This document contains an architectural drawing set and related information for a federal contract opportunity to install a temporary Dining Facility (DFAC) tent on Camp Hovey.

The key details are:

The contract requires the installation of a 55m x 20m tension fabric structure (TFS) tent on an existing concrete foundation, as well as the installation of doors, partitions, epoxy flooring, and a new movable toilet facility with utility connections. Associated civil, mechanical, and electrical work is also required, such as connecting utilities, relocating kitchen equipment, and providing lighting and power for the tent DFAC. The contractor must complete all work within 75 days. This is a Materiel Command Army Contracting Command solicitation (W90VN824R0064) open only to MATOC contract holders. No other details on pricing, award, or set-asides are provided in the documents.

View the file

Other files

File Type Posted
UPDATED 320257_INSTALLATION TENT_CP-HOVEY_DWG_ARCH.pdf PDF
Amendment W90VN824R0064-0001.pdf PDF
320257_DWG_CIVIL.pdf PDF
320257_DWG_MECH.pdf PDF
W90VN824R0064_KO SIGNED.pdf PDF
320257_DWG_TITLE-SHEET.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

A-1

ARCHITECTURAL

GENRAL NOTES AND SCOPE OF WORK

1.

8.

2.

3.

4.

5.

6.

7.

9.

10.

11.

12.

13.

14.

15.

WALL : 2.29 SM. DEG K/W

ROOF : 5.30 SM. DEG K/W

R-VALUE :

GENERAL NOTES

16.

17.

1.1

1.2

1.3

1.4

SCOPE OF WORK (ARCHITECTURAL WORK)

NEW CONSTRUCTION (L) WORK

2.1

2.2

2. MOVABLE TOILET

CONNECT MECHANICAL AND ELECTRICAL UTILITY LINE TO NEW TOILET.

PLAN AND SCHEDULE.

INSTALL DOORS AND FRAMES INCLUDING HARDWARE SETS AS SHOWN ON FLOOR

INSTALL PARTITIONS AS SHOWN ON FLOOR PLAN AND SCHEDULE.

APPLY EPOXY COATING WITH NON SLIP GRITS ON EXISTING CONCRETE FLOOR.

TEMPORARY SPACES.

FURNITURE(TABLES & CHAIRS) AND EQUIPMENT WILL BE MOVED TO TENT OR 1.5

PROVIDE DISCONNECTION AND CONNECTION OF EQUIPMENTS.1.6

AS SHOWN ON DWG.

PROVIDE NEW MOVABLE TOILET FACILITY INCLUDING ALL TOILET ACCESSORIES

1.1

NEW CONSTRUCTION (L) WORK

SCOPE OF WORK (ELECTRICAL WORK)

AND SWITCHES WITH ASSOCIATED WIRING FOR TENT DFAC.

PROVIDE LED LIGHTING FIXTURES, EXIT SIGNS AT EACH EXIT, EMERGENCY LIGHTS

TENT DFAC

TENT DFAC

NOTES FOR ELEC. WORK

REQUIREMENT.

TYPE OF LIGHTING FIXTURES OF TENT DFAC TO MEET THE FOLLOWING ILLUMINATION

CONTRACTOR SHALL PROVIDE SHOP DRAWING FOR LIGHTING SYSTEM INCLUDING

DINING AREA: 300LUX AT DINING TABLE

FOOD SERVING AREA:300LUX AT FOOD PREPARATION SURFACE

KITCHEN AREA: 500LUX AT FOOD PREPARATION SURFACE

(NFPA101), AND SPECIFICATAION.

THE LATEST VERSION OF NATIONAL ELECTRICAL CODE (NFPA70), LIFE SAFETY CODE

EXIT SIGNS AND EMERGENCY LIGHTS SHALL BE PROVIDED TO TENT DFAC TO MEET

1.

2.

NOTES FOR ELEC. WORK

1.

TO PRODUCTS OF THE MANUFACTURES INDICATED.

IDENTIFICATION PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS

COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING

THE GENERAL CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER.

IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT.

OR RENOVATION.

CONDITION AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION

THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING

OF THE STRUCTURE.

TO DEMOLITION OF THE LOAD BEARING WALLS TO PREVENT COLLAPSE

APPROPRIATE TEMPORARY SUPPORTS SHALL BE CONSTRUCTED PRIOR

THE DAMAGES TO MATCH UP TO ADJACENT AREAS AT HIS OWN EXPENSE.

