132491_MECH_DWG.pdf

PDF 4 MB Posted

Attached to
Repair Quonset Hut Building S-1709, Camp Casey (MATOC Only)
Solicitation number
W90VN824R0061
Issued by

About this file

This document is a set of mechanical drawings and specifications for the repair of Quonset Hut Building S-1709 at Camp Casey in Korea. The key details include:

The mechanical scope of work involves repairing the heating, cooling, ventilation, and plumbing systems. This includes installing new split heat pump systems, electric wall heaters, air conditioning units, unit heaters, piping, insulation, controls, and related accessories. The ventilation system will be repaired by installing a new energy recovery ventilator, exhaust fans, ductwork, and intake louvers. The plumbing system will be repaired by installing a new electric domestic hot water heater, water cooler, domestic water piping, and plumbing fixtures. The drawings provide detailed schematics, equipment schedules, and installation instructions for the mechanical systems.

The overall project also includes civil, architectural, electrical, and structural repairs to the building. The contract opportunity is solicitation number W90VN824R0061, issued by the Department of the Army Materiel Command Army Contracting Command for the "Repair Quonset Hut Building S-1709, Camp Casey (MATOC Only)".

View the file

Other files

File Type Posted
132491_STRC_DWG.pdf PDF
132491_ARCH_DWG.pdf PDF
W90VN824R0061.pdf PDF
132491_ELEC_DWG.pdf PDF
132491-CIVIL_DWG.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M-1

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

SYMBOLS

MECHANICAL MATERIAL INDICATIONS &

M E C H A N I C A L M A T E R I A L I N D I C A T I O N S & S Y M B O L S

NTS

PD

Pa

OS&Y

OXY

OD

OAIL

OA

QT

PRV

PPM

POL

POC

PLMB

PH

PG

RT

RPM

RH

RDTR

RA

R12, R22

QTY

A B B R E V I A T I O N S

SBM

SAN

SA

SCH

FLOWMETER, ORIFICEBUTTERFLY

REFRIGERANT LIQUID

CHILLED WATER SUPPLY

CHILLED WATER RETURN

AIR COOLED CONDENSING UNIT

AIR CONDITION UNIT (S)

APPARATUS DEW POINT

AIR CONDITION (-ING,-ED)

CHILLED/HOT WATER RETURN

AMERICAN WIRE GAUGE

PRESSURE, BAROMETRIC

CUBIC METER PER HOUR

CHILLED/HOT WATER SUPPLY

CAPACITYCAP

CONNECTION

CONTINUE

COMPRESSOR

CUBIC METER

CPRSR

CONN

CONT

CU M

CHILLED WATER

CAST IRON PIPE

CIRCUIT

CLASSIFICATION

COOLING LOAD

COEFFICIENT

COUNTER CLOCKWISE

CLASS

CLG LOAD

COEF

CMH

CIP

CCW

CHW

CKT

ACV ALARM CHECK VALVE

AVERAGEAVG

BOILING POINT

CENTIGRADE

BAROMETER(-TRIC)

BRAKE HORSEPOWER

BP

BHP

C

BARO PR

AWG

BARO

ALUMINUM

ALTITUDE

AMBIENT

AIR HANDLING UNIT

AMPERE(AMP, AMPS)

APPROXIMATEAPPROX

ALT

AMB

AMP

AIR COND

ADP

AL

AHU

AIR COOLED

ACCU

ACLD

ACU

CHR

C/HWR

C/HWS

CHS

RL

D DRAIN

DIAMETER, INSIDE

ISOMETRIC

IRON PIPE SIZE

JOULE

THERMAL CONDUCTIVITY

KILOGRAM

KILOGRAM PER SQ. CENTIMETER (GAUGE)

KILOGRAM PER SQ. CENTIMETER

KILOGRAM PER SQ. CENTIMETER (ABSOLUTE)

KILOCALORIE PER HOUR

EXPANSION JOINT

EXPLOSION PROOF

FIRE HOSE CABINET

FULL LOAD AMPERES

ENTERING WATER TEMP

EVAPORAT (-E,-ING,-ED,-OR)

EXTERNAL STATIC PRESSURE

FACE AREA OR FRESH AIRFA

FHC

FHY

FLA

FIRE HYDRANT

ESP

EXPJT

EWT

EVAP

EP

EQPT

ENT

EFF

EQUIPMENT

ENTERING

EFFICIENCY

KG/SQ CM

KG/SQ CM A

KG/SQ CM G

KG

KCAL/HR

J

K

ID

ISO

IPS

NO

N.O.

NIC

NPT

MPS

NC

N/A

N.C.

MAX

MIN

MPH

MM

NOT IN CONTRACT

NATIONAL TAPER PIPE (THREAD)

NUMBER

NORMALLY OPEN

MINIMUM OR MINUTE

METERS PER HOUR

METERS PER SECOND

NORMALLY CLOSED

NOISE CRITERIA

NOT APPLICABLE

MAXIMUM

MILLIMETER R

FEMALE PIPE THREAD

FUEL OIL

GALVANIZED STEEL

GAGE OR GAUGE

FIXTURE

FEED WATER PUMP

FACE VELOCITY

FLUSH VALVE

FREQUENCY

FIBERGLASS REINFORCED PLASTIC

HORIZONTAL

HOT WATER HEATER

HOT WATER

HOUR(S)

HORSEPOWER

MERCURY

HEAD

HOSE BIBB

HERTZ

GRAMS

FRPCWP CIRCULATING WATER PUMP

DIRECT EXPANSION

DRY PIPE VALVE

EQUIVALENT DIRECT RADIATION

ENTERING AIR TEMPERATURE

DOUBLE POLE DOUBLE THROW

DEWPOINT TEMPERATURE

DRY BULB TEMPERATURE

DECIBEL OR DRY BULB

DIESEL OILDO

ECON

ECC

EAT

EDR

DX

DPV

DPDT

DPT

ECONOMIZER

ECCENTRIC

o

DIFF

DIAG

DIA or

DIV

DBT

DB

DIFFERENCE

DIAGRAM

DIAMETER

DIVISION

DEGREE

HR

HORIZ

HWH

HW

HZ

HP

HG

HD

HB

GALVS

GA

GR

FXTR

FWP

FVEL

FV

CUBIC MILLIMETER

CLOCKWISE OR COLD WATER

COEFFICIENT, VALVE FLOWCv

CU MM

CW

PLUG VALVE

THREE WAY

FPT

FO

FREQ

GATE, ANGLE

GATE, GLOBE

GLOBE

GATE

CONTROL

KJ KILOJOULE

LH

LT

LWT

LPS

M

LL

LPD

LPH

LM

LAV

LAT

LBS

LG

KW

KWH

L

LATENT HEAT

LEAVING WATER TEMPERATURE

LITERS PER HOUR

LITERS PER SECOND

LAUNDRY TRAY

METERS

LIQUID LINE

LITERS PER DAY

LINEAR METER

LEAVING AIR TEMPERATURE

LAVATORY

POUNDS

LENGTH

KILOWATT

KILOWATT HOUR

LITERS

P

FLOWMETER, VENTURI

FLOW SWITCH

PRESSURE SWITCH

PRESSURE GAUGE AND COCK

PUMP (INDICATE USE)

STRAINER

STRAINER, BLOW OFF

KG/SM

KG/SM A

KG/SM G

PS

P

OFM

FS

VFM

KILOGRAM PER SQ. METER

KILOGRAM PER SQ. METER (ABSOLUTE)

KILOGRAM PER SQ. METER (GAUGE)

JACKET WATER RETURN

MEDIUM PRESSURE STEAM

MEDIUM PRESSURE CONDENSATE

LOW PRESSURE STEAM

LOW PRESSURE CONDENSATE

BOILER BLOW DOWN

PUMPED CONDENSATE

JACKET WATER SUPPLY

VACUUM PUMP DISCHARGE

FUEL OIL TANK VENT

CONDENSATE WATER SUPPLY

CONDENSATE WATER RETURN

MEDIUM TEMPERATURE HOT WATER SUPPLY

MEDIUM TEMPERATURE HOT WATER RETURN

LOW TEMPERATURE HOT WATER SUPPLY

LOW TEMPERATURE HOT WATER RETURN

PIPE TO BE REMOVED

REFRIGERANT DISCHARGE

REFRIGERANT SUCTION

LPS

CONTROL AIR MAIN

air conditioning and refrigeration

RD

RS

(NAME)E

(NAME)

M

EXISTING PIPE

COMPRESSED AIR

VACUUM (AIR)

HWR

VAC

A

MTWS

MTWR

HWS

FOD FUEL OIL DRAIN

FOR

CS

CR

FOV

FOG

FOS FUEL OIL SUPPLY

FUEL OIL RETURN

FUEL OIL GAUGE

PC

VPD

MU

LPC

BBD

MAKE UP WATER

MPS

MPC

JWR

JWS

heating

PIPING

CHECK, SWINGSANITARY DRAIN

PITCH OR PIPE, UP(U), DOWN(D)

FLOOR SINK (200mm x 200mm)

PIPE SLEEVE WITH FIRE STOPPING

VENT THRU ROOF

BFP

valves : (for selective actuators)

PLAN

HOSE BIBB

AIR LINEA

BALL

ELEV.

