W90VN824R0044 Technical Exhibit 1 thru 6_Revised.pdf
PDF 299 KB Posted
- Solicitation number
- W90VN824R0044
About this file
This document is a Technical Exhibit that provides details regarding the requirements for a federal contract opportunity to perform sampling and analysis of storm water and industrial wastewater at various military installations in South Korea for the U.S. Army Contracting Command.
The key details include: a list of required deliverables such as sampling plans, analysis results, and final reports; a location list and area map of the sampling points across multiple installations; a detailed list of the 79 storm water and industrial wastewater sampling points and associated parameters, analysis methods, frequencies, and quantities; a performance requirements summary matrix; and the contract requirements including the period of performance, contractor qualifications, and prior work experience. The federal contract opportunity has a solicitation number of W90VN824R0044 and is being issued by the Department of the Army Materiel Command Army Contracting Command.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Exhibit
Technical Exhibit #1 – 6.0 Deliverables
DELIVERABLE FREQUENCY # OF COPIES MEDIUM/FORMAT DISTRIBUTION
A001 (Para. 2.1.1.1) Provide sampling plan.
One (1) time before first sampling
1 Electronic File Email/PDF
COR/ACOR
A002 (Para. 2.1.1.3) Provide analysis result, pictures, check list for USAG Yongsan- Casey
Two (2) times for Storm water a year and One (1) time for Industrial Wastewater a year
1 Electronic File Email/PDF
A003 (Para. 2.1.1.3) Provide final report.
One (1) time a year Three copies Two (2) hard copy and One
(1) Electronic file
Two (2) hard copy and One (1) electronic file
COR/ACOR
A004 (Para. 2.1.2.1.1) Phase In/Phase Out
Within 30 days of contract award: All documents shall be accepted by the KO
1 Hard Copy & 1 Electronic File
One (1) hard copy and One (1) electronic file
KO
A005 (Para 2.1.13) Manual Operations
Within 15 days of contract award:
Manual Operations Contingency Plan shall be accepted by the KO
1 Hard Copy & 1 Electronic File
One (1) hard copy and One (1) electronic file
KO
A006 (Para. 2.4.2.3.1) DoD Cybersecurity Awareness Training
All Contractor employees must complete the DoD Cybersecurity Awareness Training before issuance of network access and annually thereafter
One (1) copy of a certificate
One (1) hard copy COR
A007 (Para. 2.4.3.1) Safety Plan
Review and Acceptance: During phase in and within 10 days of commencement of work Revisions: five (5) calendar days prior to effective date of change
1 Electronic Copy
Email/PDF
A008 (Para. 3.3) Quality Control Plan
Initial: within 30 days of contract award (or with the Contractor’s proposal if it is used in the evaluation process) Updates: All QCP updates shall be accepted by the COR
1 Electronic Copy
Email/PDF COR/ACOR
Technical Exhibit #2 – Location List and Area Map
Location List:
The work under this contract shall be performed at Camp Yongsan, Camp Casey, Camp Hovey, Rodriguez Live Fire Complex (RLFC), and Warrior Base in USAG Yongsan-Casey.
Area Map
Technical Exhibit #3, Sampling Points
Storm Water Sampling Points.
Installation # Sampling Point Water Type Frequency
Casey
1 Gate 1 Outfall (Storm water) 2 Times/Year
2 Gate 3 Outfall (Storm water) 2 Times/Year
3 222 South Outfall (Storm water) 2 Times/Year
4 246 North Outfall (Storm water) 2 Times/Year
5 690 North Inlet (Storm water) 2 Times/Year
6 811 NE Inlet (Storm water) 2 Times/Year
7 1018 East Inlet (Storm water) 2 Times/Year
8 1116 North Inlet (Storm water) 2 Times/Year
9 1842 Inlet (Storm water) 2 Times/Year
10 2361 South Inlet (Storm water) 2 Times/Year
11 Casey Creek Inlet (Storm water) 2 Times/Year
Hovey
12 Bridge 579 Outfall (Storm water) 2 Times/Year
13 4399 East Inlet (Storm water) 2 Times/Year
14 3445 SW Inlet (Storm water) 2 Times/Year
15 3428 Inlet (Storm water) 2 Times/Year
16 3866 West Inlet (Storm water) 2 Times/Year
RLFC 17 Rodriguez Live Fire Complex Outfall (Storm water) 2 Times/Year
W/Base 18 254 South Outfall (Storm water) 2 Times/Year
Yongsan
19 B#1344 Southwest Outfall (Storm water) 2 Times/Year
20 Stream Outfall B#1455 South Outfall (Storm water) 2 Times/Year
21 B#1607 Southeast Outfall (Storm water) 2 Times/Year
22 Stream Inlet B#2701 Northeast Outfall (Storm water) 2 Times/Year
23 B#4805 East Outfall (Storm water) 2 Times/Year
24 B#4815 Northeast Outfall (Storm water) 2 Times/Year
25 B#4280 Child Develop Center Outfall (Storm water) 2 Times/Year
26 B#5701 Northwest Outfall (Storm water) 2 Times/Year
27 B#5709 West Outfall (Storm water) 2 Times/Year
28 5717 Southwest Outfall (Storm water) 2 Times/Year
Total: 28 Points x 2 Times = 56 Points
Industrial Wastewater Sampling Points.
