H01._J1-00579-9J__DRAWING_-_4.PDF

PDF 3 MB Posted

Attached to
DEMOLITION OF BUILDING B140, 141 & 142, CP WALKER, DAEGU KOREA
Solicitation number
W90VN9-19-R-0057
Issued by

About this file

DRAWINGS 4

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HGFEDCBA

DESIGNED BY

CHECKED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :SAFETY REP

SIGNAL REP

FES

FORCE PROTECTION

CHIEF,

DESIGN & TECH. REVIEW Br.

O & M

HOUSING DIV.

REVIEWED BY

SYMBOL BY CHK.ZONE DATE APVD.

R E V I S I O N S

DESCRIPTION

SHEET OF

UNITED STATES ARMY GARRISON DAEGU

DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br

UNIT #15746, APO AP 96218-5746

DATE:

AS SHOWN

ARCHITECTURAL

AE-01

CAMP WALKER

AS SHOWN

ARCHITECTURAL

CAMP WALKER

KIM, CHI SOP

J1-00579-9J

KIM, DONG HWAN

AE 01

SCALE : 1 / 100

REMOVAL FLOOR PLAN & BUILDING VIEW

1.

2.

3.

OR COMMENCING WORK ON THE PROJECT.

CONDITION AND DIMENSIONS PRIOR TO SUBMISSION OF CONTRACT PROPOSAL

THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING

CONDITION TO ADJACENT AREAS AS DIRECTED BY THE CONTRACTING OFFICER.

DAMAGES TO EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH

THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL

4.

AND SUBMITTED TO THE CONTRACTING OFFICER FOR APPROVAL.

FIELD BY THE CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITIONS

EXACTLY FIELD CONDITIONS, SUCH DETAILS SHALL BE PREPARED IN THE

SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH

5.

SATISFACTION OF THE CONTRACTING OFFICER.

DEMOLISHING OR REMOVING AT THE CONTRACTORS EXPENSE TO THE

TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY DISMANTLING,

THE CONTRACTOR SHOULD BE RESPONSIBLE FOR REPAIR / RESTORATION

AND DETOUR ROAD PLAN FOR VEHICLES DURING THE CONSTRUCTION PERIOD.

THE CONTRACTOR SHOULD PROVIDE TEMPORARY ACCESS ROAD PLAN

AND SUBMITTED TO THE CONTRACTING OFFICER FOR APPROVAL.

AND DETOUR ROAD PLAN FOR VEHICLES DURING THE CONSTRUCTION PERIOD

THE CONTRACTOR SHOULD PREPARE TEMPORARY ACCESS ROAD PLAN

6.

MISSION OPERATION.

WORK STAGE BY STAGE WITHOUT ANY INCONVENIENCE TO THE CUSTOMER’S

THE WORK AND GET APPROVAL FROM THE GOVERNMENT AND EXECUTE

THE CONTRACTOR SHALL SUBMIT WORK SCHEDULE PRIOR TO COMMENCING7.

DEMOLITION NOTES

GENERAL NOTES

FAN

SHED

FAN

SHED

KITCHEN

8’-8"

14’-1"

11’-3"

8’-8"

14’-1"

11’-3"

2 2

32664

107’-2"

REMOVE EXISTING CONCRETE STOOP

12’-11"

4’-9"

14’-9"

19’-0"

15’-2"

5’-5"

7’-7"

7’-11"

10’-8"2

8’-1"

12’-6"1

4’-0"

4’-5"

N

BUILDING: 141

FLOOR: 1

EXISTING DAY TANKS

SCOPE OF WORK

REPAIR / MAINTAINANCE : K - WORK

REMOVE EXISTING CONCRETE STOOP.

REMOVE EXISTING OUTDOOR UNIT WITH CONCRETE PAD.

REMOVE EXISTING SHED.

[ BLDG. NO.140AB, 141AB & 142AB ]

DEMOLISH EXISTING WHOLE BUILDING COMPONENTS.

AND ALL DUCT WORK WITH ALL ASSOCIATED ACCESSORIES AND PARTS.

AC UNIT, EXHAUST FAN, REGISTER, DRYER VENT, KITCHEN HOOD, PAD, PIPES, VALVES

REMOVE EXISTING HVAC SYSTEM INCLUDING WARM AIR FURNACE, UNIT HEATER,

[ ONLY BLDG. NO. 140A ]

AND PARTS AND TURN IN TO DPW AFTER CLEANING THE INTERIOR AND EXERIOR.

REMOVE EXISTING DAY TANKS AT BLDG. #140A WITH ALL ASSOCIATED ACCESSORIES

PIPES AND VALVES WITH ALL ASSOCIATED ACCESSORIES AND PARTS.

REMOVE EXISTING PLUMBING SYSTEM INCLUDING WATER HEATER, FIXTURES, PAD,

3 5

DEMOLITION NOTES

GENERAL NOTES, REMOVAL FLOOR PLAN,

SCOPE OF WORK

CLEANING AND RETURN IN DAY TANKS.

7. THE CONTRACTOR SHALL REPORT TO ENVIRONMENTAL DIVISION AND COR FOR

6. SALVAGEABLE MATERIAL WITHIN PROJECT LIMIT SHALL BE RETURNED TO DPW.

5. DEMOLITION OF MECHANICAL AND ELECTRICAL ITEMS IS ALSO INCLUDED.

THE GUIDANCE OF COR.

SHALL BE REMOVED OR CUT AND CAPPED OR ABANDONED IN ACCORDANCE WITH

4. REMOVAL OF UNDERGROUND UTILITY LINES FOUND DURING THE REMOVAL WORK

ENVIRONMENTAL GOVERNING STANDARDS FOR KOREA, USFK PAM 200-1.

3. ALL DISPOSAL WORK SHALL BE IN ACCORDANCE WITH THE APPLICABLE KOREAN

REMOVED, UNLESS OTHERWISE INDICATED.

2. ALL STRUCTURES WITHIN REMOVAL BOUNDARY SHALL BE DEMOLISHED AND

INDICATED, UNLESS OTHERWISE NOTED.

1. ALL DEMOLITION WORKS SHALL BE CONFINED WITHIN THE REMOVAL WORK LIMITS

D - 19 - 09

19 JUN 19

DEMOLITION OF BUILDING 140, 141 AND 142

J1-00579-9J
J1-00579-9J_Drawing
J1-00579-9J_C
J1-00579-9J_C01
J1-00579-9J_C02
J1-00579-9J_AE
J1-00579-9J_AE01
J1-00579-9J_AE02

J1-00579-9J_E01

File details come from the government source that posted it.