TE7 STAR Inspection Checklist Forms.pdf

PDF 441 KB Posted

Attached to
Fuel Tank Federal contract opportunity
Solicitation number
W90VN7-24-R-A005
Issued by
Department of the Army

About this file

The document provided contains a series of Tank Compliance Assessment Checklists for annual and monthly inspections of both aboveground and underground storage tanks. The checklists cover a comprehensive set of criteria to assess the condition and compliance of tank containment, foundations, appurtenances, corrosion control, level and overfill prevention, electrical systems, and overall tank site. The checklists require responses to indicate the presence or absence of various tank components and whether they are in working order.

The related federal contract opportunity is for a Fuel Tank requirement, with a solicitation number of W90VN7-24-R-A005. The Department of the Army is the procuring agency. The Performance Work Statement for this opportunity is attached, but not provided in the given documents.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TANK COMPLIANCE ASSESSMENT CHECKLIST

ANNUAL ORGANIZATIONAL TANK ASSESSMENT

Installation Date:

Real Property ID:

Installation/GSU:

Owner:

Unit/Org: Designation:

Location: Volume (Gallons):

Model: Contents:

Serial #:

Finding Status:

Perform Date: Status:

Assessor: Duty Phone:

Conclusion:

Comments:

For Official Use Only

TANK CONTAINMENT

Are there water accumulations, debris, vegetation, cracks, fire hazards, or holes observed in the tank containment?

Correct Response: NResponse: Yes No N/A

Comments:

Are containment drain valves in working order and closed?

Correct Response: YResponse: Yes No N/A

Comments:

TANK FOUNDATION AND SUPPORTS

Is there evidence of tank settlement, foundation washout, or foundation cracking?

Correct Response: NResponse: Yes No N/A

Comments:

Is there any cracking, spalling, or corrosion of tank supports and/or saddles?

Correct Response: NResponse: Yes No N/A

Comments:

Are ladders, platforms, handrails, and stairs secure with no indication of corrosion and/or damage?

Correct Response: YResponse: Yes No N/A

Comments:

TANK AND APPURTENANCES

Is the normal vent clear and free of obstructions?

Correct Response: YResponse: Yes No N/A

Comments:

Is vent located five feet or more from adjacent buildings?

Correct Response: YResponse: Yes No N/A

Comments:

For class I fuels (ie MOGAS, AVGAS), are normal vents located at least 12 feet above grade?

Correct Response: YResponse: Yes No N/A

Comments:

For Official Use Only

TANK AND APPURTENANCES (continued)

Are there emergency vents for the primary tank?

Correct Response: YResponse: Yes No N/A

Comments:

If the primary tank is equipped or designed with an emergency vent, is it operable (vent cover can be lifted by hand)?

Correct Response: YResponse: Yes No N/A

Comments:

If a secondary tank is present and equipped or designed with an emergency vent, is it operable (vent cover can be lifted by hand)?

Correct Response: YResponse: Yes No N/A

Comments:

If the primary tank is equipped or designed with a pressure vacuum vent, is it operable?

Correct Response: YResponse: Yes No N/A

Comments:

Are all valves in working order?

Correct Response: YResponse: Yes No N/A

Comments:

Are NFPA-compliant placards present and legible?

Correct Response: YResponse: Yes No N/A

Comments:

CORROSION CONTROL

Is there any evidence of paint coating failure or corrosion of tank and piping surfaces?

Correct Response: NResponse: Yes No N/A

Comments:

Is there evidence of corrosion at pipestand and piping interfaces (undercutting of pipe) including underside of piping?

Correct Response: NResponse: Yes No N/A

Comments:

Is there cathodic protection for underground metallic piping?

Correct Response: YResponse: Yes No N/A

Comments:

Is cathodic protection working and being checked regularly?

Correct Response: YResponse: Yes No N/A

Comments:

LEVEL AND OVERFILL PREVENTION

Has the tank level indicating device been tested and is it in working order?

Correct Response: YResponse: Yes No N/A

Comments:

Is tank level gauge viewable from the filling point?