BACKFLOW PREVENTER

PIPE SLEEVE

(NAME)

ACID

200mm x 200mm

SURFACE CLEANOUT

FLOOR CLEANOUT

FLOOR DRAIN

CHEMICAL SUPPLY PIPES

FUNNEL DRAIN, OPEN

FCO

FD

SCO

FLOOR OR GRADE

FLOOR OR GRADE

CONDENSATE DRAIN BELOW

CONDENSATE DRAIN ABOVE

ACID WASTE

GASG

CD

CD

AIR VENT, MANUAL

AIR VENT, AUTOMATIC

W/ MEASURING TAP

EXPANSION LOOP

EXPANSION JOINT

BALL JOINT

ANCHOR, MAIN

ANCHOR, INTERMEDIATE

ALIGNMENT GUIDE

AIR SEPARATOR

FLEXIBLE CONNECTOR

SQUARE HEAD BALANCING COCK

EJ

S

MV

AVV

CHECK, NON-SLAM

CONTROL, ELECTRIC-PNEUMATIC

CONTROL, PNEUMATIC-ELECTRIC

QUICK OPENING

PRESSURE REDUCING

NEEDLE

LOCK SHIELD

HOSE END DRAIN

SAFETY

RELIEF

SQUARE HEAD BALANCING COCK

QUICK CLOSING, FUSIBLE LINK

R

S

PE

EP

plumbing

COLD WATER

HOT WATER RETURN

HOT WATER SUPPLY

VENT

MOTOR ELECTRIC

DIAPHRAGM

valves, special duty :

SOLENOIDS

valve actuators

M

FDAD

SUCTIONQUANTITY SUCT

TONS OF REFRIGERATION

TEMPERATURE DIFFERENCE

HEAT TRANSFER COEFFICIENT

SANITARY

SUBMERSIBLE

SUPPLY AIR

SCHEDULE

RADIATOR

REFRIGERATION TON

REVOLUTIONS PER MINUTE

RELATIVE HUMIDITY

RETURN AIR

THERMAL RESISTANCE

REFRIGERANT (12, 22, ETC)

TYPICALTYP

URINAL

UNIT HEATER

UR

UH

U

THERMOSTAT

THICKNESS

THERMOMETER

TEMPERATURE

SYMBOL

TSTAT

TONS

THERM

THK

TEMP

TD

SYM

SINGLE POLE DOUBLE THROW

LPH, STANDARD CONDITIONS

LPS, STANDARD CONDITIONS

LPD, STANDARD CONDITIONS

SAYBOLT SECONDS UNIVERSAL

SAYBOLT SECONDS FUROL

SENSIBLE HEATOUTSIDE AIR INTAKE LOUVER SH

PRESSURE DROP OR DIFFERENCE

PRESSURE REDUCING VALVE

PHASE (ELECTRIC)

PERCENT

PARTS PER MILLION

POINT OF CONNECTION

PLUMBING

PETROLEUM, OIL AND LUBRICANTS

QUART

OUTSIDE SCREW & YOKE

DIAMETER, OUTSIDE

PRESSURE GAGE

POLE

PASCAL

OXYGEN

SPRINKLERSPR

STEEL

STANDARD

STEAM

SQUARE

STAINLESS STEEL

STORAGESTOR

STL

STD

ST

SSU

SST

SSF

SQ

SENSIBLE LOAD

STATIC PRESSURE

SQUARE METER

SPECIFICATION

SPDT

SPEC

SM

SP

SLPH

SLPS

SLPD

SL

ALARM CHECK VALVE

SIDEWALL SPRINKLER

PENDENT SPRINKLER

UPRIGHT SPRINKLER

FIRE DEPARTMENT CONNECTION

PRE-ACTION VALVE

NOT TO SCALE

OUTSIDE AIR

(2-WAY SHOWN)

DRY-PIPE VALVE

SECOND

SAFETY FACTOR

SPECIFIC GRAVITYSG

SF

SEC

VARIABLE AIR VOLUMEVAV

VENTILATION

PRESSURE, DYNAMIC(VELOCITY)

WATER-COOLED

WATER CLOSET

WATTHOUR OR WATER HEATER

WET BULB TEMPERATURE

WATERPROOF

WSHR

WCLD

WTRPRF

WH

WT

W/

WD

WC

WBT

WEIGHT

WITH

WASHER

WIDTH

VP

VOL

WB

W

VISC

VERT

VENT

VEL

VOLUME

WET BULB

WATT

VISCOSITY

VERTICAL

VELOCITY

MANUAL VOLUME DAMPER

SMOKE DAMPER (PROVIDE ACCESS DOOR)

PNEUMATIC OPERATED DAMPER

VLV

V

VAC

M

VALVE

VOLT

VACUUM

SPLITTER DAMPER

SD

AD

VD

grilles, registers and diffusers :

SG

SR

600/300

300x150

200mm NCD

FIGURE IS ON TOP

810mm x 400mm dampers

ELBOW, TURNED DOWN

REDUCER, CONCENTRIC

REDUCER, ECCENTRIC (STRAIGHT, INVERT)

REDUCER, ECCENTRIC (STRAIGHT, DOWN)

TEE, OUTLET DOWN

TEE, SINGLE SWEEP

sprinkler

UNION, SCREWED

UNION, FLANGED

TEE, OUTLET UP

TEE

LATERAL

CONNECTION, BOTTOM

CONNECTION, TOP

ELBOW, TURNED UP

BUSHING

CAP

WELDED

FLANGED

SOLDERED

SCREWED BELL AND SPIGOT

SOLVENT CEMENT

SOUND ATTENUATOR

DETECTORS, FIRE AND/OR SMOKE

ELECTRIC MOTOR OPERATED DAMPER

FIRE DAMPER (PROVIDE ACCESS DOOR)

BACKDRAFT DAMPER

BDD

S

TRANSITION

TURNING VANES

SF

CHANGE OF ELEVATION, RISE(R), DOWN(D)

DUCT SECTION, NEGATIVE PRESS., FIRST

ACCESS DOOR, VERTICAL OR HORIZONTAL

COWL, (GOOSENECK) AND FLASHING

ACOUSTICAL LINING

FLEXIBLE DUCT

FLEXIBLE CONNECTIONFC

FIGURE IS ON TOP

R

AD

47.2

TG

94.4

UC 13mm

DG

500/300L

DUCT WORK

810mm x 400mm

810mm x 400mm

THERMOSTAT, ELECTRIC

TRAP, ELECTRIC (INDICATE TYPE)

fitting :

R

THERMOMETER

EXHAUST AIR GRILLE OR REGISTER, CEILING

DUCT SECTION, POSITIVE PRESS., FIRST

DIRECTION OF FLOW

SR

DIFFUSER, LINEAR

RETURN AIR GRILLE OR REGISTER, CEILING

CEILING DIFFUSER, SQUARE TYPE

CEILING DIFFUSER, ROUND TYPE (200mm

(600mm x 300mmH, 472 LPS)

UNDERCUT DOOR (13mm, 47.2 LPS)

DOOR GRILLE (300mmx150mmH)

NECK DIAMETER)

TRANSFER GRILLE ASSEMBLY

LOUVER, DOOR OR WALL

(500mmWx300mmH, 94.4 LPS)

RG

RR

SUPPLY AIR GRILLE OR REGISTER, SIDEWALL

EXHAUST AIR GRILLE OR REGISTER, CEILING

SUPPLY AIR GRILLE OR REGISTER, CEILING

ER

SG

EG

EXISTING WORK TO BE REMOVED.

POINT OF CONNECTION NEW TO EXISTING

OR END OF DEMOLITION WORK

EXISTING WORK TO REMAIN.(E)

(R) REMOVE EXIST WORK

C

A

CHONG, ST

REPAIR QUONSET HUT BUILDING S-1709

CAMP CASEY

132491

M-2

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

SCOPE OF WORK MECHANICAL GENERAL NOTES

3. MARK ALL EXPOSED INTERIOR PIPING AT 8 METER(26 FT) INTERVALS, WITH PLASTIC WRAPAROUND TYPE PIPE LABLES

CONFORMING TO ASME/ANSI A13,1-1996 "SCHEME FOR IDENTIFICATION OF PIPING SYSTEMS", INDICATING THE TYPE

OF FLUID CARRIED AND DIRECTION OF FLOW. LABELS ARE NOT REQUIRED ON SPRINKLER SYSTEM BRANCH LINES AND

PIPES LESS THAN 50MM (2 INCHES) IN NOMINAL.

4. PROVIDE ALL SEISMIC PROTECTION MEASURES FOR THE FIRE PROTECTION SYSTEM IAW NFPA 13 FOR "PROTECTION OF

PIPING AGAINST DAMAGE WHERE SUBJECT TO EARTHQUAKES". INCLUDING, BUT NOT LIMITED TO, SWAY BRACINGS, FLEXIBLE COUPLINGS, CLEARANCES, AND SEPARATION ASSEMBLES.