Installation # Sampling
Point Bldg Usage Water Type Frequency
Casey
1 38 Vehicle Storage Outfall (Industrial Wastewater) 1 Time/Year
2 93 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
3 94 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
4 105 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
5 343 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
6 481A Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
7 497 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
8 499A Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
9 627 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
10 628 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
11 635 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
12 644 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
13 647A Heavy Shop Outfall (Industrial Wastewater) 1 Time/Year
14 647B Heavy Shop Outfall (Industrial Wastewater) 1 Time/Year
15 647C Heavy Shop Outfall (Industrial Wastewater) 1 Time/Year
16 648 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
17 775 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
18 786 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
19 793 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
20 794 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
21 882A Sewage Plant Outfall (Industrial Wastewater) 1 Time/Year
22 882B Sewage Plant Outfall (Industrial Wastewater) 1 Time/Year
23 891 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
24 1024 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
25 1064 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
26 1068A Gas Station (DLA) Outfall (Industrial Wastewater) 1 Time/Year
27 1068B Gas Station (AAFES) Outfall (Industrial Wastewater) 1 Time/Year
28 1158A Tank Wash Rack Outfall (Industrial Wastewater) 1 Time/Year
29 1158B Tank Wash Rack Outfall (Industrial Wastewater) 1 Time/Year
30 1171 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
31 1564 POL Tank Farm Outfall (Industrial Wastewater) 1 Time/Year
32 1751 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
33 1753 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
34 1758 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
35 1904 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
36 1937 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
37 2285 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
38 2286 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
39 2367 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
40 2526A Mainat Shop (TMP) Outfall (Industrial Wastewater) 1 Time/Year
41 2528 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
42 2604 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
Installation # Sampling
Point Bldg Usage Water Type Frequency
Hovey 43 3461 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
44 3468A Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
45 3468B Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
46 3469 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
47 3478 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
48 3482 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
49 3484 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
50 3505 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
51 4108 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
52 4125A Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
53 4125B Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
54 4130 Wash Plat Form Outfall (Industrial Wastewater) 1 Time/Year
55 4322A Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
56 4322B Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
57 4367 Motor Pool Outfall (Industrial Wastewater) 1 Time/Year
Yongsan
58 1314 ORG Storage Bldg Outfall (Industrial Wastewater) 1 Time/Year
59 1344 Eng/Housing MNT Outfall (Industrial Wastewater) 1 Time/Year
60 5701 Maint Shop Outfall (Industrial Wastewater) 1 Time/Year
61 5709 Admin Outfall (Industrial Wastewater) 1 Time/Year
62 5711 Maint Shop Outfall (Industrial Wastewater) 1 Time/Year
63 5712 Maint Shop Outfall (Industrial Wastewater) 1 Time/Year
64 5713 Maint Shop Outfall (Industrial Wastewater) 1 Time/Year
65 5714 Maint Shop Outfall (Industrial Wastewater) 1 Time/Year
66 5741 OWS Outfall (Industrial Wastewater) 1 Time/Year
67 5742 OWS Outfall (Industrial Wastewater) 1 Time/Year
68 5743 OWS Outfall (Industrial Wastewater) 1 Time/Year
W/Base 69 285 Wash Rack (TSAK) Outfall (Industrial Wastewater) 1 Time/Year
Re-Sample +10 Resample after cleaning the oil/water separator if the analysis results exceed the criteria of KEGS.
