
SWALK
91.7
SWALK91.7
SWALK
91.5
SWALK
91.5
SWALK
91.4
SWALK
91.4
SWALK
91.3
SWALK
91.2
SWALK
91.4
SWALK92.0
SWALK
92.1
SWALK 92.0
SWALK
91.4
SWALK
92.6
SWALK
SWALK
92.6
SWALK
92.6
SWALK 92.6
SWALK
92.6
SWALK
92.6
SWALK
92.6
SWALK
92.2
SWALK
92.1
SWALK
92.1
SWALK
92.2
SWALK
92.3
SWALK
92.3
SWALK
92.3
SWALK
92.3
SWALK
92.2
SWALK
92.1
SWALK
92.1
SWALK
92.1
SWALK 92.0
SWALK
92.0
SWALK92.1
SWALK
92.6
SWALK
92.6
SWALK
92.2
SWALK
92.6
SWALK
92.3
SWALK
92.7
92.7
SWALK
92.3
SWALK
92.1
SWALK
92.2
SWALK
92.0
SWALK
92.0
SWALK
92.2
SWALK
92.3
SWALK
92.3
SWALK
SWALK
92.9
SWALK
93.0
SWALK
93.0
SWALK
92.9
SWALK
93.2
SWALK
92.9
SWALK
93.0
SWALK
93.0
SWALK
93.3
SWALK
93.9
SWALK
93.9
SWALK
93.9
SWALK
93.9
SWALK
93.9
SWALK
92.8
SWALK
94.2
SWALK
94.5
SWALK
94.3
SWALK
94.3
SWALK
94.2
SWALK
93.9
SWALK
94.1
SWALK
94.0
SWALK
94.1
SWALK
94.1
SWALK
94.1
SWALK
94.0
SWALK
94.2
SWALK
94.2
SWALK
94.4
SWALK
94.3
SWALK
94.2
SWALK
94.1
SWALK
94.2
SWALK
94.3
SWALK
94.2
SWALK
93.0
SWALK
93.5
SWALK
94.0
SWALK
94.0
SWALK
93.4
SWALK
93.0
SWALK
92.6
FENCE
92.6
FENCE
92.6
FENCE
92.6
FENCE
92.6
FENCE
92.6
FENCE
92.6
FENCE
94.0
W-FENCE
94.0
W-FENCE
94.0
W-FENCE
94.0
W-FENCE
92.6
W-FENCE
92.6
W-FENCE
92.7
W-FENCE
93.0
W-FENCE
92.7
W-FENCE
W-FENCE
94.2
W-FENCE
94.3
W-FENCE
94.2
W-FENCE
94.2
W-FENCE
W-FENCE
92.9
W-FENCE
92.9
W-FENCE
92.5 84 92.6
W-FENCE 92.6
W-FENCE 92.6
W-FENCE
94.2
92.4
SMH
92.5
SMH
95.1
SMH
95.1
SMH
95.0
SMH
94.2
SMH
94.1
SMH
92.7
SMH
92.6
SMH
92.8
SMH
92.8
SMH
91.9
INLET
91.9
INLET91.9
INLET
91.9
INLET
91.2
INLET
91.2
INLET
91.4
INLET
91.4
INLET
92.3
INLET
92.3
INLET
94.5
INLET
94.2
INLET
94.3
INLET
94.3
INLET
91.6
MH
91.7
MH
91.7
MH
91.7
MH
91.7
MH
91.8
MH
92.3
MH
92.3
MH
92.4
MH
92.5
MH
92.5
BIBB
92.6
BIBB
92.8
BIBB
94.1
BIBB
92.9
BIBB
92.6
TMH
92.6
TMH
92.6
92.6
SCO
92.9
SCO
92.6
SCO
94.2
SCO
94.3
SCO
94.1
SCO
94.1
SCO
92.9
93.2
R-WALL
92.6
R-WALL
92.5
R-WALL
92.6
R-WALL
92.4
DMH
92.5
GROUNDING
92.8
PAD
92.7
PAD
92.6
PAD
91.6
LP
92.6
SHRUB
92.6
SHRUB
92.6