5. PROVIDE LABEL TAG INDICATING "NORMALLY OPEN" OR "NORMALLY CLOSED" ON ALL VALVES INCLUDING AND NOT LIMITED

TO ALL RISER AND TRIM, SECTIONAL VALVES, INSPECTIORS TEST VALVES AND DRAINS.

6. SPRINKLERS WITH O-RINGS ARE NOT PERMITTED. PLUG TYPE TAMPER SWITCH SHALL NOT BE USED.

7. INSATLL SYSTEM TEST CONNECTION ON WET PIPE SYSTEM AND SHALL BE LOCATED AT THE MOST REMOTE BRANCH LINE.

8. ALL VALVES ON WET PIPE SYSTEM SHALL MEET NFPA 13 REQUIREMENT.

9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITION AND DIMENSIONS PRIOR TO

COMMENCING ANY CONSTRUCTION OR RENOVATION.

10. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS FOR NEW WORK SUCH AS EQUIPMENT & SERVICE CLEARANCE, EQUIPMENT PAD SIZE, INSTALLATION LOCATIONS, AND ADDITIONAL ITEMS.

13. CONNECT TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE THE EXISTING EQUIPMENT ANY

14. CONTRACTOR SHALL SUBMIT MANUFACTURERS INSTALLATION SHOP DRAWINGS FOR APPROVAL BY GOVERNMENT.

15. FOR O & MA PROJECTS, KOREA, OCTOBER 1, 2003 DEPARTMENT OF THE ARMY FORM AS A PART OF THIS PROJECT. THE

DETAILS WILL BE UTILIZED WHILE PERFORMING THE MECHANICAL SCOPE OF WORK AT NO ADDITIONAL COST TO THE U.S.

GOVERNMENT.

16. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACT FIELD CONDITIONS. SUCH DETAILS SHALL BE

PREPARED IN THE FIELD BY THE CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE

CONTRACTING OFFICER FOR APPROVAL.

17. ALL MECHANICAL SYSTEMS SHALL BE TESTED, ADJUSTED AND BALANCED BY THE CONTRACTOR IN STRICT ACCORDANCE WITH

APPLICABLE SECTIONS OF DIVISION 22 & 23 - MECHANICAL, O & MA STANDARD TECHNICAL SPECIFICATIONS FOR

MISCELLANEOUS PROJECTS, KOREA. THE HVAC TESTING, ADJUSTING AND BALANCING (TAB) REPORT SHALL BE SUBMITTED

TO THE PROJECT COR FOR GOVERNMENT REVIEW AND APPROVAL.

18. ALL SUPPLY, RETURN AND EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED ACCORDING TO SMACNA STATIC PRESSURE

CALSS 500PA AND DUCTWORK SHALL MEET THE REQUIREMENTS OF SEAL CLASS C.

28. PROVIDE VOLUME DAMPERS ON DUCTWORK BRANCH LINES WHETHER SHOWN ON THE DRAWINGS OR NOT.

PROVIDE REMOTELY ACTUATED DAMPERS IN AREAS WITH GYPBOARD OR CONCEALED CEILINGS.

30. ANY PIPES THAT PENETRATE FIRE RATED WALL (EXISTING/NEW) SHALL BE SEALED PER SPEC.

31. LOCATION AND SIZES OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. APPROXIMATE AND SHALL BE VERIFIED

AT THE JOB SITE.

1. THE EQUIPMENT SHOWN ARE SUGGESTED LOCATIONS HOWEVER FINAL LAYOUT SHALL BE IN ACCORDANCE

WITH APPLICABLE CODES, MANUFACTURER'S RECOMMENDATIONS, AND EQUIPMENT LISTINGS. CONTRACTOR

SHALL COORDINATE SPRINKLER HEADS LOCATIONS WITH, LIGHTING FIXTURES, AND HVAC DEVICES. ALL EQUIPMENT

SHALL BE UL LISTED AND/OR FM APPROVED IN ACCORDANCE WITH NFPA 13, NFPA 20 AND THE PROJECT SPECIFICATION.

2. THE CLEARANCES AROUND PIPE PENETRATION AT FIRE RATED WALLS AND/OR FLOOR SHALL BE PROPERLY SEALED

WITH APPROVED FIRE STOPPING MATERIAL IAW SPECIFICATION 07 84 00.

11. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL DAMAGES TO EXISTING AREAS

CAUSED BY THIS PROJECT AND TO MATCH CONDITION TO ADJACENT AREAS AS DIRECTED BY THE CONTRACTING OFFICER.

19. PROVIDE ACCESS PANELS TO ALL CONCEALED VALVES, DAMPERS, AND EQUIPMENT. PROVIDE ACCESS DOORS

IN DUCTS AT ALL AUTOMATIC CONTROL DAMPERS, FIRE DAMPERS, FIRE/SMOKE DAMPERS, DUCT SMOKE

DETECTOR, BACKDRAFT DAMPERS AND FOR ANY ITEM INDISE DUCTS REQUIRING SERVICING OR INSPECTION

12"X12" ACCESS PANELS FOR TWO VALVES. COORDINATE THE LOCATION OF ACCESS PANEL TO INSURE THAT

THE EQUIPMENT CAN BE MAINTAINED ADEQUATELY. PROVIDE REMOTELY ACTUATED DAMPERS IN AREA WITH

WITH GYPBOARD OR CONCEALED CEILINGS.

20. INSTALL CONDENSATE DRAINS AT A MINIMUM SLOPE OF 1 / 4INCH PER 1FOOT. INSULATE ALL SEWER PIPING

RECEIVING AIR CONDITIONING CONDENSATE DRAINS, OR ANY OTHER COLD LIQUID WHICH MAY CREATE

CONDENSATION, FROM SINK BODIES EXPOSED TO AIR BELOW THE FLOOR.

21. PROVIDE TURNING VANES IN ALL ELBOWS THAT CHANGE AIR DIRECTION MORE THAN 30 DEGREES OR USE

RADIUS ELBOWS. PROVIDE AIR SPLITTER DAMPERS AT ALL BRANCH TAKE-OFFS FROM THE MAIN DUCT.

PROVIDE SPIN-IN TYPE FITTINGS AT ALL ROUND DUCT TAKE-OFFS FROM SQUARE OR RECTANGULAR MAINS.

22. PIPING SYSTEM SHALL BE FLUSHED, PURGED & CLEANED PER SPECS REQUIREMENTS AND FLUSHED UNTIL

ALL WATER BEING FLUSHED IS CLEAR AS TAP WATER.

23. ALL CONDENSATE DRAINS FROM COOLING UNIT (AS NOTED ON THE DRAWINGS) SHALL BE PROVIDED WITH

SHUT-OFF VALVE WITHIN 1M OF THE UNIT.

24. DISPOSAL OF CONSTRUCTION DEBRIS, WASTE MATERIALS, MATERIALS RESULTING FROM DEMOLITION ACTIVITIES, AND THE LIKE SHALL BE DONE BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE U.S. GOVERNMENT.

25. ALL EQUIPMENT CONNECTIONS TO DUCTWORK SHALL HAVE A MIN. OF 100MM OF REINFORCED CANVAS FLEXIBLE

DUCTWORK FOR VIBRATION ISOLATION.

26. PROVIDE DIFFUSERS AND GRILLE FRAMES COMPATIBLE WITH ARCHITECTURAL CEILING TYPES, REFER TO

ARCHHITECTURAL DRAWINGS FOR CEILING TYPES.

27. PROVIDE FIRE DAMPERS AT ALL DUCT PENETRATIONS THROUGH FIRE RATED WALLS AND FLOORS. FIRE DAMPER

RATINGS SHALL BE COMPATIBLE WITH THE FIRE WALL OR FLOOR. FIRE DAMPERS SHALL BE UL LISTED.

29. THE MECHANICAL/CONTROLS CONTRACTOR SHALL PROVIDE ALL THE WIRINGS, RELAYS, CONTROLLERS, CONDUITS

AND ALL NECESSARY ACCESSORIES FOR H.V.A.C CONTROLS.

32. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWINGS. SHOP DRAWING SHALL NOT

BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.

EQUIPMENT, DUCT WORK, PIPING ETC. DAMAGED DUE TO THE WORK PERFORMED UNDER THIS CONTRACT SHALL

BE REPAIRED OR REPLACED BY THIS CONTRACTOR.

12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND REINSTALLATION OF ALL OBSTRUCTIONS AS

NECESSARY TO ALLOW FOR INSTALLATION AND REPLACEMENT OF MECHANICAL AND FIRE PROTECTION SYSTEM AT

NO ADDITIONAL COST TO THE GOVERNMENT, INCLUDING, BUT NOT NECESSARILY LIMITED TO ITEMS SUCH AS WALLS, CEILLING, ROOF, PIPE, DUCT, EQUIPMENT AND ELECTRICAL ITEMS.