EXISTING AREAS CAUSED BY THIS PROJECT AND SHALL REPAIR

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES MADE TO

FIELD CONDITION AND SUBMITED TO COR FOR APPROVAL.

PREPARED AT THE SITE BY THE CONTRACTOR ACCORDING TO ACTUAL

WITH THE FIELD CONDITION. IN THAT CASE, SHOP DRAWINGS SHALL BE

SOME DETAILS SHOWN ON CONTRACT DRAWINGS MAY NOT COINCIDE

DRAWINGS TO COR FOR APPROVAL.

CONTRACTOR SHALL SUBMIT MANUFACTURER'S INSTALLATION SHOP

INSTALLATION.

DETAILS AND GET APPROVAL FROM COR BEFORE FABRICATION AND

CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL DOOR/WINDOW

ELECTRICAL, TELEPHONE AND FIRE ALARM SYSTEM.

REPLACEMENT OF MECHANICAL (PLUMBING, HEATING, EQUIPMENT, ETC),

AND CEILING WHERE REQUIRED FOR THE INSTALLATION AND/OR

OF ANY OBSTRUCTED ITEMS, CUT, PATCH AND RESTORE WALLS, FLOORS

THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL/REINSTALLATION

OF THIS PROJECT.

OCTOBER 1, 2003 SHALL BE AS A PART OF THE CONTRACT DOCUMENT

STANDARD DETAIL DRAWINGS FOR O&MA PROJECT, KOREA, DATED

NO. 595b, COLORS.

AND COLOR NUMBERS ARE FROM TM-5-807-7 AND FEDERAL STANDARD

COLOR OF MATERIALS & PAINTS SHALL BE SELECTED BY USING AGENCY

OR STORAGE OFFICE, DPW. PER DIRECTION FROM COR.

SALVAGE OR SERVICEABLE MATERIALS SHALL BE RETURNED TO SUPPLY

PRIOR TO COMMENCEMENT OF FLOOR TILE WORK.

ALL CONCRETE FLOOR SURFACES SHALL BE LEVELED AND SMOOTHED

3.1.14, OMA STD SPECIFICATION 15181.

AND OTHER ITEMS REQUIRING MAINTENANCE/OPERATION IAW THE SECTION

PROVIDE ACCESS DOORS FOR ALL CONCEALED VALVES, VENTS, CONTROLS

SHOWING THE PRODUCT IS LEAD FREE.

DATA SHEET (MSDS), WRITTEN IN ENGLISH, FROM THE MANUFACTURE

THE CONTRACTOR SHALL PROVIDE A CERTIFICATE OR MATERIAL SAFETY

THE NON-VOLATILE SOLIDS) DURING THE EXECUTION OF THIS PROJECT.

OR COATINGS WITH LESS THAN 0.05 PERCENT LEAD BY WEIGHT OF

THE CONTRACTOR SHALL USE "LEAD FREE" COATINGS (LIQUID PAINTS

DOCUMENTATION TO 8 CES/CEAN.

PROVIDE THE NEW SURVEY REPORT AND ASBESTOS REMOVAL

ENVIRONMENTAL GOVERNING STANDARD (KEGS). THE CONTRACTOR SHALL

APPROPRIATE ASBESTOS CONTROL IS IN ACCORDANCE WITH THE KOREA

MATERIALS SHALL BE REMOVED PRIOR TO ANY WORK TO ASSURE THAT

OFFICER. THE WORK AREA SHALL BE RESURVEYED AND ASBESTOS

SHALL CEASE WORK IN THE AFFECTED AREA AND NOTIFY THE CONTRACTING

ASBESTOS CONTAINING MATERIAL ARE DISCOVERED, THE CONTRACTOR

PRESENT IN THE AREAS AFFECTED BY THIS WORK: IF SUSPECTED

ASBESTOS FREE. TESTS HAVE INDICATED THAT ASBESTOS IS NOT

IN ENGLISH, FROM THE MANUFACTURER VERIFYING THE PRODUCT IS

THE CONTRACTOR SHALL PROVIDE A CERTIFICATE OR MSDS, WRITTEN

0.1 PERCENT BY WEIGHT) DURING THE EXECUTION OF THIS PROJECT.

THE CONTRACTOR SHALL USE "ASBESTOS FREE" MATERIALS (LESS THAN

TFS TENT SAMPLE PICTURES

TFS TENT ELEVATION SAMPLE

INSTALLATION TENT

CAMP HOVEYKIM, YK

320257

SKIRT DETAILS FOR APPROVAL BY COR.