SHRUB
92.7
SHRUB
92.6
SHRUB92.6
SHRUB
92.7
SHRUB
92.5
SHRUB
92.5
SHRUB
92.5
SHRUB
92.5
SHRUB
92.5
SHRUB
92.6
SHRUB 92.6
SHRUB
92.6
SHRUB 91.6
SHRUB
91.4
WV
91.5
WV
91.4
WV
91.4
WV
91.9
WV
91.7
WV
92.1
WV
92.2
WV
92.2
WV
91.8
POST
91.7
KOOTER
92.1
TREE
92.1
TREE
92.1
TREE
92.0
TREE
92.2
TREE
92.3
TREE
92.3
TREE
92.6
TREE
92.5
TREE
92.4
TREE
92.3
TREE
92.4
TREE
92.4
TREE
92.6
TREE
92.5
TREE
90.8
TREE
92.9
TREE
93.2
TREE
93.2
TREE
93.0
TREE
92.9
TREE
93.1
TREE
92.9
TREE
93.9
TREE
94.5
TREE
94.3
TREE
94.2
TREE
94.2
TREE
94.1
TREE
94.1
TREE
93.6
TREE
94.2
TREE
94.2
TREE
94.3
TREE
94.2
TREE
94.1
TREE
94.1
TREE
94.1
TREE
94.1
TREE
94.1
TREE
94.1
TREE
92.5
PLANTER
92.5
PLANTER 92.5
PLANTER
92.6
PLANTER
92.6
PLANTER
92.5
PLANTER
92.5
PLANTER
92.6
PLANTER
92.5
PLANTER
92.6
92.9
PLANTER
92.8
PLANTER
92.6
PLANTER
91.4
PLANTER
92.6
PLANTER
92.7
PLANTER
92.7
PLANTER
92.6
PLANTER
92.7
PLANTER
92.8
PLANTER
92.8
PLANTER
92.9
PLANTER
92.9
PLANTER
92.9
PLANTER
92.9
PLANTER
94.1
PLANTER
94.2
PLANTER
94.2
PLANTER
94.2
PLANTER
94.1
PLANTER
94.1
PLANTER
94.1
PLANTER
92.4
EP
92.4
EP
92.3
EP
91.8
EP
92.3
EP
92.2
EP
91.7
EP
93.0
EP
94.7
EP
92.7
EP
94.1
EP
91.6
SB
91.5
SB 91.5
SB
91.4
AC
91.2
AC
91.2
AC
91.5
AC
91.6
AC
91.6
AC
91.6
AC
91.5
AC
91.5
AC
91.5
AC
91.6
AC
91.7
AC
91.8
AC
92.0
AC
92.1
AC
92.3
AC
92.6
AC
92.5
AC
92.1
AC
92.2
AC
91.9
AC
91.7
AC
91.8
AC
91.8
AC
91.7
AC
91.6
AC
91.5
AC
91.6
AC
91.5
AC
91.5
AC
91.8
AC
91.8
AC
91.8
AC
92.0
AC
93.5
AC
93.6
AC
93.7
AC
93.7
AC
93.8
AC
93.9
AC
94.0
AC
94.1
AC
93.9
AC
93.9
AC
93.9
AC
94.0
AC
94.0
AC
94.0
AC94.0
AC
94.1
AC
94.1
AC
93.1
AC
93.0
AC
92.9
AC
92.6
AC
93.3
C-FENCE
92.6
G-WIRE
92.5
G-WIRE
92.8
CAV
92.6
CAV
94.1
CAV
93.0
TR
92.7
TR
92.5
TR
92.5
TR
93.3
TR
93.3
TR
93.1
TR
93.4
TR
92.5
SP
92.4
SP
92.4
SP
92.2
SP
92.0
SP
91.9
SP
92.0
SP
92.3
SP
92.6
SP
92.3
MIRROR
92.0
GMH
92.0
GMH
90.2
COMMH
90.2
COMMH
92.1
EMH
92.1
EMH
92.7
EMH
92.7
EMH
94.0
EMH
94.2
EMH
94.1
EMH
93.2
WELL
94.5
DITC
H
94.6
DITC
H
94.6
DITC