33. PRIOR TO INSTALL NEW HVAC AND PLUMBING PIPING CONTRACTOR MUST COORDINATE WITH THE EXIST

DUCTWORK AND PIPING ELEVATION/LOCATION. IF THE EXIST DUCT ELEVATION IS CONFLICTED WITH NEW PIPING

INSTALLATION. REMOVE THE EXIST DUCTWORK AND INSTALL NEW DUCTWORK AND MAKE ALL NECESSARY DUCT

CONNECTION TO FUNCTION AS ORIGINALLY INTENDED.

MECHANICAL GENERAL NOTES AND

SCOPE OF WORK

WORK CLASS "K" (REPAIR AND MAINTENANCE WORK)

INCLUDING PLUMBING FIXTURES, AND ALL ASSOCIATED ACCESSORIES AS SHOWN ON DRAWINGS.

INSULATION, SEWER AND VENT PIPING SYSTEM, WATER HAMMER ARRESTS, FLOOR DRAIN, FLOOR CLEANOUT

ELEC. WATER COOLER, DOMESTIC HOT WATER RECIRC. PUMP, DOMESTIC COLD AND HOT WATER PIPING SYSTEM,

3. REPAIR THE PLUMBING SYSTEM BY INSTALLING NEW ELECTRIC DOMESTIC HOT WATRE HEATER, MOTORIZED DAMPER AND ALL ASSOCIATED ACCESSORIES FOR VENTILATION SYSTEM AS SHOWN ON DRAWINGS.

CONTROLS, DIFFUSERS, REGISTER, DUCTS, INSULATIONS, OUTSIDE AIR INTAKE LOUVER WITH BIRDSCREEN,

2. REPAIR THE VENTILATION SYSTEM BY INSTALLING NEW ENERGY RECOVERY VENTILATOR, EXHAUST FANS, FOR HVAC SYSTEM AS SHOWN ON DRAWINGS

INSULATIONS, CONTROLS, EQUIPMENT SUPPORT (CONC. PAD), AND ALL ASSOCIATED ACCESSORIES

ELECREIC WALL HEATER, SPLIT AIR CONDITIONING UNIT, ELECTRIC UNIT HEATER, VALVES, PIPING,

1. REPAIR THE HEATING AND COOLING SYSTEM BY INSTALLING NEW SPLIT HEAT PUMP SYSTEM, CHONG, ST

REPAIR QUONSET HUT BUILDING S-1709

M-3

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

MECHANICAL EQUIPMENT SCHEDULE - 1

NOTE :

REQUIRMENTS.

ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENT

THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING

QUANTITIES ARE SHOWN FOR ESTIMATING PURPOSE ONLY,

M E C H A N I C A L E Q U I P M E N T S C H E D U L E - 1

SYMBOL ZONE DESCRIPTION

AS PER MANUFACTURER RECOMMENDATIONS.

3 SIMILAR TO LG MULTI V 5 MODEL ARUM288BTE5 OR APPROVED EQUAL.

REFRIGERANT

TYPE

HEATING CAPACITY SHALL BE BASED ON 8 DEG C

T Y P EITEM NO SERVICE

HEATING CAP.

(BTU/H)

REMARKSQTY.

OUTDOOR SPLIT SYSTEM HEAT PUMP UNIT

COOLING CAPACITY SHALL BE BASED ON 35 DEG C21NOTES :

(BTU/H)

COOLING CAP.

TYPE

REFRIGERANT

HEATING CAPACITY SHALL BE BASED ON 8 DEG C

COOLING CAP.

(BTU/H)

NOTES : 1 2 COOLING CAPACITY SHALL BE BASED ON 35 DEG CALL HEAT PUMP UNITS REFRIGERANT PIPING SHALL BE INSTALLED

INDOOR SPLIT SYSTEM HEAT PUMP UNIT

QTY. REMARKS

POWER INPUT

(W)

VOLT/PH/HZ

(BTU/H)

HEATING CAP. CFM

SERVICEITEM NO T Y P E

COMPRESSOR

TYPE

ELECTRICAL

MOP(A) MCA(A) QTY

FAN

TYPE QTY

(H/M/L)

VOLT/PH/HZ

3 SIMILAR TO LG MULTIV MODEL ARNU183TSA4 OR APPROVED EQUAL.

ELECTRICAL DATA

MCA MOP

3YEARS WARRENTY

AS PER MANUFACTURER RECOMMENDATIONS.

ALL HEAT PUMP UNITS REFRIGERANT PIPING SHALL BE INSTALLED 3YEARS WARRENTY

HPU

4-WAY CEILING CASSETTE TYPE5 OFFICE-1,2,3,4,5(102,103,104,105,106)

31 221,50019,100 70 208/ 1/ 60417/381/348 R-410A2-WAY CEILING CASSETTE TYPE3 STORAGE(112),CORRIDOR(110) 0.84 15

51 221,50019,100 79 208/ 1/ 60735/653/556 R-410A 15

4-WAY CEILING CASSETTE TYPE2 CONFERENCE RM(111)

4 SIMILAR TO LG MULTIV MODEL ARNU243TSA4 OR APPROVED EQUAL. 5 SIMILAR TO LG MULTIV MODEL ARNU183TAA4 OR APPROVED EQUAL.

324,000288,000 R-410A

ENERGY RECOVERY VENTILATION

321MULTI V 5 HEAT PUMP1

OHPU

HSS DC SCROLL 3 PROPELLER 4208/ 3/ 60 40+80 28.5+57.9 4

HEAT PUMP UNIT

SAC

SPLIT AIR CONDITIONING

QTY.ITEM NO SERVICE T Y P E COOLING CAP

(W)

31 2 4

REMARKSREFRIGERANT

TYPE

VOLT/PH/HZPOWER INPUT

(W)

1 COMM ROOM(114)

PACKAGED SPLIT AIR CONDITIONING TYPE

WALL MOUNTED

6,500 2,250 220/1/60 R-410A

CAPACITY SHALL BE BASED ON 35DEG C

1 2

4ALL AC UNIT REFRIGERANT PIPING SHALL BE INSTALLED PERMANUFACTURER RECOMMENDATIONS.

WALL MOUNTED DUCT FREE SPLIT COOLING SYSTEM WITH REMOTE ELECTRONIC CONTROLLER.

LG ELECTRINICES MODEL "NO. SW16BDKWMS OR APPROVED EQUAL.

NOTES :

MOP

(A)

30A

HPU

61 231,50028,000 199 208/ 1/ 60855/771/687 R-410A 2.09 15

ERV

T Y P EQTY.ITEM NO

ENERGY RECOVERY VENTILATION UNIT

HORIZONTAL

AIR FLOW RATE

(CFM)

POWER INPUT

(W)

SOUND

PRESSURE

dB(A)

ELECTRIC RATING REMARKS

REFERED TO "LG"MODEL NO. LZ-H080GXN0 OR APPROVED EQUAL470/470/376 420 41/38/36 208V/60Hz/1PH

(H/H/L)

HEATING CAP.

(BTU/H)(BTU/H)

COOLING CAP.

25,470 30,000

HPU

2.09

2-WAY CEILING CASSETTE TYPE1 BREAK RM(115) 41 227,30024,200 70 208/ 1/ 60512/438/364 R-410A 15 7

HPU

0.84

6 SIMILAR TO LG MULTIV MODEL ARNU283TAA4 OR APPROVED EQUAL.

CHONG, ST

REPAIR QUONSET HUT BUILDING S-1709

M-4

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

MECHANICAL EQUIPMENT SCHEDULE - 2

NOTE :

REQUIRMENTS.

ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENT

THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING

QUANTITIES ARE SHOWN FOR ESTIMATING PURPOSE ONLY,

M E C H A N I C A L E Q U I P M E N T S C H E D U L E - 2

PROVIDE UNIT MTD. DISCONNECT

(AMPS)

WALL MTD TYPE

HEAVY DUTY, RECESSED

WALL MTD TYPE

2,0002 120/ 1/ 60

EH

12.5

12.5

AMPERAGE

(WATTS)

EH

REMARKS

VOLT/PH/HZ

TOTAL

1,000 120/ 1/ 60

ELEMENT CAPACITY

HEAVY DUTY, RECESSED

T Y P ESERVICEQTYITEM NO

ELECTRIC WALL HEATER

SWITCH.

PROVIDE UNIT MTD. DISCONNECT

SWITCH.

VEST-1 (101 & 116)

W & M TOILET (107 & 109)

AIR CAP.(LPS) VOLT/PH/HZHPRPM

1,600 208/1/601/100165.2

FAN CAPACITYITEM

DISCHARGE

T Y P E

HORIZONTAL

ELECTRIC UNIT HEATER

NO

QTY SERVICE

TYPE

REMARKS

208/1/60

VOLT/PH/HZ

HEATING ELEMENT CAP

POWER(KW)

EUH PROVIDE UNIT MTD. DISCONNECT SWITCH.

W/ BUILT-IN THERMOSATAT

HORIZONTAL

MECH & ELEC

RM (113)

ITEM NO Q'TY

EWC

DESCRIPTION

ELECTRIC WATER COOLER

CAPACITY : 8.0GPH, 50 DEG F DRINKING WATER

POWER : 370WATTS, 115 V, 1 PH, 60 HZ.

