H01._J1-00579-9J__DRAWING_-_4.PDF
PDF 3 MB Posted
- Solicitation number
- W90VN9-19-R-0057
About this file
DRAWINGS 4
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
AS SHOWN
ARCHITECTURAL
AE-01
CAMP WALKER
AS SHOWN
ARCHITECTURAL
CAMP WALKER
KIM, CHI SOP
J1-00579-9J
KIM, DONG HWAN
AE 01
SCALE : 1 / 100
REMOVAL FLOOR PLAN & BUILDING VIEW
1.
2.
3.
OR COMMENCING WORK ON THE PROJECT.
CONDITION AND DIMENSIONS PRIOR TO SUBMISSION OF CONTRACT PROPOSAL
THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING
CONDITION TO ADJACENT AREAS AS DIRECTED BY THE CONTRACTING OFFICER.
DAMAGES TO EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH
THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL
4.
AND SUBMITTED TO THE CONTRACTING OFFICER FOR APPROVAL.
FIELD BY THE CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITIONS
EXACTLY FIELD CONDITIONS, SUCH DETAILS SHALL BE PREPARED IN THE
SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH
5.
SATISFACTION OF THE CONTRACTING OFFICER.
DEMOLISHING OR REMOVING AT THE CONTRACTORS EXPENSE TO THE
TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY DISMANTLING,
THE CONTRACTOR SHOULD BE RESPONSIBLE FOR REPAIR / RESTORATION
AND DETOUR ROAD PLAN FOR VEHICLES DURING THE CONSTRUCTION PERIOD.
THE CONTRACTOR SHOULD PROVIDE TEMPORARY ACCESS ROAD PLAN
AND SUBMITTED TO THE CONTRACTING OFFICER FOR APPROVAL.
AND DETOUR ROAD PLAN FOR VEHICLES DURING THE CONSTRUCTION PERIOD
THE CONTRACTOR SHOULD PREPARE TEMPORARY ACCESS ROAD PLAN
6.
MISSION OPERATION.
WORK STAGE BY STAGE WITHOUT ANY INCONVENIENCE TO THE CUSTOMER’S
THE WORK AND GET APPROVAL FROM THE GOVERNMENT AND EXECUTE
THE CONTRACTOR SHALL SUBMIT WORK SCHEDULE PRIOR TO COMMENCING7.
DEMOLITION NOTES
GENERAL NOTES
FAN
SHED
FAN
SHED
KITCHEN
8’-8"
14’-1"
11’-3"
8’-8"
14’-1"
11’-3"
2 2
32664
107’-2"
REMOVE EXISTING CONCRETE STOOP
12’-11"
4’-9"
14’-9"
19’-0"
15’-2"
5’-5"
7’-7"
7’-11"
10’-8"2
8’-1"
12’-6"1
4’-0"
4’-5"
N
BUILDING: 141
FLOOR: 1
EXISTING DAY TANKS
SCOPE OF WORK
REPAIR / MAINTAINANCE : K - WORK
REMOVE EXISTING CONCRETE STOOP.
REMOVE EXISTING OUTDOOR UNIT WITH CONCRETE PAD.
REMOVE EXISTING SHED.
[ BLDG. NO.140AB, 141AB & 142AB ]
DEMOLISH EXISTING WHOLE BUILDING COMPONENTS.
AND ALL DUCT WORK WITH ALL ASSOCIATED ACCESSORIES AND PARTS.
AC UNIT, EXHAUST FAN, REGISTER, DRYER VENT, KITCHEN HOOD, PAD, PIPES, VALVES
REMOVE EXISTING HVAC SYSTEM INCLUDING WARM AIR FURNACE, UNIT HEATER,
[ ONLY BLDG. NO. 140A ]
AND PARTS AND TURN IN TO DPW AFTER CLEANING THE INTERIOR AND EXERIOR.
REMOVE EXISTING DAY TANKS AT BLDG. #140A WITH ALL ASSOCIATED ACCESSORIES
PIPES AND VALVES WITH ALL ASSOCIATED ACCESSORIES AND PARTS.
REMOVE EXISTING PLUMBING SYSTEM INCLUDING WATER HEATER, FIXTURES, PAD,
3 5
DEMOLITION NOTES
GENERAL NOTES, REMOVAL FLOOR PLAN,
SCOPE OF WORK
CLEANING AND RETURN IN DAY TANKS.
7. THE CONTRACTOR SHALL REPORT TO ENVIRONMENTAL DIVISION AND COR FOR
6. SALVAGEABLE MATERIAL WITHIN PROJECT LIMIT SHALL BE RETURNED TO DPW.
5. DEMOLITION OF MECHANICAL AND ELECTRICAL ITEMS IS ALSO INCLUDED.
THE GUIDANCE OF COR.
SHALL BE REMOVED OR CUT AND CAPPED OR ABANDONED IN ACCORDANCE WITH
4. REMOVAL OF UNDERGROUND UTILITY LINES FOUND DURING THE REMOVAL WORK
ENVIRONMENTAL GOVERNING STANDARDS FOR KOREA, USFK PAM 200-1.
3. ALL DISPOSAL WORK SHALL BE IN ACCORDANCE WITH THE APPLICABLE KOREAN
REMOVED, UNLESS OTHERWISE INDICATED.
2. ALL STRUCTURES WITHIN REMOVAL BOUNDARY SHALL BE DEMOLISHED AND
INDICATED, UNLESS OTHERWISE NOTED.
1. ALL DEMOLITION WORKS SHALL BE CONFINED WITHIN THE REMOVAL WORK LIMITS
D - 19 - 09
19 JUN 19
DEMOLITION OF BUILDING 140, 141 AND 142
| J1-00579-9J |
| J1-00579-9J_Drawing |
| J1-00579-9J_C |
| J1-00579-9J_C01 |
| J1-00579-9J_C02 |
| J1-00579-9J_AE |
| J1-00579-9J_AE01 |
| J1-00579-9J_AE02 |
J1-00579-9J_E01
File details come from the government source that posted it.