This document is a Request for Proposal (RFP) issued for the repair of Quonset Hut Building S-1709 at Camp Casey, Korea. The work includes civil, architectural, mechanical, electrical, and structural repairs such as replacing flooring, walls, roof, lighting, plumbing, HVAC, and fire alarm systems. Some new construction is also required, including a pavilion and concrete pavement.
The solicitation is only open to existing Area I & II General Construction Multiple Award Indefinite Delivery Indefinite Quantity (MATOC) contractors. The estimated price range is between $500,000 and $1,000,000. Proposals are due by 1100 hrs local time on August 14, 2024. A site visit is strongly recommended on August 6, 2024. The Government requires performance within 10 calendar days of award and completion within 180 calendar days. The solicitation provides detailed specifications, drawings, and technical provisions for the required work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 132491_STRC_DWG.pdf | ||
| 132491_ARCH_DWG.pdf | ||
| 132491_MECH_DWG.pdf | ||
| 132491_ELEC_DWG.pdf | ||
| 132491-CIVIL_DWG.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0012160112
a. This is a Request for Proposal (RFP) issued to existing Area I & II General Construction Multiple Aw ard Indef inite Delivery Indefinite Quantity (MA IDIQ) Contractors only
Contract Number: W91QV N-24-D-0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0082, 0099, 0103, 0107.
b. Site V isit: A ll MAIDIQ contractors w ho intend to propose on this solicitation are strongly recommended to attend the Site V isit. See Section L f or the schedule.
c. If the contractor is unable to submit the proposal in response to this RFP, the contractor shall submit the “No-off er letter” by closing date and time specif ied in the solicitation.
d. CONSTRUCTION PRICE RA NGE Pursuant to FAR 36.204 the estimated price range is between $500,000 TO $1,000,000
***Fund are not presently available f or this project. No aw ard w ill be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date.***
CPT DUVA LDA DRIA N, A LEXA NDER C. 315-755-0645
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
24-Jul-2024
(RFP)
(IFB)
X
CA LL:
Repair Quonset Hut Building S-1709, Camp Casey
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CF R) 53.236-1(e)
11. The Contractor shall begin perf ormance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________
12 A . THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE A ND PAY MENT BONDS?
( If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. A DDITIONAL SOLICITA TION REQUIREMENTS:
A. Sealed of f ers in original and __________1 copies to perf orm the w ork required are due at the place specified in Item 8 by ___________ local time ______________14 Aug 2024 (date). If this is a sealed bid solicitation, of f ers must be publicly opened at that time.
shall be marked to show the of f eror's name and address, the solicitation number, and the date and time of f ers are due.
B. An of fer guarantee is, X is not required.
C. All of fers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in f ull text or by ref erence.
D. Of f ers providing less than _______70 calendar days f or Government acceptance af ter the date of f ers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair )
1. SOLICITATION NO.
IMPORTANT - The "offe r" se ction on the r eve rs e must be fully com ple ted by offer or .
4. CONTRACT NO.
7. ISSUED BY CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO CASEY
UNIT#15289
APO AP 96224-6224
UNITED STATES
W90V N8
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDA R DAY S
11:00 AM (hour)
Sealed envelopes containing off ers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
132491
8. A DDRESS OFFER TO (If Other Than Item 7)
FA X:TEL: TEL: FAX:
W90VN824R0061 26
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FA CILITY CODE
17. The of feror agrees to perf orm the work required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this of fer is accepted by the Government in w r iting w ithin ________ calendar days after the date of fers are due.
the minimum requirements stated in Item 13D . Failure to insert any numb er means the offeror accepts the minimum in Item 13D.)