MODEL : ELKAY LZSTL8WSLK OR APPROVED EQUAL.

UL LISTED, NSF61 APPROVAL, BI-LEVEL, WALL MOUNT TYPE,

SENSOR-ACTIVATED BOTTLE FILLING STATION, VISUAL FILTER MONITOR,

FRONT AND SIDE BUBBLER PUSH BAR, REFRIGERATION SYSTEM,

NSF 42 & 53 CERTIFIED FILTER, 1-1/2"DRAIN

ITEM NO Q'TY

FANS

SERVICE TYPE

AIR CAP

(LPS) N O T E

FAN MOTORESP

(Pa) RPM

HP VOLT/PH/HZ

R E M A R K S

EF

115/1/60 NOTES : 1

2 DISCONNECT SWITCH

BIRDSCREEN3

BACKDRAFT DAMPER

PREFABRICATED ROOF CURB.

ROOF MOUNTED BELT DRIVE

CENTRIFUGAL FAN

431 2

431 2

ROOF MOUNTED BELT DRIVE

CENTRIFUGAL FAN

1 1,02793.3 1/4

EF

115/1/60275W. TOILET(107)/M. TOILET(109)/J/C(108)

234 1/462.3 948

ELECTRIC TYPE

WATER SYSTEM

DOMESTIC HOT

ELEMENT CAPACITY

REMARKSTYPEITEM NO SERVICE

Q'TY

VOLT/PH/HZ

3.0

KW

220/1/60 21.1 43.3

ELECTRIC HOT WATER HEATER

TEMP. RISE

(DEG C) TEMP. (DEG C)

SUPPLY WATER

(LITS)

113.6

STORAGE

CAPACITY

EWH

MECH & ELEC RM(113)

CHONG, ST

REPAIR QUONSET HUT BUILDING S-1709

M-5

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

M5 SCALE : 1 / 100-

EXIST/REMOVAL GROUND FLOOR PLAN

EXIST/REMOVAL GROUND FLOOR PLAN

ACCESSORIES.

EXHAUST FANS, INSULATIONS, CONTROLS, EQUIPMENT SUPPORT (CONC. PAD), AND ALL ASSOCIATED

ALL HVAC DUCTS, AIR CONDITIONS, PLUMBING PIPING. VALVES, DIFFUSERS, GRILLES, LOUVERS, REMOVE EXISTING DETERIORATED GAS TYPE WARM AIR FURANCES, GAS PIPING SYSTEM, HEAT PUMP SYSTEM, TURN-IN TO SUPPLY DIVISION

AND ALL ASSOCIATED ACCESSORIES.

REMOVE EXISTING DETERIORATED GAS PIPING SYSTEM,

CHONG, ST

REPAIR QUONSET HUT BUILDING S-1709

M-6

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

NEW GROUND FL HVAC PIPING PLAN

1. CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND

2. CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR HVAC PIPING

PRIOR TO HVAC PIPING INSTALLATION.

3. PROVIDE CEILING/WALL ACCESS PANEL FOR VALVES.

NOTES :

M6-

NEW GROUND FL HVAC PIPING PLAN,

AND NOTES

DIRECTION OF HVAC PIPING AND DRAIN PIPING IN FIELD (TYP.).

GWB CEILING

ACST OR

TO CEILING)

(FINISH MATCH

16 GA STEEL FRAME

PIANO HINGE

CONTINUOUS

(LIGHT WEIGHT METAL)

FINISH MATCH TO CEILING

14 GA STL ACCESS PANEL

AS REQUIRED

CAM LATCH

STL PLATE FRAME

75 Wx6 THK

@ EACH CORNER

WIRE HANGER

10 GA.

& NUT

6 DIA BOLT

CEILING ACCESS DOOR DETAIL

W.TOILET

MECH/ELEC

COMM

M.TOILET

EWC

RM

RM

SCALE : 1 / 50

PIPE CHASE

METAL PIPE TRAY

NEW CONC.PAD

PIPE CHASE

METAL PIPE TRAY

SAC

.A .A

.A

O.A

E S

R

OFFICE-4

OFFICE-5

RM

CONFERENCE

CORRIDOR

JAN

OFFICE-3

OFFICE-2

OFFICE-1

STORAGE

BREAK RM

C

T

T

T

T

T

T T T

ACCESS DOOR(TYP)

VEST-2

T

T T

ERV

HPU

HPU

HPU

HPU

HPU

HPU

HPU

HPU

HPU

SAC

NEW CONC.PAD

HPU

VEST-1

HPU

OHPU

EH

EH

EH

EUH

CHONG, ST

REPAIR QUONSET HUT BUILDING S-1709

M-7

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

1. CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND

M7 SCALE : 1 / 100-

NOTES :

SUSPENDED LAY-IN OR GYPSUM BOARD CEILING.

AIR DEVICE SCHEDULE

MATCH TO CEILING COLOR INDICATED ARCH. DWG.

SUSPENDED LAY-IN OR GYPSUM BOARD CEILING.

4-WAY THROW UNLESS OTHERWISE INDICATED

USE FOR 150 DIA NECK DIA AND SMALLER.

OPPOSED BLADE DAMPER

NOMINAL FULL FACE 300x300 3-CONE

DIFFUSER FOR SURFACE MOUNTING IN

EQUALIZING DEFLECTOR OR GYPSUM BOARD.

NOMINAL FULL FACE 600x600 3-CONE

DIFFUSER FOR MOUNTING IN

USE FOR 200 DIA NECK DIA AND LARGER.

b) a)

SUPPLY

RETURN

EXHAUST

FUNCTION TYPE

E-1

R-1

UNIT NO.

S-1

REGISTER

REGISTER

TYPE ACCESSORIES

ALUMINUM

MATERIAL

FINISH

2 4 3 5

REMARKS

TRANSFERG-1 EXHAUST OR TRANSFER GRILLE

REGISTERSUPPLYS-2 1 4 2ALUMINUM

ALUMINUM

ALUMINUM

ALUMINUM 1 6-

DIRECTION OF HVAC DUCT IN FIELD (TYP.).

2. CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR HVAC DUCT

PRIOR TO HVAC DUCT INSTALLATION.

AIR DEVICE SCHEDULE AND NOTES

NEW GROUND FL HVAC DUCT PLAN-1

NEW GROUND FL HVAC DUCT PLAN-1,

ROUND DIFFUSER

W.TOILET

FEC

MECH/ELEC

OFFICE-1 OFFICE-3

STORAGE

OFFICE-2

OFFICE-5

OFFICE-4

COMM

102 103 104

CORRIDOR

EWC

BREAK RM

VEST-1

RM

RM

O.A

E.A S.A

R.A

O .A

E .A

VD VD

37.7 LPS

20 LPS

20 LPS

ERV

20 LPS

20 LPS

O100

O150

O150

O100

O150

O200

O150 O150

O200

O150

O200

O200 O200

O150

O150

RM

CONFERENCE

M.TOILET

JAN

O200

O250

O200

O200

O200

O250

O150

O100

O100 O100

O150

O100

O100

O100

O150

O200

O100 O125

O150

O150 O150

O150

O100

O100

O125

O100

O100

O100

O100

O125

O100

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

S-1: 150ONCD

12.2 LPS

S-1: 150ONCD

20 LPS

S-1: 150ONCD

13.2 LPS

x 2

S-1: 150ONCD

20 LPS

S-1: 150ONCD

37.7 LPS

S-1: 150ONCD

13.2 LPS

x 3

E-1: 150ONCD

12.2 LPS

BDD

MD

20 LPS

E-1: 150ONCD

E-1: 150ONCD

13.2 LPS

x 2

E-1: 150ONCD

13.2 LPS

x 3

E-1: 150ONCD

2 x

11 LPS

S-1: 150ONCD

2 x

11 LPS

EF

EXHAUST FAN

E-1: 200x200

37.8 LPSE-1: 250x250

2 x

118.6 LPS

VD

EF

EXHAUST FAN

M

V

MOTORIZED DAMPER

w/BIRDSCREEN AND

300x300 O.A INTAK LOUVER

VENTILATION

THERMOSTAT

BIRD SCREEN(TYP OF 2)

HOODED WALL CAP W/STS METAL

STAINLESS STEEL SQUARE SHAPE

VEST-2

CHONG, ST

REPAIR QUONSET HUT BUILDING S-1709

M-8

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

HVAC CONTROL FLOW DIAGRAM

M8-

HVAC PIPE FLOW DIAGRAM

HVAC CONTROL FLOW DIAGRAM

NOT TO SCALE

M8- NOT TO SCALE

ENERGY RECOVERY

VENTILATOR UNIT

HVAC SYSTEM

S.A

RA

T

SA

SUPPLY AIR

RETURN AIR

DX THERMOSTAT

TO/FROM

TO/FROM

HVAC SYSTEM

SHUT-DOWN

EMERGENCY

EA

OA

CONTROL BOX

TO/FROM

OUTDOOR UNIT

MOTOR DAMPER

BACKDRAFT DAMPER

MD

BDD

M8- NOT TO SCALE

ERV CONTROL DIAGRAM

HVAC PIPE FLOW DIAGRAM,

AND ERV CONTROL DIAGRAM

ERV

1ST

OHPU

HPU

ERV

HPU

HPU

HPU

HPU

HPU

HPU

HPU

HPU

OFFCIE-6

(106)