H
94.6
DITC
H
94.6
DITC
H
94.6
DITC
H
94.3
FTANK
94.2
FTANK
93.2
FTANK
93.0
FTANK
93.2
FTANK
94.2
MONITOR
94.3
SUMP
94.2
SUMP
94.2
SUMP
94.2
SUMP
93.0
ELEC
94.1
ELEC
W/VW/V
W/V
W/V
W/VW/V
E/P
E/P
E/P
E/P
E/P E/P
E/P
E/P
E/P
E/P E/P
W/V
S/PS/P
S/P
W/V
S/P
S/P
S/P
S/P
S/P
FHT
LP
S/B
PM
J
ITE
MEL
EC
S
T
G
C
E
E
S
S
S
S
S
SCO
FDC
TRASH
T R
A S H
E
S
O
S
(P
VC
, D
0)
S
S
S
S
S
S
S
SS
S
(PVC, D=150)
S
S
S
S
S
(P V C , D
S
(P
VC
, D
0)
S
L
IF
T
S T A T
IO
N
FANFAN
F A N
F A N
FA
N
FA
N
(PVC, D=100)
S
(P V C , D
D
SD (R
CP
, D
0)
(R C P D
S
D
(RCP, D=760)
SD
(R C P D
S D
(PVC
, D
200)
(RCP, D=450)SD
FAN
TRASH
S D (R
C P
D
(D=200, ASSUMED)
W
(D 0, A
SS
UM
ED)
W
W (D
A S S
U M
E D
W (D
A S S U
M E D
(D
A S S
U M
E D
WW
(D
A S S
U M
E D
W (D
A S S
U M
E D
W
(D=32, ASSUMED)
(D
A S S U
M E D
W
W (D
, A
SS
UM
ED)
FOL
FO
L
F O
L
F O
L
FO
L
FO
L
(PVC, D=200)
SHED SHED
SHED
SHED
S H E D
S H E D
BL
DG.
B L D
G
BLDG. #142
S
G
AND SHRUBS
REMOVE EXISTING TREES
SCALE : 1 / 200
CAMP WALKER
KU, HUN MO
CIVIL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
C-2
CHI, K. K.
GRAPHIC SCALE
SCALE: 1 : 200
4000 8000
N
DEMOLITION OF BUILDING 140, 141 AND 142
SITE LAYOUT PLAN
J1-00579-9J
19 JUN 19
SITE LAYOUT PLAN
SCOPE OF WORK
GENERAL NOTES:
SUBMISSION OF CONTRACT PROPOSAL.
DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO
1. THE CONTRACTOR SHOULD VERIFY ALL EXISTING CONDITIONS AND
IF REQUIRED.
DETOUR ROAD FOR VEHICLES DURING CONSTRUCTION PERIOD
5. CONTRACTOR SHOULD PROVIDE TEMPORARY ACCESS ROAD AND
ON THE PROJECT.
BY THE CONTRACTING OFFICER PRIOR TO COMMENCING WORK
PORTION OF THE JOB BY THE COR AND SHOULD BE APPROVED
2. THE CONTRACTOR SHOULD SUBMIT SHOP DRAWINGS FOR ANY
CONTRACTING OFFICER.
CONTRACTORS EXPENSE TO THE SATISFACTION OF THE
DAMAGED BY DISMANTLING, DEMOLISHING, OR REMOVING AT THE
RESTORATION TO THEIR ORIGINAL CONDITIONS OF THE ITEMS
3. THE CONTRACTOR SHOULD BE RESPONSIBLE FOR REPAIR/
ITEMS WHICH WILL INTERFERE WITH THE CONSTRUCTION OPERATIONS.