A MOUNTS SEE SCHEDULE OF PRICES
18. The of feror agrees to f urnish any required perf ormance and payment bonds.
19. A CKNOWLEDGMENT OF AMENDMENTS
(The o fferor acknowledges receipt o f amendments to the so lic itation -- give number and date of each)
A MENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON A UTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS A CCEPTED:
22. AMOUNT 23. ACCOUNTING A ND APPROPRIA TION DATA
24. SUBMIT INVOICES TO A DDRESS SHOWN IN ITEM
(4 c opies unless otherwis e speci fied)
CODE
(Insert any number equal to or greater than
20C. OFFER DA TE
25. OTHER THAN FULL A ND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MA DE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME A ND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTA NCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor i s not required to sign this document.)
document and retu rn _______ c opies to iss uing office.) Contrac tor agrees Y our of fer on th is s olicita tion, is hereby acc epted as to the item s li sted. This award con-to f urnish and del iv er a ll i tems or perform al l work , requ isi tions identi fied s umm ates the c ontract, which c ons ists of (a) the Gov ernm ent s olicita tion and on this form and any continuation sheets for the c ons ideration sta ted in this y our of f er, and (b) this c ontract award. No f urther con tractual document is contrac t. The rights and obligations o f the parties to thi s contrac t shall be necessary .
gov erned by (a) this contract award, (b) the s oli citation, and (c) the clauses, representations , certi fications , and specif ic ations or inc orporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRA CTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF A MERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER W ILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contrac tor is required to sign th is28. NEGOTIATED AGREEMENT
(M ust be ful l y completed by offer or )OFFER
W90VN824R0061
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
K WORK
FFP
K WORK
FOB: Destination
PURCHASE REQUEST NUMBER: 0012160112
PSC CD: 5680
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job
L WORK
FFP
L WORK
FOB: Destination
PURCHASE REQUEST NUMBER: 0012160112
PSC CD: 5680
NET AMT
Section C - Descriptions and Specifications
SPECIFICATIONS
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY
UNIT #15543
APO AP 96224-5543
AMIM-YNP-G 9 July 2024
SPECIFICATIONS
FOR
PROJECT NO.: 132491
Repair Quonset Hut Building S-1709
Camp Casey, Korea
TABLE OF CONTENTS
1. Technical Provisions - I: Statement of Work
2. Technical Provisions - II: Technical Detail Specifications
3. Technical Provisions - III: Special Conditions
4. Appendix "A": List of Applicable Contract Drawings
TECHNICAL PROVISIONS - I
STATEMENT OF WORK
PROJECT NO TITLE LOCATION
132491 Repair Quonset Hut Building S-1709 Camp Casey
1. DESCRIPTION: The work to be performed to repair Quonset hut building S-1709 is described below and executed by one or more of the groups.
1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.
1.2. Work by In-House Labor: Not applicable to this project.
1.3. Work by Troop Labor: Not applicable to this project.
2. PRINCIPAL FEATURES: This project includes the following principal features:
2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.
2.1.1. Civil Work
2.1.1.1. Replace 0.6m width steel grating ditch.
2.1.1.2. Replace concrete sidewalk.
2.1.1.3. Replace granite/concrete curb.
2.1.1.4. Replace stone wall with average 06m H high land free standing wall.
2.1.1.5. Plant rhododendron indicum and cherry blossom tree.
2.1.1.6. Restore AC pavement.
2.1.1.7. Replace six (6) surface inlet (0.5x0.5m) with 150mm DIA PVC drainpipe.
2.1.1.8. Paint 150mm thickness reflective white.
2.1.1.9. Replace 100mm THK gravel on 4mm THK non-woven fabric.
2.1.1.10. Restore solid sodding with topsoil.
2.1.1.11. Replace 150mm PVC sewer line with One (1) surface cleanout.
2.1.1.12. Replace two (2) concrete encasement on sewer line.
2.1.1.13. Replace water lines and gate valves with necessary accessories.
2.1.2. Architectural Work
TP I-1
2.1.2.1. Floor work
2.1.2.1.1. Replace deteriorated existing floor tile with new Polyvinyl Chloride Tile (PVCT) including Vinyl Cove Base (VCB) as shown on new floor plan and interior finish schedule.
The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall be corrected for new flooring. Provide leveling concrete for existing concrete slab if needed.
2.1.2.1.2. Replace deteriorated existing FCT with new including cement bond coat, waterproof membrane, mortar bed as shown on floor plans, sections and detail drawings.
2.1.2.1.3. Apply epoxy coating with non-slip grits on exist floors as shown on floor plan, and interior finish schedule.
2.1.2.1.4. Replace deteriorated existing concrete stoops with new as shown on floor plan.
2.1.2.1.5. Replace deteriorated existing granite stone tile with new including mortar bed as shown on floor plans, detail drawing and finish schedule.