Correct Response: YResponse: Yes No N/A

Comments:

1550424661A Cross-Out

For Official Use Only

LEVEL AND OVERFILL PREVENTION (continued)

Has the overflow shutoff mechanism (shut off valve or float valve) been tested to determine if it is in good working order?

Correct Response: YResponse: Yes No N/A

Comments:

If a High Level Alarm is present, has it been tested to determine if it is in good working order?

Correct Response: YResponse: Yes No N/A

Comments:

Are anti-siphon valves operable (if present)?

Correct Response: YResponse: Yes No N/A

Comments:

ELECTRICAL WIRING AND EQUIPMENT

Is the tank grounded?

Correct Response: YResponse: Yes No N/A

Comments:

Are grounding straps secure and in good order?

Correct Response: YResponse: Yes No N/A

Comments:

Are wiring, wiring conduit, and junction boxes in good condition?

Correct Response: YResponse: Yes No N/A

Comments:

Are electrical components in classified conduit and enclosures as required?

Correct Response: YResponse: Yes No N/A

Comments:

TANK SITE

Are traffic bollards and/or protection from vehicle traffic in place where required?

Correct Response: YResponse: Yes No N/A

Comments:

ADDITIONAL

Have all other Local, State, or Federal requirements checklist(s) been accomplished, if required, and documents uploaded to this tank record? Provide appropriate reference to record in comments.

Correct Response: YResponse: Yes No N/A

Inspector Signature

MONTHLY ORGANIZATIONAL TANK ASSESSMENT

Installation Date:

Real Property ID:

Installation/GSU:

Owner:

Unit/Org: Designation:

Location: Volume (Gallons):

Model: Contents:

Serial #:

Finding Status:

Perform Date: Status:

Assessor: Duty Phone:

Conclusion:

Comments:

For Official Use Only

TANK CONTAINMENT

Are there water accumulations, debris, vegetation, cracks, fire hazards, or holes observed in the tank containment?

Correct Response: NResponse: Yes No N/A

Comments:

Are containment drain valves in working order and closed?

Correct Response: YResponse: Yes No N/A

Comments:

If the tank is a double wall tank, was there water or fuel in the tank interstitial space?

Correct Response: NResponse: Yes No N/A

Comments:

Are there leaks, broken seals, and/or corrosion of manhole covers?

Correct Response: NResponse: Yes No N/A

Comments:

Are there any indications of leakage, staining, seepage, or corrosion around tank shell or concrete pad?

Correct Response: NResponse: Yes No N/A

Comments:

Are there any indications of leakage, staining, seepage, or corrosion on piping, pipe connections, or pipe stands?

Correct Response: NResponse: Yes No N/A

Comments:

Are there any indications of leakage, staining, seepage, or corrosion on valves?

Correct Response: NResponse: Yes No N/A

Comments:

Are there any indications of leakage, staining, seepage, or corrosion on tank supports/saddles?

Correct Response: NResponse: Yes No N/A

MONTHLY ORGANIZATIONAL TANK ASSESSMENT

For Official Use Only

TANK CONTAINMENT (continued)

Is the tank level gauge working, readable, and can be observed by the operator from the fill position location?

Correct Response: YResponse: Yes No N/A

Comments:

Are ladders, platforms, handrails, and stairs secure with no indication of severe corrosion and/or damage?

Correct Response: YResponse: Yes No N/A

Comments:

Are containment egress (exit) pathways clear?

Correct Response: YResponse: Yes No N/A

Comments:

Are gates/doors operable and in working order?

Correct Response: YResponse: Yes No N/A

Comments:

Are fire extinguishers maintained in a serviceable condition and located in the designated area?

Correct Response: YResponse: Yes No N/A

Comments:

Has an AF Form 332 been completed for any deficiencies observed?

Correct Response: YResponse: Yes No N/A

Comments:

Are NFPA-compliant placards present and legible?

Correct Response: YResponse: Yes No N/A

Comments:

ADDITIONAL

Have all other Local, State, or Federal requirements checklist(s) been accomplished, if required, and documents uploaded to this tank record? Provide appropriate reference to record in comments.