UNDERGROUND ROCK BASE, EXISTING UTILITY LINES, AND OTHER
CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS
4. THE SITE INDICATED ON THE DRAWING SHOULD BE GRADED AND
AND OTHER UTILITY MARKERS IN THE PROJECT LIMIT.
6. CONTRACTOR SHALL RESTORE/REESTABLISH SURVEY MONUMENTS
FROST DEPTH UNLESS OTHERWISE NOTED.
8. WATER AND SEWER LINE SHOULD HAVE A MINIMUM COVER OF
WITHOUT ANY ADDITIONAL COST.
INCLUDING FALSEWORK SUCH AS FORMWORKS AND SHORING
9. CONTRACTOR SHOULD PROVIDE ANY NECESSARY RESOURCES
LAWS AND REGULATIONS.
GOVERNMENT LEASED PROPERTY IN ACCORDANCE WITH LOCAL
DISPOSAL OF WASTE MATERIALS SHOULD BE OUTSIDE U.S
CONTRACTOR BY THE GOVERNMENT.
AREA AND NO LAY DOWN AREA SHALL BE PROVIDED FOR THE
OFFICES AND STORAGE AREAS SHALL BE WITHIN THE CONSTRUCTION
LOCATION APPROVED/INDICATED BY C.O.R. ADMINISTRATIVE FIELD
TEMPORARY FACILITIES ACCORDING TO O&MA SPEC. AT THE
CONTRACTOR SHOULD PROVIDE AND MAINTAIN THE CONTRACTOR’S
APPROVAL PRIOR TO COMMENCING THE WORK.
SUBMITTAL TO THE DESIGN AND TECHNICAL REVIEW BRANCH FOR
THE CONTRACTOR SHOULD PREPARE AND SUBMIT MATERIAL
TRAFFIC AND OPERATIONS.
FOR THE PROTECTION AND SAFETY OF THE PUBLIC AND/OR MILITARY
PROTECTIVE FACILITIES AND SHALL TAKE ALL NECESSARY PRECAUTIONS
SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES AND OTHER
CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL NECESSARY
MILLIMETERS AND STATIONS AND ELEVATIONS ARE IN METERS.
UNLESS OTHERWISE NOTED ALL THE DIMENSIONS ARE IN
TO DPW
SALVAGEABLE MATERIAL WITHIN PROJECT LIMIT SHALL BE RETURNED
14.
13.
10.
11.
12.
15.
#2 (GENERAL REQUIREMENTS)
#1 (REPAIR/MAINTENANCE)
AND CONCRETE PAVEMENT
REMOVE EXISTING CONCRETE SIDEWALK
SIDEWALK AND PAVEMENT
REMOVE EXISTING CONCRETE
REMOVE EXISTING PLANTERS
CUT AND PLUG
REMOVE EXISTING WATER LINES,
SEE ARCH. & MECH. DRAWINGS
(1- STORY BUILDING)
REMOVE EXISTING BUILDING, S-142
SEE ARCH. & MECH. DRAWINGS
(1- STORY BUILDING)
REMOVE EXISTING BUILDING, S-140
REMOVE EXISTING WOODEN FENCE
AND SURFACE CLEANOUTS
REMOVE EXISTING SEWER LINES
REMOVE EXISTING CONCRETE PADS
SEE ARCH. DRAWINGS
REMOVE EXISTING BUILDING, SHED(S)
PROJECT WORK LIMITS
1. SEE GENERAL AND REMOVAL NOTES ON DRAWING REF. NO. C-2.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
CONCRETE PAD(S)
FUEL PIPING SYSTEM, SUMPS AND
REMOVE EXISTING FUEL OIL TANKS,
(BY ENVIRONMENTAL DIV.)
EXISTING TREES TO REMAIN, 17EA
VALVES AND VALVE BOXES
REMOVE EXISTING WATER GATE
ITEM TO ABANDON
ACCOMPLISH THE CIVIL SCOPE OF WORK.
PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED TO
OF THE ARMY INSTALLATION MANAGEMENT COMMAND" FORM AS A
O & MA PROJECT, KOREA, REVISION1, 30 OCTOBER 2015, DEPARTMENT
COMMAND" AND "STANDARD TECHNICAL SPECIFICATIONS FOR
2015, DEPARTMENT OF THE ARMY INSTALLATION MANAGEMENT
DETAIL DRAWINGS, FOR O & MA PROJECT, KOREA, 30 NOVEMBER
7. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD
REMOVAL NOTES
1.
2.
3.
4.
5.
6.
7.
9.
10.SEE THE ELEC. DRAWINGS FOR ELEC. REMOVAL WORKS.
REMOVAL OF 17EA TREES WILL BE BY ENVIRONMENTAL DIVISION.
TO THE BUILDING SHALL BE REMOVED AND CUT & CAPPED.
THE LOCATION OF UTILITY LINES. ALL UTILITY LINES CONNECTED
ARE SHOWN ON THE DRAWING OR NOT, CONTRACTOR SHALL VERIFY
EXISTING UTILITY LINES (WATER, SEWER, STORM DRAIN, AND FUEL OIL)
AND ENVIRONMENTAL DIVISION.
DURING EXCAVATIONS OF FUEL LINE AND SUMP PUMPS TO THE COR
CONTRACTOR SHOULD REPORT ANY CONTAMINATED SOIL DISCOVERED
ABANDONED IN ACCORDANCE WITH THE GUIDANCE OF COR.
REMOVAL WORK SHALL BE REMOVED OR CUT AND CAPPED OR
REMOVAL OF UNDERGROUND UTILITY LINES FOUND DURING THE
KOREA, USFK PAM 200-1.
APPLICABLE KOREAN ENVIRONMENTAL GOVERNING STANDARDS FOR
ALL DISPOSAL WORK SHALL BE IN ACCORDANCE WITH THE
EXISTING CHAIN-LINK FENCE, ETC.
FOR THE PROJECT LIMITS, I.E. EDGE OF PAVEMENT, EDGE OF ROADWAY,
EXISTING GROUND FEATURES SHALL BE USED AS A DEMARCATION
AS INDICATED AND REQUIRED.
THE ITEMS WITHIN THE PROJECT BOUNDARY SHALL BE REMOVED
LIMITS INDICATED, UNLESS OTHERWISE NOTED.
ALL REMOVAL WORKS SHALL BE CONFINED WITHIN THE PROJECT
REMOVE EXISTING FUEL OIL LINE
11.
W/V
W /V
W /V
W/VW/V
W/V
LINES (AS REQUIRED)
ELEC. POWER, TELEPHONE, CONTROL
LINES SUCH AS WATER, IRRIGATION,
REROUTE UNDER GROUND UTILITY
12.
2 5
D - 19 - 09
REROUTE UNDER GROUND UTILITY LINES (AS REQURED).
REMOVE EXISTING SEWER LINES AND SURFACE CLEANOUTS.
REMOVE EXISTING FUEL OIL LINES.
REMOVE EXISTING FUEL OIL TANKS, FUEL PIPING SYSTEM, SUMPS.
REMOVE EXISTING WOODEN FENCE.
REMOVE EXISTING PLANTERS.
REMOVE EXISTING TREES AND SHRUBS.
REMOVE EXISTING HOSE BIBS.
REMOVE EXISTING WATER LINES, CUT AND PLUG.
REMOVE EXISTING WATER GATE VALVES AND VALVE BOXES.
REMOVE EXISTING CONCRETE PADS.
REMOVE EXISTING CONCRETE SIDEWALK AND CONCRETE PAVEMENT.
REMOVE EXISTING HOSE BIBS
| J1-00579-9J |
| J1-00579-9J_Drawing |
| J1-00579-9J_C |
| J1-00579-9J_C01 |
| J1-00579-9J_C02 |
| J1-00579-9J_AE |
| J1-00579-9J_AE01 |
| J1-00579-9J_AE02 |
J1-00579-9J_E01
File details come from the government source that posted it.