OFFICE--5

(104)

OFFICE-2

(103)

OFFICE-1

(102)

CORRIDOR

(110)

CONFERENCE RM

(111)

STORAGE

(112)

HPU

OFFICE-3

(105)

CORRIDOR

(110)

HPU

BREAK RM

(115)

1ST

OHPU

HPU

ERV

HPU

HPU

DARIN

HPU

HPU

HPU

HPU

PBL-1601H2

HPU

HPU

OFFCIE-6

(106)

OFFICE--5

(104)

OFFICE-2

(103)

OFFICE-1

(102)

CORRIDOR

(110)

STORAGE

(112)

PBL-1601H2PBL-3501H2PBL-3501H2PBL-3501H2PBL-7001H2PBL-7001H2PBL-7001H2PBL-8701H2

HPU

OFFICE-3

(105)

PBL-1601H2

CORRIDOR

(110)

HPU

PBL-3501H2

CONFERENCE RM

(111)

BREAK RM

(115)

CHONG, ST

REPAIR QUONSET HUT BUILDING S-1709

M-9

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

(OUTDOOR UNIT)

(INDOOR UNIT)

CONTROLLER

SPACE COOLING REMOTE

T

ACU

ACU

AIR CONDITIONING UNIT

BUILT-IN CONTROL

RS

RL

SEQUENCE OF OPERATION

AIR CONDITIONING UNIT

OUTDOOR UNIT SHALL CYCLE "ON-OFF"BY BUILT-IN-HEAD PRESSURE CONTROL.

SET "FAN-OFF-COOL"SWITCH TO"COOL"POSITION, SPACE THERMOSTAT CONTROLS

SOLENOID VALVE "ON-OFF"TO MAINTAIN IT'S SETPOINT OF 25.5 DEG C.

THE THERMOSTAT SHALL HAVE A TEMPERATURE RANGE OF 12.7 DEC. C

INCLUDE WALL MOUNTED THERMOSTAT AND ON-OFF SWITCH.

MANUFACTURER SHALL FURNISH THE CONTROL SYSTEM TO

SEQUENCE OF OPERATION

THE THERMOSTAT SHALL CYCLE WALL HEATER TO MAINTAIN THERMOSTAT

SETPOINT. SET THE THERMOSTAT AT 12.7 DEG.C.

TO 29.4 DEC. C.

GENERAL:

MELECTRIC UNIT HEATER

ELEC. UNIT HEATER CONTROL

THERMOSTAT &

WALL MOUNTED

ON-OFF SWITCH

SWT

(EH-1 THRU EH-5)

INTEGRAL THERMOSTAT

WALL HEATER W/

ELECTRIC WALL HEATER CONTROL

THERMOSTAT SETPOINT. SET THE THERMOSTAT AY 20 DEG. C.

THE THERMOSTAT SHALL CYCLE WALL HEATER TO MAINTAIN

SEQUENCE OF OPERATION

12.7 DEC. C TO 29.4 DEC. C.

THE THERMOSTAT SHALL HVAC A TEMPERATURE RANGE OF

INTEGRAL THERMOSTAT.

MANUFACTURER SHALL FURNISH THE SYSTEM TO INCLUDE

GENERAL

MECH RM VENT SYS CONTROL DIAGRAM

VENTILATION THERMOSTAT(T-1)

BACKDRAFT DAMPER VENTILATION TO MAINTAIN T-1 SETPOINT.

SHALL OPERATE AND OPEN O.A. INTAKE DAMPER AND MOTORIZED

WHEN SPACE TEMP. RISES ABOVE 37.7 DEG.C, ROOF EXHAUST FAN

SEQUENCE OF OPERATION

T

T-1

SET AT 37.7 DEG. C.

DM

VENT THERMOSTAT

H

OFF

H

A

OL'S

1PH 120VAC

T

DAMPER MOTOR

O.A.

C

N

W/A.O.H. SEL. SW

MAGNETIC MOTOR STARTER

G

LOUVER W/BIRDSCREEN

OUTSIDE AIR INTAKE

FOR MECH.RM.

DAMPER

MOTORIZED O.A.

O.A.

M

COMM CLO

EF

E.A.

NOT TO SCALE

NOT TO SCALE

NOT TO SCALE

NOT TO SCALE

ACU UNIT CONTROL DIAGRAM

O/L

HAND

PUMP CONTROL

DOMESTIC HOT WATER HEATER CONTROL DIAGRAM

P

G

C1

GREEN PILOT

HOLDING COIL

LIGHT

FOR P-2

MOTOR STARTER

T-1

OFF

AUTO AQUASTAT SHALL CONTROL PUMP TO MAINTAIN ITS SET POINT.

DIFFERENTIAL. AND SUITABLE FOR 8 FLA AT 120 VAC.

ITS SETPOINT. T-1 SHALL BE PROVIDED WITH A COPPER CAPILLARY.

REMOTE BULB THERMOSTAT T-1 SHALL CONTROL PUMP P-2 TO MAINTAIN

P

GROUND

AS FOLLOWS ;

SEQUENCE OF OPERATION

120V, 1PH, 60HZ

T-1 SHALL BE A REMOTE BULB

FUSE

WELL

(TYPICAL)

SEE ELECTRICAL DWGS

MOUNT IN DOMESTIC

HOT WATER RETURN PIPING

EWH

T

T-1 AQUASTAT

DOMESTIC HW

RECIRC. PUMP

SENSOR STRAP ON

P

ELECTRIC HOT WATER HEATER

NOT TO SCALE

CONTROLS

M9

M9 M9

M9

M9

CHONG, ST

REPAIR QUONSET HUT BUILDING S-1709

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

M-10

1. CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND

3. PROVIDE CEILING/WALL ACCESS PANEL FOR VALVES.

- M10 SCALE : 1 / 100

2. CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR PLUMBING PIPING

PRIOR TO PLUMBING PIPING INSTALLATION.

DIRECTION OF HOT/COLD WATER, SEWER AND VENT PIPING IN FIELD (TYP.).

NOTES :

P.D.I

SYMBOL

WATER HAMMER ARRESTER SCHEDULE

Q' TY

FIXTURE

UNIT RATING

1 - 11

12 - 32 20 mm

15 mm

SIZE

CONN.

REMARK

COMPRESSION CHAMBER WITH EXPANSION

STAINLESS STEEL CONSTRUCTION PRESSURIZED

B

A

( TYPICAL )

W.TOILET

MECH/ELEC

OFFICE-1 OFFICE-3

STORAGE

OFFICE-2

OFFICE-5 OFFICE-4

COMM

102 103 104

105106

JAN

BREAK RM

RM

CONFERENCE

PM

VEST-1

VEST-2

RM

RM

P-1 x 4

P-3 x 3

P-5 x 4P-8

P-8

P-750

SEE CIVIL DWG

FOR CONT.

EWH

ELEC. WATER HEATER

NEW CONC. PAD

PRESSURE RELIEF VALVE

HOSE BIBB

M.TOILET

CORRIDOR

WATER HAMMER ARRESTOR

(P.D.I:"A" TYPE)(TYP OF 2)

WATER HAMMER ARRESTOR

(P.D.I:"A" TYPE)(TYP OF 2)

WATER HAMMER ARRESTOR

(P.D.I:"A" TYPE)(TYP OF 2)

50 32 40 32

40 25

EWC

WASTE

PIPE CONNECTION

H.W. VENT

BACK

R E M A R K S

PLUMBING FIXTURE SCHEDULE

C.W.

NOTES :

QTY.

P-1

SYMBOL

F I X T U R E

LAVATORY

WATER CLOSET4

3P-3 URINAL 504020 -

RESPONSIBLE FOR VERIFYING ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENTS

1. QUANTITIES ARE SHOWN FOR ESTIMATION PURPOSE ONLY, THE CONTRACTOR SHALL BE

REQUIREMENTS.

7515 40SERVICE SINK1 15

2. ALL PLUMBING DEVICES FOR POTABLE SERVICE HAS TO CONFIRM TO NSF 61, CHAPTER 8&9

WALL MOUNTED STAINLESS STEEL TYPE.

SINGLE BOWL

KITCHEN SINK STAINLESS STEEL TYPE4015 50P-7 1

P-5

P-8

FLUSH TANK TYPE, AMERICAN STANDARD

WALL HUNG TYPE/AMERICAN STANDARD

COUNTER TOP TYPE./AMERICAN STANDARD

PLUMBING FIXTURE SCH.,

WATER HAMMER ARRESTER SCH. AND NOTES

NEW GROUND FL PLUMBING PIPING PLAN - 1

NEW GROUND FL PLUMBING PIPING PLAN-1,

CHONG, ST

REPAIR QUONSET HUT BUILDING S-1709

CAMP CASEY

CW & HW PIPING

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

M-11

- M11 SCALE : 1 / 50

NEW MECH RM & TOILET PLUMBING PIPING

1. CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND

3. PROVIDE CEILING/WALL ACCESS PANEL FOR VALVES.

2. CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR PLUMBING PIPING

PRIOR TO PLUMBING PIPING INSTALLATION.