2.1.2.2. Interior and exterior wall work
2.1.2.2.1. Replace existing all GWB wall board walls with new GWB wall (Normal, water resistant or 'X' type) including metal studs as shown on floor plans, sections, and detail drawings.
2.1.2.2.2. Paint on all existing interior walls including as shown on floor plan, detail drawings interior finish schedule.
2.1.2.2.3. Replace deteriorated existing Glazed Ceramic Wall Tile (GCWT) with new including cement bond coats, waterproof membrane, plastering with metal lath and waterproof GWB as shown on floor plans and section.
2.1.2.2.4. Replace existing exterior walls with new EIFS and face bricks as shown on floor plan, elevations, sections and detail drawings.
2.1.2.2.5. Replace deteriorated existing wall with new wooden panel as shown on floor plan and interior finish schedule.
2.1.2.2.6. Replace deteriorated existing wall with new MCP (Marble Composition Panel) at VEST-1 as shown on floor plan and interior finish schedule.
2.1.2.2.7. Replace deteriorated existing wall with glass block at VEST-1 as shown on floor plan, elevation and interior finish schedule.
2.1.2.2.8. Apply skim coat plaster on concrete wall as shown on floor plan, sections and finish schedule.
2.1.2.3. Interior and exterior ceiling and roof work
2.1.2.3.1. Replace deteriorated existing ceiling with new acoustical ceiling tiles including metal suspension systems as shown on floor plans and interior finish schedule.
2.1.2.3.2. Replace deteriorated existing ceiling with new GWB (Normal, water resistant or
TP I-2
'X' type) ceiling including ceiling suspension system as shown on floor plans and finish schedule.
2.1.2.3.3. Paint on all interior ceiling surfaces as shown on interior finish schedule and section.
2.1.2.3.4. Replace deteriorated existing roof with new standing seam metal roof including insulation and accessories as shown on floor plan, roof plan, elevations and details.
2.1.2.3.5. Replace deteriorated metal canopy with new as shown on floor plans, elevations, and detail drawing.
2.1.2.3.6. Replace deteriorated existing rain gutters, downspouts and concrete splash blocks with new as shown on floor plans, elevations, sections and detail drawings.
2.1.2.4. Miscellaneous work
2.1.2.4.1. Replace deteriorated existing doors and door frames with new including new hardware sets as shown on new floor plan and door schedule.
2.1.2.4.2. Replace deteriorated existing window including insect screen with new aluminum thermal breaker type windows including glass as shown on floor plans, elevations, and window schedule.
2.1.2.4.3. Replace deteriorated existing window horizonal mini blinds with new, fireproof type.
2.1.2.4.4. Replace deteriorated existing wooden head, jam and sill for all windows with new as shown on door/window schedule (Natural color, oak).
2.1.2.4.5. Replace deteriorated existing aluminum louver with new as shown on floor plans and louver schedule.
2.1.2.4.6. Replace deteriorated existing Fire Extinguisher Cabinets (FEC) with new as shown on new floor plan and detail drawing.
2.1.2.4.7. Replace existing all toilet accessories with new as shown on floor plans and detail drawings.
2.1.2.4.8. Replace interior and exterior signages with new as shown on floor plan, elevation and signage schedule.
2.1.2.4.9. Replace deteriorated existing metal shelf with mop rack with new in janitor room.
2.1.2.4.10. Replace deteriorated existing AL grating with new at main entrance as shown on floor plan and detail drawing.
2.1.2.4.11. Replace deteriorated existing bulletin board with new as shown on floor plan, detail drawing and signage schedule.
2.1.2.4.12. Replace deteriorated existing lavatory cabinet and kitchen cabinet with new including base cabinets and upper cabinets as shown on floor plan, interior elevation and detail drawing.
2.1.2.4.13. Replace deteriorated existing wooden wall rail and wooden base board with new as shown on floor plans, interior elevations, sections and detail drawings.
2.1.2.4.14. Replace deteriorated existing projection screen and projector mount with new as shown on floor plans, detail drawings and interior finish schedule.