Correct Response: YResponse: Yes No N/A

ANNUAL UST INSPECTION

Installation Date:

Real Property ID:

Installation/GSU:

Designation:

Location:

Volume (Gallons):

Contents:Model:

Finding Status:

Perform Date: Status:

Assessor: Duty Phone:

Conclusion:

Comments:

For Official Use Only

SECONDARY CONTAINMENT SUMPS (SUBMERSIBLE TURBINE PUMP, DISPENSER, TRANSITION)

Are containment sumps free of damage?

Correct Response: YResponse: Yes No N/A

Comments:

Are containment sumps free of leaks to the containment area and without indication of a release to the environment?

Correct Response: YResponse: Yes No N/A

Comments:

Are containment sumps free of water, product and debris? Liquid and debris must be removed and disposed of properly.

Correct Response: YResponse: Yes No N/A

Comments:

HAND-HELD RELEASE DETECTION EQUIPMENT

Do hand-held release detection equipment (e.g. groundwater bailers and tank gauge sticks) accurately measure liquid depth?

Correct Response: YResponse: Yes No N/A

Comments:

DISPENSERS

Are dispenser hoses, nozzles and breakaways free of loose fittings, deterioration, signs of leakage, or improper functionality?

Correct Response: YResponse: Yes No N/A

Comments:

EQUIPMENT TESTING

Is annual piping testing complete with passing results? (Ref: 40 CFR 280.41)

Correct Response: YResponse: Yes No N/A

Comments:

Is triennial spill bucket and containment sump testing complete with passing results? (Ref: 40 CFR 280.35)

Correct Response: YResponse: Yes No N/A

Comments:

Unit/Org:

Serial #:

ANNUAL UST INSPECTION

For Official Use Only

EQUIPMENT TESTING (continued)

Is triennial overfill equipment (Automatic Shutoff Device and Alarm) verification, inspection, and testing complete with passing results?

(Ref: 40 CFR 280.35)

Correct Response: YResponse: Yes No N/A

Comments:

Is annual electronic monitoring system (Automatic Tank Gauging - ATG and liquid sensors) inspection and testing complete with passing results? (Ref: 40 CFR 280.40)

Correct Response: YResponse: Yes No N/A

Comments:

Is annual line leak detector testing complete with passing results? (Ref: 40 CFR 280.40, 280.44)

Correct Response: YResponse: Yes No N/A

Comments:

ADDITIONAL

Have all other Local, State, or Federal requirements checklist(s) been accomplished, if required, and documents uploaded to this tank record? Provide appropriate reference to record in comments.

Correct Response: YResponse: Yes No N/A

MONTHLY UST INSPECTION

Installation Date:

Real Property ID:

Installation/GSU:

Designation:

Location: Volume (Gallons):

Model: Contents:

Serial #:

Finding Status:

Perform Date: Status:

Assessor: Duty Phone:

Conclusion:

Comments:

For Official Use Only

SPILL PREVENTION EQUIPMENT

Is spill prevention equipment (e.g. spill buckets) in good working condition and capable of containing spills?

Correct Response: YResponse: Yes No N/A

Comments:

Is spill prevention equipment free of corrosion?

Correct Response: YResponse: Yes No N/A

Comments:

Is spill prevention equipment free of water, product, or debris? Liquid and debris must be removed and disposed of properly.

Correct Response: YResponse: Yes No N/A

Comments:

Is fill pipe free of obstructions (i.e. gauging stick segments, trash, debris etc.)? Any obstructions must been removed.

Correct Response: YResponse: Yes No N/A

Comments:

Is the fill cap in good condition and equipped with an intact gasket?

Correct Response: YResponse: Yes No N/A

Comments:

Does the fill cap and its assembly fit securely on the fill pipe before, during, and after deliveries?

Correct Response: YResponse: Yes No N/A

Comments:

Is double-walled spill prevention equipment interstitial area free from leaks? (Applicable only to double-walled spill prevention equipment)

Correct Response: YResponse: Yes No N/A

Comments:

RELEASE DETECTION EQUIPMENT

If the tank is equipped with release detection, is the equipment operating properly to determine usual operating conditions (i.e., faulty alarms, monitoring discrepancies, readings, etc.)?