CONTRACTOR SHALL PROVIDE SHOP DRAWINGS OF TFS TENT INCLUDING TENT END

2.

HOLES FOR EXHAUST HOOD, UTILITY EQUIPMENT AND ELECTRICAL SYSTEMS, ETC.

CONTRACTOR SHALL COORDINATE WITH COR AND IN-HOUSE WORKERS TO MAKE

(TFS TENT NEED A 3-YEAR WARRANTY FOR MAINTENANCE)

FOUNDATION, AND REMOVE TENT 3-YEARS AFTER COPLETION.

INSTALL TFS(TENSION FABRIC STRUCTURE) TENT (55M x 20M) ON EXISTING CONCRETE

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

SCALE:

1/100

FLOT DFAC TENT LAYOUT PLAN

A-2

ARCHITECTURAL

FLOT DFAC TENT LAYOUT PLAN

KITCHEN AREA FOOD SERVING AREA

QUEUING AREA

DINING AREA (300 SEATS)

AREA

ENTRANCE

EXIT AREA

DISH WASHING AREA

LEGEND

FULL PARTITION (VARIOUS HEIGHT)

HIGH PARTITION (H: 2,000)

LOW PARTITION (H: 800)

CASHIER COUNTER

FULL PARTITION

LOW PARTITION

(H: 800)

FULL PARTITION

LOW PARTITION

(H: 800)

HIGH PARTITION

(H: 2,000)

INSTALLATION TENT

CAMP HOVEYKIM, YK

320257

1600 7400

D4

D3

D1

D1

D1

D1

D1

D1

D2 D2

D2 D2

(H:3000+VARIOUS)

(H:3000+VARIOUS)

FEC

FEC

FEC

FEC PROVIDE NEW FIRE EXTINGUISHERS CABINETS(FEC)

A3

1D

A3

1C

A3

1B

A3

1A

S'STL COUNTER TOP

W/THK1.4 x 600(D)

3,900 x 600 x 1,000(H)

RETURN TABLE OPENING

WALL

WALL SUPPORT

WALL

WALL SUPPORT

A3

1C

INSTALLATION TENT

CAMP HOVEYKIM, YK

320257

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

A-3

ARCHITECTURAL

WALL SECTIONS AND DOOR DESCRIPTIONS

STRIPPING

SAFETY RUBBER

2 - SAFETY RUBBER STRIPPING FOR GLASS DOOR

2 - DOOR HANDLE

2 - DUST PROOF STRIKE, L04011

4 - DOOR STOP, L02161

2 - DEAD LOCK (TOP & BOTTOM)

2 - FLUSH BOLT (TOP & BOTTOM)

1 - THRESHOLD, J32180

2 - THRESHOLD FOR FLOOR CLOSER, C08011

2 - TOP PIVOT HINGE, C07021

2 - FLOOR CONECEALED CLOSER, C06012

HDW - ENTRANCE GLASS DOOR

ENTRANCE GLASS DOOR

DOUBLE DOOR

TEMPERED GLASS

THK.12mm

D1 EXIT DOOR (EXTERIOR)D2 D3 D4

FRAMES

STEEL

STAINLESS

SINGLE DOOR WITH STEEL DOOR FRAME

* STEEL FLUSH, INSULATED

1 - WEATHER STRIPPING

1 - THRESH HOLD, J12190

1 - DOOR HOLDER, L01381

1 - KICK PLATE, J102

1 - DOOR CLOSER, C02021

(TYPE"1" AND FUNCTION "8")

1 - EXIT DEVICE (PUSH PAD TYPE)

3 - BUTT, HINGES TYPE A5112 (NRP)

HDW - EXIT DOOR (EXTERIOR)

WITH STEEL DOOR FRAME

* WOOD FLUSH, SOLID CORE DOUBLE DOOR

DISH WASHING AREA DOOR

1 - ALUMINUM THRESHOLD, J12190

2 - DOOR HOLDER, L01381

2 - DOOR CLOSER, C02021

2 - FLUSH BOLTS

1 - LOCK SET, F04 (LEVER TYPE)