TP I-3
2.1.2.4.15. Replace deteriorated access doors with new on wall & ceiling as required.
2.1.2.4.16. Provide 3 sets renderings (size: 760mm x 500mm) and image file for exterior building S-1709, Camp Casey.
2.1.2.4.17. Remove existing ACM as below in the building S-1709, Camp Casey.
- Transit board (mech room) – 20 SF
- Air sampling (work area)
- Final air sampling
- ECON unit
- ACM transportation & disposal (1 ton truck)
- MOB/ demobilization
2.1.3. Mechanical Work
2.1.3.1. Repair the heating and cooling system by installing new split heat pump system, electric wall heater, split air conditioning unit, electric unit heater, valves, piping, insulations, controls, equipment support (concrete pad), and all associated accessories for HVAC system as shown on drawings.
2.1.3.2. Repair the ventilation system by installing new energy recovery ventilator, exhaust fans, controls, diffusers, resister, ducts, insulations, outside air intake louver with bird screen, motorized damper and all associated accessories for ventilation system as shown on drawings.
2.1.3.3. Repair the plumbing system by installing new electric domestic hot water heater, electric water cooler, domestic hot water recirc, pump, domestic cold and hot water piping system, insulation, sewer and vent piping system, water hammer arresters, floor drain, floor clean out, including plumbing fixtures, and all associate accessories as shown on drawing.
2.1.4. Electrical Work
2.1.4.1. Replace existing interior/exterior lightings, fixtures, exit lights, toggle switches, 3-way switches, lighting contactor with photocell, wires and conduits with new.
2.1.4.2. Replace existing watthour meter and current transformer, panelboards, receptacles with cover plates associated wiring and conduits with new.
2.1.4.3. Replace existing safety switches, motor controllers, junction boxes, control/power wires and conduits for mechanical systems with new.
2.1.4.4. Replace existing fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull station, smoke detector and relay module, antenna, visual/signal strobes (15 or 75 candela), microphone, speaker (wattage as required) device, fire alarm building transmitter, lighting arrester and associated wiring and conduit.
2.1.4.5. Replace existing telecommunication system including telephone terminal board, telephone/data outlets with cover plates, terminal blocks, equipment rack, and associated wire and conduit with new.
TP I-4
2.1.4.6. Replace existing CATV distribution cabinet, pull boxes, CATV outlets and associated wiring and conduit with new.
2.1.4.7. Replace existing exterior underground telecommunication line and associated accessories as shown on the drawings.
2.1.4.8. Replace existing exterior power distribution system with new including pad mounted transformer, primary concrete pole, manhole, primary, secondary line and associated accessories, wiring and conduit as shown on the drawings.
2.1.5. Structure Work
2.1.5.1. Repair by replacing existing concrete slab.
2.1.5.2. Repair by replacing existing concrete stoop.
2.1.5.3. Repair by replacing existing wall with 200 THK concrete wall and foundation.
2.1.5.4. Repair by replacing existing roof with steel column and beam.
2.1.5.5. Submit structure design analysis and shop drawing.
2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.
2.2.1. Civil Work
2.2.1.1. Construct one (1) pavilion.
2.2.1.2. Construct 1.0m W foot notes pavement.
2.2.1.3. Construct 150mm THK concrete pad.
TP I-5
TECHNICAL PROVISIONS - II
TECHNICAL DETAIL SPECIFICATIONS
GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION- 1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.
The Standard Technical Detail Specifications:
The work shall conform to the most current version of the listed standards/specifications below.