Correct Response: YResponse: Yes No N/A

Comments:

Owner:

Unit/Org:

MONTHLY UST INSPECTION

For Official Use Only

RELEASE DETECTION EQUIPMENT (continued)

If the piping is equipped with release detection, is the equipment operating properly to determine usual operating conditions (i.e., faulty alarms, monitoring discrepancies, readings, etc.)?

Correct Response: YResponse: Yes No N/A

Comments:

Have copies of release detection reports been obtained, for each tank system, to meet record keeping requirements?

Correct Response: YResponse: Yes No N/A

Comments:

Has the Impressed Current Rectifier Check been conducted and results documented within the last 60 days?

Correct Response: YResponse: Yes No N/A

Comments:

ADDITIONAL

Have all other Local, State, or Federal requirements checklist(s) been accomplished, if required, and documents uploaded to this tank record? Provide appropriate reference to record in comments.

Correct Response: YResponse: Yes No N/A

AST_ANNUAL_STAR_Chklst
AST_MONTHLY_STAR_Chklst
UST_ANNUAL_STAR_Chklst
UST_MONTHLY_STAR_Chklst
Response_1: Yes
Response_4: Yes_4
Response_5: Yes_5
Response_6: Yes_6
Response_7: Yes_7
Response_8: Yes_8
Text11:
0: KUNSAN AB
2: 8 CES
3: XXXX
5: BLDG# XXXX
7:
8:
11:
12: YYYY/MM/DD
13: SSgt.
15: No Finding
17:
text22:
0:
2:
4:
5: xxxxx
7: Deisel
12: Complete/In-Work
14: 782-XXXX
comments1:
0:
1:
0:
6:
11:
15:
22:
comments5555:
comments6666:
Response_2: Yes_2
Response_3: Yes_3
Response_9: Yes_9
Response_10: Yes_10
Response_11: Yes_11
Response_12: Yes_12
Response_13: Yes_13
Response_14: Yes_14
Response_15: Yes_15
Response_16: Yes_16
Response_17: Yes_17
Response_18: Yes_18
Response_19: Yes_19
Response_20: Yes_20
tank ID: AST-XXXX
comments1111:
0:
5:
9:
14:
18:
comments222222:
0:
7:
11:
16:
18:
19:
comments88:
Response_21: Yes_21
Response_22: Yes_22
Response_23: Yes_23
Response_24: Yes_24
Response_25: Yes_25
Response_26: Yes_26
Response_27: Yes_27
Response_28: Yes_28
Response_29: NA_29
comments333:
comments33333:
0:
5:
9:
16:
comments44:
0:
5:
9:
comment:
Response: No
Text4:
0: KUNSAN AB
1: 8 CES
3: XXXX
4: BLDG# XXXX
6:
7:
0:
1:
3: YYYY/MM/DD
4: SSgt
6: NO FINDINGS
7:
Text5:
0:
2:
3: HFR - Aboveground
4: XXXX
6: DEISEL
STATUS: COMPLETE/ IN-WORK
DUTY PHONE: 782-XXXX
Text7:
0:
4:
7:
11:
15:
19:
22:
26:
TANK ID: AST# 0000
COMMENTS111:
0:
4:
8:
11:
15:
19:
22:
24:
Status:
Comments:
Serial:
conclusion: No Finding
installation date:
duty phone: 782-xxxx
contents: Gasoline
Perform Date: KUNSAN AB
Unit/Org: AAFES
Location: BLDG#
Model:
comment111:
comment 112:
COMMENT1:
COMMENT2:
COMMENT3:
comments 11:
COMMENT4:
comments 12:
comments 13:
comment 14:
Tank ID: UST xxxxx
comment 15:
installation/GSU:
0: KUNSAN AB
owner: AAFES
unit: FILLING STATION
location: BLDG# 1108
model:
serial:
installatindate:
real property id:
designation:
volume:
contnts: Gasoline
finding status:
Perform date: YYYY/MM/DD
Assessor: Mr.
status: complete/ in-work
duty phoen: 782-xxxx
Conclustion: No Finding
comments:
Qcomments:
0:
4:
8:
11:
12:
0:
4:
8:
11:
13:
0:
4:
7:
8:

File details come from the government source that posted it. Updated .