6 - BUTT, HINGES TYPE A5112 (NRP)

HDW - DISH WASHING AREA DOOR

WOODEN LOUVER

350 x 300

* 2EA x 350 x 300 WOODEN LOUVER

WITH STAINLESS STEEL FRAMES

* TEMPERED GLASS DOUBLE DOOR (THK.12mm)

* DOOR SIZE : 1,800 x 2,150 * DOOR SIZE : 900 x 2,150 * DOOR SIZE : 1,800 x 2,150

WITH STEEL DOOR FRAME (HALF SIZE)

* WOOD FLUSH, SOLID CORE SINGLE DOOR

1 - DOOR HOLDER, L01381

1 - DOOR STOP, L02141

1 - KICK PLATE, J102

1 - LOCK SET, F75 (LEVER TYPE)

2 - BUTT, HINGES TYPE A5112

HDW - PASSAGE DOOR

PASSAGE DOOR

,0

,0

,2

VCB VCB

@400 O.C.

METAL STUD

ON 150THK

ON 12THK PLYWOOD

PAINT

INSULATION

SCALE:

WALL SECTIONS & ELEVATIONS

1/20

SCREEN

TENT FABRIC

ON PLYWOOD

PAINT

PASSAGE OPENING

VCB

GRIT

W/NON-SLIP

EPOXY GRIT

W/NON-SLIP

EPOXY

WALL

WALL-SUPPORT

@400 O.C.

METAL STUD

ON 150THK

ON 12THK PLYWOOD

PAINT

GRIT

W/NON-SLIP

EPOXY

VCB VCB

GRIT

W/NON-SLIP

EPOXY

FRAMES

STEEL STRUCTURE

FIX TO MAIN

INSULATION

EXST CONC FLOOREXST CONC FLOOR

EXST CONC FLOOR

VCB

GRIT

W/NON-SLIP

EPOXY

VCB

GRIT

W/NON-SLIP

EPOXY

@400 O.C.

METAL STUD

ON 150THK

ON 12THK PLYWOOD

PAINT

ON 12THK PLYWOOD

PAINT

1A 1B 1C 1D

SCALE:

N/A

DOOR DESCRIPTIONS

STAINLESS STEEL CAP

THK1.4 x 600W(CONT.)

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

A-4

ARCHITECTURAL

W.TOILET

M.TOILET

SCALE: 1/100

SCALE:

IMAGE CUT

N/A

S.S.

PTDWR

PTDWR

VANITY CABINETMOP RACK

GENERAL NOTES

MANUFACTURES INDICATED.

PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE

COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING IDENTIFICATION 1.

FOR APPROVAL.

CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITION AND SUBMITTED TO COR

CONDITION. IN THAT CASE, SHOP DRAWINGS SHALL BE PREPARED AT THE SITE BY THE

SOME DETAILS SHOWN ON CONTRACT DRAWINGS MAY NOT COINCIDE WITH THE FIELD

FOR APPROVAL.

CONTRACTOR SHALL SUBMIT MANUFACTURER'S INSTALLATION SHOP DRAWINGS TO COR

2.

3.

4.

5.

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER

IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT. THE GENERAL

AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR RENOVATION.

THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION

1.

TOILET BUILDING NOTES

TOREA.CO.KR

10,000MM X 3,200MM X 3,700MM

MODEL : TR-CR, TOREA

MOVABLE TOILET PLAN

REPAIR / MAINTENANCE (K) WORK

SCOPE OF WORK (ARCHITECTURAL WORK)

PROVIDE NEW MOVABLE TOILET FACILITY INCLUDING ALL TOILET ACCESSORIES AS SHOWN ON DWG.

CONNECT MECHANICAL AND ELECTRICAL UTILITY LINE TO NEW TOILET.

INSTALLATION TENT

CAMP HOVEYKIM, YK

320257

MOVABLE TOILET PLAN AND NOTES

MOVABLE TOILET

1.

2.

,2

10,000

4,600 5,400

TTD

2-ROLL TYPE

VANITY CABINET

GLASS

MIRROR

MIRROR GLASS

PARTITION

URINAL

A-01
A-02
A-03
A-04

File details come from the government source that posted it. Updated .