DIVISION 01 – GENERAL REQUIREMENTS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 33 29 LEED(TM) DOCUMENTATION
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES
FOR CONTAMINATED SITES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
TP II-1
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED
MATERIAL
02 65 00 UNDERGROUND STORAGE TANK REMOVAL
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS
MATERIALS
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 83 19.00 10 LEAD BASED PAINT HAZARD ABATEMENT, TARGET
HOUSING & CHILD OCCUPIED FACILITIES
DIVISION 03 – CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 20 00.00 10 CONCRETE REINFORCING
03 15 00.00 10 CONCRETE ACCESSORIES
03 30 00 CAST-IN-PLACE CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 – METALS
05 05 23 WELDING, STRUCTURAL
05 12 00 STRUCTURAL STEEL
05 21 23 STEEL JOIST GIRDER FRAMING
05 30 00 STEEL DECKS
05 50 14 STRUCTURAL METAL
FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
TP II-2
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 41 13 METAL ROOF PANELS
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 87 16 FRAGMENT RETENTION FILM FOR GLASS
DIVISION 09 - FINISHES
09 22 36 LATH
09 24 23 STUCCO
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 01 EXTERIOR SIGNAGE
10 14 02 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
DIVISION 12 – FURNISHINGS
TP II-3
12 21 00 WINDOW BLINDS
12 32 00 MANUFACTURED WOOD CASEWORK
12 36 00 COUNTERTOPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 52 00 HEATING BOILERS
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 – ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE
28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 – EARTHWORK
TP II-4
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS
32 11 16 SUBBASES FOR FLEXIBLE PAVING
32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE
COURSE
32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE FOR
PERVIOUS PAVEMENT
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 11 BITUMINOUS SURFACE TREATMENT
32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 17 24.00 10 PAVEMENT MARKINGS
32 92 23 EXTERIOR PLANTS
32 92 23 SODDING
DIVISION33 – UTILITIES
33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
TP II-5
TECHNICAL PROVISIONS - III
SPECIAL CONDITIONS
1. Material Approval Submittal:
(1) The contractor shall submit a shop drawing submittal schedule and the material approval request with all supporting documents to the COR within 7 days after receipt of NTP.
(2) The Contractor shall process submittals in accordance with Section 013300 – SUBMITTAL
PROCEDURES
2. Extended warranty - FAR 52.246-21
2.1. Extended warranty list
L/N Warranty Item Description Warranty
Period (Yrs) Certification
(Yes / No) Warranty Tag
(Yes / No) Repair Time after call
1 Metal roof panel Installer 10 N N 24 Hrs
2 LED light Product 10 Y Y 7 Days
3 Split air conditioning Product 3 Y Y 24 Hrs
4 Heat Pump system Product 3 Y Y 24 Hrs
5 Energy Recovery Ventilation Unit Product 3 Y Y 24 Hrs
2.2. Contractor shall submit to COR the Warranty Certification with 4025 for the listed items.
2.3. Contractor shall submit to COR Warranty management plan and approve it before 30 days of pre-warranty conference. (OMA Sec 01 78 00)
2.4. Contractor shall have the Pre-Warranty Conference before Contract Close Date. (OMA Sec 01 78)
2.5. Warranty Information and Data
2.5.1. Contractor shall submit Warranty tag design, COR shall review and approve it for the listed and shall install it for the listed items. (OMA Sec 01 78 00)
2.5.2. Submit the O&M Manual with Manufacture’s instruction for DPW training. (OMA Sec 01 78 00)
TP III-1
3. The contractor shall have personnel on site for the fire alarm work upon Government's direction, who are certified by the National Institute for Certification in Engineering Technologies (NICET) Level III or equivalent. Equivalent Certificate in Korea is the following which is issued by the Human Resource Development Service of Korea. If the contractor doesn’t have personnel who are certified by NICET, the contractor shall have two personnel who are certified for (1) and the other (2) below.
(1) Engineer Fire Fighting Facilities - Electrical (소방설비기사 -전기)
(2) Engineer Fire Fighting Facilities – Mechanical (소방설비기사 -기계)
4. Environmental Requirements in Contract
The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.
In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.
All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.
Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.
The responsibilities of all contractor personnel include:
(1) Comply with all applicable environmental laws, regulations and installation environmental policies.
(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention
Plan.
TP III-2
(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.
(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.
(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.
(6) Open burning is prohibited on the Government premises IAW installation environmental policy.
(7) Participate in installation’s recycling program.
(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office.
Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.
(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.
(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.
(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.
(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.
(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.
TP III-3
5. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW
COVER SHEET
After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.
A. AT Level I training. This standard language is for contractor employees with an area of performance within as Army controlled installation, facility or area. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete AT Level I awareness training within 30 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil
B. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
B-a. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014- 05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
C. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
TP III-4
D. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
TP III-5
Section F - Deliveries or Performance
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 days * The time stated for completion shall include final cleanup of the premises.
(End of clause)
Section J - List of Documents, Exhibits and Other Attachments
LIIST OF DOCUMENTS AND EXHIBIT
APPENDIX "A"
LIST OF APPLICABLE CONTRACT DRAWINGS
GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD-DETAIL-DRAWINGS- FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.