Total: 69 Points + 10 (Re-Sample) = 79
Technical Exhibit #4 – Sample Parameters, Analysis Methods, Frequency and Quantity
Storm Water
Parameters Sample
Type Frequency
Sample Number
QA
Samples
(Duplicate)
Equip
/Field
Blank
Total Sample Number
Arsenic (Total) Grab 2 Times/Year 28 4 4 72
Chromium (Total) Grab 2 Times/Year 28 4 4 72
Copper (Total) Grab 2 Times/Year 28 4 4 72
Iron (Total) Grab 2 Times/Year 28 4 4 72
Lead (Total) Grab 2 Times/Year 28 4 4 72
Oil and Grease Grab 2 Times/Year 28 4 4 72 pH Grab 2 Times/Year 28 4 4 72
Selenium (Total) Grab 2 Times/Year 28 4 4 72
Total Suspended Solid Grab 2 Times/Year 28 4 4 72
TPH-Diesel Range Grab 2 Times/Year 28 4 4 72
TPH-Gasoline Range Grab 2 Times/Year 28 4 4 72
Turbidity Grab 2 Times/Year 28 4 4 72
Zinc (Total) Grab 2 Times/Year 28 4 4 72
Industrial Wastewater
Parameters Sample
Type Frequency
Sample Number
QA
Samples
(Duplicate)
Equip
/Field
Blank
Total Sample Number
Alkyl Benzene Sulfonate (ABS) (mg/L) Grab 1 Time/Year 79 6 8 93
Arsenic (mg/L) Grab 1 Time/Year 79 6 8 93
Cadmium (mg/L) Grab 1 Time/Year 79 6 8 93
Chromium (mg/L) Grab 1 Time/Year 79 6 8 93
Parameters Sample
Type Frequency
Sample Number
QA
Samples
(Duplicate)
Equip
/Field
Blank
Total Sample Number
Copper (mg/L) Grab 1 Time/Year 79 6 8 93
Cyanide (mg/L) Grab 1 Time/Year 79 6 8 93
Fluorine (mg/L) Grab 1 Time/Year 79 6 8 93
Hexavalent Chromium (mg/L) Grab 1 Time/Year 79 6 8 93
Lead (mg/L) Grab 1 Time/Year 79 6 8 93
Mercury (mg/L) Grab 1 Time/Year 79 6 8 93
Normal Hexane Extracts:
- Mineral Oil (mg/L) Grab 1 Time/Year 79 6 8 93
- Animal/Vegetable Oil (mg/L) Grab 1 Time/Year 79 6 8 93
PCB (mg/L) Grab 1 Time/Year 79 6 8 93 pH Grab 1 Time/Year 79 6 8 93
Phenol (mg/L) Grab 1 Time/Year 79 6 8 93
Soluble Iron (mg/L) Grab 1 Time/Year 79 6 8 93
Soluble Manganese (mg/L) Grab 1 Time/Year 79 6 8 93
Tetrachloroethylene (mg/L) Grab 1 Time/Year 79 6 8 93
Total Nitrogen (mg/L) Grab 1 Time/Year 79 6 8 93
Total Phosphorous (mg/L) Grab 1 Time/Year 79 6 8 93
Total Suspended Solids (mg/L) Grab 1 Time/Year 79 6 8 93
Trichlorethylene (mg/L) Grab 1 Time/Year 79 6 8 93
Zinc (mg/L) Grab 1 Time/Year 79 6 8 93
Technical Exhibit #5 – Performance Requirements summary (PRS) Matrix
Required Services/ Performance Object
PWS
Paragraph
Number
Performance Standard
Maximum Allowable Degree of
Deviation from Requirement (AQL Level)
Method of Surveillance
Deduct Schedule
Prepare sampling tools and equipment and submit a sampling plan
2.1.1.1 The contractor
provided all necessary items and sampling plan.
COR will inspect items and review plan after contract is awarded.
95% Compliance and performance standard
The COR will visually inspect sampling tool and equipment.
Contractor shall re-performance within two
(2) weeks.
Perform required sampling of storm water and industrial wastewater
2.1.1.2 The contractor will
provide manpower to perform water sampling according to the sampling plan.
95% Compliance and performance standard
Random and Split Sampling
Contractor shall re-performance within two
(2) weeks.
Submit analysis result
2.1.1.3 The contractor
provided analysis results with sampling points’ picture, visual check list after all sampling finished within 10 calendar days. Quality
100% Compliance and performance standard
100% Inspection
Contractor re-performance within one
(1) month assurance results should be done for analysis.
Submit final report for total sampling and analysis
2.1.1.3 The contractor
provided final report within 10 calendar days after completing the report in response to Government comments.
100% Compliance and performance standard
Review and acceptance the data by
COR.
Contractor re-performance within one
(1) week
The Contractor will ensure that the licenses or certificates are kept current. Copies of these licenses or certifications will be provided to the COR
2.4.4.1 The contractor
provided current and valid licenses or certificates and training. COR will check out them upon starting from first sampling to last sampling.
100% Compliance and performance standard.
The COR will review 100% of Contractor certifications.
Contractor shall re-submit current and valid licenses or certificate within two
(2) weeks.
Technical Exhibit #6 – Contract Requirements
1.0 Requirements
1.1 Period of Performance (PoP). Base year with four (4) option years.
Base Year Period: 1 Aug 24 – 31 Jul 25 1st Option Year Period: 1 Aug 25 – 31 Jul 26 2nd Option Year Period: 1 Aug 26 – 31 Jul 27 3rd Option Year Period: 1 Aug 27 – 31 Jul 28 4th Option Year Period: 1 Aug 28 – 31 Jul 29
1.2 Contractor’s Qualification. The contractor shall be familiar with storm water and industrial wastewater monitoring requirements as specified in USFK Regulation 201-1 and all other local and US rules and regulations. Contractor should analyze samples by laboratory which has valid certificate of “National Environmental Laboratory Accreditation Program (NELAP-국가 환경실험실 인증 프로그램)” issued by National
Environmental Laboratory Accreditation Conference Institute (국가 환경실험실 인증협회).
1.3 Prior Work Experience. The Contractor shall have at least two years of experience in the sampling and analysis of storm water and industrial wastewater for the U.S. Government or in the local economy within the last five (5) years.