DIRECTION OF HOT/COLD WATER, SEWER AND VENT PIPING IN FIELD (TYP.).

NOTES :

WATER HAMMER ARRESTER SCH. AND NOTES

NEW MECH RM & TOILET PLUMBING PIPING PARTIAL PLAN-2

PARTIAL PLAN-2, PLUMBING FIXTURE SCH.,

W.TOILET

FEC

MECH/ELEC

OFFICE-1 OFFICE-3

STORAGE

OFFICE-2

OFFICE-5

OFFICE-4

COMM

102 103 104

JAN

CORRIDOR

EWC

BREAK RM

RM

CONFERENCE

VEST-1

VEST-2

RM

RM

SEE CIVIL DWG

FOR CONT.

S

100 FCO

V

V

M.TOILET

S

OPEN DRAIN

V

50 FD

50 FD

75 FD

80 VTR

V

V

V

V

V

V

V

CHONG, ST

REPAIR QUONSET HUT BUILDING S-1709

CAMP CASEY

SEWER & VENT PIPING

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

M-12

FD ECA BG HF

HOT PIPE LINE

HGD FECBG H A

CG

MF

EXPOSED

CLINCHING STAPLE @ 100 O.C.

CG OR

MF

EXPOSED

WEATHER

A

C

D

B

CLASS II ADHESIVE

OVERLAP (40)

VAPOR-BARRIER JACKET

2. HOT WATER HEATING

3. HEATED OIL PIPE LINE

1. STEAM & CONDENSATE

5. REFRIGERATION SUCTION

4. A/C CONDENSATE DRAIN

LONGITUDINAL JOINTS

COLD WATER PIPE LINE

3. DUAL TEMP. WATER

2. CHILLED WATER

1. MAKE-UP WATER

DOWN TO SHED WATER

SHALL BE OVERLAPPED

ALUMINUM JACKET

H

G

NOTE :

BAPIPING

COLD PIPE LINE

HOT PIPE LINE

D EC

INSULATION

PIPE

AREA

ITEM

80 JACKET STRIPE

F

CONCEALED

VAPOR-BARRIER JACKET

(MIN. 40 JACKET OVERLAP)

VAPOR-BARRIER COATING

10 W x 0.5 THK @300 O.C.

ALUMINUM LOCK-TYPE BANDS

80 JACKET STRIP OR

MF - MINERAL FIBER SHALL BE USED FOR HOT PIPES

CG - CELLULAR GLASS SHALL BE USED FOR COLD PIPES

SEE SPECIFICATION FOR INSULATION THICKNESS

PIPE INSULATION DETAIL3

REFRIGERANT PIPE SLEEVE DETAILS2

"B"

"A"

"A"

"B"

DRAIN PIPE

S=1/100

PIPE

REFRIGERANT

1M

ROD

HANGER

CONNECT TO MAIN PIPE

POWER WIRE

WIRE

COMMUNICATION2

HANGER BRACKET

3/8" HANGER ROD

NUT

WASHER

HANGER ROD(3/8")

STRONG ANCHOR X 4

CELING HEAT PUMP UNIT DETAILS1

OUTER TAPE

FROM HEAT PUMP

INSULATION

COVER

REFRIGERANT GAS PIPE

TO INDOOR UNIT

FROM HEAT PUMP

A

B

TO INDOOR UNIT

EXIT SIDE

(X) VERTICAL LEVEL

:IMPOSSIBLE

(O) HORIZONTAL LEVEL

:POSSIBLE

E

(X) HORIZONTAL LEVEL

:POSSIBLE BRANDH TAKE OFF LEVEL

1.MAINTAIN HORIZATAL ELVEL BETWEED

REFRIGERANT PIPES PRIOR TO /AFTER

BRANCH TAKE OFF FITTINGS.

NOTE

1,240

1,260

Mount:4ea

,6

1,240

,8

4 OUTDOORUNIT PAD DETAIL

DETAILS - 1

CHONG, ST

REPAIR QUONSET HUT BUILDING S-1709

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

M-13

DUCT INSULATIONDUCTWORK DETAILS 64 5

C cmh x Y=X

SD

A cmh B cmh

X

NOTE; ABOVE APPLY TO SUPPLY AND RETURN

W

SD

YX

W

Y

D

90° RADIUS ELBOWS

FOR D OF 300 OR MORE

USE VANED ELBOW

D LESS THAN 300

R=D Y

R1=(X+Y)/2

R2=X+Y

X OR W LESS THAN 300

Y

R1

Y

R

D

R2=X+Y

90° TEES

R1=(X+Y)/2

SD

W2

R2=W1+W2

X

R

TURNING VANES (TYP.)

RETURN ONLY

Y

BRANCH TAKEOFFS

C 300 OR MORE

MANUAL DAMPER

X OR Y LESS THAN 300

R1=(W1+W2)/2

SPLITTER DAMPER(TYP.)

PROVIDE VE WHEN COIL OR DIFFUSER IS

1,500 OR LESS FROM BRANCH TAKEOFF.

A cmhC c h m x Y=X C cmh

SD

A cmh B cmh

W

W

20° MAX.

X

W

R=W

W

NOTE; SEE SMACNA DUCT MANUAL

C LESS THAN 300

(1985) FIGS. 2-7

C c m h

A cmh

PREFERED OFFSET

FULL RADIUS WHERE POSSIBLE

OFFSETS

FROM RECTANGULAR MAIN

ROUND DUCT TAKEOFF

ALL FOUR SIDE OF DUCT 300 APART

THE 100 OVERLAP.

RIGID TYPE

CLASS II ADHESIVE UNDER

APPLY VAPOR-BARRIER JACKET)

EMBEDDED BETWEEN COATS.(WHEN FIELD

BARRIER COATING WITH GLASS CLOTH

APPLYING TWO COATS OF VAPOR-

EDGES OF THE INSULATION JOINT.

AND NOT MORE THAN 80 FROM THE

VAPOR-BARRIER JACKET

D

F

E

EXPOSED

STAPLE

OVERLAP

A ADHESIVE

B

C

FASTENER

INSULATION

VAPOR-BARRIER JACKET

F

CLASS II ADHESIVE UNDER

A

600 LARGE DUCT

D

C

E

THE 50 OVERLAP.

FLEXIBLE TYPE

B

CONCEALED

DUCT IN

AREA

ITEM

DUCT

CLASS II ADHESIVE (LESS THAN 600 DUCT) AROUND ENTIRE PERIMETER OF THE

100 O.C. WITH TYPE II VAPOR-BARRIER COATING

DUCT IN 150 WIDTH STRIPS ON 300 ON CENTER

MORE THAN 80 FROM DUCT CORNER.

BOTTOM/SIDES 450 O.C. AND NOT

ALL TRANSVERSE EDGES

DIMENSIONS

TO BE COATED WITH ADHESIVE

CB

E

FOLDED CORNER

PIN AND WASHER

ALTERNATE

(FASTENER)

12.71 TO 30.5 MPS

DUCT SECTION

UP TO 12.7 MPS

VELOCITY

(TYPICAL 1,200 OR 1,500mm)

A

E

B

LINING

C

B

C

B

C

A

E

1.NOTE :

DUCT LINING DETAIL

MAXIMUM SPACING FOR

INTERVALS ARE

LAPPED AND BUTTED CORNER

FRONT

WALL

CONSIDERING SERVICE, SUCTION AND DISCHARGE.

CONSIDER AT LEAST A SPACE AS SHOWN IN THE DRAWING,

WHEN INSTALLING THE PRODUCT,NOTE :

OUTDOORUNIT INSTALL2

FASTENERS ACTUAL

APPROXIMATE.

FIN. GRADE

150 150

SECTION

PLAN

N F S M

150150ACTUAL EQUIPMENT SIZE

AT EXPOSED EDGES

20mm CHAMFERS #4 @300 O.C.

50 CLR

CONC. PAD

150 150 150150ACTUAL EQUIPMENT SIZE

A C

T U

A L

E

Q U

IP

M E

N T

S

IZ

E

EQUIPMENT UNIT

GRAVEL BASE

150mm THK.

WITH MANUFACTURER.

FINAL PAD SIZE SHALL BE CORDINATED

6" (150mm) LARGER THAN UNIT SIZE AND

ALL EQUIPMENT CONC PAD SIZE SHALL BE

NOTE :

OHPU CONCRETE PAD DETAIL

DETAILS - 2

CHONG, ST

REPAIR QUONSET HUT BUILDING S-1709

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

M-14

PLAN

SUB EXHAUST

TYPICAL AIR HANDLING UNIT CONDENSATE

D1 = UNIT FAN OPERATING NEGATIVE PRESSURE PLUS 2"

SIDE VIEW

RISER

EXHAUST DUCT

BATH ROOM MAIN

AIR DUCT (150x100)

BATH ROOM MAIN

SUB EXHAUST

EXHAUST DUCT

RISER

DEVICE SHOWN ON

D2 = EQUAL TO "D1".