Ring No. Sheet No. Description Date
T-1 T-2
TITLE SHEET-1
TITLE SHEET-2
9 JUL 24
CIVIL
3 C-1 LOCATION PLAN AND GENERAL NOTES 9 JUL 24
4 C-2 REMOVAL PLAN 9 JUL 24
5 C-3 SITE LAYOUT PLAN AND SCOPE OF WORK 9 JUL 24
6 C-4 UTILITIES PLAN AND SCOPE OF WORK 9 JUL 24
7 C-5 GRADING SECTION-1 9 JUL 24
8 C-6 GRADING SECTION-2 9 JUL 24
9 C-7 PAVILION DETAIL 9 JUL 24
10 C-8 FOOTNOTE PAVEMENT 9 JUL 24
C-9 C-10 C-11 C-12 C-13
S-1
S-2
S-3 S-4 S-5 S-6 S-7
TREE PLANTING DETAIL
MISC DETAILS-1
MISC DETAILS-2
MISC DETAILS-3
MISC DETAILS-4
STRUCTURE
GENERAL NOTE, DESIGN DATA AND TYPICAL
DETAILS
EXST/REMOVAL GROUND FLOOR PLAN
A-1
FOUNDATION GROUND FLOOR PLAN
ROOF FRAME PLAN
CROSS SECTION
BEAM, COLUMN, WALL & FOUNDATION SCHEDULE
DETAILS
9 JUL 24
9 JUL 24
9 JUL 24
ARCHITECTURAL
23 A-1 GENERAL NOTES, SCOPE OF WORK AND ACM NOTE 9 JUL 24
24 A-2 EXISTING FLOOR PLAN AND LEGEND 9 JUL 24
25 A-3 NEW GROUND FLOOR PLAN AND LEGEND 9 JUL 24
26 A-4 NEW ROOF PLAN 9 JUL 24
27 A-5 ELEVATION-1 AND 2 9 JUL 24
A-6 A-7 A-8
A-9
A-10 A-11 A-12 A-13 A-14 A-15 A-16 A-17 A-18 A-19 A-20 A-21
A-22 A-23
A-24 A-25
ELEVATION-3 AND 4
GENERAL SECTIONS
ENLARGED NEW GROUND FLOOR PLAN AND
LEGEND
ENLARGED PARTIAL FLOOR FLAN @TOILETS &
INTERIOR ELEVATIONS-1
INTERIOR ELEVATIONS-2
INTERIOR ELEVATIONS-3
EXTERIOR WALL SECTIONS & DETAILS
INTERIOR WALL SECTION-1
INTERIOR WALL SECTION-2
ROOF DETAILS
CABINET DETAILS
MISC DETAILS-1
MISC DETAILS-2
MISC DETAILS-3
MISC DETAILS-4
INTERIOR, EXTERIOR FINISH SCHEDULE & FINISH
SCHEDULE NOTE
MATERIAL & COLOR SCHEDULE
DOOR/WINDOW SCHEDULE, ELEVATIONS AND
DETAILS
HARDWARE SCHEDULE & DOOR/WINDOW NOTE
SIGNAGE PLAN, SCHEDULE & DETAILS
9 JUL 24
9 JUL 24
9 JUL 24
9 JUL 24
9 JUL 24
9 JUL 24
9 JUL 24
9 JUL 24
9 JUL 24
9 JUL 24
9 JUL 24
9 JUL 24
9 JUL 24
9 JUL 24
9 JUL 24
MECHANICAL
M-1 MECHANICAL MATERIAL INDICATIONS & SYMBOLS
A-2
49 M-2 MECHANICAL GENERAL NOTE AND SCOPE OF
WORK
9 JUL 24
50 M-3 MECHANICAL EQUIPMENT SCHEDULE-1 9 JUL 24
51 M-4 MECHANICAL EQUIPMENT SCHEDULE - 2 9 JUL 24
52 M-5 EXISTING AND REMOVAL GROUND FLOOR PLAN 9 JUL 24
53 M-6 NEW GROUND FL HVAC PIPING FLAN, AND NOTES 9 JUL 24
54 M-7 NEW GROUND FL HVAC DUCT PLAN-1, AIR DEVICE
SCHEDULE AND NOTES
55 M-8 HVAC PIPE FLOW DIAGRAM, HVAC CONTROL LOW
DIAGRAM AND ERV CONTROL DIAGRAM
9 JUL 24
56 M-9 CONTROLS 9 JUL 24
57 M-10 NEW GROUND FL PLUMBING PIPING PLAN-1,
PLUMBING FIXTURE SCH, WATER HAMMER
ARRESTER SCH, AND NOTES
9 JUL 24
58 M-11 NEW MECH RM & TOILET PLUMBING PIPING PARTIAL
PLAN-2, PLUMBING FIXTURE SCH., WATER HAMMER
ARRESTER SCH. AND NOTES
9 JUL 24
59 M-12 DETAILS-1 9 JUL 24
60 M-13 DETAILS-2 9 JUL 24
61 M-14 DETAILS-2 9 JUL 24
62 M-15 DETAILS-4
ELECTRICAL
63 E-1 LEGEND, GENERAL NOTES AND SCOPE OF WORKS 9 JUL 24
64 E-2 NEW GROUND FLOOR LIGHTING PLAN 9 JUL 24
65 E-3 LIGHTING FIXTURE DETAILS 9 JUL 24
66 E-4 LIGHTING FIXTURE SCHEDULE 9 JUL 24
67 E-5 NEW GROUND FL POWER PLAN 9 JUL 24
68 E-6 NEW GROUND FLPOER/CONTROL PLAN FOR
MECHANICAL SYSTEM
9 JUL 24
69 E-7 NEW GROUND FLOOR FIRE ALARM/MASS
NOTIFICATION SYSTEM
9 JUL 24
70 E-8 NEW FIRE ALARM/MASS NOTIFICATION DIAGRAM 9 JUL 24
71 E-9 NEW GROUND FLOOR LAN/TEL PLAN 9 JUL 24
72 E-10 NEW LAN/TEL SYSTEM DIAGRAM 9 JUL 24
73 E-11 NEW GROUND FL CATV PLAN 9 JUL 24
74 E-12 NEW CATV SYSTEM DIAGRAM 9 JUL 24
E-13 E-14 E-15
E-16
NEW POWER ONE-LINE DIAGRAM & NEW PANEL
BOARD “MDP” LOAD SCHEDULE
EXIST/NEW EXTERIOR TELECOMMUNICATION LINE
DISTRIBUTION PLAN
REMOVAL/EXIST/NEW EXTERIOR ELECTRIAL
DISTRIBUTION PLAN
9 JUL 24
9 JUL 24
A-3
Section K - Representations, Certifications and Other Statements of Offerors
CLAUSES INCORPORATED BY REFERENCE
52.203-2 Certificate Of Independent Price Determination APR 1985 252.209-7999 Representation by Corporations Regarding and Unpaid
Deliquent Tax Liability or a Felony Conviction under any Federal Law
FEB 2012
ATTACHMENT: CONTRACTOR’S TAX EXEMPTION DECLARATION
(1) References:
(i) Contract clause, "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."
(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.
(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.
(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.
(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.
(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.
(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):
Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total
This item will be imported specifically for this contract? Yes _________ No ________
(ii) Special Excise Tax:
Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total
Name of item manufacturer
(iii) Value Added Tax (VAT):
Input VAT on materials purchased for this contract. _________ Input VAT on transportation leased/rented for this contract. _________ Input VAT on equipment leased/rented for this contract. _________ Input VAT on services purchased for this contract. _________ Output VAT on total contract amount. _________
(iv) Special Excise (Petroleum) Tax:
No. of Unit Price Total Tax Liters w/o Tax Tax/Unit Amount
Regular Gasoline __________ (L) ₩_________ ₩________ ₩_________
Premium Gasoline __________ (L) ₩_________ ₩________ ₩_________
Diesel __________ (L) ₩_________ ₩________ ₩_________
Other __________ (L) ₩_________ ₩________ ₩_________
(3) Name of Oil Company Refinery from which POL products will be purchased:
Oil Company: _________________________________________ (Name only)
(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except for ROK MND-funded contracts and delivery orders), and Special Excise Tax.
Contractor’s Signature
Section L - Instructions, Conditions and Notices to Bidders
GENERAL INSTRUCTIONS
GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL
1. The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215- 1(f)(4).
2. Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.