THE PLUMBING

DRAIN PIPING DETAIL

DRAWINGS

(BUT NO LESS THAN 40)

DRAIN LINE SIZE

OF AHU CONNECTION

(BUT NO LESS THAN 40)

CLEAN OUT PLUG

THREADED

TOWARDS DRAINAGE

PITCH DOWN

OF AHU CONNECTION

DRAIN LINE SIZE

D2

D1

FROM EXHAUST

GRILLE

FROM EXHAUST

GRILLE

PIPE SLEEVE-THRU FLOOR WITH

WATERPROOFING

SEALANT #2

PIPE SLEEVE - THRU INTERIOR WALL

INTERIOR WALL

CEILING

RUBBER OR

MATERIAL

PLASTIC)

METAL BAND

BACK UP

SEALANT #2

(CLOSED CELL

FLEXIBLE FOAM

AHU DRAIN PAN

(TYP)

SLEEVE

PIPE

ALL AROUND

BACK UP MATERIAL

SEALANT #2

PIPE WITHOUT INSULATION

WATERPROOFING

PIPE WITH

L

MIN 7 CLEARANCE

INSULATION

PIPE WITHOUT

INSULATION7

C

INSULATION

METAL JACKET

SLEEVE

4 LBS/SF LEAD OR

16 OUNCE COPPEER

FLASHING

FLEXIBLE FOAM

(CLOSED CELL

RUBBER OR

PLASTIC)

BACK UP

MATERIAL

PIPE WITH INSULATION

LC

METAL JACKER

FLOOR

P

IP

E

METAL BAND

AIR DUCT (150x100)

BATH ROOM EXHAUST DUCT RISER DETAIL

ANCHOR

BOLT & NUT

ISOLATOR

VIBRATION

SEE DETAIL "A"

WATER CHILLER

150150

PAD SIZE(INCH)

LENGTH

3350 -80

50 CLR

FOR

CHILLER UNIT

4# @ 1300 OC

80 CLR

2" CLR

2400 - 150

WIDTH

REMARKS

GRAVEL FILL

WATER CHILLER

FIN GRADE

25 CHAMFER

SEE DETAIL "A"

300 THK COMPACTED

NOTE ; 1. THE PAD SHOULD BE AT LEAST 6 INCHES LARGER

ALL AROUND THAN THE UNIT.

NOTE ; SUPPORT PIPE BOTH SIDE OF WALL SO THAT NO

WALL FAN

POWER ROOF FAN

RECOMMENDED BY MFG.

SCREWS SIZE & Q'TY AS

OUT SIDE

DAMPER

BACK DRAFT

WALL VENTILATOR

CONC. WALL

B Y

M F

G

CURB HT.

300 MIN.

MIN. 2 EACH SIDE

BY FAN MFR.,

RECOMMENDED

LAGBOLTS AS

POWER ROOF VENTILATOR

INSTALLATION OF GRAVITY ROOF FANS(VENTILATORS)

NOTE;

DIVISION 7 WORK

INSULATED ROOF CURVE,

EXHAUST DUCT WORK

WHERE SCHEDULED.

BACKDRAFT DAMPER

SEE ARCH. DWGS.

WOOD BLOCKING,

SEE ARCH. DWGS.

ROOF CONSTR.

SEE ARCH. DWGS.

(SPECIFIED IN DIVISION 7)

FLASHING

WOOD NAILER

ALL AROUND

GASKET SEAL

WEIGHT RESTS AT POINT OF SLEEVE

2. ACTUAL SIZE OF PAD SHALL BE COORDINATED WITH MFR

SHALL BE SIMILAR.

"D

"D 1"

PAD DETAIL

1 2 3 4

5 6 7

DETAILS - 3

CHONG, ST

REPAIR QUONSET HUT BUILDING S-1709

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

M-15

JUTE PACKING

SUPPLY

FROM BRANCH

FOR LOCATION AND

STAINLESS STEEL FLUSH TYPE ACCESS COVER PLATE

FLOOR CLEANOUT

2.CHROMIUM-PLATED BRONZE, NICKEL BRONZE,NICKEL BRASS OR

NOTES : 1.WATER-PROOF MEMBRANE IS NOT REQUIRED IN SLAB ON GRADE.

Y-BRANCH

CAST IRON

PIPE

WATER-PROOF MEMBRANE

FINISH/TILE FLOOR

WHEN NOT THRE RUN

PLUG Y-BRANCH

1/8 BEND

AREA/PIT DRAIN

DRAINS

DRAIN AND BACKWATER VALVE

SEE NOTE-2

SEE NOTE-2

FILL/BED

SEE NOTE-1

SLAB

STRUCTURAL

SEE NOTE-1

CEMENT

THREADED PLUG

TYPE

SEE NOTE-1

OUTLET SIZE

FLOOR/SHOWER DRAIN

SEE NOTE-2

A

MEMBRANE

TO LAST

FIXTURE

WATER HAMMER ARRESTOR

HEIGHT

B

C

A

DIMENSION SHALL BE

DIAMETER

12-32

33-60

CAPACITY(FU)

FIXTURE UNIT

1-11

SIZE

DISPLACEMENT

HYDRAULIC DISPLACEMENT

PRESSURE PNEMATIC

COPPER ADAPTOR

20 OR 25 SEE DWGS

SCORIATED COVER

SEE NOTE-2

WATER-PROOF MEMBRANE

ADJUSTABLE HOUSING

TWO PIECE THREADED

WATER SERVICE MAIN

4. DRAINS SHALL HAVE A CAST IRON BODY AND SEEPAGE PAN AND

1. WATER-PROOF MEMBERANE ARE NOT REQUIRED IN SLAB ON GRADE.

WATER-PROOF MEMBRANE

A CHROMIUM PLATED BRONZE, NICKEL BRONZE OR NICKEL BRASS STRAINER.

EXTERIOR THRUST BLOCK

PROVIDE STEEL HARNESS THRUST

RESTRAINT RODS FROM ELL TO

NEOPRENE GASKET

LEAD CAULKING

FINISH FLOOR

DRAINS SHALL BE CONNECTED TO CAST IRON P-TRAP.

2. NEOPRENE RUBBER GASKET COMPRESSION TYPE JOINT.

3.

CEMENT

FILL/BED

SLAB

STRUCTURAL

FINISH/TILE FLOOR

WALL SLEEVE

BELOW FROST LINE

NON FREEZE TYPE WALL

POLISHED BRONZE BOX

20 HOSE CONNECTION

HYDRANT

GRADE

WALL CLAMP

KEY HANDLE

OUTSIDE WALL

FLOW CONTROL

COPPER SHELL

FLOOR

FINISH/TILE

CEMENT

SLAB

WATER-PROOF

STRUCTURAL

FILL/BED

ORIFICE

PIPE SLEEVE THRU FLOOR

CAULK

H E

IG

H T

DIAMETER

FLUID

BELLOWS

CUSHION

AS CLOSE TO FLOOR AS

POSSIBLE

GATE VALVE

UNION

15 HOSE BIBB W20

HOSE THREAD

BRASS CASING

PIPE SOCKET

61-113D

VARIED DEPEND UPON

MFR

1 2

4 5

FILL/BED

CEMENT

SLAB

STRUCTURAL

SEE NOTE 2

SEE NOTE 1

MEMBRANE

WATERPROOF

FLOOR

FINISH/TILE A

P-TRAP

ADAPTOR

WASTE LINE

CLEANOUT PLUG

3 FLOOR DRAIN

DETAILS - 4

CHONG, ST

REPAIR QUONSET HUT BUILDING S-1709

000000-Repair Quonset Hut building S-1709, Cp Casey(FINAL)-M1
000000-Repair Quonset Hut building S-1709, Cp Casey(FINAL)-M2
000000-Repair Quonset Hut building S-1709, Cp Casey(FINAL)-M3
000000-Repair Quonset Hut building S-1709, Cp Casey(FINAL)-M4
000000-Repair Quonset Hut building S-1709, Cp Casey(FINAL)-M5
000000-Repair Quonset Hut building S-1709, Cp Casey(FINAL)-M6
000000-Repair Quonset Hut building S-1709, Cp Casey(FINAL)-M7
000000-Repair Quonset Hut building S-1709, Cp Casey(FINAL)-M8
000000-Repair Quonset Hut building S-1709, Cp Casey(FINAL)-M9
000000-Repair Quonset Hut building S-1709, Cp Casey(FINAL)-M10
000000-Repair Quonset Hut building S-1709, Cp Casey(FINAL)-M11
000000-Repair Quonset Hut building S-1709, Cp Casey(FINAL)-M12
000000-Repair Quonset Hut building S-1709, Cp Casey(FINAL)-M13
000000-Repair Quonset Hut building S-1709, Cp Casey(FINAL)-M14
000000-Repair Quonset Hut building S-1709, Cp Casey(FINAL)-M15

File details come from the government source that posted it. Updated .