SUBMISSION OF PROPOSAL
The offeror shall email offer to the contract specialist MAJ Duvaldadrian, Alexander (email address :
Alexander.c.duvaldadrian.mil@army.mil ) and contracting officer Mr. Kim, Chong Nak (email address:
chongnak.kim.ln@army.mil ) by the Korea local closing time and date which can be found in Block 13 on page 1 of this solicitation. After submission of the offer, the offeror shall send an additional email shall to the contract specialist to verify if offer is received. It is the offeror responsibility to verify receipt of offer from contract specialist before the Korea local closing time and date. All questions should be emailed to alexander.c.duvaldadrian.mil@army.mil and chongnak.kim.ln@army.mil within seven (7) calendar days after the solicitation is issued.
CLOSING DATE: The electronic offer shall be submitted by 1100 hrs on the closing date of RFP.
SUBMISSION REQUIREMENTS
A. PRICING PROPOSAL: The pricing proposal must clearly indicate prices for each Contract Line Item Number in Section B - Supplies or Services and Prices.
B. DETAILED OFFER BREAKDOWN: The detailed offer breakdown must clearly identify all costs that can materially impact the statement of work. Offeror shall provide one (1) original offer breakdown with price and one (1) redacted version. The redacted version should be free of price, model numbers, any organizational logos that identifies your organization personal names, emails, and phone numbers.
C. SECTION K-ATTACHMENT FOR TAXES: Offerors must complete all tax portions of SECTION K. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, offerors shall propose exemptions of specific ROK taxes that are legitimate, attributable to the contract, and authorized by the applicable stated references.
D. SECTION K-OTHER: Offerors must complete all Non-Tax related portions of SECTION K.
E. COMPLIANCE WITH SOLICITATION: Failure to submit the above requirements under SECTION L may be grounds for determining the proposal to be non-compliant. For example, if a detailed offer breakdown is not submitted, the contracting officer will be unable to find the offeror's pricing proposal acceptable and the offeror's be ineligible for award. Noncompliance will only be cured if the government holds discussions as detailed in SECTION L.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- Date: 6 AUG 2024 Time: 0900 Korea Standard Time POC: Mr. So, Ki Chong
DSN: 315 722-4535
(c) Participants will meet at Location: Rm#424, 4FL, S-2409, Casey
(d) Escort : Any Contractor who needs escort shall bring Korea identification card , passport or driver license (주민등록증, 여권 혹은 운전면허증) and contact to Mr. So, Ki Chong
(e) Interested participants shall email the following information to COR, Mr. So, Ki Chong (kichong.so1.ln@army.mil 722-4355) NLT 1200 hours, 5 AUG 2024.
* Company Name & Name of Site Visit attendees
Government does not receive any information from interested site visit participants, the Government will cancel the Site Visit without notice.
(End of provision)
Section M - Evaluation Factors for Award
EVALUATION FACTORS
EVALUATION FACTORS FOR AWARD
Electronic offers submitted by 1100 hours on the closing date of RFP shall be considered timely.
1. EVALUATION CRITERIA
a. The pricing proposal shall be evaluated to determine whether it is complete and reasonable. A complete and reasonable pricing proposal will be deemed acceptable.
b. The detailed offer breakdown will be used by the contracting officer to determine whether proposed prices are complete and reasonable. A detailed offer breakdown may be used by the contracting officer to determine whether an offeror is able to complete the requirements under the contract, and/or whether discussions will be conducted pursuant to instructions to the offerors.
c. SECTION K - Representations, Certifications and Other Statements of Offerors
d. SECTION K-TAXES will be evaluated to determine whether it is complete. In addition, propose exemptions of specific ROK taxes will be evaluated to determine whether they are legitimate, attributable to the contract, authorized, and reasonable. A complete SECTION-K that only proposes exemptions of specific ROK taxes that are legitimate, attributable to the contract, necessary to complete the Task Order, do not improperly overstate any proposed tax exemption, authorized, and reasonable will be deemed acceptable.
e. SECTION K-OTHER will be evaluated to determine whether it is complete. A complete SECTION KOTHER will be deemed acceptable.
2. BASIS FOR AWARD:
Award shall be made to the responsible offeror submitting the lowest priced offer that is evaluated as acceptable for all evaluation criteria.